Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹66.5 L
EMD Value
₹78,500
Closing Date
10 Feb 2026, 6:10 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (Mech.),Gandhinagar
SITC of solar rooftop system on Trust Hospital Building at Alang
268347
27 of 2025-26
Open
Electrical - All
Works
Gandhinagar
13 documents required · 12 mandatory · 1 optional
₹2,832
Gujarat Maritime Board NON PLD Account
₹78,500
27 Jan 2026
27 Jan 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
NAME OF WORK:- SITC of solar rooftop system on Trust Hospital
Building at Alang
(Page No. 1 to 82 )
Amount put to Tender :-Rs.
The Executive Engineer (M)
Gujarat Maritime Board
Sector10 A, Opp. Air Force Station
Gandhinagar - 382
Email: [email protected]
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Name of work :- SITC of solar rooftop system on Trust Hospital Building
This tender paper contains total pg. No. 01 to
Sr. Particulars Page. No.
01 Front page & Index 01 to
02 Notice Inviting Tender 03 to
03 General Information 06 to
04 Instruction of Bidders 08 to
05 Annexures I to VI 14 to
06 Electrical work tender form 21 to
07 Scope of work & Specifications 67 to
08 Special condition for solar system on a 71 to
hospital building
09 Special condition 72 to
10 Approved make list 73 to
11 General condition (Electric works) 74 to
12 Price Bid 76 to
Please read as :-
(1) GUJARAT MARITIME BOARD instead of GUJARAT STATE.
(2) Vice Chairman and Chief Executive Officer, GMB instead of Governor of Gujarat.
(3) EXECUTIVE ENGINEER (MECH.) instead of EXECUTIVE ENGINEER.
(4) Executive Engineer (Mech.), Gujarat Maritime Board, Gandhinagar instead of
Executive Engineer (Mech.), Gujarat Maritime Board, PIU Porbandar.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
CHAPTER-2 Notice Inviting On-Line Tender
Details about Tender: -Tender Notice No. 27 of 2025-26
Department Name : Gujarat Maritime Board
Circle : Superintending Engineer (Mech.),
5th Floor, Sagar Bhavan, Sector 10A, CHH
Road, Gandhinagar -382010.
Division (For Inviting Tander only) : Executive Engineer (Mech.),
Gujarat Maritime Board, Gandhinagar.
Division (For issue of A.L. & W.O. and : Executive Engineer (Mech.)
work execution) Gujarat Maritime Board, PIU, Bhavnagar
IFB No. : Tender Notice No. 27 of 2025-26
Name of Project : SITC of solar rooftop system on Trust Hospital
Building at Alang
Location : At Alang port
Name of Work : SITC of solar rooftop system on Trust Hospital
Building at Alang
Estimated Contract Value (INR) : Rs. 66,49,714.00/-
Period of Completion : 06 Months.
Bidding Type : Open
Bid Call (Nos) :
Tender Currency Type : Single
Tender Currency Settings : Indian Rupee (INR)
Joint Venture : Not Applicable
Bid Document Fee : Rs.2832.00 by D.D.(Non refundable)inclusive of
Bid Document Fee Payable To : Gujarat Maritime Board NON PLD Accout,
Payable at Gandhinagar.
EMD (INR) : Minimum of Rs.78,500/- (incl. GST)in form of
FDR of any scheduled/ nationalized bank With
with minimum 06 months validity.
EMD in favour of : The Executive Engineer (Mech.), Gujarat
Maritime Board, Gandhinagar Payable at
Bid Document Downloading Start : 27/01/2026
Bid Document Downloading End Date : 10/02/2026 (up to 18:10 hrs.)
Last Date & Time for Receipt : 10/02/2026 (up to 18:10 hrs.)
(Submission) of Bids
Bid Validity Period : 120 days after opening of price bid
Submission of documents etc. : The Bidder has to submithe following
required documents in electronic format only
through online scanning and send the same
documents in a sealed envelope through
RPAD/Speed Post only from 11/02/2026 to
19/02/2026 up to office hr. at the Office of
the Executive Engineer (M), SAGAR
BHAVAN, Gujarat Maritime Board, 5th floor
Mech.wing, Opp: Air Force Station, Sector
10A, Gandhinagar-382010 mentioning the
name of work on the sealed envelop.
1. Letter of Application
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
2. Tender fee of Rs.2,832.00 (Incl. 18% GST)
(Non refundable) in form of D.D. of any
Nationalized/Scheduled bank in favour of "
Gujarat Maritime Board, Non PLD Account.”
Payable at Gandhinagar.
3.Earnest money deposit Rs.78,500.00/- in
form of FDR of any Nationalized/Scheduled
bank with minimum 06 months validity in
favour of the Executive Engineer (Mech.),
G.M.B. Gandhinagar.
5. GST tax Registration
6. Valid Bank solvency of Rs. 13.30 Lacs Or
above from any Nationalized/Scheduled
bank for tendering pupose, issued on or after
01st january-2026.
7. Valid Electrical Contractor License issued
by E & P Department, Gujarat.
8.The Bidders should submit necessary
document regarding registratiton with
GEDA for the work of installation of solar
rooftop system.
9. PQForms – I to VI.
Note: - No conditional offer will be acceptable
in letter of application.
Remarks : The tenderer shall submit their offer in
electronic format At website, after digitally
signing the same. Offerswhich are not digitally
signed will not be accepted.No offer in physical
form will be accepted and anysuch offer if
received by GMB will be outright rejected.
Contact Information : Phone. + 91 079 23246551 / 23238346/7/8
Email: [email protected]
Online Bid Opening Date : Dt: 20/02/2026 from 12.00 Hrs. Onwards…
Officer Inviting Bids only : The Executive Engineer (Mech.),
Gujarat Maritime Board, Gandhinagar.
Officer as E.I.C. (For issue of A.L. & : The Executive Engineer (Mech.),
W.O. and work execution) Gujarat Maritime Board, PIU- Bhavnagar.
Bid Opening Authority : The Superintending Engineer (Mech.)
GMB Complex, Sector 10A, CHH Road
Gandhinagar -382010
Address : The Superintending Engineer (Mech.)
GMB Complex, Sector 10A, CHH Road
Gandhinagar -382010
General Terms and Conditions
(1) Bidders can download the tender document free of cost from the website.
(2) Bidders have to submit Price bid in Electronic form only on nprocure website till the
time for submission.
(3) Offers in physical form will not be accepted in any case.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
(4) Free vendor training camp will be organized every Saturday between 4.0 to 5.00 P.M.
solutions-A Division of GNFC Ltd., Biders are requeste take benefit of the same.
(5) Government Of Gujarat, & Governor MAY BE READ AS GUJARAT MARITIME
BOARD, & CHAIRMAN respectively.
Bidders who wish to participate in online tenders will have to procure / should have
legally valid Digital Certificate as per Information Technology Act-2000 using it they can
sign their electronic bids. Bidders can procure the same from any of license certifying
Authority of India or can contract (n)code solutions-
A division GNFC Ltd, who are licensed Certifying Authority by Govt. of India.
All bids should be digitally signed, for details regarding digital signature certificate related
involved the below mentioned address should be contacted:
(n) Code Solutions A division of GNFC
301, GNFC Infotower, Bodakdev, Ahmedabad – 380 054 (India)
E-mail: [email protected], website: www.tender.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
Other Terms & Conditions as per detailed tender documents
Signature of Contractor Executive Engineer (M),
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
GENERAL INFORMATION
The Gujarat Maritime Board (GMB) was set up on 5th April 1982 under Gujarat Maritime Board Act, 1981, in order
to develop, administer, operate and regulate the state’s port sector.
Gujarat Maritime Board (GMB) on behalf of Chairman invites on line e - Tender offer for SITC of solar rooftop
system on Trust Hospital Building at Alang.Work details are given in the scope of work category of this tender. The
time limit considered is 10 (Ten) months.
2.2 Site Information
There is a multi-speciality hospital established by GMB in 2019 at Alang. It is managed by the Red Cross society
Bhavnagar branch, under consultation with and also funded by GMB. It is beneficial to labours at ship recycling
yard of Alang and local people of Alang, residing there.The contractor has to carryout the said work Trust
Hospital Building at Alang. Contractor is strongly advised to visit the site and acquainted himself with the site
condition its surrounding etc. in view of performing the scope of tender.
2.3 Definition:
In the contract documents, the following expression shall have the meanings herein assigned to them except
the contact otherwise requires.
The Expression “Board”: means Gujarat Maritime Board constituted under the Gujarat Maritime Board
The expression “Work” where used in this document shall, unless there be something in the subject or
contest repugnant to such construction, be constructed to mean the work or the work contracted and
to be executed under or in virtue of the contract, whether temporary or permanent and whether
originally or altered, substituted or additional. It shall include all extra or excess works and variations
and be subject to all commissions ordered in accordance with these conditions.
“Site” means the land, jetty and/or other places on, stacking area, under, in or through which works are
to be executed or carried out and services to be rendered any other lands or places provided by Gujarat
Maritime Board for the purpose of the contract together with such other places that may be specifically
designated in the contract as forming part of the site.
“Contract” means the notice inviting tenders, general conditions of contract, terms and conditions of
contract, specifications, price bid, tender and contract agreement made at the time of awarding the
work and also the mutual agreement made jointly during contract period.
“Bidder”/” Contractor” shall mean the person or persons, firm, company or corporation who’s tender
has been accepted by the GMB and includes Bidder’s/ Contractor’s personal representative, successors
and permitted assignees or joint Bidders who shall be deemed tobe bound jointly and separately.
“Contract Period” means total time limit allowed for this work i.e. 06 months from the date of issue of
commencement order by the Authority for “SITC of solar rooftop system on Trust Hospital Building at
Alang..” means total quantity in the items mention in the Bill of Quantities which may be increased or
decreased as mentioned in the tender document which approved by the Competent authority.
“Engineer-in-charge” (EIC) shall mean the Executive Engineer (M), GMB, Bhavnagar or his authorized
representative who shall exercise only such authority on behalf of the Executive Engineer as may have
been delegated to him from time to time by the Executive Engineer and powers delegated to him by the
Government/GMB Rules.
“Approved” means approval given in writing including verbal approval for which subsequent written
confirmation is given and “approval” means approval in writing including as aforesaid.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
“Competent authority” Officer or officers of the Gujarat Maritime Board competent to exercise the
powers conferred upon him/them by the GMB/Government.
Drawings” means the drawings referred to in the specifications and attached with the agreement and
any modifications of such drawings approved in writing by the classification society / EIC or such other
drawings as may, from time to time be furnished or approved in writing by the EIC.
2.4 Abbreviations:
GMB / Board - Gujarat Maritime Board.
DMSITC - Design, Manufacture, Supply, Installation,
Testing and Commissioning.
EIC - Engineer-In-Charge.
AR - Authorized Representative.
BOQ - Bill of Quantities.
BIS - Bureau of Indian Standard.
SE (Mech) - Superintending Engineer (Mechanical)
XEN (Mech) - Executive Engineer (M).
DEE (Elect) - Dy. Executive Engineer (Elect.)
GoI - Government of India
GoG - Government of Gujarat
GPCB - Gujarat Pollution Control Board
Signature of contractor Executive Engineer (M)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
INSTRUCTIONS TO BIDDERS
On behalf of the Gujarat Maritime Board, the Executive Engineer (M), PIU, GMB, Gandhinagar
invites ON-LINE tenders from Experienced Contractors for SITC of solar rooftop system on Trust
Hospital Building at Alang
3.1 BID SUBMISSION
1. The bid should be uploaded (submitted) through the official web site
www.tender.nprocure.com "AS per NIT".
2. The physical documents shall be submitted through RPAD/Speed Post only “As per NIT”. Beyond
the last date physical submission will not be accepted/ considered in any case and it will be
returned back to the bidder. The envelope must be super-scribed with name of work SITC of
solar rooftop system on Trust Hospital Building at Alang. GMB is not responsible for the tender
process if on the cover name of tender work is not mentioned.
The Board does not assume any responsibility for the supporting tender documents being torn/
damaged during the postal transit. It is the responsibility of the Bidder to see that the supporting
tender documents reach this office before due date as fixed and notified in the tender notice
for the purpose of receipt of the tender.
3.2 TENDER FEE (NON-REFUNDABLE):
Tender Document can be download from GMB website www.nprocure.com and the tenderer
have to pay tender fee in form of Demand Draft (DD) “As per NIT". Scanned copy of the same
must be uploaded online as well as physical submission as per NIT.
Tender without Tender fees, will be rejected outright.
3.3 EARNEST MONEY DEPOSIT:
a) The Bidder shall submit Earnest Money “As per NIT” in form of Fixed Deposit Receipt (FDR) with
the tender, failing which the tender will not be considered.
b) The earnest money shall be submitted in the form of FDR of any scheduled/ nationalized bank
as “Mentioned in NIT”. Cheque/D.D. will not be accepted towards the Earnest Money Deposit.
c) The Earnest Money deposited by the unsuccessful Bidders will be refunded after the
finalization of tender. E.M.D. shall not bear any interest.
d) The Earnest Money deposited by the successful Bidder will be refunded on receipt of Security
Deposit/Performance Security.
e) If any party backs out after GMB has accepted his bid, it will be considered default and in such
case, necessary action against bidder will be taken by GMB such as 1. Forfeiting of EMD 2.Black
listing the agency for three years etc.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
3.4 SECURITY DEPOSIT AND PERFORMANCE SECURITY:
The successful Bidder has to furnish a Security Deposit (SD) of sum equivalent to 10% of the
total contract price + GST in the favor of Executive Engineer(M), PIU, GMB, Bhavnagar in the
form of FDR with the Gujarat Maritime Board of Nationalised/ scheduled Bank.
a) If the security deposit is not furnished within 15 days on issuing acceptance letter or such
extended period as may be permitted by the Executive Engineer (M) in writing, the earnest
money is liable to be forfeited and the contract cancelled.
b) In the event of the Bidder, after the issue of the communication of acceptance of the offer by
the GMB, failing/refusing to execute the agreement as hereinafter provided, the Bidders shall
be deemed to have abandoned the contract and such an act shall amount to be construed as
the bidder's calculated and willful breach of contract, the cost and consequence of which shall
be to the sole account of the Bidder and upon such an event, the Board shall have full right to
claim damages in addition to the forfeiture of Earnest Money Deposit.
c) In the event of the Bidder, after the issue of the Acceptance Letter (AL) by the GMB, fails/refuse
to execute the agreement as hereinafter provided, the Bidder shall be deemed to have
abandoned the contract and such an act shall amount to be construed as wilful breach of
contract. In such case the Board shall have full right to claim damages incurred in addition to the
forfeiture of earnest money deposit.
d) The GMB may at their option forfeit the Security Deposit ,if the bidder fails to affect the peform
the services or observe the conditions of contract. The Board will also be at liberty to deduct
any sum that may be due to the GMB from the SD or from any sums of money due or that may
become due under any other contract to the bidder. This is without prejudice to the rights of
the Board under the terms of the contract.
e) The said Security deposit shall not in any way be construed as a limitation of the bidder's
responsibility or liability pertaining to his obligations and/or guarantees under the contract and
shall be without prejudice and in addition to any other remedies available to the Board in terms
of the contract and/or the laws of the land.
f) The Security Deposit of 10% shall be released only on completion of satisfactory Performance
Maintenance Guarantee /warranty period of 10(Ten) years after completion of the work.
3.5 TIME SCHEDULE:
The time allowed for the completion of the work SITC of solar rooftop system on Trust Hospital
Building at Alang Is considered as under: Total Time limit -06(Six) Months from the date of issue
of work order or as mentioned in work order.
3.6 RIGHT OF THE BOARD TO ACCEPT OR REJECT THE TENDER:
The Board does not bind itself to accept the lowest tender and reserves the right to reject any
or all tenders received without assigning any reason, whatsoever.
Tenders in which any of the particulars and prescribed information is inadequate or incomplete
in any respect and/or the prescribed conditions are not fulfilled are liable to be rejected.
The Gujarat Maritime Board reserves the right to accept or reject any tender or drop the entire
tendering process without assigning any reasons thereof.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
3.7 PRE CUM TECHNICAL QUALIFICATION:
The bidder will be qualified based on the information submitted online in the prescribed Form
(I) to (VI) attached with this bid regarding their experience, financial position, technical
capabilities etc. and hence all bidders are requested to fill the information correctly strictly in
prescribed Performa only with full knowledge and supporting documents otherwise they will be
disqualified for the work.
The information for financial data and project costs by the bidder should be submitted in Indian
The competent authority of the Gujarat Maritime Board shall evaluate the pre-qualification
3.8 MINIMUM QUALIFICATION CRITERIA AND EVALUATION PROCEDURE
1. PQ cum technical bid will be evaluated on the basis of following main criteria as per details
provided by the bidders in requisite Performa i.e PQ Form (I) to (VI)along with prescribed
application form given in this bid, without which tender/application will not be considered for
evaluation and opening of price bid. On the basis of amount of experience for similar works,
annual turnover and solvency certificate. Bidders who fulfill the minimum criteria will be
qualified for opening of price bid.
2. Main criteria of evaluation:
A. General Criteria (As per NIT documents)
B. Financial Criteria
C. Experience Criteria
B Financial Criteria
1. Annual Turnover of any one of the last 05 financial years i.e from 2020-21 to 2024-2025 shall be
more than Rs. 66,49,714.00 (As per Annexure IV)
2. Solvency certificate: Bank Solvency of Rs. 13.30 Lac Or above of from any of the
nationalize/scheduled bak issued on or after 1 st January
C Experience Criteria:
Experience of having successfully completed of similar* work of following amount during last Five
years i.e from 01-04-2020 to till the due date of bid.
One similar completed work costing not less than of Rs. 26.60 Lac.
*Similar work means: Experience of successfully completion of minimum Single project of SITC of
60 KW solar rooftop system.
3.9 BID OPENING
a) The On-line tender for Pre-Qualification cum Technical bid shall be opened “As per NIT”.
b) The Technical bid shall be opened online of those Bidders who are pre-qualified. The date and
time of opening of the Technical Bid will be notified to the qualified Bidders in advance of opening.
c) During the process of Bid evaluation GMB may call the bidders for discussion /clarification and
also can ask for requisite support documents.
d) The Price bid shall be opened online for those Bidders who are pre-qualified and technically
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
e) Tenders submitted by Bidders shall remain valid for acceptance for a period of 120 days from the
date of opening of the price bid. The Bidder will not be allowed during the declared period of
validity to revoke or cancel his tender or to vary any term thereof.
f) If any Bidder withdraws his tender before the date of validity as declared, the earnest money
deposited by the Bidder, shall be outright forfeited. There shall be considered as breach of
contract and action against bidder shall be taken according to norms.
g) The work will be awarded to the lowest techno-commercial offer after approval obtained from
the competent authority.
h) Only the authorized representatives of the bidders will be allowed to be present during bid
3.10 ADDENDA/CORRIGENDA:
The Executive Engineer (Mech),PPU, GMB, Gandhinagar shall have the right to revise or to amend
the contract documents prior to the date of receipt and opening of the tender aforesaid such
revision or amendments or extensions, if any, as may be considered necessary.
Addenda/Corrigenda to the tender documents may also be published On-Line by the Executive
Engineer (M),PPU, GMB, Gandhinagar prior to the date of opening of the tenders, to clarify or
reflect modifications in the contract terms and conditions.
3.11 COLLECTION OF DATA - BIDDER'S RESPONSIBILITY:
1. The Bidder shall visit the site and acquaint himself fully with the site and local conditions and no
claims whatsoever will be entertained on the plea of ignorance of difficulties for installation and
operation of the system. Before submitting the tender, the Bidder shall be deemed to have
clearly understood and satisfied himself regarding the work and services, all conditions liable to
be encountered during the execution thereof and that prices, rates and/or compensation
quoted in the offer are adequate and all inclusive with respect to all factors, circumstances and
conditions likely to be incidental, both direct and indirect, to the work and services.
2. The prices and amount quoted by the Bidder shall include all costs, including escalation of labor,
material, equipment, transport and/or storage charges, insurance, inspection fees, increase in
cost due to government and other charges, direct and indirect, till the work is completed in
accordance with the scope of the contract and contract period. GST will be paid extra as actual
on submission of documentary evidence for payment made to GST Department.
3.12 AMBIGUITY:
In case of there be any ambiguity or doubt as to the meaning of any of the tender
clauses/conditions or, if any further information is required, the matter should immediately be
referred to the Executive Engineer (M), Gujarat Maritime Board, Bhavnagar in writing, whose
interpretation shall be final and binding.
3.13 SIGNING THE CONTRACT:
The successful Bidder shall be required to execute an agreement on stamp paper of the required
value within 15 days from the date of issue of the notice of Letter of Intent with submission of
security deposit as per clause no 3.3. In the event of failure on the part of the successful Bidder
to execute the agreement within the above stipulated period, or the period agreed by the Board,
the Earnest Money deposited by him will be forfeited and apart from that the Board being in
such circumstances entitled to treat the successful Bidder as in breach of contract and proceed
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
3.14 JURISDICTION:
The contract is subject to the jurisdiction of the local courts of Bhavnagar (Gujarat).
All the documents contained in the tender shall form a part of agreement including instructions,
conditions, special conditions, Technical specifications document etc. and any correspondence
related to this Contract.
3.15 Letter of Application shall be submitted in proper format. Incomplete offers shall be rejected.
1. The bidder shall satisfy himself with regard to the nature of work to be carried out, its scope,
the conditions of the contract, etc included in the bid document.
2. The cost associated with the preparation and submission of bid shall be borne by the bidder and
GMB shall in no case be responsible or liable for such costs.
3.16 The language for submission of bid should be in English.
3.17 The enclosed schedules should be filled in completely and all questions should be answered. If
any particular query is not relevant, it should be stated as "NOT APPLICABLE ".
3.18 Financial Data, Projects Costs, value of work etc. should be given in Indian rupees only.
3.19 For any clarification The Executive Engineer (Mech.) Block No:3, Port Colony no-2,
Near BalVatika, Bor Talav, BHAVNAGAR-364003 Phone : 0278-2443195may be contacted by
prior appointment on working day. For site visit and information regarding relevant data will
be also available at the above address.
3.20 If a proprietary firm makes the application, it shall be signed by the proprietor above his full
name and the full name of his firm with its current address.
3.21 If the application is made by a firm in partnership, it shall be signed by all the partners of the
firm, above their full names and current addresses or by a partner holding the power of attorney
of the firm by signing of the application in which case a certified copy of the power of attorney
shall accompany the application A certified copy of the partnership dead, current address of the
firm and the full names, and current of all the partners of the firm shall also accompany the
3.22 If limited company or a limited corporation makes the application, a duly authorized person
holding the power of attorney for signing the application in which case a certified copy of the
power of attorney shall accompany the application shall sign it. Such limited company or
Corporation will be required to furnish satisfactory evidence of its existence before the contract
3.23 Information furnished must be sufficient to show that the Bidder is a capable in all respects to
successfully complete the envisaged contract works strictly on the basis of the Bidder, having
already carried out satisfactorily works of similar size, nature and complexity.
3.24 While submitting the schedules, duly filled in, the Bidder shall enclose the latest copies of
brochures and technical documentation giving more information about the firm and all the
3.25 The Gujarat Maritime Board reserves the right to reject any or all bids without assigning any
reasons and the Gujarat Maritime Board decision shall be final and binding.
3.26 Detail of company profile shall be furnished in Annexure-(General information) of the
3.27 Solvency certificate only from any of the bank from Nationalised/Schedule Bank.
3.28 No costs incurred by bidder in making this offer like providing clarification or attending
discussions, conferences or site visits will be reimbursed by the Gujarat Maritime Board.
3.29 Bidder shall enclose list of ongoing works of similar nature and list of similar nature of jobs under
taken during last five years. Copies of certificates/documents in support shall be attached.
3.30 Details of the litigation, if any, during last three years shall be furnished as per performa
3.31 During the tenure of profession, details of awards, if any and such additional information shall
3.32 The tenders shall remain open for a period of 120 days from the date of opening of the price
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
bid and that the Bidder is not allowed to withdraw or modify the offer of his own during this
period. If any, Bidder withdraws his tender before the said period or makes modifications of his
tender, which are not acceptable to the Board the Board shall, without prejudice to any right or
remedy, be at liberty to forfeit in full the EMD absolutely.
3.33 The PQ cum Technical Bid should contain all other documents (except the price bid) viz;
specifications, general conditions etc. and Bidder’s letter regarding deviations to the general
terms & conditions, if any. It should be very clearly understood that the PQ cum Technical Bid
should be restricted to only "Technical matters and the tender amount of other price should not
be discussed in the PQ cum Technical Bid. Conditions in "PQ cum Technical Bid" should be
specific so as to evaluate them correctly and to arrive at the correct financial effect.
3.34 The rates should be filled only in Price bid of tender documents nowhere else rates are to be
mentioned. The price bid should contain only rate and amount of the work. Any condition in the
price bid shall be liable for rejection of offer of that bidder.
3.35 The bidders will understand clearly that the rates quoted are for complete works and include all
costs due to labor, plants & equipments, transportation, supervision of GMB officials including
lodging & boarding, various other services like water, power, taxes, duties, materials and all
matters and things necessary for satisfactory completion of the work and no claim for additional
payment beyond the offered/accepted rates will be entertained and the bidder will not be
entitle subsequently to make any claim on the ground of misrepresentations or on the ground
that he was supplied with wrong information given by any person ( whether the person is the
employee of GMB or not ). Any failure on the part of Bidder to obtain all necessary and correct
information for the purposes of filling his Bid and prices / rates therein shall not relieve him from
any risks or liabilities arising out of consequence upon the submission of the Bid.
3.36 Should there be any discrepancy or any doubt or obscurity as to the meaning of any of these Bid
documents or as to anything to be done or not to be done or as to those instructions to be
observed by the bidder, they may point out in writing such queries to the Executive Engineer
(M), GMB, Gandhinagar by letter / fax, as soon as possible. In such case the decision given by
the competent authority shall be final and binding to the bidder(s).
3.37 GMB may issue any corrigendum in regards to any deviation in clause by uploading the
documents on tender web-sites.
3.38 No contract will be awarded except to the qualified and responsible bidders capable of
performing the classes of work contemplate.
3.39 No Bid shall be deemed fit for consideration unless, it is completed in all respect.
Executive Engineer (M)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
QUALIFICATION DATA SHEET TO BE FILLED UP BY THE BIDDER.
The qualification questionnaire contains the following forms:
P.Q. FORM-I : Letter of Application
P.Q. FORM -II : Document Fees & EMD Details
P.Q. FORM III : General Details
P.Q. FORM-IV : Turnover
P.Q. FORM -V : Work Experience
P.Q. FORM -VI : History of Litigation
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
LETTER OF APPLICATION
The Executive Engineer (Mech.),
5th Floor, Mechanical Division,
Gujarat Maritime Board Office Complex
Sagar Bhavan, Sec-10 A "CHH" Road
Having examined the Bid documents including scope of works and time frame of the aforesaid work, I/we
hereby submit all necessary information and relevant documents as desired.
The application is made by us on behalf of................................ ………………………….duly authorized to submit the
The necessary evidence admissible in law in respects of authority assigned to us on behalf of the firms for
applying and for completion of the contract document is attached herewith.
It is certified that the information furnished in this document is correct & authentic.
I/We confirm that we have not been barred & blacklisted by any Government organization OR Major Port Trust
OR Minor Port Board in India for any such works in last three Years.
I/We shall make available to the GMB any additional information it may find necessary or require for this
tender purpose.
I/We promise that we will abide by all rules & regulation as laid down by G.M.B. time to time for execution of
any contract as may arise during this contract period
I/We have examined and have no reservation to these tender documents with any addendum issued by GMB.
I/We undersigned accept that GMB reserves the rights to reject any or all tender for this work without
assigning any reason.
Place: Signature of the applicant
(Name in bracket)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Document Fees & EMD Details
Document Fees Detail
D.D./Banker’s cheque No.& date
Bank Name & Address
Bank Name & Address
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
P.Q. FORM-III General Details
All individual firms applying for pre-qualification must complete the information in these forms.
1. Name of firm:
2. Head office address:
3. Local office address (if any):
4. Telephone: Contact:
5. Facsimile: E-Mail & Website:
6. Place of incorporation / registration: Year of incorporation / registration:
7. Service Tax No. :
9. Main lines of business:
10. Details of office set up with Key staff name,
designation, & other detail
11. Other information ( if any)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
P.Q. FORM –IV Turn over
All individual firms applying for pre-qualification must complete the information in these forms.
Particular Year Value
Note:Copy of Chartered Accountant certified shall be attached online with the Tender & should be
submitted in physical.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Bidders should provide information showing their experience for similar works as mentioned in the table below.
Experience of successfully completed works during last 05 financial years i.e. from 01-04-2020 to last date of
online submission of bid for the proposed work as per relevant clause of PQ bid shall be taken in to consideration.
A. Experience in Contracts of works completed:
Sr. Name Owner/ Address Contact Value of Detail Order Successfully
No of with phone person name contract (copy Completion
work Client / Fax No. & Mobile no. Attached) Certificate of
1. The above information should be filled in the table and supporting documents in soft copies
should be submitted inclusive of work order and work completion certificate etc. in e-tender.
2 The work completion certificate shall mention date of start, date of completion, amount of
Work done, signature of concern.
3 If bidder will submit Non-Government work experience cert OR Subletting work experience cert
then they have to furnish following certificates.
- Self-attested copy of Work order, completion certificate.
- Self-attested copy of letter of permission/approval given by the employer for subletting
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
History of Litigation
(On 300 Rupees Non judicial Stamp paper)
We here by undertakes and confirms that our agency M/s
nor banned for tender participation or execution of the works during last 03 years by any Govt./PSU
Authority ever.
Yours faithfully,
(Name of Authorized signatory)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Roads & Building Department
Government of Gujarat
Division:_ “Mechnical Division - Gandhinagar___
ELECTRICAL WORK
SITC of solar rooftop system on Trust Hospital
Name of work :- Building at Alang
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Name of work :- SITC of solar rooftop system on Trust Hospital Building at Alang.
Tender document Page No
C Instruction to tenderers
D Forms of tender for electrical work (in duplicate) with schedule of time
E General conditions
F Data Sheet for E-tendering
G General conditions of contract for electrical works
J Specification for electrical works
K List of approved electrical Product
(i) Amount put to tender
(ii) Tender Fee
(iii) Earnest Money
(iv) Security Deposit sum equivalent to 10% of the total contract
price(+GST) and Performance Security of sum equivalent to 5% of total
contact price In favour of XEN(M) PIU, BVR
Last Date of Receipt of Tenders by R.P.A.D.Dt. ---------/--------/-------------- Downloading of
tender documents From date / /2025 to / /2025 up to office hrs.
Last Date & Time for Receipt (Submission) of Bids. / /2025 up to office hrs. As per NIT
Submission of supporting documents and Tender Fees etc. in /RPAD/Speed post. / /2025 to /
/2025 up to office hrs.
Online Bid Opening Date / /2025 from 12:00 hrs. on words (if possible).
Divisional Accountant /
Executive Engineer
(Only in case of Tender above Ten Lakhs)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Name of work :- SR to Electrical Installation at Labour Colony,Alang.
1. Estimated Cost Rs.
3 Ernest Money 1% Rs.32,500.00
4. Validity period of tender offered (120*) days from the stipulated
date of receiving of the tender but no
modification shall be allowed after handing
over tender to postal authorities.
120 days from the last date of online
submission of tender (only in case of works
Estimated above Rs.5 lacs.)
5.Security Deposite* …10% Rs.
(i) in the form of small savings or Narmada Bonds
( of minimum one year time limit)…. 2.5% Rs…-………………………………
(ii) To be deducted from bills ….. 2.5% Rs…-………………………………
(iii) Performance bond/FDR of schedule bank… 5% Rs…-…
6. Time Limit …
* strike out whichever is not applicable
* Vide R &BD G.R.No. TNC-1088-1B/1 (13)/C dated 4-5- 1993 & revised vide G.R.No. tnc-1088/1b/18/(13)-c, dt.31-8-94
Deposit furnished in the form of interest bearing document as per item4(i) can further be extended for renewal if so desired
and communicated by the contractor in writing before one month from the date expiry date.Similarly cash Deposit deducted
as the item No.4(II) can also be converted into interest bearing fixed term securities of schedule and Nationalized Banks, if
so desired and communicated by the contractor in writing.
Should this tender be accepted,I/We hereby agree to abide by and fulfil all the terms and provisions of the conditions
of the contract annexed here too so far as applicable and in default thereof to forfeit and pay to Government in Office the
sums of money mentioned in the said condition.
(Receipt No………….dated…………. from the Government Treasury or Sub-Treasury at ………………….. in respect
of sum Rs……………….. is forwarded herewith representing the earnest money + (a) the full of value of which is to be
absolutely to Government should I/We not deposit the full amount of security deposit specified in the above memorandum in
accordance with Clause I of the said conditions, otherwise the said sum of above Rs………………… shall be refunded).
Place : * Digital Signature of the Contractor
** Signature of the Contractor
(Whites) *** (At the time of execution of contract document)
* Digital Signature of contractor before submission of tender
** Signature of the contractor of the time of execution of contract document.
*** Signature of witness to Contractor's signature at the time of execution of contract document.
The above tender is hereby accepted by me on behalf of the governer of Gujarat.
The Executive Engineer (Mech)
________________Mech. Division
Note : The normal rate of Secutiry Deposit is 5 percent for works upto Rs.15 lacs and a further 5% as performance bond for
works above Rs. 15 lacs. Out of 5% of Security Deposit 50% is Payable at the time of acceptance of tender
and the balance by deduction from progress bills.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Instructions to Tenderers
1. Tenders, sealed and marked on the outside forwill be received by the undersigned
Upto theday of / /2025
in the form of "Tender for Electrical Works" here to annexed
2. The tenders shall state precisely in his tender the type and description of the materials, plant and stores
he proposes to use for the work. If he proposes to use materials, plant or stores of other than Indian
manufacture he must clearly state this in his tender, together with the name, manufacturer and of the
country of origin of the same.
3. The officer with whom cash deposits are to be made, or to whom securities are to be endorsed in
accordance with clause 3 of the General Conditions of Contract for Electrical Works,is the Ex. Engr.
(Mech), Bhavnagar port.
4. The work must be carried out in accordance with the General Conditions of Contract " for Electrical
Works, and the general specification for electrical works in Government building.
5. Plans may be seen, in the office of theDy. Ex.Engr. (Electrical), Bhavnagar, Sub-Division.
Department : Gujarat Maritime Board
6. The Governor of Gujarat does not undertake to accept the lowest or any tender.
Executive Engineer(Mech)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Form of Tender for Electrical Works
G.M.B. Department
1.I/We do hereby tender to execute the whole of the work
Described in the accompanying tender for the several sums, and in the case of measured works, at the several
rates, set forth in the tender hereto attached and signed by me/us and should this tender be accepted. I/We
further undertake to complete the work within the time stated below reckoned form the date of acceptance of
tender, namely.
2.I/We do agree and bind myself/ourselves to abide by and fulfill the general conditions of contract and the
Special Conditions of Contract annexed to the Specification or in default thereof to pay to the purchaser, as
reasonable compensation for such breach of such conditions, the sums of money mentioned in the said
3. I/We further agree to make good at my/out own expense all defect in the installation which appear within
twelve months from the date bringing the installation into beneficial use when such defects are due to defective
workmanship or material executed or supplied by me/us.
4.I/We hereby declare that my/our near relative are not working in this Division or in its sub-division as an Ex.
Engineer, Deputy Executive Engineer, Additional Assistant Engineer, Overseer, Divisional Accountant, Store
Keeper, Manager of Atithi/VishramGruha and in the circle as a Superintending Engineer in additional for
Panchayat Works not working nor having posting as Chairman of P.W. Committee or as incumbent in
JillaPanchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer(Mech),
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Form of Tender for Electrical Works
G.M.B. Department
1.I/We do hereby tender to execute the whole of the work
Described in the accompanying tender for the several sums, and in the case of measured works, at the several
rates, set forth in the tender hereto attached and signed by me/us and should this tender be accepted. I/We
further undertake to complete the work within the time stated below reckoned form the date of acceptance of
tender, namely.
2.I/We do agree and bind myself/ourselves to abide by and fulfill the general conditions of contract and the
Special Conditions of Contract annexed to the Specification or in default thereof to pay to the purchaser, as
reasonable compensation for such breach of such conditions, the sums of money mentioned in the said
3. I/We further agree to make good at my/out own expense all defect in the installation which appear within
twelve months from the date bringing the installation into beneficial use when such defects are due to defective
workmanship or material executed or supplied by me/us.
4.I/We hereby declare that my/our near relative are not working in this Division or in its sub-division as an Ex.
Engineer, Deputy Executive Engineer, Additional Assistant Engineer, Overseer, Divisional Accountant, Store
Keeper, Manager of Atithi/VishramGruha and in the circle as a Superintending Engineer in additional for
Panchayat Works not working nor having posting as Chairman of P.W. Committee or as incumbent in
JillaPanchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer(Mech),
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
GENERAL CONDITIONS
1. The work of the Electrical Installation shall be carried out as per I.S Specifications I.S. 732-Code
Part I, II & III - 1982-83 of practice of Electrical wiring and fitting in building.
For Hospitals I.S. 7732 of
For Educational Installation I.S. 108941-1984
For Aluminium Conductor I.S. 398-1984 Part III
2. The fitting should be fixed with mild steed hooks to be supplied and erected and duly grouted in the
cement concrete by the contractor wherever possible the decision of the Ex. Engr. in respect of the feasibility of providing such hooks in the cement
concrete, shall be final and binding on the contractors
3. The work shall have to be completed within the prescribed time limit unless the extension in the
time limit at the instance and the request of the 'contractors is granted by the authorities in which case, the application for the extension in time
limit have to be made by the contractors by registered post before the date of expire of the schedule time limit under the agreement.:- 90 days
from the date of commencement.
4. The amount of Rs. 1-00 for each empty wooden box of ceiling fan and 0-50 pairs for each empty
wooden box of Table fan issued to the contractors for* the work as per Schedule B of the work shall be recovered from the Contractors.
5. Materials required for the work shall be supplied to the contractor as per the rates mentioned in the
Schedule 'A' attached herewith and the cost of materials will be recovered from their bills.
6. The tender documents required shall have to be filled with either ink or by ball pen.
(G.R.B.& C. Dept. No. TNC-1175-1113-853/198 V. Dated. 8-6-79.)
7. In addition to the above the tender will also be liable to be rejected outright if
(i) Any of the pages of the tender is/are removed or replaced.
(ii) In the case of "item rate" tender, the rates are not entered in ink. in figures and words and the total of each item and grand total are not
(ii) In the case of "item rate" tender, the rates are not entered in ink. in figures and words and the total of each item and grand total are not
struck by the tender or in ink in the last column of schedule 'B' under his signature.
(iii) All corrections, additions or pasted slips are not initialed by the tenderer,
(iv) Any erasure is made by him in the tender AND
(v) The tenderer in the case of a firm, each partner or the person holding the power of attorney thereof does not sign or the signature is/are
not attested by witness on page 8 of the tender in the space provided for the purpose.
8. A certificate of registration as an approved contractor should be attached with the tender.
9. In respect of tenders from the co-operative society a solvency certificate of an amount equal to 20% of the amount of the work put to
tender will have to be produced along with the tender or a certificate, regarding the borrowing capacity of the society issued by the legal Assistant,
Directorate of Cottage Industries will have to be produced along with the tender.
10. The several documents forming the contract are the essential parts of the contract and requirement occurring in one is as binding as though
occurring in all, they are intended to be mutually explanatory and complementary and to describe and provide for a complete work.
11. In the event of any discrepancy the several documents forming the contract or in any one document the following order of procedure
(a) Dimension and quantities:
(ii) Schedule 'B' of the tender form
(iii) Specification
On drawing figures, dimensions unless obvious in the contract will be followed in preference to seal dimension.
(b) Description:
(i) Schedule 'B' of the tender form
(iii) Specifications
In case of defective description or a ambiguity, the Ex. Engineer in charge should issue further instructions directing in what manner the work is
to be carried out is being understood that the last modern practice is to be followed. The contractor should forthwith comply with such instruction.
12. The contractor should take no advantage of any apparent error, omission in drawings or a specification and the Ex. Engineer in charge
should be permitted to make fulfill the intent of the plans and specifications.
13. Controlled materials (Essentially certificate)
(i) As regards "Controlled materials, the R. & B. Dept. will help to arrange for the permits as far as possible and hold the contractor in securing
the same. All incidental charges in procuring these materials shall be borne by the permit as far as possible by the contractor himself. Though the
R. &, B. Dept. will help to arrange for the permit as far as possible and help the contractor in obtaining the materials, it shall not accept any
responsibility for any delay or loss or account of delay caused to the contractor while obtaining the same.
(ii) The contractor shall submit the monthly returns in the prescribed forms at to the receipts and actual use of the controlled materials during
the month to the Ex. Engr. of every calendar month.
(iii) The contractor shall submit the Ex. Engineer or his representatives to inspect the stock of the controlled materials by him at any time
whenever the Ex. Engineer or his representatives so desire.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
14. The tender for the work shall remain open for a period of 90 days (Ninety days) from the date of opening of tenders for the work. The
offer having validity less than 90 days will be rejected outright. The tenders will not be allowed to withdraw or modify the offer on his/their own
during the course of finalization of tender.
15. The contractor shall employ only such laborers who shall produce a valid certificate of was vaccinated against small posmallpoxa period
of last three years.
16. The contractor shall provide drinking water facilities to the workers, labourers to comply with the provisions, the engineer in charge shall
give notice facility to the workers, Labourers within a period of ten days from the date of the notice in writing, the Engineer in charge shall
thereupon make the arrangement for the drinking water at the cost of the contract.
17. The contractor shall provide the amenity of shade and shelter to the workers, labourers and their children on Govt. work as soon as the
work starts" If the contractor fails to provide shade and shelter than the Govt. Shall provide the same at the cost of the contractor.
Govt Resolution PWD No. TNC-2172 (i) 76-C Dt, 4-7-1973.
18. Challan for earnest money @ 1% of the estimated cost must accompany the tender. The tenderer may pay earnest money up to Rs. 50,000 in cash or on
the form of a Crossed demand draft or in case of tenderer is a member of only IEEMA DEPOSIT AT CALL receipts of Nationalized of scheduled Bank drawn in
favour if Executive Engineer, Divisional Officer concerned. However in respect of the works estimated to cost above Rs. 50 lacs, the amount of earnest money in
excess of Rs. 50,000 Can be offered by the contractor, at his choice, in the form of Bank Guarantee of the Scheduled Bank only. The Bank Guarantee in such cases
will be furnished in the following form. In such cases also, the amount of first Rs. 50,000 will paid in the form of cash or crossed demand drafts or fixed deposit
receipts or deposit at call receipts worth the validity period of not less than the 6 Months of the nationalized or Scheduled Banks.
The Contractors, who have secured an exemption certificate for payment of earnest money by depositing Lump Sum earnest money, but
produce the certified copy of the exemption certificate along with the tender.
Where as M/s. (Hereinafter called the Tenderer) is
desirous and preferred to tender for works in accordance with the terms and conditions of tender for the work of
and where as We, Bank agree to give the tenderer a guarantee for the Earnest Money.
1. Therefore, we hereby affirm that we
are guarantors on behalf of the Tenderer up to total rupees
in words) Rs. (in figures) and we undertake to pay to
Executive Engineers Division Department of Government of Gujarat the
(name of Govt. Previous notice of judicial or to be specified). up to his first written demand, without demur, without delay and
without the necessity of a previous notice of judicial or administrative procedures and without the necessity to prove to the Bank the defects or
shortcomings or debits of the contract or any sum within the limit of Rs.
2. We further agree that the Guarantee herein contained, shall remain in full force and effects during the period that would be taken for the
acceptance of tender.
However, unless a demand of a claim under this Guarantee is made for us in writing on or before the
(Date to be specified-will not be less than 180 days from the date of opening the tender) we shall be
discharged from all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during the currency except with the previous consent of the Executive Engineer
Division in writing.
4. We lastly undertake not to revoke the guarantee for any charge in the constitutions of the tenderer or of the Bank.
Date Signature & Seal of Guarantor
*Strike out whichever is not applicable.
19. Wires of I.S.I. mark will be allowed to be used on the work.
20. The rates should be written both in words and figures inclusive of all taxes and duties.
21. The percentage additions in total amount tendered of any items are not allowed however if overall reduction in and figures. If
21. The percentage additions in total amount tendered of any items are not allowed however if overall reduction in and figures. If
no reduction is to be made the gap should be filled in by the word 'NIL'.
Note : As per Govt. Resol. No. CDN/1269/PAC/51-C.dt. 15/4/1978
22. Safeguards :
(a)That the percentages and the tender amount by each contractor shall actually be shown to the other contractors who may be present
at the time of opening the tenders.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
(b)That's a tender with any erasures and/or other writing in percentage (both in word and in figures) shall be rejected outright.
(c)That insertions and or correction in the percentage quoted (both in words and in figures) resulting inan increase in the value of the work shall
be liable to be rejected outright unless it was authenticated by the officer opening the tender at the time of opening tender as well as the
contractors they may be present at the time of opening tender and.
(d)That any other correction or insertions shall be authenticated by the officer opening the tender and the intending bidders who may be
23.Any error in quantity or amount in Schedule 'B' showing items of works to be carried out shall be adjusted in accordance with the following
(a)In the event of a discrepancy between the description in words and figures quoted by a tenderer in the rate column, the description in words
(b)In the event of an error occurring in the amount column of the Schedule 'B' showing item of works, as a result of wrong multiplication of the
unit rate and quantity, the unit rate shall be regarded as firm and multiplication shall be amended on the basis of the rate.
(c)All errors in total in the amount column, and in carrying forward totals shall be corrected.
(d)Any rounding off of amounts against items of in totals shall be ignored. The tendered sum so altered shall for the purpose of tendering be
substituted for the same original tendered and considered for acceptance.
24.Battens shall be teak wood for acceptable quality and shall be varnished before fixing in position.
25.The wooden - co-op board should be polished on both the sides.
26.Whenever Government materials are issued, the contractor shall be responsible for the safe custody and proper use of the materials.
27.The loose electrical fitting connection should be done at the time of handing over possession of the building to the concerned civil or
administrative department and accordingly after taking over possession of this connection concerned Civil/Administrative Department is
responsible for fittings.
28.(i) Late tenders (i.e. tender received after the specified time of opening) Delayed tender (i.e. tenders received before the time of opening
but after the due date time or receipt of tenders)'and post tender offers shall not be opened and considered at all.
29.(ii) The tenders received (by registered post after the time of date specified in the tender notice) shall not be received by the concerned
office from the postman, for which date and time may be recorded on the cover of the tender as to when tender was refused by the Divisional
Accountant or the Divisional Head or any other person in charge.
30.VAT where recoverable / payable shall be deducted from bills for payment according to rules Prevailling at the time of payment.
Executive Engineer.(Mech)
Sit Signature of contractor/s
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Pages 7 & 8 are for E-tendering of Electrical Tender Form only
DATA SHEET For Electrical E-Tendering
(A) Details of Tender Item :
SrNo. Name of Work Estimated EMD Tender fee Total Period for
Tender (Rs.in in Rs. Security Completion
Value ____) Deposit of Work
(B) Eligibility : Registered in
(C) Schedule for e-tendering is fixed as under :
(i) Site Visit (If any) On date ____/___/________;____;____ hrs.
(ii) Downloading of tender documents From Date //2025
Start & End date upto date //2025 Till16:10hrs.
(iii) Online submission of bid upto date / /2025 Till16:10hrs.
(iv) Submission of EMD and Tender fee Submission in electronic format only through online
by scanning and then the same should be sent in
original toAs perThe
the NIT &TenderEngineer
Executive Documents
(Mech.) Port colony
No.2 Block No.3, Near balvatica,Bor Talav, Bhavnagar
Phone : 2443195 send the same through R,P,A,D, So
Between / /2025 to / /2025 up to office hrs.
(v) Online opening of Bid On date //2019at 12;00hrs. on words (if possible)
(vi) Bid Validity Period 120 days from the end date of downloading Bids
* Biders can download the tender documents free of cost from the website.www.rnb.nprocure.com
* Bidders have to submit bid in Electronic format only on above mentioned website till the Date &
Time shown above.
* Offers in physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure / should have legally valid
Digital Certificate (Class -III) as per Information Technology Act-2000 using which they can sign
their electronic bids. Bidders can procure the same from any of the license certifying Authority of
India or can contract (n) code solution-a division of GNFC Ltd., who are licensed Certifying by
Govt. of India.
(D) (i) Bid inviting authority Executive Engineer (Mech.) GMB, Bhavnagar
(ii) Bid Opening Authority words and figures at the end of Schedule B
(E) Mode of Quoting Rates Percentage rate tender Percentage premium or rebate in
words and figures at the end of Schedule B
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
The list of certifying agencies are as mentioned under :
Sr.No.Name of Certifying AgencyWebsite Address
1. (n) Code solution (G.N.F.C.) www.gnvfc.com
2. Safecrypt www.safescrypt.com
3. TCS www.tcs.-ca.tcs.co.in
4. MTNL www.mtnltrustline.com
As a result of E-tendring the information / Instructions on Pages 4 to 6 following may be read as modified below : -
General Conditions from Page 4 to 6 are substituted for E-tendering as below :
7. In addition to the above the bid will liable to be rejected if :-
(i) The bidder proposes any alteration in the work specified or in the time allowed for carrying
out the work or any condition in the covering letter.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the
8. A Certificate of registration as approved contractor should be incorporated in electronically
transmitted bid.
14. The tender for the work shall remain open for a period of 120 days counted from the last
date of online submission of bid.
20. The rates should be expressed both in words and figures inclusive of all taxes and duties.
22. The bid will also be liable.
(i) The bidder proposes any alteration the work specified or in the time allowed for carrying
out the work or any condition or correction made in any code or mode of Schedule-B or
Specifications.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign
31. (i) The Bids shall be offered in Electronic format only on online website www.grnb.nprocure.com
/ www.nprocure.com till the date and time shown on Page 12..
31. (ii) Payment of Tender Fee and Earnest Money Deposit : " FDR for E.M.D. & DD for Tender fee shall be submitted
in electronic format only through online (by scanning) while uploading the bid. This submission shall mean that E.M.D. &
tender fee are received for purpose of opening the bid. Accordingly offer of those shall be opened whose E.M.D. & tender
Fee is received electronically. However for the purpose of realization of D.D. bidder shall send the D.D. in original to
Superintending Engineer _____________________ As per NIT &Tender
Circle Documents
_______________________ at the time of tender opening or
send the same through R.P.A.D. So as to reach Executive Engineer (M), GMB MECH Division Bhavnagar within 7 days
from the last date of opening. Penaltative action for not submitting D.D. in original to E.E. by bidder shall be initiated.
D.D. for Exemption Certificate is not necessary. However Exemption Ceritificate shall have to be submitted ekectronically
through online. If the contractor does not remit the tender fee & the earnest mony within the specified time his registration
will be held in abeyance for one year & his tendering code will be cancelled for one year.
Any documents in supporting of tender bid shall be submitted in electronic format only through online (by scanning etc.)
& hard copy will not be accepted separately." (R&B Circular No. prca-102008-p-sa, dated 18-1-2008 & R.&B.D.G.R. No.
Parach-102008-5-C (Partfile) dated 27-11-08)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
General Conditions of Contract for Electrical works in the building and Communication Department
General Conditions of Contract
1.Definitions of terms:
In construing the general conditions and the annexed specification the following words shall have the meaning here
assigned to them unless there is something in the his successors and assigns.
The "governor of Gujarat" shall include his successors and assigns.
The "Engineer" shall mean the Ex. Engineer, Electrical Division, for the time being attached to the Public works
Department of the Gujarat State or such other officer as may be appointed by the Ex. Engineer, Electrical Division to
supervise the work on behalf of the Governor of Gujarat.
The "Contractor" shall mean the Tenderer whose tender, shall be accepted by the Governor of Gujarat and shall include
the tenderer's legal personal representatives of successors and assigns.
"Plant" shall mean and include any machine any machine fixed of movable, use for the generation or transmission of
power of actuated by power.
"Work" or "Works" shall mean the whole the plant and material to be provided and work to be done executed of carried
out by the contractor under the contract.
The "Contract" shall mean all the documents by which the agreement by the contractor to be provided to execute of carry
out the plant work or works shall be constituted or in or by which the terms of such agreement or any of them are contained
or set forth specially as per these General conditions, any special conditions attached to or issued with these conditions.
The specification, the Drawing, the invitation for Tenders (if any) of any other letter. notice or document upon or with
reference to which the Tender is made and the Schedule of prices (if any) furnished by the contractor with these his
The "Specification" shall mean the specification annexed to these General conditions and the Schedule thereto (if any).
The "Site" shall mean the whole of the premises, buildings and grounds in or upon which the Plant works or works is or
are to be provided. Exacted done or carried out.
The "Drawings" shall mean the drawings issued with the specification which will ordinarily be identified by being signed
by the Engineer and any further drawings submitted by the contractor with his tender and duly signed by him and accepted
or approved by the Engineer and all other drawings supplied or furnished by the contractor or by the Engineer in
accordance with these General conditions.
The "Special Conditions" shall mean the special conditions of contractor (if any) attached to general condition.
The "Schedule" shall mean the schedule or schedule attached to the specification.
2.Contractor to inform himself fully :
The contractor shall be deemed to have carefully examined the invitation for Tender (if any) the general and any special
conditions, the specification and Drawings and the Schedule of price(in any). In case off discordance or want of
agreement between or amongst the several things herein described and the grounds or data of the contract then these
conditions shall have precedence of and be held to be more correct and binding and in like manner detailed drawings
shall be held to be more correct. and binding then general drawings and in like than drawing made to a smaller scale, or
for general instruction and figured dimensions shall be held to be more correct than dimensions be scale but subject
nevertheless in case of doubt or dispute as to any of the matters aforesaid to the determination and decision of Engineer
as hereafter is more particularly mentioned and provided always that nothing herein contained shall limit the powers of
the Engineer herein after mentioned.
3.Security Deposit :
The Person/persons whose tender is accepted (hereinafter called the "Contractor" which expression shall unless
excluded by or repugnant to the context include his Legal heirs, executors, administrators and assignees) shall (a)
Deposit with the Executive Engineer a sum sufficient to make up the full security deposit specified in the tender in cash
or Government securities (as mentioned in para 208 of Gujarat Public Works Department Manual Vol.1) duly transferred
in the name of the Executive Engineer or fixed Asdeposit
receiptsDocuments
or Term Deposits of Narmada Project in the name of the
Executive Engineer within a period of 10 days form the date of receipt of the Notification of acceptance of his tender, or
(b) (i) deposit fifty percentage of the total security deposits as specified in the tender form with the Executive Engineer in
form of small saving schemes or securities of Sardar Narmada Nigam or F.D. Rs. of scheduled Bank. However, the
Contractor can deposit twenty five percentage of total security deposit in the form of Govt. security (as mentioned in para
208 of Gujarat Public Works Department Manual Vo.(1) or Term Deposits of Narmada Project duly transferred in
the Name of the ExecutiveEngineer, or fixed deposit receipts in the name of the Executive Engineer within a period of
ten days form the / date of receipt of notification of acceptance of his tender. If the security deposit is not paid within the
above specified time, no work order will be issued till the issue about delay is finally decided by the competent authority
(b) (ii) The Government shall be deemed to have been authorized to deduct the balance of fifty percentage of the security
deposit as specified in the tender form the amounts that become payable to the contractor form the work done the contract
form time to time, such deduction shall not exceed ten percentage of the amount so payable and the whole amount paid
in cash or by way of deduction shall be held by Government by way of security deposit. For the works whose estimated
amounts is more that become payable to the contractor for the work done the contract form time to time, such deduction
shall not be held by Government by way of security deposit. For the works whose estimate amount is more than rupees
fifteen lacs, the Contractor shall have to give the performance bond supported but F.D.R. or Unconditional. So that same
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
can be encased without giving any reason by the Executive Engineer Non Transferable and Irrevocable Bank Guarantee
of any schedule bank equivalent to five percentage of the estimated amount put to tender along with the initial security
deposits. All compensation, Liquidated damages or other sums or money payable by the contractor to Government under
the terms of this contract shall be deducted form or recouped by the realization of a sufficient part of his security deposit,
or form the interest arising there form or performance bond form any sums which may sums which may due or may
become due by Government to the Contractor on any whatsoever and whatsoever and whether in respect of this contract,
any other contract or otherwise. In the event of his security deposit being reduced by reason of any such deduction or
recumbent as aforesaid, the contractor shall within ten days thereafter, make good in cash or in Government securities
transferred as aforesaid, any sum or sums, required to make good the shortfall in the amount of the security deposit.
The securities deposit, when paid as above shall at the cost of the depositor, do converted into interest bearing
Government securities in the name of Executive Engineer provided that the depositor has expressly desired this in writing.
This is subject to the condition that twenty five percentage of the total security deposit must be held in the form of small
saving schemes or Term Deposits of Narmada Project. If the full amount of the security deposit to be considered as
considered as cancelled and legal steps shall be taken against the contractor for recovery of the amounts.
Fifty percentage of the Security Deposit along with performance bond shall become refundable within fifteen days after
the final completion certificate issued a per Clause-25. All dues under this contract or other contract. or otherwise,
including the royalty charge if "No Due-Certificate" is not produced by the contractor shall be recovered form the final
certificate is issued as per clause-25. The remaining fifty percentage of the security deposit shall be refunded after expiry
of the Defect Liability period as per clause-33 after deducting there form the amount of expenses, is any Government
under this contract.
Performance Bond
(The date of his bond must not be prior the date of the instrument in connection with which it is given)
Principal (Contractor)
Sum of bond (express in words and figure)
Contract No. and date of contract
Know all men by these presents, that we, the Principal and surety above named are held and firmly bound upto the
..................................... hereinafter called the Employer in the amount stated for payment of which sum, well and truly to
be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these
presents subject to the provision of which the aforesaid Contractor on demand and without demand on a claim being
make by the Employer.
The condition of this obligation is such, that whereas the principals have entered in to a contract with the Employer
numbered and dates as Shown above? and hereto attached for the execution of work
.......................................................... Now Therefore, if the Principal shall well and truly perform and fulfill all the
undertakings, covenants, terms, conditions and agreements of said contact during the original terms of the said Contract
and extensions there of that may be granted by the Employer with or without notice to the suretyand during
the life or any guarantee required under the contract and also well and truly perform and fulfill all the undertakings,
covenants, terms, conditions agreements of the `surety which the employer may sustain by reason of failure or default
on the paid of said Principal so to do.
We ........................................... further agree that agree that the grantee here. contained shall remain in full force and
effect the dues of the employer under or by for the validity of the said Contract, and that it shall continue to be enforceable
all the dues of the employer under by virtue of the Contract have been fully paid and its claims satisfied or discharged
or till the Employer certifies that the terms and conditions of the Contract have been full and property earned out by the
said Contractor and accordingly discharges the grantee. Unless demand or claim under this guarantee is made on us
writing on or before the ............................. we shall be discharged from all liability under this guarantee thereafter.
IN WITNESS WHERE OF the above bounded parties have executed this instrument under their several seals on the
date indicated above the name and corporals seal of each corporate partly being hereto affixed and these presents duty
signed by its undersigned representatives, pursuant to authority of its governing body.
In the presence of witness individual
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Attested Corporate surety
For and on behalf of the Employer
4.Mistake in contractor's Drawings
The Contractor shall submit such drawings as may be required and shall be responsible for any discrepancies, errors
omissions in any drawings other particulars supplied by him notwithstanding that such drawings or particulars may been
approved by Engineer.
5.Patent Rights etc.
The contractor shall fully indemnify the Governor of Gujarat against all actions, suits claims demands, costs, charges
expenses arising form or incurred by reason of any infringement or alleged infringement, plan, of any letters patent,
design, trademark or name copyright or other protected rights in respect of any machine, plant, work materials thing or
system or method of using fixing working or arrangement used or fixed or supplied by contractor but this in indemnity
shall not extend or apply to any action suit claim, demand cost charges or expenses arising form or incurred by reason
of the use of the work or any part thereof otherwise then in the manner of for a purpose contemplated by the contract all
royalties and other similar payments which may have to paid for the use of any machine, plants, work, material thing
system or method as aforesaid (whether payable in on sum or by installment or otherwise) shall be covered by the
contract price and payable by the contractor.
In the event of any claim or demand being made or suit brought against the Governor of Gujarat in respect of any such
matter or matters as all negotiations for the settlement of such claim or demand and such action aforesaid the contractor
shall be duly notified, thereof, and he shall conduct or suit also be conducted by him subject if and so fat as Governor of
Gujarat shall think proper under the Supervision & Control of Governor of Gujarat through the officer duly authorized on
6.Excess over Tender quantities, Extra items & Variations in Specifications, Drawings etc.
6.1 The Engineer-in-charge shall have power to make any late rations additions in or to the original specifications
drawings design instructions that may appear to him to be necessary of advisable during the progress of the work and
contractor shall be bound to carry out the work in accordance with any instructions in this connection which to him in
writing signed by the Engineer-in-charge and such alternation shall not invalidate the contract additional work which the
contractor may be directed to do in the manner above specified as part of the work shall be carried out by the contractor
on the manner above specified as part of the work shall be carried out by the contractor in the same conditions in all
respect on which the agreed to the work and at the same rate as are specified in under for the main work
6.2 Except that when the quantity of any item exceeds the quantity as in the tendor by more than 30% then contractor
will be paid for the quantity in excess of 30% at the rate entered in the S.O.R. of the year during which the excess in
quantity is first executed or tender rate, which ever is less. ( Modi. R&B GR No. TNC-102017-01-01 dated 11-07-2017)
6.3If the additional or altered work includes any class of whirl for which no rate is specified in these contract.
(i) At the rate derived form the item within the contractor which is comparable to the one involving additional altered class
of work where there are more than one comparable items, the item of the contract which in nearest in comparison with
regard to class or classes of the work involved shall be selected and the decision of the superintending Engineer as to
the nearest comparable item shall be final and binding on the contractor.
(ii) If the cannot be derived in accordance with (i) above, such class of works shall be carried out at the rate angered in
the Schedule of Rates of the Division for the year in which, the tender was received, increased or decreased by the
percentage by which the tender received increased or decreased by the percentage by which the tender amount is more
or less as compared to the amount arrived at the rates in the "Schedule of Rates" Divisions in the year in which the tender
was received. If the Schedule of rates calculated considering such items which were included in the "Schedule of Rates
of the Division for the year and or materials concerned on such item the rate to be charged would be the basic rate taken
into account for fixing the rate in S.O.R. referred to above instead of the rate.
(iii) If is not possible to arrive at the rate form(i) and (ii) above, such class of work shall be carried out at the rate decided
by the competent authorities on the basis of detailed rate analysis after hearing the contractor before as committee of
two superintending Engineers stationed at the same place or the nearest place.
6.4If the additional or altered work, for which no rate is entered in the "Schedule or Rates" of the Division is ordered to
be carried out before the rate is agreed upon, then the contractor shall within seven days of the date of receipt by him of
the order of carry out the work, inform the Engineer-in-charge does not agree to this rates, the shall be notice in writing
be at liberty to cancel his order to carryout such class of work and arrange to carry it out in such manner as he may
consider fit advisable, provided always that if the contractor shall commence work or inure any expenditure in regard
thereof before the rates shall have been determined as lastly herein before mentioned, then in such cases he shall only
be entitled to be paid in respect of the work carried out or expenditure incurred by him prior to the date of the determination
of the rate as aforesaid according to such rate or rates as shall be fixed by the Engineer-in-charge. In the event of the
dispute the decision the Superintending Engineer of the Circle shall be final.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Where, however, the work is to be executed according to the designs, drawings and specifications recommences by the
contractor and accepted by the competent authority, the alternation above referred to shall be within the scope of such
designs drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the increase in the cost occasioned
by alternations bears to the cost of the original contract work and the certificate of the Engineer-in-charge as to such
proportion shall final and conclusive.
7.Work man ship and materials :
The works shall be carried out in all respects with workmanship and materials of the best and most substantial and
approved qualities to the entire satisfaction of the Engineer who may reject any plant, apparatus of material or work ship
which slab in his opinion be of defective quality any such rejection to be final and conclusive. The contractor shall at his
own expenses provide all material labour, haulage, power, tools, tackles and apparatus necessary to execute and
complete the works and plant in the manner aforesaid.
8.Use of work pending completion :
The Governor of Gujarat shall be at liberty at any time to put into beneficial use the whole or any part of the work he may
desire to use pending the formal completion and taking over of the same.
9.Subletting of contract :
The contractor shall not without the consent in writing of the Governor of Gujarat under the hand of the Engineer assign
or sublet the contract nor make any sub contract with an person or persons for the execution of any portions of the work
other than for raw materials, or for any part of the work of which the manufacturers are named on his contract.
10.Protection and liability for a accidents, Theft and Damage :
The contractor shall at all items until the commencement of the period maintenance as provided in clause 16 property and sufficiently
cover up and protect all materials delivered on site form damage or injury by exposure to the weather and shall take every proper
precaution against accident, damage or injury on the same from any cause. The contractor shall be and remain answerable and liable
for all accident and damage thereto which until the commencement of the period of maintenance as provided for under clause 16 may
arise or be occasioned by the acts or omissions of the contractor or his workmen, agents, servants or sub-contractors and all looses
and damages arising from such accidents damage or injuries and aforesaid shall be made good in the most complete and substantial
manner by and at sole cost of the contractor and to the satisfaction of the Engineer.
Provided that should the Engineer certify, that the work has been completed but that owning to circumstances over which
the contractor has no control he work cannot be taken the contractor shall nor be held liable for any loss of or damage to
the work occasioned by such delay in taking over and occurring more than one month after date of completion of the
work as certified by the Engineer.
Until the work shall be or deemed to be taken over as hereafter provided the contractor shall also indemnify to
Government of Gujarat from and against all claims and demands, suits proceedings, cost and expenses in respect in
respect of or in connection with any injury to person or damage to property by whomsoever sustained or by defective for
thefts of any property of the Governor of Gujarat or of other committed by any employees of his own or his subcontractors
and shall be liable for the costs of replacing any property stolen.
Subject as hereinafter provided the contractor shall at his own expense insure and at all times prior to the commencement
of the period of maintenance keep insured against destruction or damage by fire or earthquake storm and tempest such
plant and materials ordered for the work as may for the time being be upon the site for the full value of such plant and
12.Materials brought on the site :
All materials tools and tackle brought to and delivered upon the site for the purpose of the work shall from the time of
their being so brought vest in and be the property of the Governor of Gujarat but may be used for the purpose of the work
but for that purpose only and not on any account be removed or taken away by the contractor or any other person without
the express permission in writing of the Engineer but the contractor shall nevertheless (subject as hereinafter provided)
be solely liable and responsible for any loss or destruction thereof or damage unless resulting from causes beyond the
contractor's control not being causes insurance against destruction or damage from which is provided for in clause 11..
The Governor of Gujarat shall have a lien on such materials, tools and tackle for any sum which may to any time prior to
the completion of the works be due or owing to him the contractor under in respect of or by reason of the contract and
shall be at liberty to sell and dispose of any of such materials, tools and tackle remaining after the completion of the
works in such manner as he shall think fit, and to apply the proceeds in or towards the satisfaction of such sum or sums
so due or owing as aforesaid but subject to such lien and power of sale and disposal such surplus materials, tools and
tackle shall being to the contractor and may be removed and disposed of by him as he shall think fit after the lien is
withdrawn by the Engineer-in-charge.
If the contractor shall at any time fail in the opinion of the Engineer to proceed with the work with due diligence and
expedition or shall refuse, neglect or omit to comply with any orders given to him in writing by the Engineer-in-accordance
with the provisions of the conditions or shall commit any other breach of the provision of the contract, the Engineer shall
be at liberty to give notice in writing to the contractor to make good the failure neglect. omission or the Engineer shall be
at liberty to give notice in writing to the contractor to make good the failure neglect. omission or breach complained of
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
and should be contractor shall fail to comply with any such notice within such period as may be prescribed in such period
as may be prescribed in such notice then and in such case the Governor of Gujarat shall be at liberty to employ workmen
other than those of the contractor to perform and execute the work in respect of which the failure neglect or omission
referred to in such notice shall have been committed or occurred. If the Governor of Gujarat shall think fit, it shall be
lawful for him to enter into a new contract with any other persons, or person, for the execution of such part of the work
as may not have been executed and in that event the Governor of Gujarat shall without incurring any liability to the
contractor be entitled to use all or any of the materials, tools, tackle or there things which may then be on site for the
purpose of completing the work or any part there of and to provide any additional materials, tools, or tackle required for
the purpose and the cost of executing any such work and providing any such materials shall be paid by the contractor to
the Governor of Gujarat on demand.
Subject to and after satisfaction of the lien of the Governor of Gujarat for any sum due to him by the Contractor for any
expenses cost or charges incurred in the completion of the work, all materials , tools, tackle or other thing remaining on
the site and unsold after such completion shall forthwith hereafter be removed by the contractor.
14.Replacement of Defective work or material :
If during the progress of the work the Engineer shall notify in writing to the contractor that in his opinion the Contactor
has executed any unsound or imperfect work, or has supplied any materials inferior in quality to those stipulated for by
the contractor, the contractor shall at his own expense, within ten days of his receiving the notice proceed with due
expedition to remove or after and reconstruct or replace the work or as the case may be supplied fresh materials up to
the standard of the specification. In place of the work or materials
complained of by the notice (as the case may be) and in case the contractor shall fail to do so the Governor of Gujarat
intention so to do forthwith at the cost of the contractor remove the work or materials complained of and perform all such
work or (as the case may be) supply all such materials in place of those complained of as may be necessary or proper
in order to comply with the contractor and the cost as certified by the Engineer of any such removed and performance of
work or supply of materials shall be paid by the contractor to the Governor of Gujarat on demand provided always that
nothing in this clause shall be deeded to derive the Government Gujarat or effect any other rights or remedies under the
contract or otherwise which I may have in respect of such defects of deficiencies. No payment which have been made
on account of materials delivered or work executed shall be socked on as acceptance of such or any work or materials.
15.Cutting away & making good :
The tender is include all necessary cutting and making good for the purpose of the contract of the wood work, walk,
floors-site of the site. The contractor win be held responsible for and will have to make good at his own expanse to the
satisfaction of the Engineer, any damages to or disfigurement of the site which may have been caused the acts or
omissions of himself or his servants or agents in connection with the carrying out the contract.
16.Maintenance :
The Contractor shall make good at his own expense all defects "due to faulty design material, or workmanship on the
part of the contractor which may during a period of 120 calendar months form the date of which the work is certified by
the Engineer to have been brought into beneficial use or if no such certificate is given from the date of the final payment
for the work under clause 20 (which period is hereinafter called the "the period of maintenance") develop under proper
use in the work or any part thereof by replacing plant materials or work or otherwise as a may be necessary. Any such
making in the work or any part thereof by replacing plant materials or work or otherwise as may be necessary. Any such
making good by the contractor shall in no case relieve him form his liability to make good any further defect in these work
made good replace which made develop during the reminder of such period of twelve months, if any such defects are
clearly squired to prevent any recurrence of such defects. If any defects or alterations which contractor shall become
liable make good or make under this clause by not made good or made good or make the same (as the case may be) a
the risk and expense of the Contractor, but without prejudice to any other right or remedies which the Governor of Gujarat
may have against the Contractor in respect of his default in making good or making the same as aforesaid/and the cost
of any such making good or making shall be paid by the contractor to the Government of Gujarat on demand.
17.Contractor's Representative & workmen :
The contractor shall employ at lest on competent representative, whose name or names shall have previously been communicated in
writing to the Engineer by he contractor to Superintend the carrying out the works. The said representative of) more then one shall be
employed then, one of such representative shall always be present on the site during working hours and any written orders or
instruction which the Engineer or his duly authorized representative, whose name shall have been previously communicated in writing
to the contractor, may give to the said representative of contractor shall be deemed to have been given to the contractor.
The Engineer shall be at liberty to object to any representative or person employed by the Contractor in execution of or otherwise
about the work who in the Engineers opinion, shall misconduct himself or be incompetent or notice in writing requiring him to do so.
17.A Minimum age of persons employed and employment of donkeys or other animals :
(i)The contractor shall not employ any person who is under the age 12 years.
(ii)The contractor shall not employ donkeys or other animals with breaching of string or thin rope. The breaching must be
at lest three inches side and should be tape (Newer).
(iii)No animal suffering from sores, lameness or emaciation or which is immature shall be employed on the word his name
shall be removed form the list contractors.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
(v)The Engineer shall remove form the work any person or animal found working which does not satisfy these conditions
and to responsibility shall be accepted by the Governor of Gujarat for any delay caused in the completion of the work by
18.Submission of Samples :
The contractor shall not without written sanction of the Engineer use for the execution of the work any materials plant or
stores of any type of description other than those specified in his tender. He shall if required to do so or at his options,
deposit samples, at the Office where Engineer for approval and the Engineer shall within 14 days or the receipt of the
samples, express in writing contract to his approval or otherwise of the samples deposited and all materials, plant
and stores used in the execution of the work, must be in every away equal to the deposited samples.
All the deposited samples will be returned to the contractor within one away equal to the deposited samples. All the
deposited samples will be returned to the contractor within one month of the work being taker over.
19.Deduction from contract Price :
The amount or all cost of work, expenses; or other sums which under the contract shall be payable by the contractor to
the Governor of Gujarat from any moneys due or becoming due by him to the contractor under contract, without-prejudice
to the Governor of Gujarat. right to recover the same by the ordinary process of law.
20.Terms of Payments :
Subject to any deduction which the Governor of Gujarat may be authorized to make under the contract, the contractor shall be entitled
upon the certificate of the Engineer to the effect hereinafter stated payments of R.A. Bills shall be made to contractor as per items,
in measurable units executed according to the specifications.
It at any time the contractor shall be prevented for any period of not less than 30 days from causes within the control of the Governor
of Gujarat either first, from delivering on the site any plant or materials ready in India for delivery or secondly from proceeding with the
erection at any plant or materials which he had already delivered & the site, the Governor of Gujarat shall bear the cost of storage and
protection, including insurance in accordance the clause ii, of the plant and materials during such period in the first of such of contractor
shall be entitled to payment of 80% of the value certified as aforesaid of the plant or materials delivery of which shall have been so
prevented within one month from the date on which as certified by the Engineer such plant or materials are so ready as aforesaid
provided that all portions thereof have been suitably and sufficiently marked as being property of the Governor of Gujarat and are
delivered into the custody of some person approved by the Engineer who has granted at receipt thereof.
Installments shall be due and payable by the Governor of Gujarat within one month from the date of each certificate of
21.Certificate of Engineer :
Every application to the Engineer for a certificate must be accompanied by a detailed claim in duplicate setting forth (in
the order of the Schedule of price if any) particulars of the Plant or materials delivered and work executed to the Engineer
in accordance with the contract shall be issued within 14 days of the application. No application for a certificate shall be
made within 14 days previous applications.
22.Certificate not to affect rights of the Governor of Gujarat of contractor :
The Engineer may be any certificate make any correction or modification in any certificate previously issued by him any
payment shall be regulated any adjusted accordingly, No certificate of the Engineer shall nor shall any payments on
accounts by the Governor of Gujarat the Contractor, nor extension of time for the execution of the work by contractor
which may be ranted by the or behalf of the Governor of Gujarat affect or prejudice any of the lights, of the Governor of
Gujarat against the contractor under or relieve him any of his obligations for or in respect of the due performance of the
contract, or be interpreted as approval of work done or of materials supplied.
23.Suspension of work :
The Governor of Gujarat shall any to the contractor all proper expenses arising from suspensions of the work by order in
writing of the Engineer or any other officer on behalf of the Governor of Gujarat unless such suspension is due of some
default on the part of the contractor or any subcontractor under him.
24.Damages for delay in completion :
(i) If the Contractor fails to complete the work under contract by the stipulated date, he shall pay liquidated damages of
Rs.0.1 percentage of the contract value per day form the date of delaying the said work up to the date of completion and
banding over to the Government.
(ii) However also if the contractor fails to complete and part of the work Proportionate to by the time in relation to the
value of such part, he shall pay Liquidated damages per day from the date of delaying the said part of the work up to the
date of completion or the said designated part at the rates shown in the said schedule of the contract value of such part
for such failure till the said designated part is completed.
(iii) It execution or on any other ground he shall apply in writing to the Ex. Eng. before the (iii) The agree gate maximum
of liquidated damages payable under this clause shall not exceed Rs. 0.1 percentage of contract value per day and shall
be subject to the maximum amount of ten percent of the estimated amount put to tender.
(iv) Delays requiring payment of ten percent liquidated damages of the amount put to tender for performance bond in
forfeiture of works estimated to cost more than Rs. 15 lacs, for performance) and registration of the contractor shall also
be kept in abeyance of three years form the date as fixed in all such cases.
24.A If the contract shall desire an extension of the time for completion of work on the ground of his having been
unavoidably hindered in execution or on any other ground he shall apply in writing of the Ex. Eng. before the expiration
of the period stipulated in the tender or before expiration of 30 days from the date on which he was hundred as aforesaid
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
onwith the cause for making for extension occurred which ever is earlier and the Ex. Eng. may if in his opinion. There are
reasonable and bona fide grounds for granting. And extension grant such extensions as the thinks necessary or proper.
The decision of the Ex. Eng. in his matter shall be final.
No applications for extension of time for completion of work shall be considered unless it is received by registered post
in the office of the Executive Engineer or left at his office and obtained receipt there of duly signed by the Executive
Engineer or his nominee authorized in this respect.
The date of receipt of application by the Executive Engineer, shall be considered as the date of application for the
purpose of counting the period as mentioned above.
24.B "If the contractor or his workmen or servants shall break, deface injure or destroy and part of the building or the
work in question in/or which they may be working or any building road fence, enclosure or glass-land or cultivated ground
contingence to the premises on which the work or any part there is being executed or if any damage shall be done to the
work form any cause whatever before completion of the work or before the completion of the maintenance period
whichever is later or any damages occurred caused due to normal flood or rain or if any imperfection become apparent
in it within three months from the grant of a certificate of completion, final or otherwise by the Engineer-in-charge, the
contractor shall make good the same at his own expenses or in default, the Engineer-in-charge may cause the same to
be good by other contractor and deduct expenses (of which the certificate of the Engineer-in-charge shall be final) from
any sums that may then be due or may thereafter become due to the contractor or from his security deposit or the
proceeds of sale thereof a sufficient portion thereof".
24.C Force Major Clause :
Neither party shall be liable to the other for any toll or damage occasioned by or arising out of acts of God such as
Unprecedented flood, Volcanic eruption, earthquake or other convulsion of nature and other acts such as but not
restricted to general strike invasion, the acts of foreign countries, hostilities, or war like operations before or after
declaration of war, rebellion military or usurped power which prevent performance of the contract and which could not
have been foreseen of avoided by a prudent person.
Note : Unprecedented flood means *here flood crossing the Hi Flood Level of the past-year (s) which is on the available
record.Modified Vide R&BD.G.R. No. TNC-1096-IB-143-(16)-C dated 11-1-99)
25.Time of taking over :
The work shall for the purpose of all the provisions of these conditions be deemed to have been completed and taken
over by the Governor of Gujarat when the Engineer, shall have certified in writing that it has been completed in
accordance with the contract conditions and such certificate shall not be unreasonable with held nor shall the Engineer
delay its issue on account of commissions of defects which in his opinion do not effect the efficient use of work but such
issue shall be without prejudice to the contractor's liability to make good any such omission and defects with the greatest
possible expedition.
26.Death or Bankruptcy :
The if the contractor shall die or become insolvent or bankrupt or have a receiving order made against him or compound
with or make on proposal carrying on his business under inspection or for the benefit of his creditors or commit and act
of insolvency or bankruptcy, or being a corporation bordered to be wound up or have a received or representative to
determine the contract and the Governor of Gujarat may in that event complete the contract in such time and manner
and by such person as he shall think fit.
27.Disputes to be referred to Gujarat Public Works Disputes Arbitration Tribunal :
The disputes relating to this contract in so far as they fall within the jurisdiction of Gujarat public works Disputes arbitration
tribunal shall be referred to the said tribunal of Gujarat State.
However the reference to Arbitration Tribunal under this clause will not stay fulfillment of obligations of the contractor or
rights of the Engineer-in-charge under this contracts, unless otherwise ordered to the contrary by the said Tribunal as
Interim Relief measure.
(The following clause is to deemed included in this conditions only when Plant or Machinery is included in the contract.)
28.Contract Drawings :
The contractor shall submit to the Engineer for his approval on or before the dates stipulated for the purpose in the
specification copies of all the drawings of the general arrangements of the plant as set out therein and of such detail
drawings as may be reasonably necessary.
Within Fourteen days from the receipt, by him of such copies the Engineer shall signify his approval or otherwise of the
same and if he does not do so he shall be doomed to have approved thereof.Within Fourteen days from the notification
by the Engineer to the contractor of his approval such copies, of in the absence of such notification within-thirty days
from the receipt of such copies, the copies in ink on tracing cloth, or Ferro Gallic prints mounted on cloth, of ail drawings
as approved shall be supplied to the engineer by the contractor respective and shall there upon the signed by the
contractor and become there property of the Governor of Gujarat.Such signed copies of the drawing shall not be departed
from in any way whatsoever except with the written permission of the Engineer, During the execution of the works of the
signed copies shall be always kept available for reference on the site. In the event of the Contractor desiring to keep in
his own possession a signed copy of the drawings as approved the shall supply three copies instead of two and in this
case the Engineer shall sign the third copy air I return the same to the Contractor.
29.Manner of Execution, Quality of materials etc. :
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
The plant shall be manufacture, constructed, provided, put in position and maintain in-fore best and most substantial and
workmen like manner and materials of the best and approved qualities having regard to the respective uses.
30.Test on site :
In all cases where the special conditions are provided for tests on the site where there of plant materials on workmanship
the Governor of Gujarat except where otherwise specifically stipulated shall provide free of charge such layout materials
fuel stores, apparatus and instruments as may be requisitioned from time to time efficiently to carryout such tests in
accordance with the condition.
Where electrical energy is required for tests on site and supply is available on the site form an existing installation such
electrical energy shall be supplied to the contractor by the Govt. free of charge at the pressure and frequency of the
ordinary supply is available the electrical energy necessary for such tests shall be provided by the contractor.
31.Delivery of plants & materials :
No. plant materials shall be tendered for delivery until and intimation is writing shall have been given to the contractor by
the Engineer that Governor of Gujarat is ready to take delivery.
32.Tests on completion :
On the completion of the works on the site is accordance with the contract the contractor shall give the Engineer notice
in writing of such completion. The Engineer shall after receipt of such notice by notice in writing under his hand for date
and an hour on that date fore the making of the test on site if any such are provided for the contract".
The contractor shall carry our such tests upon the date and at the hour so fixed and if the Engineer or his authorized
representative shall attend on that date at that hours such test shall be carried out in the presence the Engineer or such
representative.
If any portion of the plant fails under the tests to satisfy the contract conditions similar tests according to the contractor
shall pay to the Governor of Gujarat all reasonable expenses to which he may be put by such test.
If the test or may repeated tests so required as aforesaid be not made by the contractor on the date fixed as aforesaid
or the same by the Engineer may proceed to make such test himself at the contractor's risk and expense.
If in any test under this clause the plant tested shall fail to satisfy the contract conditions the Governor of Gujarat shall
as from the date stipulated by the contract for completion nevertheless have the right of using such plant until the same
shall satisfy such conditions and such Use shall be at the contractor's risk. In the event of the 1 question where there the
to Arbitration as any portion of the plant the Engineer may certify to be capable of being use on condition of paying to the
submitted contractor a sum calculated (according the period of the use) at the rate of 5 percent per annum upon the
amount with held or deducted in respect of such plant.
33.Rejection of Defective Work :
If the works, or any portion thereof shall not the opinion of the Engineer on the stipulated tests (if any) being made is
accordance with the contract satisfy the contract conditions within three months after the date stipulated for completion
which the works in his opinion fail to comply with the contract conditions and requiring the contract to make good, after
or replace the same within such time to be specified in the notice as the engineer may consider reasonable and the
contractor shall make good, after or replace the same as required by such notice and such as to make it employ with the
requirements of the contract condition within the time so specified. Should be he fail to do so within that the Governor of
Gujarat may make good after of replace thesame as so required any the cost of such making alteration good or
replacement (less) in case of any replacement any such, which would have become due to the contractor under the
contract in respect of the works replaced and which shall not have been paid to his) shall be paid by the contractor to the
Governor of Gujarat demand or should the Governor of Gujarat not make good after of replace any detective works in
respect of which notice as aforesaid shall be given within six weeks from the date of the given of such notice the contractor
shall repay the Governor of Gujarat all sums (in any) paid byhim to the contractor in respect of such works.Nothing
contained in this clause shall prejudice or affect the rights of the Governor of Gujarat under the contractor whether in the
way of enforcement of penalties of otherwise in respect of any delay in the completion of this work.
34.Use of plant of works pending making good :
If at expiration of the time specified for making good, altering or replacing the plant of works in any notice given by the
engineer to the contractor under the last proceeding clause the contractor shall not have duly made good. altered or
replaced the same in accordance with the contractor the Governor of Gujarat shall be at liberty if he thinks fit to make
use of the same for such time as shall be reasonably sufficient according to the circumstances enable him, to make good
after or replace the same (whichever he may see fit to do) provided that in respect of the period of such user, the Govt.
of Gujarat shall not be entitled to any damages under clause 24 of these conditions land in the case of complete
replacement the contract shall be entitled to be paid reasonable sum for same.
35.Workmen's compensation in case of injury :
The contractor shall be responsible for any compensation and shall pay to his workmen compensation payable for injuries
under the workmen's compensation Act 1923 (VIII of 1923) hereinafter called the said Act. If such compensation is paid
by Government form the contract under sub-section. (1) of section 12 of the said Act, on behalf of the contractor. It shall
be recoverable by Government from the contractor under sub section (2) of the said section such compensation shall
be recovered in the manner laid down in clause 3 and 19 of the condition of contract.
36.The Apprentices :
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
The contractors shall afford or procure as the case may be every facility to Indian apprentices for practical training in the
Owned managed controlled or patronized by so as to enable the Indian apprentices to acquire full knowledge of the
technique and work of their trade industry calling or profession.
37.Set off Clause :
Any sums of money due to the contract (including the security deposit returnable to the contractor under this contract
shall be appropriated by the Government and shall be set off against any claim of the Government for the payment of
such of a money arising out of or under any other contract made by the contract with the Government. When no such
amount for purpose of the recovery form the contract against any claim of the Government is available such a recovery
shall be made from the contractor as arrears of land revenues.
38.Appointment of Local Labourers :
The contractor should as far as possible obtain the requirement of labourers skilled and unskilled from the nearest
employment exchanges so as to utilize the local employment potential. If there are no local employment exchange or
such exchanges are not able to provide the required labourers locally. suitable local should be utilized to the maximum
extent possible.
39.Fair wages :
If a contractor fails to within 7 (seven) days to the labours(s) worker(s) the minimum wages prescribed by the Government
under the minimum wages Act.1949 as in force form time to time the Executive Engineer or the officer of a equal rank
shall be at liberty to deduct the amount payable to the labourer(s) workers form his (contractor's) bill or deposit(s) payable
on account by the contract alter making due inquiries and shall not be entitled to any aforesaid. Before or compensation
on account of any loss that the he (contractor) may have to incur of the action as aforesaid. Before the action a aforesaid
is enforced notice in writing to the contractor shall be issued by the Executive Engineer or the officer of the equal rank to
pay the wages as per minimum wages Act enforce at the relevant time. If the contractor does not act as aforesaid within
seven days then the action contemplated as above shall be taken against him.
40. Licence for contract labour :
Before starting the work, the contractor will have to obtain the licence from the District Assistant Labour Commissioner
under the Contract Labour ( Regulation and Abolition) Act, 1970 and contract Labour ( Regulation and Abolition) Gujarat
Rules 1972 after paying necessary fees and deposit on the basis of the number of labourers to be employed on the work
and will have to supply two true copies of the said licence to the Deputy Executive Engineer before the work is started.
Signature of contractor/s Executive Engineer(Mech)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Schedule showing (approximately) the materials to be supplied from the Public works Store for work Contracted to be
executed and the rates at which they are to be charged for
Particulars Approximate quantityRate at which the materials will be charged to Place of delivery
Note : 1. The person or firms submitting the tender should see that the rates in the above schedule are filled up by the
Engineer-in-charge before the issue of the form prior to the submission of the tender.
Note : 2. Store to be supplied to contractors for a work free of cost should be mentioned in Schedule 'A' in addition to
schedule 'B' and the specification attached to the contract agreement form.
Signature of contractor/s Executive Engineer(Mech)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Memorandum showing items of works to be carried out :
(For works Estimated above Rs. 5 lakhs)
Items Quantities estimated Item of work Estimated Rates Unit Total amount
Items Quantities estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less estimated quantities
In figures Inwords
As per attached seperatly
I/We am/are willing to carry out the work at …………………………………………… % above/below percent (should be
written in figures and words) of the estimated rates mentioned above. Amount of my/our tender works out as under
* Estimated amount * Estimated amount
*Put to tender Rs…………..... *Put to tender Rs. ………………
*Deduct :……..% below Rs……………. *Add……% above Rs………………
*Net Rs……………. *Total Rs………………
* (Please strike out whichever is not applicable)
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
Specifications of the Division or as directed.
Note 2 - All the columns is Schedule should be filled with ink and the total of the entries in the last
The column should be struck be the contractor under his signature.
Note 3 - Rates quoted include clearance of the site (prior commencement of work and at its close) in
All respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - To be continued on additional sheets, if found necessary.
Signature of Contractor/s Executive Engineer.(Mech)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Memorandum showing items of works to be carried out :
(For works Estimated above Rs. 5 lakhs)
Items Quantities estimated Item of work Terendered Rates Unit Total amount
Items Quantities estimated Item of work Terendered Rates Unit Total amount
No. but may be more or according to
less estimated quantities
In figures Inwords
(A) Total Tendered amount Rs………………………………………………
(B) Rebate on above tendered amount (if any)……% (in figure) Rs………………………………..
(C) Net tendered amount (A - B) Rs……………………………………………..
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
Note 2 - Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Signature of Contractor/s Executive Engineer(Mech)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Specifications for Electrical Works in Government BuildingSubject to the General condition of Contract in
1. Wirings Rule :
The installation generally shall be carried out in conformity with relevant Indian standards. Specification of and code of
practices prevail, Indian Electricity Rules, 1956 and Indian Electricity Act. 1910 as amended from time to time.
2. Definition :
The definition of terms shall be in accordance with the Indian standard code of Practice for Electrical wiring installation
IS-732-1982 except for the definition of a point in case of internal Electrical Installation. For definition of point wiring and
measurement of Electrical works IS-5908-1970 shall be referred to.
3. Voltage and Frequency of supply :
All current consuming devices shall be suitable for frequency of 50C/s and systems of voltage manual for unless
otherwise specified.
4. Layout of wiring and its description :
(i) The wiring shall be carried out as per schedule "Power" wiring must be in screwed conduit and shall be kept
separate and distinct from lighting wiring. All wiring must be done on the distribution system with main and branch
distribution boards at convenience centers and without isolating fuses. All conductors shall run as far as possible along
the walls and ceiling as to be easily accessible and capable of being thoroughly inspected. The balancing of the circus
will be arranged beforehand by the Ex. Engineer Electrical Division.
(ii) Within one month of the taking over the installation, the contractor shall supply to the Ex. Engineer Elect. Division
a complete set of wiring diagrams of the same on drawings to be supplied when available by the Executive Engineer
Electrical Division and to the satisfaction of the Ex. Engineer, Elect. Dept. and these wiring pains shall be "Drawings"
within the meaning of the term as used in the General conditions of contract.
5. Conductors :
All conductors unless otherwise specified shall not be less than 1.5 sq. mm. for point wiring and 2.5 sq. mm for mains
conductors for power and lighting circuits shall be adequate size to carry the designed circuit load without exceeding the
permissible thermal limits for the installation, and such sizes will be stipulated in specifications and or drawings.
6.1 All cables shall conform to relevant Indian Standards.
6.2 Conductors of all cables except the flexible cable shall be of aluminum. The smallest aluminum conductor for the
final circuit shall have a nominal cross sectional area of not less than 1.5 sq. mm. The minimum size of the aluminum
conductors for power wiring shall be 4 sq. mm.
6.3.1 Conductors of flexible cables shall be of copper the minimum cross sectional area of such a cable shall be
mm. The Flexible cable shall have a uniform and adequate insulation.
6.3.2 Unless the flexible cables and conductors are protected by amount or though rubber of PVC Sheath, theses shall
not be used in workshops and other places where they are liable to mechanical damage.
6.3.3 Core flexible cables shall be used for connecting single phase Appliances or phase, natural & earth connections.
7. Fall of Potential :
The Cross sectional area of all conductors inside buildings shall be so proportioned to their lengths that the drop in voltage between
main fuses and the farthest point or any lamp shall not exceed three percent of the voltage of the consumer's with all the consuming
devices in use.
7.1 If the Cable Size is increased to avoid the voltage drop in circuit current rating of the cable shall be more than that for which
circuit is designed. In each circuit or sub circuit or sub circuit every cable shall have current higher than the full load current.
8. Ratings of lamps and fan socket outlets : Points and exhaust fans
8.1 Incandescent lamps installed in residential and non-residential building shall be rated at 60 watts & 100 watts respectively.
8.2 Table fans and ceiling fans shall be rated at 60 watts, exhaust fan shall be rated at 100 watts and 1000 watts
respectively for the purpose of load assessment unless actual values of the load area, know or specified.
9.1 Before the installation is commissioned following tests shall be carried out.
(1) Insulation Resistance Test.
(2) Polarity Tests of Switches
(3) Earth continuity tests
(4) Earth electrodes Resistance test.
9.2.1.1 The insulation Resistance shall be measured between the earth and the whole system of conductors or
any section thereof with all fuses in place and all switches close, and except in earthed concentric wiring all lamps in
position or both poles of installation otherwise electrically connected together. A direct current pressure of not less than
the twice working pressure provided that it need not exceed. 500 volts for medium voltage circuits where the supply is
derived from three wire D.D or a ploy phase A.C. system, the neutral pole of which is connected to earth either direct or
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
through added resistance, the working pressure shall be deemed to be that which is maintained between the phase
conductor and the neutral.
9.2.1.2The insulation sentence shall also be measured between all conductors to one pole or phase conductor of the
supply and all the conductors connected to the neutral or to the other pole or phase conductors of the supply with all
lamps in position and switches in "OFF" position and its value shall be less than specified in sub-clause 9.2.
9.2.1.3The insulation resistance in Mega-ohms measured as above shall not be less than 50 mega ohms divided by the
number if the outlet or when PVC insulated cables are used for wiring 12.5 mega ohms divided by number of outlets.
9.2.1.4Where a whole installation is being tested a lower value than that given by the formula subject to a minimum of
mega ohm is acceptable.
9.2.1.5A preliminary and similar test may be made before lamps, etc., . Are installed and in this event the insulation
resistance to earth should be not less than 100 mega ohms divided by the number of outlets or when PVC insulated
cables are used for wiring 25 mega ohms divided by number of outlets.
9.2.1.6The term "Outlet" includes every switch except that a switch except that a switch combined with a socket outlet
appliance or lighting, fitting is regarded as one outlet.
9.2.1.7Control rheostat heating and electric sign may, if required, be dis-connected from the circuit during the test, but in
that event the insulation resistance between the case or framework, and all live parts of each rheostat, appliance and
sign, shall be not less than that specified in the relevant Indian Standard Specification or where there is no such
specification shall be not less than half a mega ohm.
9.2 Polarity Test :
9.2.2.1In a two wire installation a test shall be made to verify that all switches in every circuit have been fitted in the same
conductor throughout& such conductor shall be labeled or marked for connecting to the phase conductor or to the non-
earthed conductor of the supply is fitted in a conductor which is labeled or marked for connection to one of the phase
conductors of the supply.
9.2.2.2In a three wire or a four wire installation a test shall be made to verify that every non-linked single pole switch is
fitted in a conductor which is labeled or marked for connection to one of the phase conductors of the supply.
9.2.2.3The installation shall be connected to the supply for testing. The terminate of all switches shall be tested by a teat
lamp one lead of which is connected to the earth. Glowing of the test lamp to Us full brilliance when the switch is in on
position irrespective of appliance in position or not shall indicate that the switch is connected to the right polarity.
9.2.3 Earth Continuity Test :
The earth continuity conductor including metal conduits and metallic envelopes of cables in all cases shall be tested for
electrical continuity and the electrical resistance of the same along with the earthing lead but excluding any added
resistance or earth leakage circuit breaker measured form the connection with the earth electrode to any point in the
earth continuity conductor in the completed installation shall not exceed one ohm.
9.2.3.1Earth Dlectrode Resistance Test :
The Earth electrode Resistance test may be carried out by magger Earth Testers containing a direct reading ohmmeter,
a hand driven generator and auxiliary electrodes.
9.3On completion of an electric installation (addition and alteration) a certificate shall be furnished by the contractor
countersigned by the certified Supervisor under whose direction supervision the installation was carried out. This
certificate shall be in the prescribed form as given in Appendix-B in addition to the test certificate required by Local
Electrical Supply Authorities.
10.Joint and looping back :
Unless with the sanction of Ex. Engineer, Electrical Divisions all joints in conductor shall be means of approved
mechanical connectors in suitable and approved junction boxes but looping back system shall be preferable. in wiring
unless otherwise specified phase and live conduct shall be looped at the switch box where a neutral conductor can be
looped form light, fan or socket in non-residential buildings neutral and earth continuity wire shall be brought to each of
'the switchboards should be of adequate size to accommodate at least one number of 5 Amps, socket outlet and control
switch in future.
Main Switchgears, Switch Board and their location :
11.1 All main switches (other hart loses of ironclad pattern) carrying current of 10 Amp. And above shall be twitted for
back connections and shall be suitably protected.
11.2 AH switches and circuit breakers shall be constructed in accordance with the I.S. 4237-1967. General requirement for
switchgear and conrtol gear for voltage not exceeding 1000 volts and other relevant I.S. provided also that spring shall be either of
phosphor bronze or if steel shall be copper or Nickel plated and that handle shall the so fastened that they do not tend to unscrew
11.3 All main switches shall be either of metal cad enclosed pattern of any insulated enclosed pattern which shall be fixed at close
proximity to the point of entry of supply.
11.4 Switch boards shall net be erected above gas, stoves, or within 2.5 mm of any washing unit in the washing rooms of laundries
or in the bathrooms, lavatories, toilets or kitchens.
11.5 Switch boards, if unavoidably fixed in places likely to be exposed to weather, to drip or to abnormal moose temperature the
outlet casing shall be weatherproof and shall be provided with glands or bushing of adopted to receive screwed" conduit according to
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
the manner in which cables are run P/C and double flanged bushes shall be fitted in the holes of the switches for entry and exit of
11.6 A Switch board net he installed so that its bottom is within 1.25 mm above the floor unless the front of the switchboard completely
enclosed by a door or the switchboard is located in a position to which only authorized persons have access.
11.7 Switch boards shall be recessed in the wall if so specified in the schedule of work or in the special specification. The front shall
be fitted with hinged panel of other suitable material such as bakelite in wood frame with locking arrangement, the buts surface of door
being flush with the walls. Ample room shall be provided at the back for connections and at the front between the switchgear mountings
11.8 Equipments which are on the front of a switchboard shall be so arranged that inadvertently personal contact with live parts in
unlikely during the manipulation of switchgears. changing of fuses or like operations.
11.9 No holes other than the holes by means of which the panel is fixed shall be drilled closer than 1.3 from any edge of the panel.
11.10 The various live parts, unless they are effectively scroended by substantial barriers of non hydroscopic, nomiammbale insulating
material, shall be so spaced that space shall not be maintained between such parts and earth.
11.11 The arrangement of gear shall be such that they shall be readily accessible and their connections to all instruments and
apparatus shall also be traceable.
11.12 In every case in which switches and fuses are fitted on the same pile, these fuses shall be so arranged that the fuses are not
alive when their respective switches are in the off position.
11.13 No fuses other than fuses in the instrument circuit shall be fixed on the back of or behind a switch board panel of frame.
11.14 All the metal switchgears and switch boards shall be painted, prior to erection with one coat of antiruse primer, After erection
they shall be painted with two coats of approved enamel or alluminium paint as required on all sides wherever accessible.
11.15 All switch boards connected to medium voltage and above shall be provided with "Danger Notice Plate" conforming to relevant
Indian Standards.
12. Control at Point of Commencement of Supply :
12.1 There shall be a linked man switchgear with fuse on each live conductor of the supply mains at the point of entry. The wiring
through out the installation shall be such that there is no break in the natural shall also be distinctly marked. In this connections Rule
32(2) of the Indian Electricity Rules, 1966 (See Appendix-A_ shall also be referred.
12.2 The main switchgear shall be situated as near as practicable to be termination of services line and shall be easily accessible
without the use of any external aid.
12.3 On the main switchgear, where the conductor of a two wire system or any earthier neutral conductor of a multi wise system or
a conductor which is to be connected thereto, an indication of a permanent nature shall be provided to identify earthier neutral
conductor. In this connection Rule 32(1) of Indian Electricity Rules, 1956 (see appendix 'A') shall be referred.
13. Switch Board & Distribution Boards :
I Metal clad switch gear shall preferably be mounted on any of the following types of Board.
13.1 Hinged type Metal Board :
There shall consist of a box made of sheet metal not less than 2 mm thick and shall be provided with a hinged cover to enable the board to swing
open for examination of the wiring at the back. The joints shall be welded. A teak wood board, thoroughly protected both inside and outside with good
insulating varnish conforming to
IS : 347-1952 specification for varnish sheiac for General purpose and of not less than 6.5 mm thickness shall be provided at the back for attachment
of incoming and outgoing cables. There shall be a clear distance of not less than 2.9 cm between the teak wood board and the cover, the distance
being increased for larger boards in order that on closing of the cover, the insulation of the cables in not subjected to damage and no shoat
length of cables is subjected to excessive twisting or bending in any case.
The board shall be security fixed to the wall by means of rag bolts, plugs or wee den Gut ties and shall be provided with
a locking arrangement and an earthing stud. All wires passing through the metal board shall be bunched. Alternatively,
hinged type metal boards shall be made of sheet covering mounted on channel or angle iron frame.
Note : Such type of boards are particularly suitable for small switch-boards for mounting metal-clad switchgear connected
to supply at low voltages.
13.2 Fixed type Metal Boards :
These shall consist of an angle or Channel of iron frame fixed on the wall or on floor and supported on the wall at the top
if necessary. There shall be a clear distance of one metre in front of the switch board. If there are attachments of base
connections at the back of the switch board Rules 51(1)c) of Indian Electricity Rules, 1956 shall apply
NOTE : Such type of boards are particularly suitable for large switchboard for mounting large
Number of switchgears or higher capacity metal clad switch gears of both.
13.3 Teak wood Boards :
For small installation connected to a single phase 230 volts supply teak wood boards may be caused as main boards or
sub-boards. These shall be of seasoned teak or other durable wood with solid back impregnated with varnish of approved
quality with all joints dovetailed.
13.4 In large size medium voltage installations, before proceeding with the actual construction of the boards proper
drawing showing the detailed dimensions and design including the disposition of the mounting a which shall be
symmetrically and neatly arranged for arriving at the overran dimensions shall be prepare and approved by the engineer-
13.5 Recessing of Boards :
Where so specified the switch boards shall be recessed in the wall. The front shall be fitted with a hinged panel of teak
wood or other suitable materials, such as bakelite, or with unbreakable glass doors in teak wood frame with locking
arrangement, the other surface off the doors being flush with the walls, ample room shall be provided at the back for
connection and at the front between the switchgear mountings.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
13.6 Arrangement of Apparatus :
a)Equipment which is on the front of a switchboard shall be so arranged that inadvertently personal contract with live
parts is unlikely during the manipulation of switches, changing of fuses or like operation.
b)No apparatus shall project beyond any edge of panel. No fuse body shall be mounted within 2.5 cm of any edge of the
panel and no hole other than holes by means of which the panel is fixed shall be drilled closer than 1.3 cms from any
edge of the panel.
c)The various live parts unless they are effectively screened by substantial barriers of non-hydroscopic, non inflammable
insulating material, shall be so spaced that an are cannot maintain between such parts and earth.
d)The arrangement of the gear shall be such that they shall be readily accessible and their connections to all instruments
and apparatus shall be so spaced that an are cannot maintain between such parts and earth.
e)The arrangement of the gear shall be such that they shall be readily accessible and their connection to all instruments
and apparatus shall also be easily traceable.
f)In every case in which switches and fuses are fitted on the same pole, these fuses shall be so arranged that the fuses
are not alive when their respective switches are in the 'OFF' position.
g)No fuses other than fuses instrument circuit shall be fixed on the back of or behind a switchboard panel or flame.
13.7 Marking of Apparatus :
a)Where a boards is connected to voltage higher than 250 volts, all the apparatus mounted on it shall be marked in the
following colours to which the apparatus or its different terminal may have been connected.
Alternating Current Direct Current
Three-phase-red Three wire system-2 otherwise
Yellow & blue Positive red & negative blue
Natural-black Natural-black
Where fuse-wire three phase wiring is done, the neutral shall be in one colour and the other three wires in another colour
b) Where a board has more than one switch shall be marked to indicate which section of the installation it controls)
c) All markings required under the rule shall be clear permanent.
13.8 Main & Branch Distribution Board :
13.8.1Main and branch distribution boards shall be any type mentioned in 13.1, 13.8.1. Main and branch distribution
boards shall be of any type mentioned in
13.8.2Main distribution boards shall be provided with a switch or air circuit breaker on each pole of each circuit, a fuse
on the phase or live conductor and a link on the neutral or earthed conductor of each circuit. The switches shall always
13.8.3Branch Distribution Board :
13.8.3.1 Branch distribution boards shall be provided with a fuse of a miniature circuit breaker of both the
(adequate rating-setting chosen on the live conductor of each circuit and the earthed neutral conductor
shall be connected to a common line and be capable of being disconnected individually for testing
purposes. At least one spare circuit of the same capacity shall be provided on each branch distribution
13.8.3.2 In residential installations, lights and fans may be wired on a common circuit such sub circuit shall not have [more than total
after points of lights, fans and socket outlets/The load of such circuits shall be restricted to 800 watts. III a separate of an circuit is
provided the number of fans in the circuit shall not exceed ten. power sub-circuits shall be designed according to the load but in no
case shall there be more than two outlets on each sub-circuits
13.8.3.3 In industrial an other similar installations requiring the use of group control of switching operation, circuits, for
(socket outlets may be kept separate from fans f<v>n lights. Normally fans and lights may be wired on a common circuit,
however, if need is let separate circuits may be provided for the two. The road on any law voltage sub circuit shall not
(exceed 3000 Watts.) In case of new installation, all circuits and sub-circuits shall be designed by making provision of
(percent increase in load due to any future modification. Power sub-circuits shall be designed according to the load but
in no case shall there be more than four outlets in each sub-circuits
13.9 Installation of Distribution Boards :
13.9.1The distribution fuse-boards shall be located as near as possible to the centre of the load they are intended to
13.9.2These shall be fixed on suitable stanchion or wall and shall be accessible for replacement of fuses.
13.9.3These shall be of either metal-clad type, or damp situations, they shall be of the weather proof type and if instated
where exposed to explosive dust, vapour or gas, they shall be of lame proof type
13.9.4Where two or more distributions fuse boards feed low voltage these distribution boards shall be
(1)Fixed not less than 2 mm apart or
(2)Arranged so that it is not possible to open two at a time, namely they are interlocked and the metal case is marked
Danger 415 volts or (3) installed in a room of enclosure accessible to only authorized person.
13.9.5All distribution boards shall be marked lighting, power as the case may be and also marked with the voltage and
number of phases of the supply Each shall be provided with a circuits list giving details of each circuit which it controls
and the current rating of the circuit and size of fuse element.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
13.9.6Triple pole distribution boards shall not be generally used for final circuit distribution unless specification approval
of Engineer-in-charge is obtained in special cases where use of Tripple pole distribution boards are inevitable they shall
be of H.R.C. fuse type only.
13.10 Wiring and Distribution Board :
13.10.1In wiring a branch board, total load of the consuming devices shall be divided as far as possible, evenly between
the number of ways of the boards leaving the spare circuit for future extension.
13.10.2All connections between pieces of apparatus or between apparatus and terminal son a board shall be neatly
arranged in a definite sequence following the arrangement of the apparatus mounted thereon, avoiding unnecessary
13.10.3Cables shall be connected to a terminal only by soldered or welded or crimped lugs using suitable sleeve, lugs
or ferrules unless the terminal is such a form that it is possible to securely clamp them without the cutting away of cable
13.10.4All bare conductor shall be rigidly fixed in such a manner that a clearance of at least 2.5 cms. is maintained
between conductor of opposite polarity or phase and between the conductors any material other than insulating material.
13.10.5If required a pilot lamp shall be fixed and connected through on independent single-pole switch and fuse to the
bus-bars of the board.
13.10.6In a hinged type board, the incoming and outgoing cables shall be fixed at one or more points according to the
number of cables on the back of the board leaving suitable space in between cables and shall also, if possible be fixed
at the corresponding points on the switch board panel. The cables between these points shall be arranged to form a "U"
or "S" shaped loop which shall be of such length as to allow the switchboard pannel to swing through an angle of not less
14.Capacity of Circuits :
14.1 Lights and fans may be issued on a common circuits and such a circuit shall not have more than a total of ten
points of lights, fan and socket outlets or a load of 800 watts whichever is less. The power circuits shall be designed with
a maximum of two outlets per circuits generally when load is not known or specified. In non-residential buildings at
important District centres however one outlet per circuit may be preferred. The circuit shall be designed based on the
circuit where not specified the load shall be taken as 1 kw per outlet, where the load is more than 1 kw it should be
controlled by a isolator switch or miniature circuit breeder.
15.Passing Through walls and floors :
15.1 Where conductors pass through walls one of the following methods shall be employed. Care shall be taken to see
that wires pass very freely through protective pipe of box and that the wires pass through in a straight line without any
twist of cross in wires, on other ends of such holes.
(a)A teak wood box extending through the whole thickness of the wall shall be buried in the wall and casings or conductors
shall be carried so as to allow 1.3 cms air space on three sides, of the casing conductor.
(b) The conductor shall be caned either in a rigid steel conduit conforming to *IS : 1653-1964 specification for Rigid Steel conduits of
Electrical wiring (Revised) or a rigid non - metallic conduit conforming to *IS : 2609-1963 specification of Rigid Non-Metallic conduits
for Electrical Installations, or in a porcelain tube of such size which permits easy drawing in. The end of conduit shall be neatly bushed
with porcelain, wood or other approved material.
(c) Insulated conductors while passing through floors shall be protected form mechanical injury by means of rigid steel conduit (see
*IS 1653-1964) to a height not less than 1.5 mm above the floors and flush with the ceiling below. This steel conduit shall be earthed
and securely bushed.
15.2 Where a was tube passed outside a building so as to be exposed to weather the outer end shall be belt mounted and turned
downwards and portly bushed on the open end.
16.Fixing to Walls and Ceilings :
Plugs for ordinary walls or ceilings shall be of while seasoned teak or other approved hardwood not less than 5 cm long
2.5 c.m. square on his inner end and 2 c.m. square on the outer end. They shall
be cemented into walls to within 7.5 mm of the surface, the remaining being finished according to the nature of the surface
with plaster of lime punning.
16.1 Where owing to irregular crossing or other reasons the plugging of the walls or ceiling with wood plugs presents
difficulties, the weed casing weed pattern, metal conduit or clear (as the case may be) shall be attached to the wall or
ceiling in an approved manner in the case of new building wherever possible teak wood plugs shall be fixed in the walls
before they are plastered.
16.2 To achieve neatness, plugging of walls or ceiling may be done by an approved type of asbestos metallic or a fiber
17.Branch Switches :
Where the supply is derived from a three-wire of four-wire source, and distribution is done on the two wire system all
branch switches shall be placed in the outer or live conductor of the circuit and no single-phase switch of use shall be
inserted in the middle wire, earth or earthed natural conductor of the circuit. Single pole switches (Other than for multiple
control) Carrying not more than 15 amperes any be of tumbler type which shall be 'ON' when the handle known is down.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Where conductors are required to be threaded through tubes or channels formed in the metal work of fittings Liiofor must
be free form sharp angles or projecting edges and such size that will enable them to be wired with the conductors used
for the final sib-circuits without removing the boarding taping or outer covering as far as possible all tubes and channels
should be of sufficient size of permit 'Looping bank' of wires cables and flexible cords other than those designed for high
temperature shall not be used for wiring fittings except for portable fit limits. All fittings must have not less than a half inch
male nipple Fittings and lamp holders for gas filled lamps shall be adequately ventilated.
18.1 Where light fitting is supported by one or more flexible cords the maximum weight to which the twi flexible cords may be
subjected shall be as follows.
Nominal cross No. &Dia in Max. Permissible
sectional mm of wires. weight
18.2 No inflammable shade shall form a part of light fitting unless such shade is well protected against all risks or fire. Celluloid shade
or light fitting shall not be used under any circumstances.
18.3 Fitting of wire :
The use of fitting wire shall be restricted to the internal wiring and the lighting fittings. Where fitting wire is used for wiring, for the sub-
circuit loads shall be terminated in a ceiling zone or connector from which they shall be carried into the fittings.
19.Lamp Holders :
Lamp holders for use on brackets and the like shall be in accordance with *IS : 1258-1967 specification for Boy onet
lamp holders and all those for use flexible pendants shall be provided with cord grips. All lamp holders shall be provided
with shade carriers. Where centre contact Edison screw lamp holders are used, the outer or screw contacts shall be
connected to the middle wire, the natural and the earthed conductor of the circuit.
20.Outdoor Lamps :
External and road lamps shall have weather proof fittings of approved design so as to effectively prevent the admission
of moisture. An insulating distance piece of moisture proof materials shall be inserted in the fittings. Flexible cord and
cord grip lamp holders shall pot be used where exposed to whether in veranda’s and similar exposed situations where
pendants are used, they shall be of fixed rod type
All incandescent lamps, unless otherwise required an suitable protected, shall be hinge at a height of not less than
m above the floor level. They shall be in accordance with IS : 418 : 1957 specification for Tongsten Filament General
Service electric lamps
22.Fans, Regulators and Clamps
22.1Ceiling fans :
Ceiling fans including their suspension shall conform to *IS 374-1960 specification for electric ceiling fans and regulators
(Revised) & to the following requirements
(a) All ceiling fans shall be wired to ceiling rouses or to special connector boxes to which fans rod wires shall be
connected and suspended from books or shackles with insulators between rod wires shall be connected and suspended
from hooks or shackles with insulators between hooks and suspension rods. There shall be no joint in the suspension
rod. but if joints be avoidable then such joints shall be screwed to special couplers of 5 cm minimum length and both
ends of pipes shall touch together within couplers and shall in addition be secured by means of split pins alternatively
the two pipes may be welded.
(b) Fans clamps shall be of suitable design according to the nature of construction of ceiling on which these clamps are
fitted in all cases fan clamps shall be fabricated from tested new metal of suitable sizes and they shall be as close fitting
as possible Fan clamps for weed beams shall be of suitable flat iron fixed on two sides of the beam and according to the
size and section of the beam one or two mid steel bolts passing through the beam shall hold both flat irons together Fan
clamps for steel join shall be fabricated from tested flat iron to fit in rigidly at the bottom flange of the beam. Care shall
he taken during form tested flat iron to fit in rigidly at the bottom flange of the beam. Care shall he taken during form
tested flat iron to fit in rigidly to the bottom flange of the beam Care shall be taken during fabrication that the metal does
not crack while hammering to shape. Other fan clamps shall be made to suit the position, but in all cases care shall be
taken to see that they are rigid and safe.
Note : All tan clamps shall be so fabricated that fans revolve steadily.
(c) Canopies on top and bottom of suspension rod shall effectively hide suspensions and connections to fan motors,
(d) The lead-in wire shall be of nominal cross-sectional are a not less than 1.0 mm 2 with copper and 1.5 mm2 alluminium
and shall be protected form abrasion.
(e) Unless otherwise specified the clear distance between the ceiling fan and the floor shall be less than 2.75 m
22.2.0Exhaust Fans :
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
For fixing of an exhaust fan a circular hole shall be provided in wall to suit the size of the fan which shall be fixed by the
means of rag-bolts embedded in the wall the hole shall be neatly plastered with cement and brought to the original finish
of the wall. The exhaust fan shall be connected to exhaust fan point which be wired as neatto the hole as possible by
means of a flexible cord, care being taken that the blades in the proper direction.
23. Attachment of fittings and accessories :
23.1.1 In other than conduit wiring all ceiling crosses, brackets, pendants and accessories attached to watts or ceiling
shall be mounted on substantial teak wood block twice Varnished after all fixing holes are made in them. Blocks shall be
not less than 4 cms deep. Brass screws only shall be used for attaching finings and accessories to their base blocks.
24.Interchangeability :
Similar part of all switches, lamp holder, distribution, fuse board, ceiling rouses, brackets, pendants, fans and all other
fittings of same type shall be interchangeable in each installation.
25.Conduit Wiring System :
25.1.1Type and size of conduit - All conduit pipes shall be conforming to *IS : 1653-1964, furnished with galvanised or
stove enamelled surface. All conduit accessories shall be of threaded type and under no circumstances pin grip type or
clamp type accessories be used. No steel conduit less than 16 mm in diameter shall be used. The number of insulated
conductors that can be drawn into rigid steel conduit are given in Table II.
25.1.2Bunching of cables - Unless otherwise specified, insulated conductors of AC supply and DG supply shall be
bunched in separate conduits.
25.1.3 Conduit-Joints-Conduit pipes shall be joined by means of screwed couplers and screwed accessories only (*IS : 2667-1964)
Specification for Fittings for Rigid Steel Conduits for Electrical Wiring. In long distance stance straight runs of conduit inspection type
couplers at reasonable intervals shall be provided or running threads with couplers and jam-puts (in the latter case the bare threaded
portion shall be treated with anti - corrosive preservative) shall be provided. Thread on conduit pipes in all cases shall be between
mm to 27 mm long sufficient to accommodate pipes to full thread portion of couplers or accessories. Cut ends of conduit pipes shall
have no sharp edges nor any or buries left to avoid damage to the insulation of conductors while puling them through such pipes.
Table-II Maximum Permissible Number of 250-V Grade
Single core cables that can be drawn into rigid steel
(clause 6.51 1)
Nominal Number 16 20 25 32 40 50
Crossectional and (No. of Cables Max)
area Diameter in
mm of wires S B S B S B B S BS B S B S
* For Cu. Conductors only
+ For Al Conductors only
Note-1The cable shows the maximum capacity of capacity for the simultaneous drawing-in of cables. The table applies
to 250 volts grade able the columns heads 'S' apply to runs of conduit which have
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
table applies to 250 volts grade able the columns heads 'S' apply to runs of conduit which have distance not exceeding
4.2 SM between draw in boxes and which do not deflect from the straight by angle of more than
25.1.4Protection against dampess - in order to minimize condensation or seat in inside the tube, all outlets of conduit
system, shall be property drained and ventilated, but in such a manner as to prevent the entry of insects as far as possible
25.1.5Protection of conduit against rust - The outer surface of the conduit pipes including all bends, unions, tees junction
boxes, etc., forming part of the conduit system shall be adequately protected against rust particularly when such system
is exposed to weather in all cases no bare threaded portion of conduit pipe shall be allowed unless such bare threaded
portion is treated with anti-corrosive preservative or covered with approved plastic compound.
25.1.6Fixing of Conduit - Conduit popes shall be fixed by heavy gauge saddles, secured to suitable wood plugs or any
other approved plug with screws in an approved manner at an interval of not one than one meter but on either side of
coppers or bends or similar fittings, saddles shall be fixed at a distance of 30 cm. from the centre of such fittings.
25.1.7Bends in conduit - All necessary bends in the system including diversion shall be done bending pipes, or by insuring
suitable solid or inspection type normal bends, elbows or similar fittings or by fixing cast iron inspection boxes whichever
is more suitable. Conduit fitting shall be avoided as far as possible. On conduit system exposed to weather, where
necessary, said type fitting shaft be used. Radius of such bends in conduit pipes shall be not less than 7.5 cm. No length
of conduit shall have more than the equivalent of four quarter bends from outlet, the bends at the outlets not being
25.1.8Outlets - All outlets for fitting switches etc., shall be boxes, of .suitable metal or any other approved outlet boxes
for other surface mounting or flush mounting system.
28.1.6Conductors - Ail conductors used in conduits wirings shall preferably be stranded. No single core cable nominal
Cross - sectional area greater than 130 mm shall be enclosed In a conduit and used for alternating current.
28.1.7Erection and earthing of conduit - The conduit of each circuit or section shall be completed before conductors are
drawn in. The entire system of conduit and permanently” connected to earth conforming the requirements specified under
pipe in a workman like manner for a perfect continuity between each wire and conduit. Gas or water pipes shall not be
used as earth medium. If conduit pipes are liable to mechanical damage, they shall be adequately protected..
25.2 Recessed Conduit wiring system with Rigid Steel conduits - Recessed conduit wiring system comply with all the
requirements for surface conduit wiring system specified in 6.5.2.1 to 6.5 2.4.
25.2.1Making of chase - The chase in the wall shall be neatly made and be of ample dimensions to permit the conduit to
be fixed in the manner desired In the case of buildings under construction chases shall be provided in the wall, ceiling
etc., at the time of their construction and shall be filled up nearly after erection of conduit and brought to the original finish
25.2.2Fixing of conduit in chase - The conduit pipe shall be fixed by means of staples or by means of soft saddles not
more than 60 cm apart. Fixing of standard bends or elbows shall be avoided as far as practicable and all curves
maintained by bending the conduit pipe itself with a lunge radius which will permit easy drawing in of conductors. All
threaded joints of rigid steel conduit shall be treated with some approved preservative compound to secure protection
25.2.3Inspection boxes - Suitable inspection boxes shall be provided to permit periodical inspection and to
facilitate removal of wires, if necessary. These shall be mounted flush with the wall Suitable ventilating holes shall be
provided in the inspection box covers.
25.2.4Type of accessories to be used - AM outlets such as switches and wall sockets, small be either of flush mounting
type of surface mounting type.
(a) Flush mounting type - AlI flush mounting outlets shall be of cast iron mild steel boxes with a cover of approved
insulating material or shall be a box made of a suitable’ insulating material.
The switches and other outlets shall be mounted on such boxes as would be approved. The metal box shall be efficiently
earthed with conduit by an approved means of earth attachment.
(b) Surface mounting type - If surface mounting type outlet box is specified, it shall be of any be through flexible conduits
of the same size as the rigid conduit.
25.3 Conduit Wiring System with Rigid Non-Metallic Conduits:
Rigid Non-Metallic conduits are used for surface recessed and concealed conduit wiring.
25.3.1Type and size - All non-metallic conduits used shall conform to IS : 2509-1963adb shall be used with the
corresponding accessories (See IS : 3419-1965) specification for Fittings for Rigid Non - Metallic Conduits).
25.3.2Bunching off cables - Conductors of AC supply and DC supply shall be bunched in separate conduits. The
number of insulated cables that may tie drawn into the conduits are iveri In Table III. In this table space. factor does not
exceed 40 percent.
Table-III MAXIMUM PERMISSIBLE NUMBER OF ?r,O VOLTS GRADE SINGLE, GORE CABLE THAT MAY BE
drawing INTO RIGID non-metallic conduits
Size of cable Size of Condits (mm)
Nominal Cross Number 16 20 25 32 40
sectional area and (Number of Cables Max)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
*For copper conductors only
*For alluminium conductors only.
25.3.3 Conduit joints - shall be joined by means of screwed or plain couplers depending on whether the conduits
are screwed or plain. Where there are long runs of straight conduit. Inspection type couplers shall be provided at intervals.
For conduit fittings and accessories reference may be made to IS : 3419-1965.
25.3.4 Fixing of conduits - The provision of 25.1.6 shall apply except that the septum between saddles or supports
is recommended to Oe 60 cms for rigid non-metallic conduits.
25.3.5 Bends in conduit - wherever necessary, bends or diversions may be achieved by bending the conduits
(See 6.5.3.9) or by employing normal bends, inspection bends, impaction boxes elbows or similar fittings.
25.3.6 Conduit fittings shall be avoided, as far as possible on outdoor system.
25.3.7 Outlets - All the outlets or fittings, switches, etc. shall be boxes of substantial construction. In Order to
minimum is condensation or sweating inside in side the conduit, all outlets of conduit system shall be properly drained
and ventilated, but in such a manner as to prevent the entry of insects, etc. as far as possible.
25.3.8 For use with recessed conduit wring system the provisions of 6.5.2.1 to 6.5.2.4 shall apply
25.3.9 Heat may be used to soften conduit for bending and forming joints in case of plaint conduits. As the material
soften when heated fitting of conduit in close proximity to hot surfaces should be avoided. Caution should be exercised
in the use of the conduit in locations where the amoient temperature is 500 C or above Use of such conduits in place
where ambient temperature is 600 C or above is prohibited.
PVC INSULATED AND P.V.C. sheathed or T.R.S wiring SYSTEM
This system of wiring is suitable for low pressure installation and shall not be used in places exposed to sun and rain nor
in damp places. provided they are sheathed in the special approved protective covering and well protected to withstand
26.1 Attachment to walls and ceiling :
All caies on brick walls, stone or plastered walls and ceiling shall be run on well seasoned perfectly straight and well
seasoned, perfectly straight and well varnished on four sides, teak wood or any approved hard weed battens not less
then 10 mm fin shed thick, width of which shall be such as to suit total width of cables laid on the batten, prior to election,
these shall be pained with one coat of varnish or approved paint of colour to match with surrounding. These battens shall
be secured to wall and ceilings by flat head wood screws to faws plug or Phil plug at an internal not exceeding 75 em.
Wood plug can be used only with special approval of the Engineer in charge. The flat head wood screws shall be counter
within wood batten and smoothed down
26.1.2Where wiring is to be carried out along the face of the rolled steel joints a wooden batten adequate width shall first
be laid on the same and dipped to it as in corispicousiy as possible. The wiring should then be fixed to this barking shall
be suitable bushed to prevent the abrasion of the cables.
26.1.3Attachment to false ceiling: In no case, the open wiring shall be run above the false ceiling without the approval of
Engineer-in-charge
26.20 Link dips: Only alluminium alloy clips/joint clips shall be used. The thickness shall be 0.32 mm (30 SWG) for lengths
of 50 mm to 80 mm. The width shall not be less than 8 mm in all these cases. Link clips/joint clips shall be so arranged
that one single clip shall not hold more than two core or three single core Tiffs of PVC insulated and PVC sheathed upto
2.5 sq. mm above while-a single clip shall hold a single twin core or two single core cables. The clips shall be fixed on
varnished wood batten switch iron pins and space at interval of 15 cm bet in the case of horizontal and vertical runs.
26.3.0Bends in wiring: The wiring shall not in circumscribes be bent so as to form and abrupt right angle but must be
rounded off qt the corners to a radius not less than six times the overall diameter of the cable.
26.4.0Protection of wiring from Mechanical Damage:
26.4.1In cases where there are chances of any damage to wiring such wiring shall be drawn complying with all the
requirements of conduit wiring system.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
26.4.2Such protective covering shall in all cases be fitted on all down drops within 1.5m from the floor. or from floor level
upto the switch board whichever is less.
26.5.0Passing through floors: All cables taken through floor shall be enclosed in heavy gauge steel conduit extending
1.5m above the floor or upto the switch board whenever is less and flush conduits or pipes shall be neatly bushed with
porcelain wood or other approved material. The conduit pipes shall be security earthed.
26.6.0 Passing through walls: When conductors pass through walls, anyone of the following methods shall be employed.
Care should be taken to see that Wires pass very freely through protective pipe or box and that wires pass through in a
straight line without any twist or cross in wires on their ends of such holders.
(a) A box of teak wood or approved hard wood extended through the hole thickness of the wall shall be buried In the wall
and casings or conductors and casing or conductors shall be carried so as to allow 1.3 cm air space on the three sides
of the casing of the conductor.
(b) The conductors shall be carried in. an approved heavy huge solid drawn or lap weld conduit or in aporce-tain of such
a size that it permits easy drawing in, the enciad of conduit shall be neatly bushed with porcelain, wood or other approved
26.6.1Where a wall tube passed outside a building so as to be exposed to weather, the outer end shall be mounted
anutured downwards and property bushed or the open end, The conduit shall be neatly arranged so tjjat the cables enter
them without bending.
26.7.0Buried cables: Tile HIS PVC sheathed cable shall not normally be burring directly in plaster. Where so specified in
the special in the specification they may be taken in task wood channeling of .ample capacity or conduit pipe boned In
26.8.0Stripping of outer covering: While citing and stripping of the outer covering of the, care shall be taken that the sharp
edge of the cutting instrument does not tough the inner insulation of the conductors. The protective outer covering of the
cables shall be stripped off near connecting terminals as far as practicable. Care shall be taken to avoid hammering on
link clips with any metal instrument after the cables are laid. Where junction boxes are provided they shall be made
moisture proof with a plastic compound.
27.0 PAINTING WORK IN GENERAL:
27.1 Paints: paints, oils varnishes etc. of approved make in original to the satisfaction of the Engineer -in charge shall
27.2 Preparation of surface: The surface shell be thoroughly cleaned and dusted before painting is started. The
proposed surface shall be inspected by Engineer-in-charge or his authorized agent and shall have received the approval
beore painting is commenced.
27.3 Application: Paint shall be applied with brush. The paint shall be spread as smooth & event as possible particular
care shall be paid to rivets, ruts belts and cover lapping Before drawing cut, it shall be continuously stared, in the sarolier
containers with a smooth stick while it is being applied.
Each coat shall be allowed to dry out sufficiently before a subsequent coat is applied
27.4 Scope: painting on old surface in in/door Situations will not include prier. coat except where specially motioned in
the schedule of work or special specification. However, where rust has formed on iron and steel surfaces the spots win
be painted with one anti-mil primer coat.
27.5 Precautions: All furniture fixtures, glazing floors, etc. shall be protected by covering, All stains smears, opa-shirig,
dropping of every kind shall be removed. While painting of wiring etc. it shall be ensured that painting of will ceiling etc.
is not spoiled in any way.
27.6 Painting of conduit and accessories: After installation surface of conduit pipes, fittings switch and regulator boxes,
etc. shall be painted with two coats of approved enamel I paint or alluminium paint as required to match the finish of
surrounding wall, trussed, etc.
The clip for batten wiring shall be of Alluminium conforming to I.S. specification No. 2415-1975.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Important Clauses of Indian Electricity Rules, 1956. Following clauses of Indian
Electricity Rule, 1956 shall in particular be taken care of in the execution of electrical works.
Clause No. Subject
3. Authorisation :
29. Construction, installation, protection, operation and maintenance of electric supply lines and apparatuses.
31. Cut-out on consumer’s premises.
32. Identification of earthed and earthed neutral conductors and position of switches and cutouts therein.
33. Earthed terminal on consumer’s premises.
34. Handling of electric supply lines and apparatus.
41. Distinction of circuits of different voltages.
42 Accidental charge.
44. Provisions applicable to protective, equipment.
45. Instruction for restoration of persons suffering form electric shock.
45. Precautions to be adopted by consumers, owners electrical contractors. Electrical workmen and suppliers.
46. Periodical inspection and testing of consumer’s installation.
48. Precautions against leakage before connection
50. Supply to consumers.
51. Provisions applicable to medium high voltage installations.
58. Point of commencement of supply.
59. Precautions against failure of supply; Notice of failures.
61. Connection with earth, (low and Medium Voltage system.)
64. Use of energy at high and extra-high voltage system.
67. Connection with earth. (high & Extra-high voltage systage)
68. General conditions as to transformation and control of energy.
All clauses under Chapter VIII on Overhead Lines.
137. Mode of entry.
138. Penalty for breaking seal.
139. Penalty for breach of rule
140. Penalty for breach of rule
141. Penalty for breach of rules.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Form of Completion Certificate
I/We certify that the installation detailed below has been installed by me/us and tested
and that to the best of my/our knowledge and belief, it complies with Indian Electricity Rules. 1956, as well as the
C.P.W.D. General Specification for ElectircaI Works,
Electrical Installation at Voltage and system of supply
(1) Particulars of works:
(a) Internal Electircallnstallation No. Total Load Type of system or wiring
(i) Light point
(iii) Plug point
(a) 3 pin 5 Amp.
(b) 3 pin 15 Amp.
Description HP/KW Type of starting
(a) Molars: (i)
(c) Other plants:
(d) If the work involves installation of over head line/or under ground cable:
(a) (i) Type & Description of overhead line.
(ii) Total length & No. of spans,
(iii) No. of street light & its description
(b) (i) Total length of under ground cable & its size
(ii) No. of joint. End joint:
St. through joint:
(i) Description of earthing electrode
(ii) No. of earth electrodes :
(iii) Size of main earth lead:
3) Test Results:
(a) Insulation Resistance:
(i) Insulation resistance of the whole system Megohms.
of conductors to earth.
(ii) Insulation resistance between the Megohms.
Phase conductors and neutral.
Between phase R and neutral. Megohoms
Between phase Y and neutral Megohorns
Between phase B and neutral Megohoms
(iii) Insulation resistance between the phase conductors in case of polyphone supply.
Between phase R & phase Y Megohoms
Between phase Y & phase B Megohoms
Between phase B & phase R Megohoms
(b) Polarity Test:
Polarity of non linked single pole braches switches.
(c) Earth continuity Test:
maximum resistance between any point In the earth continuity conductor including metal conduits & main earthing lead.
(d) Earth Electrode Resistance.
Perestance of each electrode.
(e) Lighting protective System:
Resistance of the whole of lighting protective system to earth before any bonding is effected with electrode and rnotal
in/on the structure. ohms
Executive Engineer (Mech.)
Signature of contractor/s
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
All Specification standard publication etc. specified mean the latest standards, publication etc. pertaining to electrical
and should conform to the following wherever applicable.
1) Indian Electricity Act. 2003 with its amendments.
2) Indian Electricity Rules 1956 and its amendments.
3) Indian Electricity supply Act
4) Regulation for Electricity Equipment in building by l.E.F. Landon.
5) The Factory Act, 1948 and its amendments.
6) I.S. 732* 1982 Part -1, II & 1.11 code of practice for Electrical wiring and filings in buildings for low and medium
7) I.S. 4064-1976 H.D. Air break switches and fuses for-Voltages not exceeding 1100 volts.
8) I.S. 3043 - Earthing code of practice for
9) I.S. - 1554 Part-11970 PVC insulated (Heavy duty) Electrical Cables for working voltages upto and unfading
10) I.S. 694-1964 Part-11 - PVC insulated cable with Alluminium conduits (revised) for voltages upto 110 volts.
11) I.S.: 5908 -1970 - Electrical installations in buildings method of measurements of.
12) I.S.: 4237 -1967 - General requirement for switchgear and control gear for voltage not exceeding 1000 volts.
13) I.S.: 1653 -1964 - rigid steel conduits for electrical wiring (revised)
14) I.S.: 2509 -1973 - Rigid steel conduits for electrical installation (First revision)
15) I.S.: 1248 -1967 - Bayonet landholders (First revision)
16) I.S.: 418 1957 - Tungsten - Filament General service-electric lamps (Third revision)
17) I.S.: 374 -1966 - Fans and Regulators, ceiling type, electric (second revision)
18) I.S.: 2667 -1964 - Filings for rigid steel conduits for electrical wiring.
19) I.S.: 3419-1976 - Fining for rigid non-metallic conduits (First revision)
20) National Electric Code,
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Abstract of the Wiring Rules of the Institution of
Electrical Engineer
(Referred to in the specification)
Division (See clause 2 of the specification)
All electrical system in which all the conductor and apparatus are connected to a common source of supply.
1) Earthed: Effectually connected, to the general mass of the earth. Solidly earthed without the Intervention of a fuse.
switch, circuit - breaker, resistor reactor or solenoid.
2) Un-insulated Conductor: A conductor without provision, by the Interposition of a dielectric or otherwise. for its
insulation from earth.
3) Bare: Not covered with insulating material.
4) Dielectric: any material which offers high resistance to the passage of an electric current.
5) Bunch Conductor: When more than one conductor is contained within a single duct or groove or when they are run
enclosed and spaced and not spaced apart from each other;
6) Points: In wiring as per IS: 5908 -1970 - Method of measurements of electrical installation in buildings.
7) Switch board: Assemblage pf switchgear with or without instruments, but the term does not apply to a group of
local switches in a final sub- circuit where each switch has’its own insulating base.
Note : In the electricity (Factories Act) special regulations, 1908. and 1944 the term “Switchboard” includes “Distribution
8) Single pole switch: A switch suitable for closing and or opening a circuit on one phase or pole only.
9) Linked switches: A switch the blades of which are so linked mechanically as to make break all poles simultaneously
or in a definite sequence.
10) Fuse Switch: A switch the moving part of which carries one or more fuses.
11) Three Wire System :
a) Outer Conductor: Those between which there is the greatest difference of potential. This use of the word outer
must not be confused with the use of the work when applied to the external conductor of a concentric main.
b) Neutral Conductors: The term includes the neutral cond4ctor of a 3 phase 4 wire
system, the conductor of a single phase or d. c. installation which is earthed by the supply undertaking (or otherwise at
the source of the supply) and the middle wire or common return conductor of a 3 wire d.c. or single phase a.c. system.
12) Semi enclosed machine: One in which the ventilating openings in the frame are covered with -
a) Girds expanded metal or wire gauche, with openings of less fhan 1/4 Inch but not less than so as to obstruct free
b)Wire gauge. in which the openings are less than 1/4 inch but not less than 3/32 inch (diameter or width):
c)Screens with smaller openings than the above.
13)Totally - enclosed Machine:
One in which the enclosing case and bearings are dust proof and which dose not allow circulation of air between the
inside and outside of the case.
14)Pipe Ventilated Machine: An enclosed machine in which, the frame is so arranged that the ventilating air may be
conveyed to it through a pipe attached to the frame the ventilation opening maintained by the fanning action produced
be the machine itself.
15) Forced draught machine: An enclosed machine in which the ventilating air supply is maintained by an independent
fan external to the machine itself.
16)Protected Machine: One having end shall bearings and in which is free access to the interior without opening doors
or removing covers.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
SWICHES AND BREAKERS CIRCUIT
(See clause II of Specifications)
17) Switches and Circuits Breakers:
Switches and circuit breakers (rules 2b. 36 and 37) whether fixed separately or combined with lamps, holders of fittings,
must comply with the following requirements:
(a) Over threading must not take place at the point ct contract or elsewhere, when the full current flows continuously.
(b) They must be so constructed or arranged that the contracts cannot accidentally close when left open.
(c) The basis must be of incombustible, nonconductor and moisture proof material.
(d) Circuit breaker as must be so engaged and placed that no combustible material is endangered by their action.
(e) Unless placed an engine room cr in compartment arranged .For the purpose, they must their live parts covered.
The covers must be incombustible material and, must be either non-conducting or of rigid metal and clear of all internal
machinery. Foil more than 6 amperes, AI pressures exceeding 125 volts metal covers must be lined with insulating
(f) In positions where they are liable to injure or come into contact with goods, they must be further protected by an
open fronted box or other suitable guard.
(g) Handles must be installed so arranged that the hand cannot touch live metal, or be injured through and adjacent
(h) Switches having a handle projecting through an, open seat in the cover, must not be used.
Signature of Contractors Executive Engineer(Mech)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
GENERAL REQUIREMENTS
1.1 Scope of works:
The work covered by the electrical specification consists supplying and installing, electrical wiring system complete in
strict accordance with this specification and the applicable drawing and subject to the terms and conditions of the
contract./lt includes.
(a) Conduit and wiring system for fans, lighting points bells, clocks sockets, etc. including fixing of lighting fixtures
and fans etc. and miscellaneous points.
(b) Conduit and wiring system for exhaust fans, power sockets etc.
(c) Panel boards, distribution boards, switch fuse units.
(d) Complete power and lighting cable systems.
(e) Grounding system.
(f) Conduits system.
(g) Street lighting system.
(h) Other miscellaneous electrical work.
1.2 Completeness of Contract;
Any work fittings accessories or apparatus which may not have been specifically mentioned in the specification but which
are necessary in the equipment for efficient working of the plant should be deemed to be included in the contract and
should be executed and provided by the contractors. All plants and apparatus should be complete with all the details,
where such details, are mentioned in the specifications or not.
Three pints and one permanent negative of each of the final approved drawings incorporating all the modifications
proposed by the Department should be submitted. No modifications should be made in a drawing already approved by
the Engineer-in-charge without his prior consent.
Approval of the contractor’s drawing will not relieve the contractor of any part of his obligation to meet all the requirements
of .The contract.
The performance of all the equipments and the installation should be guaranteed at least a minimum period of six months
from the date of taking over the installation by the Department. All equipments must comply with the relevancy IS-BS
specifications.
1.4 Interchangeability:
All corresponding parts of similar plant and equipment should be interchangeable in every way.
All special tools required for dismantling and assembly of the equipment covered by the contract shall be supplied as
obligations under the contract.
A list of to be supplied by the Contractor should be submitted along with the tender.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Specifications for Electrical Installation in Buildings
1.1 These specifications relate to the electrical installations in the buildings of P.W.D. Electrical. The specifications
cover general requirements to be fulfilled. These general specifications are supplemented by the specifications for the
particular buildings separately attached.
1.2 These specifications are governed by the General conditions of the contract attached hereto.
1.3 APPLICABLE RULES AND REGULATIONS:
1.3.1 Installation shall be carried out conformity with regulations for electrical equipments of buildings, published by the
Institute of Electrical Engineers London (14th Edition 1966 and as amended upto date) hereinafter referred to as the I E.
E. wiring regulations Where these specifications, or the special specifications for the particular building attached hereto
are at variance with the I.E.E> regulation shall also comply with the requirements of the Indian Electricity Act, 1910 as
amended upto date rules issued thereunder and also the regulations for the Electrical Association of India Where not
specified otherwise, the installation should generally follow the Indian standard codes of practice and in their absence
the relevant British Standard of practices. All the materials shall comply with the relevant Indian Standard of British
Standard specifications
1.4 DEFINITIONS:
1.4.1. The definitions of terms in the I.E.E. Regulations shall apply in general.
1.5.1. The preliminary drawings only indicate the general scheme of requirement. The exact position of all points, control switch boxes,
runs of wiring and/or conduit joint boxes, inspection boxes, Ilains, and sub-distribution boards, mains etc shall be got approved
Engineer-in-charge. All circuits shall be clearly numbered in wiring diagrams and building plans. The detailed design of a switchboard,
special fixture or any other part of the electrical installation as may be called for by the engineer-in-charge shall also be supplied by
the Contractor and should be got approved by the Engineer-in-charge. Three sets of completion drawings and wiring diagrams showing
the instillations as executed shall be supplied by the contractor along with the completion certificate.
All materials shall be new and of the best quality conforming to the relevant I.S.B.S. Specifications. They must be the products of
reliable manufacturers of many years or standings, All like parts of materials shall be interchangeable. In case of equipments such as
circuit breakers; switch fuses etc. a descriptive and illustrated literature shall accompany the tender. The names of manufacturers’ of
various materials shall be furnished in proform in Appendix-1. Samples of materials wherever required should be deposited with the
Engineer-in-charge. All materials shall be rust-proof or rendered rust proof by application of suitable paints. The supply of all
equipments, switchgears etc. shall be complete with accessories. filings and mountings as may be required for their proper
performance, and as specified in the relevant IS-BS Code of Practice and standards.
1.7 WORKMANSHIP:
17.1. Good workmanship and neat finished appearance are the prerequisites for complying with the clauses. of these specifications.
With a view to ensure fine workmanship the Tenderer shall employ licensed wiremen with an experience of not less than 5 years in
the type of work they are engaged. The work should be done under supervisions of licensed Electrical Supervisors with good
educational qualifications and considerable experience.
1.7.2 The tenderer shall furnish the names of Supervisor and their workmen. who will be engaged in this work, with details of their
1.8 CO-OPERATIVE WITH CIVIL AND OTHER WORKS CONTRACTORS:
1.8.1 The Tenderer after the award of the contract, shall co-operate with the civil and other contractors and shall coordinate his work
of the other contractors with the least amount of dislocation and interference to the other works. The tenderer shall go through the
drawings carefully and shall furnish the Engineer-in-charge with all the details of openings in the walls etc they may be required for
concealing any of the electrical equipments or accessories. Where the contractor fails to furnish such information as may be required
for the purpose of concealing the equipments etc. they shall be made at his (Contractor) cost and expense. Any alteration to parts of
the building shall be made good at the contractor's expense and brought to the original shape and finishcolor.
The electrical contractor shall be completely responsible of the testing and commissioning of those installations covered
by these specifications in compliance with the standard procedure, in obtaining permission of the Government Electrical
Inspector. Any modification which is demanded by Government Electrical Inspector shall have to be carried out within
the scope of the contract. The contractor shall submit four copies of drawings of installations as per regulations for shall
be provided by the contractor for carrying out the solution work. All test shall be carried out in the presence of the
Engineer-in-charge or his authorized representative and his approval obtained for the test results.
1.10. COMPLETION CERTIFICATE AND MAINTENANCE GUARANTEE:
1.10.1.After the completion of the installation and contractor should furnish a certificate in the proforma in Appendix-III,
at the time of taking over the installation by the Department. The installation shall be guaranteed for period of 12 months
from the date of taking over by the Department. During the period of guarantee all defects in material or workmanship
shall be rectified or rectified or replaced free of cost to the Department.
1.11 TENDERER’S ABILITY
1.11.1.In order to enable the Department to asses the ability of the Tenderer to execute the work, the Tenderer shall
furnish evidence ot his experience and capacity to carry ounhe magnitude and nature.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
1.12.1.The rates of items shall include all traces, transport, loading and unloading charge and all such charges that may
the market are not entertained Break up figure as required in the schedule of work shall also be furnished. As far as
possible indigenous materials only shall be included for supply. Where It is unavoidable, imported items may be included
and Tenderer should dearly indicate materials, quantity, rate and amount of these items.
1.13 STORAGE SPACE:
No covered storage space will be provided-by the Department. The contractor has to make his own arrangement.
However, the Department may give an open space near the place of execution where the contractor can build his own
stores for executing the work.
1.14 DEPARTURE FROM SPECIFICATIONS:
The Tenderer should clearly indicate departure, if any from the specifications with reasons for the same.
1.15 EXTRA ITEMS:
Rates for extra items shall generally be derived from the rates already available in the schedule. Where it is not possible,
the rates shall be mutually agreed upon and contractor shall furnish a detailed analysis of the rates claimed by him.
2.TECHNICAL SPECIFICATION:
2.1 Supply System:
The wiring installation shall be suitable for 3 phase 4 wire, 400-440 V 50 cycles system of supply Colour code of different
phase shall be followed as per standard.
2.2 Wiring for Light and Fans:
2.2.2 Looping system to wiring shall be adopted. No joints shall be made at intermediate runs of cables and where they
are unavoidable. such joints shall be through approved mechanical connections.
2.2.2 Point wiring:
Point wiring shall consist to the branch wiring from the board together with the controlling switch or push as far as and
including the ceiling rose or any other approved connector or socket, outlets. In case of more than one light being
conerulled by one switch, the wiring upto the ceiling rose of the first light including the switch shall be considered as a
Primary point. Loop wiring from light shall be considered as a’ Secondary’ point and rates shall be quoted separately,
including final connections to fixtures and plugs.
2.2.3 Conductors:
No conductor for final sub circuit wiring for light and socket outlets shall across-section less than that of 2.5 sq.m
No final sub-circuit radiating from the fuse board of a sub-distribution board arid wires with 25 sq. m. (AI) cable shall carry
more than 10 lights, fans or socket outlets or a connected load of 800 watts whichever is greater. The following wattages
may be assumed for estimating the load on each sub-circuit unless otherwise known or specified.
Incandescent lamps 100 watts
Ceiling fans 60 watts
5-A Socket Outlets (lighting) 100 watts
4. ft. fluorescent tube 50 watts
5. ft. fluorescent. tubes 100 watts
In each sub-distribution board at least-one way preferably two ways shall be left spare for future requirement. A wiring
diagram giving the exact Utilization of the ways shall be prepared and fixed in the sub-distribution board itself or any
other easily accessible place. The ways of sub distribution boards shall be accordingly numbered.
2.2.5 Local Control Switches(General) :
Local control switches for circuit carrying net less than 5-5 shall be piano type and shall conform to relevant I.S.
Standards. The switch shall be ”ON’ when the knob is in the down position. All local control switches shall be connected
in the phase or live conductor only and in the natural conductor, switches shall be fixed in iron clad box and shall is so
placed that the centre of the switch box is 1.3 Mtr. from the finished floor level unless otherwise
stated. All switch boxes shall be provided with 1 /8" thick Perspex cover fixed to the switch box with chromium plated
counter sunk screws (brass).
2.25A Switches (Two Way) :
(a)Two way swatches shall be piano type single pole, double throw, 250V, suitable for flush mounting and of 5A capacity
as per the drawings. All switches shall be recessed in an embedded metal box.
(b)Each box shall have suitable outlet for fixing conduts directly.
(c)Each box shall have Perspex cover painted inside with the wall colour, if required.
(d)Each switch shall have suitable for the position in a stairway wiring. 2.2.5.B Switch Boxes (General) Electrical circuits
shall be written suitable on the cover of all switched boxes, as approved by the Engineer-in charge (elect) whenever
different phase are terminated in a switch box bakelite partition shall be provided. Each cash shall be provided with a G.I.
Earth stud nut and washers for earth connectors.
2.2.6 Ceiling Rose:
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Ceiling rose shall be used on circuits having a normally exceeding 200V. Only one flexible cord shall be attached to a
ceiling rose. Only 3-pin 5A socket outlet shall be provided in lighting circuits. All socket outlets be provided with a control
switch and they shall be mounted in switch boxes in an approved manner.
2.2.7 Fittings:
These shall be of approved type as specified in the tender schedule. The subscripts leads should terminate in a ceiling
rose or conductor in the fitting and internal connection made there from. Wherever these fitting are suspended they shall
be done so through the conduits and ball and socket joint. All fittings shall be grounded by a G.I. conductor not less than
2.2.8 Flexible wiring:
Flexible cords of not less than .23/0076 size be shall be used, The weight of suspension road shall be governed by I.E.F.
2.2.9. Ceiling Fans:
All ceiling fans shall be wired to ceiling rose and suspended from a hook shackle or clamp and insulated from the same.
All joints in the suspension, road shall be screwed and means of split pins. The fan clamps supplied by the Contractor
shall be suitable for the ceiling or proof member as the case may be For concrete roofs, fan hooks shall be buried in
concrete during concrete during construction in an approved manner and secure bound to the reinforcement.
2.2.10.Conduits and Earthing:
All conduits feeding lighting and circuits shall be provided with earth continuity G.I. conductor as specified for power
wiring. All conduits shall be as specified for power wiring.
2.3.1 Point wiring:
Point wiring power shall be as defined under section 2.2.2 and shall include the switches and sockets.
2.3.2. Loading:
AIl distribution board for power wiring shall be not less than 15 A per way. Loading per way shall not exceed normally
100 watts. The following loads may be assumed if exact figure are not known.
3-Pin 15A Outlets 1.000 Watts
3-Pin 5A Outlets 100 Watts
2.3.3 Wiring for Motors :
2.3.3.1.Final sub-circuits loop in motors shall be connected to separate ways of the Distribution board even if the current
in the sub-circuit is less then 15A. No looping is permissible.
2.3.3.2.All wiring shall be carried in H.G. conduit as specified in I.S. specification for gauge for
different sizes of conduit. When the motor is resiliently mounted fixable with approved adopters shall be used for the last
few feet. Where cables are used sufficient loop shall be left.
2.3.3.3 All switch fuse units controlling circuits feeding motor .shall be pr9vided with H.R.C. fuses or as specified:
2.3.3.4 The frame of every motor and its association contra gear shall be earthed by two separate and distinct
connections to earth connector shall be capable of earring 3 times the rating of fuse or 1.1/2 time the setting or the circuit
breakers but in no case than NO.8 S.W.G. or 7064" or equivalent cross section of copper. Where practicable, the earth
connections shall be visible for periodical inspection. Gas or water pipes shall not be used for earth connections.
2.3.3.5.Socket Outlets and Control Switches f A and 15A :
All socket outlets shall be of 3 pin type, the third pin being connected to the earth stud of nearest distribution board by
separate earthing wire: The socket shall conform to I.S.: 1293/1938,’single pole, piano type. Each socket pubets shall be
provided with a control switch of appropriate rating and as specified. The switch and socket shall be mounted inside the
iron clad box provided with 1/8” Perspex cover as directed by the Engineer-in-charge or as specified in schedule of
quantities. Inside switch box ample space shall be available around switches for connection wires to switches. All socket
outlets for power shall be mounted at the skirting level otherwise specified or as directed by the Engineer-in-charge.
The three phase plug receptacles shall have their earth terminals connected by independent earth wires to ring main
strip on the building. In buildings where explosion proof fixtures are installed single phase plug receptacles as well as
light points shall be connected to ring main ground bus installed in the building by separate earth wires of approved size.
Socket outlet shall have some provision not to receive the matching plug unless the grounding pin is in correct position.
The grounding pin of the plug shall make the contract first and break the contract last at the time of inserting or removing
the plug respectively.
The grounding terminal shall be connected to the enclosed metal body providing G.l.Stud, nut washers welded to the
Each unit shall be suitable for flush mounting as required and indicated in the applicable drawings.
Combination unit socket outlet and switch shall be complete with necessary internal wiring. The switch/socket shall be
mounted on M.S. bracket enclosed in a box.
2.4 Conduit Wiring:
2.4.1 Where conduit wiring is adopted type and size of the conduit shall be as indicated in the drawing. The minimum of
the conduit shall be 19 mm.
2.4.2 The contractor shall thoroughly study the structural of the buildings and wherever, necessary shell in consolation
with Department’s representatives at site, make suitable adjustments in the cable routings, earthing arrangements, and
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
location boxes, fitting etc. with a view to avoid interference with any part of the building, structure, equipment or any other
work in the building or to effect any improvement in the arrangement.
2.4.3 Protection of conduit against rust:
Conduit shall be given two coats of oxide paint before they are placed in position. All exposed conduit shall be planed
after installation with the colour as approved by the Engineer-in-charge. This do not apply to galvanized conduit.
2.4.3.A.Protection against insects arid damp:
In Order to minimize cocensation or sweating inside the conduit, system shall be properly drained any ventilated in such
a manner as to prevent the entry of insects.
2.4.4. Conduit shall first be installed as a complete system without cables and shall be continuous from outlet to outlet
from fitting to fitting and mechanically and electrically connected to all boxes and fittings.
2.5. SPECIFICATION FOR POWER CONTROL AND TELEPHONE CABLES:
i.The specifications cover the supply and medium voltage ”Power and control cables either in ground or trench depending
on the conditions at sate including accessories for the same. The work in general, consists of supplying, laying jointing
terminating and connecting at. 1.1. KV APLSTS PVC power and control cables.
ii.The contractor shall supply all accessories including jointing and terminating materials, compound, tapes supporting
materials, cleats cables lugs, concrete stable, bricks sand, cable-markers etc. as required to make the installation work
including digging and filling of the trenches as required.
II.SPECIFICATION:
i.All power cables to be supplied mentioned as ‘APLSTS’ in the Schedule should be mass impregnated, non draining,
paper insulated lead sheathed, double steel tape armored and must comply with the latest IS1BS specifications.
ii.All cabling materials such as cable compound, cable lugs, taped shall be of approved quality acceptable to the type
recommended by the manufacture of the cable for which it is used and approved by the Department.
as installation of all equipment shall also conform to the applicable. Codes and practice as per the IS and shall be
executed to comply with the lates Indian Electrical rules as regards the safely, payable of equipments and other essential
provisions specified therein.
iv.Only approved make of cable shall be used. ICC and CCI will be preferred,
v.The cables shall generally be laid as per is Code of practice.
III. GENERAL RULES CABLE LAYING:
i. Installation shall be carried out in a neat workmen like manner by skilled experienced and competent workmen in accordance
with the standard practices.
ii. Cables shall be laid preferably in one length to avoid joins. If straight joints are found-necessary, these can be introduced with
prior approval of the Engineer-in-charge. The cost of the straight joint however, shall not be borne by the Department. But in no case
joint shall be within the conduit G.I. pipe and duct.
iii. Proper care should be exercised in handling the cable to avoid formation of kind etc. and should it become necessary a cable
be bent to a radius not less than 20 times the overall diameter of the cable.
iv. Method of installation, routing of cable etc. shall in every case be subject to the Department’s approval and the contractors shall
modify and or certificate no extra cost to the Department’s any portions of the installation which do not meet with the Department’s
approval. All damages to the civil and other works on this account shall be made good by the contractor at no extra cost to the
The electrical contractor while notifying the building contractor for such work shall furnish the proper draws, dully explaining the
work involved of indicate at suit actual work to be carried out as may be required by the building contractor. The electrical of any such
work as the electrical work with this to the same has been completed.
v. Where cables pass through hume pipes, contractor shall fix hard wood bushed round the cables at the ends of hume pipes.
Where the cables pass through the floors or chambers and in such situation’s the Engineer shall require, the contractor shall seal
cable holes in a manner approved by Engineer-in-charge. Where cable. pass through roads mullahs. etc. cables must be protected
by class ‘A’ Hume pipe of diameters not less than 6. (15cms).
vi. The cable routs shall be the shortest and these shall be minimum inference with built up areas, lawns etc.
vii. Care shall be exercised for providing suitable props other service lines on earth at the time of excavation. Where cutting of a
lawn inevitable it should be with the approval of the Engineers-in-charge.
viii. Excavation of the trenches shall be executed with vertical sides and the trenches shall be kept as straight as possible. The
exact location of each trench shall be settled by the Engineer-in-charge. On the site when the contract is in a position to commence
each portion of the work.
The trench shall be not less than 1/2 meter wide and 90 cms deep. If more, cables are to be laid, .the width should be suitably
ix. After the cables are laid, the trench shall be filled in layers, the each layer being weal rammed by spraying. water and
consolidated and sufficient alloviance made for settlement. The extra earth over the trench should be removed from the place of trench
to a place as decided by the Engineer-in-charge at site.
x. Ends of cables shall be property sealed to prevent entry of moisture prior to installation.
xi. Where it is as specified as 1/2 core cables the 1/2 core shall be a natural conductor having reduced section.
xii. For all multi core cables each core and tails shall be brought not, marked and or colored in on approved manner.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
xiii. Cables termination shall be done with suitable compression brass glands in the case of PVC cables and cast iron
trifurcating boxes in the case pf APLSTS cables. The Armour should be connected to the right main earth building with
duplicate earth wires as per the relevant IS/BS specification.
The core insulation over each conductor shall however be retained through out the run of the conductor upto the
end where lungs shall be fitted thereon for connections. The lungs shall by fitted by means of approved solder and the
such as aleap and Eyer NO.7 liberally used. The joint shall be mechanically strong and pressure tested.
2.6 DISTRIBUTION BOARDS AND PANELS.
General Requirements :
2.6.2 All distribution panels shall comply with lEE. Rules 60-61. A clear distance of 0.91 b meter in front of the switch
board shall be kept. Where bare connections of attachment are provided at the back of the switch board the space behind
the panel shall begetter less than 0.299 meter or more than Q.762 main width there shall be a passage way from the
further outstanding part of any attachment or conductor. If the space behind the switch board exceeds 0.70 main width
there shall be a passage way from either end of the switch board clear to night of 1.928m width 0.299 m. All wiring
connection shall be made neatly and securely.
2.6.3 For crocoites carrying more than 10 Amps, tinned cable sockets shall be used, all connections shall be so made
as to form own diagram Circuit shall be clearly numbered to correspond-to wiring diagram. Names of the distribution
boards shall be painted as directed by the Engineer-in-charge. All the which fuse units and isolators D.Bs. shall be
complete with earthing studs lugs neutral bar ink. H.R.C. fuses and of approved make.
2.6.4 Skeiten type panels shall have a rigid from work adequately braced and supporting frames adequately braced over
which sheet metal shall be nearly secured. All switches distribution boards etc. shall be neatly arranged on the panels
and all connections made from the back of switches. The panels shall be rendered dust and vermin-proof. The interior of
the panels shall not be accessible to unauthorized persons.
2.6.5 The recess type boards shall .be embedding wall in –a cupboard with a metal hinged door with locking
arrangement. In all recessed conduit work all distribution boards shall be recessed. Where recessing is not possible, free
standing panel may be provided as approved by the Engineer-in-charge.
2.6.6 All individual components the switch fuse units D.Bs. etc. shall be connected by earth connected by earth continuity
wire of appropriate size with the main earth bus of the D.B.etc.The panel switches of D.Bs. shall be earthed by the less
than 2 distinctive paths to earth. Earthing of metallic parts of exposed metal shall not be effected through any structural
metal work which houses the installation. Where metallic parts are not required to be earthed and are liable to become
alive should the installation of the contractor become defective such metallic parts shall be separated by durable non
malarial from any structural work.
(a) Power panels shall be 3 phase, 4 wire, 400.230 volts for the distribution of 3 phase or single phase power loads.
Lighting panels shall be 3 phase 4 wire 400/230 volts for single phase lighting load distribution on all 3 phase.
(b) All panels shall be done of protected front type with no mechanical or electrical defects.
(c) Bus bars shall be of electrolytic copper or alluminium as specified and the properly tinned sizes as indicated on applicable
drawings as required.
(d) All knock outs for branch circuits entries shall be drilled and filled as required, for lighting panels the top and bottom cover plates
shall be. removable type.
(e) Main disconnect device for all panel boards shall be of switches of disconnect type and of the size as indicated shall be mounted
directly below the panel or through a short thread conduit of required size.
(f) The main disconnect for all panel boards shall have an entry suitable for PVC Armored cable from bottom.
(g) All panel boards shall be provided with an earthing terminal and lug for connection to the grounding system.
(h) Temperature rise of all electrical parts shall not be more than 300c With full load amperes at room temperature.
(i) All barnes and supports of current carrying parts shall be of moisture resistant insulating material and shall not be adversely
affected by arcing.
(k) The locations of panels shown in the drawings are only tentative; panels may be located at a place approved by the Engineer-
(I) All civil works connected, with fixing such as grouting chasing and making good shall be the Tenderer responsibility.
(m) Wires adequate capacity with proper size of lugs shall be used for inter connections.
(n) Panel should be self supported on angle channel iron frame work. It should be preferably of bolted construction in case bolted
or grated rigidly after leveling and alignment.
(0) The cupboard and D. B. should be of such size so to be accommodated in the existing room as per 1.5 rules and I.S. codes of
practice for installations of Medium voltage switchgear.
(p) Fabrication drawing showing the detailed dimensions and panels and its components indicating the frame work, earthing
positioning of switches. 6 Bs. cable boxes, adopter chambers etc shall be furnished to the Engineer-in-charge for his approval. All
material to be got approved by the Engineer-in-charge. Panel should be guaranteed for satisfactory operations for a period of one year
after handing over.
(q) The panel should be painted with anticorrosive paint suitable for humid ,and salty atmosphere on two coast to
Switch Gears, powers panels D. B. And S.F. Us.
phase busbar, the Sizes of the bus bars shall be so selected that the current density in bar does not exceed 150 amps,
per sq. m. for copper. The length of Dus-bar chamber should be as suitable length to fix all the switches etc. as per the
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
prevailing standards, clear spacing of two adjacent buses shall be 1 a/2" minimum bar should be tasted all along with
colour coated 11 KV grade PVC tape The maximum internal of support for each unsupported length shall exceed
SWITCH GEARS, POWERS PANELS D.B. AND S.F. U.S.
2.6.8 The bus bar shall be of copper/alluminium and fabricated to the relevant standards specification. In case alluminium
bus bar is used special with high conductivity alluminium bus bar alloy E 91 C frame conforming to E.S.S. 2898 shall be
used. The current density shall not exceed 8OOA per sq. inch. Hylam barriers will be provided over the joints to prevent
any short circuit.
The bus enclosing shall be made out not less than 16 gauge M. S. sheet construct on with angle iron support. All
interconnections between bus bars S. F Us and O. Bs shall be of adequate size and details of such inter connection shall
be furnished to the Engineer-in - charge for his approval.
The busbar shall be air insulated extensible type rectangular one. The bus bars chamber shall be dust tight by providing
gaskets secured property so as to tender it veritin proof.
The combination fuse switch unit should comply with IS 4064 BSS61 and BBS 2510 wherever applicable. It should be suitable to
accommodate High Rupturing capacity cartridge Fuse links complying with IS 2208 or BS 88 and having a certified rupturing capacity
of not less than’ 35 MVA at 4440 volts (ACS duly Q The switch gear (panrs D, Bs. etc. shall be installed generally as per is-Part -1
3072 and as specified and shown in drawings.
All fuse switch units shall be provided with, non-deteriorating HRC fuse links complying with IS 2208-1962 and having rupturing
capacity of 35 MVA at 415 volts or as specified.
All switches above 60 amps, rating shall be provided with suitable size adapted boxes. All switches mounted-on the top of the busbars
shall be provided ,with detachable type reverse entry adapter boxes. Suitably engraved tables shall be provided for each circuits as
well as for the board.
A meters sector switches and LMH meter shall be provided where. specifically mentioned. Small wiring for the inter-connecting shall
be colour coded and provided with numbered teuses for easy identification of circuits.
(a) The distribution boards should be totally enclosed metal clad complying with B. S. 214. the M. S. sheet steel enclosures for
recessed D. Bs. shall be of not less than 14 gauge.
(b) The D. B. shall be with hindoddooi and the locking arrangements as approved by the Engineer-in-charge.
(c) All the components shall be enclosed in the enclosure. The mounting of D. B. shall be got approved by the Engineer-in-charge
before carrying out the installation.
(d) The D. Bs shall have proper side-cut outs for conduits entry or cable entry as required and these shall be made on site
(e) Adequate spacing shall be provided inside the D Bs. for easy removal of the fuses and carry out the interconnection.
(f) A set of insulating bamers have to be provided between incoming breakers switches and fuses.
Switch fuse Units:
(a) All the D.P.T.P. and T. PN. Switch fuse units shall be totally enclosed iron a clad quick
make, quick break type to best Indian make conforming to the I.S. or S. 3185 specifications. All the switch fuse units shall have
mechanical Interlock with a door so that the door so that the door cannot be opened when the swatches are in ON position. The switch
should be of double be i>\ solution type to ensure safely.
(b) Each T.P & T.PN switch fuse unit shall be earthed with two distinct each connections.
(c) Suitable insulator shall be provided between phase.
(d) There shall be suitable natural link in the fuse box.
(e) All T.P and T.PN: switch fuse units snail be rated for 500 volts and D.P, (required for single phase supply) and
S.PN. switches for 250 volts.
(f) The H.HC. catndge fuse shall conform to U.S. 88 (1952).
The O.C.Bs. ACS shall be suitable for 400/440 volts 3 phase escapable of interrupting a fault MVA of not less than
The circuit breaker shall conform to the BSS-936 1940. BSS 3659 with such tripping arrangement as may as required
under special specification is for the building. Efficient and fool - proof mechanical interlocking shall be provided for the
safe operation and maintenance. The rate be inclusive of the first filling of oil.
2.7 Instrumentation:
Tile instruments and meters wherever necessary shall be housed in special sheet steel box located between switch fuses
units and bus bar chambers. The instruments etc. shall be mounted on the hinged cover with heir dial flushed. All
instruments shall have protective H. R.C. fuse links. All interconnections and small wiring shall be neatly dressed
arranged and duly coloured 10r easy identification of circuits.
Meters shall be provided as required in the Schedule, Meters shall be dead head and be suitable for 400/ 440 volt
phase 4 wire 50 c/cie (in balanced load) supply.
Each section switch shall be 3 point and of minimum 250 volts grade with silver tipped contact suitable for metering
circuits, current transformers shall be of 5VA burden and commercial metering accuracy. Indication lamps shall be penal
mounting type preferably of 250V grade. Every unit shall be prewired and interconnected to the system for its required
indicating performance. Indicating lamps shall have independent circuit fuse.
2.8 FIXING OF LIGHTING FIXTURES:
1. Location of fixtures their manner of fixing mounting height etc. are indicated in relevant drawing. Actual location
and levels shall however be arrived at site in co-ordination with other service etc. and prior approval of the Engineer-in-
charge regarding the actual location Manner of fixing shall be obtained before the work is taken up in hand.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
2. In all cases the contractor shall provide necessary interconnection wiring earthing painting etc. all necessary for
complete instolation. The contractor shall also test and commission the fixtures during completion of the work.
3. General arrangement of fixtures layout is indicated in drawings. Care shall be taken to see that all light fixtures
are in a row in a room or particular area, are in absolute line and plump and are symmetrically disposed with respect to
finished surfaces of walls, columns beams etc.
4. The inter-connections wiring from the light outlet point upto the fixture shall be carried out by means of flexible
copper wire of section not less than 1.5 mm2.
5. All fixtures suspended by means of conduits shall be done with all and socket joints or as per approved design.
2.9 Telephone system:
1. Empty conducing shall be done recessed or exposed to surface along with pulls boxes, junction boxes and
telephone outlet boxes, in areas. and location as indicated in the relevant drawing as per materials and methods as
described in regard to conducting under section "Wiring in conduits” except the G.I. pull wires of gauge not less than
SWG shall be dept pulled through conduits in aII sections so that in future telephone wires can be pullet. easy.
2. Location shown on the drawing are proximate and final location shall be decided in the field by the Engineer-in -
SPECIFICATION FOR EARTHING
1. Installation of Earthing Plates:.
All installation of earthing shall conform to Indian Electricity Rules, IS - 3043 latest edition and I.E.E. the copper
earth plates should be tinned before installation. the earth plates of copper 60 cm x 60 cm x 3.515 mm thick size as
mentioned in the schedule be in separate pits at least 150 cms to 300 cms. away from the building at a depth
necessary to reach moist earth surface but with a minimum depth of 2.5 Mtr from the finished ground Level upto the top
vertical dodge of earth electrode. The earth plate shall be thoroughly cleaned to remove all dirt from the surface and be
tinned property for electrical contact with the main ground. Each earth pit should be provided with 38 mm. dia . G.!. pipe
2.5 Mts.long or more depending upto the depth of pit, put over the vertical edge of earth plate (with top end of pipe
provided with a closed to couyler.) Alternative layers of salt and coke shall be provided surrounding the plate. The pits
shall be filled when the plates are in position and with the approval of Engineer-in-charge.
To facilitate watering the pit, a concrete compartment should be made-with funnel with mesh and cover plate as
per rules provide in ISI regulation. The masonry endorser’s shall be 25 cm x 25cm x 25 cm (deep) with C.I, lid of 23 cm
x 30 cm x30 cms. size. After installation, the earthing resistance of each earth plate should be measured by resistance
meggar in the presence of Engineer-in-charge, three days after the completion of earthing work, and the value should
conform to regulations.
Signature of contractors Executive Engineer (Mech),
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
SCOPE OF WORK & TECHNICAL SPECIFICATION
The work includes supply of SPV systems with all accessories and equipment, metering, installation, testing,
commissioning and maintenance services for 10years with free replacement warranty on spare parts
againstmanufacturing defects for ten years. It also includes obtaining permission of concern DISCOM and Chief
Electrical Inspector (CEI)approvals. i.e.
A) Registration of the Project on GEDA online portal with necessary fees, Obtaining No objection certificate, net
metering connectivity agreements from concerned DISCOM for grid connectivity and CEI’s approval and payment of
CEI Inspection Chagres, Connectivity charges, Meter charges, Meter testing charges and Meter testing activity, SMC box
charges and charges for Strengthening of the DISCOM Network as per GERC regulation etc.
The payment of the Registration Fees of GEDA shall be in the scope of the BIDDER,thus the cost to be quoted by the
bidder shall be inclusive of the GEDA Registration fees. ( Rs. 1000/- + GST per application).
B) The work covers supply, installation, commissioning and comprehensive maintenance for TEN years, including grid
connectivity charges, meter charges etc.
C) Supply, civil work, erection, testing and commissioning of SPV grid connected Power Plant as per schedule B.
D) Installation of solar meter and bi-directional meters along with second line of protection in the system such as SPD
(Surge Protection Device) etc.
E) Installation of Remote Monitoring facility along with necessary dongle etc. for the period of 10 years.
F) The scope of the work covers cleaning and washing of the Solar Photovoltaic Modules regularly to ensure that
(i)annual Capacity Utilization Factor(CUF) of the system is 17% (ii) the Performance Ratio of the system is more than
70% in each quarter during the ten years CMC Period.
i) Insurance: The bidder in its own interest shall be responsible to take an insurance policy, for all the materials to
cover all risks including all calamities and liabilities for supply, storage of materials at site, installation, testing,
installation of solar, Bidirectional meter, commissioning and including 10 year CMC period of the systems.
TECHNICAL SPECIFICATION
The proposed projects shall be commissioned as per the technical specifications given below. The specifications, in the
GERC Regulation on Net Metering shall also be applicable.
SOLAR ROOF TOP SYSTEM:
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant with Solar Panels (ALMM
approved): Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover : High Transmission
Low-Iron Tempered Glass (AR Coated), High efficency and positive power tolerance Pmax: 0/+5, Module Efficiency
should be approx. 19.5%-22%, Normal operating temperature 45'C, Junction Box with Waterproof IP67 & MC4
Compatible and Enclosed with Bypass diodes, 100% Electroluminescence test to ensure error free Modules, Thep.
temp. co-efficient of the PV module shall equal or better than -0.45%/degree C. Solar PV modules of minimum fill factor
75% to be used. Unit Production:- More than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty
and 25 year Linear Power Warranty includes all mechanical and electrical parameters of the Solar panel. Modules must
be complied to the DCR(Domestic content requirements). The Ration of AC to DC is 5:6 for the Installation capacity
which are given in AC KW. Solar Module capacity shall be minimum of 600 Wp.
Solar Inverter:
MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude
(m) ≤4000, O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated protection of
Inverter are Anti-islanding Protection, Input Reverse Polarity Protection, Insulation Resistor Detection, Ground fault
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
protection, Residual Current Monitoring Unit, Output Over Current Protection, Output Short Circuit Protection, Output
Over Voltage Protection, PV array string fault Protection. Protection Degree: IP65, User Interface LCD & APP,
Datalogger & Communication: GPRS / Wi-Fi. Integrated, Input Reverse Polarity Protection Integrated, Insulation
Resistor Detection Integrated, Residual Current Monitoring Unit Integrated, Output Over Current Protection
Integrated, Output Short Circuit Protection Integrated, Output Over Voltage Protection Integrated, Protection Degree:
IP65, User Interface LCD & APP,Datalogger & Communication: GPRS / Wi-Fi,
Module Mounting Structure: The mounting (Rectangular pipe / square pipe / circular pipe) with requisite cross bars,
nuts and bolts, etc. shall be Hot deep galvanized with minimum 80micron coating. The Rectangular / square /circular
hollow pipe section used for the structure should have a minimum thickness of 2.0 mm. other than above, the material
thickness should be minimum 2.5 mm. A certificate of a structural engineer certifying the strength and stability of the
mounting structure to withstand the weight and wind speed of 150 km/hour throughout the life span of 25 years of
the system, shall be submitted by the vendors. Hot Dipped Galvanized steel coils. suitable arrangement for base plate
for foundation , solar panel mounting, the structure should be suitable for carry the load of solar panel,wiring, sprinkler
system etc. with necessary foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used for installtion of
stucture should be (SS 304) quality.
The ground clearance of the bottom most edge of solar panel shall not be less than 300 mm to 1200 mm or as per site’s
technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System with necessary Swichgears
(Suitabel size and protection of ACDB & DCDB), inter connecting wiring, earthing system as per the CEIG drawing
approval, lightining arrester system as per the CEIG drawing approval, all liasoning work with various gov. dipartment
like state nodal agency,DISCOM & CEIG is included in agency scope .
(Excluding All charges namely GEDA Application fees, Solar connectivity Charges, Meter connectivity Charges, Meter
testing Charges and system stability/strenthning charges. This amount will either be reimbursed to the successful
bidder or will be paid directly to the concerned department by GMB.
Item-02 DC Cable:
Electron beam cross linked compound,UV, Ozone, Temperature & Hydrolysis resistant Flame Retardant, Low Smoke
Excellent Encapsulation
Very long / Service life >
Standards / Material Properties:
Fire performance : IEC 60332-1-2
Smoke emission : IEC 61034/ EN 50268-2
Halogen Free: EN 50267-2-1/-2, IEC 60754-2
Toxicity: EN 50305, ITC – Index <3
Ozone Resistant : EN50396
Weathering UV: HD 605/A1 or DIN
Approvals : EN 50618; H1Z2Z2-k
with suitable sized of PVC pipe(ISI Mark) and Clamps,Shadels,Lugs.
(A) 1 core 4 sqmm copper DC cable Colour Red
Providing, laying, dressing, terminating, testing and commissioning of 1 Core × 4.0 sq.mm copper conductor DC
cable, Red colour, complete with all accessories, as required at site, in accordance with specifications, drawings and
directions of Engineer-in-Charge.
Electrolytic grade annealed copper conductor, stranded
Flexible Class 5 as per IEC
Nominal cross-sectional area: 4.0 sq.mm
FR PVC / HR PVC / XLPE insulated (as specified in BOQ)
Insulation colour: Red (DC Positive)
Insulation thickness shall conform to relevant IS standards
Voltage grade: 600/1000 V DC, minimum
Maximum conductor resistance at 20°C: 4.61 Ω/km
Cable shall be Flame Retardant (FR) as per IS 10810 (Part 61)
Cable shall be laid in PVC / MS conduit, cable tray or trench as specified
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Proper clamping, dressing and supporting shall be carried out
Minimum bending radius shall be 6 times the overall diameter of the cable
No joints shall be permitted except with prior approval of Engineer-in-Charge
Termination shall be carried out using:
Approved copper crimping lugs
Hydraulic crimping tools
Heat shrink sleeves
Proper ferruling and identification tags
Terminations shall be neat, secure and as per approved drawings
Cable shall be of approved makes such as: Polycab, KEI , RR Kabel, Finolex, Havells
or any other equivalent make approved by Engineer-in-Charge.
Measurement shall be in running metre along actual route laid
Item-05 MOULDED CASE CIRCUIT BREAKER
Providing and erecting Approved make Four pole moulded case circuit breaker having breaking capacity ICU of 25 KA.
at 415 V,having normal current rating up to 25 A to 100A. with Fixed thermal & magnetic release suitable to work on
A.C. supply 50 c/s. with all internal connections, spreader tinned copper & complete erected in existing 16 G.M.S.
housing. . ICS=100% of ICU only Cat III
The MCCB shall be air break type and having quick make quick break with trip free operating mechanism.
Housing of the MCCB shall be of heat resistant and flame retardant insulating material.
Operating handle of the MCCB shall be in front and clearly indicate ON / OFF / TRIP positions.
The electrical contact of the circuit breaker shall be of high conducting non deteriorating silver alloy contacts.
The MCCB shall be provided with thermal magnetic type bi-metal over load release and electro-magnetic
short circuit protection device. All the releases shall operate on common trip busbar so that in case of
operation of any one of the releases in any of the three phases, it will cut off all the three phases and thereby
single phasing of the system is avoided. The MCCB whenever called for in the appendix drawings shall provide
an earth fault relay.
Providing & laying. R.C.C. Hume pipe for cable to be laid 90 cms. below ground across the road
crossing or floor with necessary material in an approved manner and making the ground as per original.
100, 150 and 300 mm dia
Excavation of trench to required depth of 90 cm below ground level (or as directed).
Width of trench suitable for accommodating suitable dia Hume pipe with adequate clearance.
Shoring and dewatering if required.
Collars, jute/bitumen packing, or rubber rings as applicable.
Sand cushioning and selected backfill material.
Laying of RCC Hume Pipe:
Pipes shall be laid to proper line and level across road/ floor.
Proper jointing using collar with jute and cement mortar (1:2) or rubber ring joint as per standard practice.
Alignment to ensure no sagging or uneven gradient.
Cable Accommodation:
Pipes laid shall be suitable for pulling electrical/power/communication cables.
rope shall be passed through pipe for cable pulling before backfilling.
Backfilling & Surface Restoration:
Backfilling with selected excavated earth and compaction in layers.
Restoring the road/floor to its original condition,
Removal of debris and site cleanup.
Quality & Safety:
Work shall be carried out as per relevant IS standards and safety practices.
Proper barricading during road cutting.
Inspection and approval by Engineer-in-Charge.
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
The RCCB should suffices all the requirements of relevant IS codes and as specified in Schedule-B. The RCCB
should be current operated and not on line voltage.The RCCB should ensure mainly the following functions.
All metal parts should be inherently resistant to corrosion and treated to make them corrosion resistant.
It should be truly current operated.
It should operate on core balance torroidal transformer.
Its accuracy should be ± 5 %.
It should operate even in case of neutral failure.
It should trip at a present leakage current within specified limit.
Its enclosure should be as per IP
It should provide full protection as envisaged by IE rules
It should conform to all national and international standards like IS
CABLE LAYING AND TRENCHES WITH ROAD CROSS HUME PIPES (AS SPECIFIED)
Cables shall be laid directly buried in earth, on cable racks, in built up trenches, on cable trays and supports,
in conduits and ducts or bare on walls, etc. as directed, which are to be prepared by Contractor. Contractor’s
scope of work includes unloading, laying, fixing, jointing, bending, and termination of the cables & all related
Where groups of HV, LV and control cables are to be laid along the same route, suitable barriers to segregate
them physically shall be provided.
Where cables cross roads and oil, gas or sewage pipes, the cables shall be laid in RCC hume pipe as specified.
In each cable run some extra length shall be kept at a suitable point to enable one or two straight through
joints to be made, should the cable develop a fault at a later date.
Jointing of cables shall be in accordance with relevant Indian Standards Codes of Practice. Materials and
tools required for cable jointing work, including cold setting bituminous compound shall be supplied by the
In any case , if an underground cable fault will take place (Other then man made) then it should be rectify by
the contractor and make a suitable cable joints with all required accessories upto the defect liability period.
ACTION WHERE NO SPECIFICATIONS:
In case of any class of work for which there is no such specification, such work shall be carried out in accordance with
the as specified in Schedule-B & relevent IS specifications, and in the event of there being no IS Specifications, then, in
such case the work shall be carried out in all respects in accordance with the instructions and requirements of the
Engineer-in-Charge.
Signature of Executive Engineer (Mech.)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
SPECIAL WORK CONDITIONS for a Solar Rooftop PV System on a Hospital Building.
1. The Hospital is a critical and continuously operating facility. The Contractor shall execute the work in such a
manner that hospital services, medical equipment, emergency operations, ICUs, OTs, diagnostic areas and patient
movement are not disturbed at any time.
2. The Contractor shall be deemed to have visited the site, examined roof conditions, access routes, existing
services and operational constraints before submission of the bid. No claim on account of lack of site knowledge
shall be entertained.
3. All works shall be carried out strictly as per approved drawings, technical specifications, relevant IS codes,
MNRE guidelines, DISCOM requirements, and instructions of Engineer-in-Charge.
4. Any shutdown of electrical supply, even for short duration, shall be taken only after prior approval and shall
be planned during minimum load period.
5. The Contractor shall deploy a competent site supervisor at all times for coordination with Hospital Engineering,
Safety and Administration departments.
6. The Contractor shall be fully responsible for safety of their personnel, patients, visitors and hospital property.
Any accident or damage shall be at Contractor’s risk and cost.
7. No drilling, cutting or penetration of roof slab/waterproofing shall be done without written approval of the
Engineer-in-Charge.
8. Solar mounting structures shall be designed considering roof load capacity, wind load and seismic conditions
as per IS codes.
9. Existing rooftop installations such as HVAC units, water tanks, pipelines, lightning protection systems and
access paths shall not be obstructed.
10. Adequate maintenance walkways and clear access shall be maintained at all times.
11. All electrical works shall be executed by licensed electricians under supervision of qualified engineers.
12. DC and AC cables shall be routed neatly using approved trays/conduits and shall not pass through patient-
sensitive areas unless unavoidable and approved.
13 Fire-rated sleeves and proper sealing shall be provided at all wall/roof penetrations.
14. Earthing and lightning protection shall be provided/augmented and integrated with the hospital’s existing
earthing system.
15. The Contractor shall ensure zero dust, debris and waste accumulation in hospital premises.
16. All waste material shall be removed from site.
17. Storage locations shall be pre-approved by the Hospital Authority.
18. Materials shall be stored safely, without blocking fire exits, corridors or emergency routes.
19. Lifting and shifting of materials shall be done using approved methods without overloading of lifts or roof.
20. No high-noise or vibration-causing activities shall be carried out near ICUs, OTs and diagnostic areas.
21. Contractor should provide O&M manuals and Warranty certificates after completion of work.
22. Training to hospital maintenance staff shall be provided before final handover.
23. The Contractor shall obtain all required approvals including:
1. DISCOM / Net Metering
2. Electrical Inspectorate / CEIG
24. The Contractor shall be responsible for any damage to hospital building, equipment or services during
execution and shall rectify the same at own cost.
25. In case of medical emergency, fire alarm, disaster drill or any instruction from Hospital Authority, the
Contractor shall immediately stop work and vacate the area.
Signature of Executive Engineer (Mech.)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
-:: SPECIAL CONDITION ::-
1. Before attending or starting the work contractor has to ensure the power shut down either from
department, electrical forman/ electician/wireman or A.A.E. or GEB whichever is applicable. (If required)
2. Contractor shall have to remain present during work at site as responsible person and he will only engage
the qualified wireman/ lineman/ Electrician for electric work as applicable.
3. Contractor will have to carryout the work according to Indian Electricity Act and Rules as amended time to
time very strictly.
4. Any negligence which may cause and accident or fatal accident will be sole responsibility of the contractor
and GMB will not be responsible and no compensation will be made by the department.
5. The contractor will have to work with full safety & precautions with all pre-arangement at site.
6. The required ladder/tower ladder trolly or vehicle mounted telescopic tower ladder including any other
tools/ tackles shall have to be porvided by the contractor.
7. Any damages due to mishandling or carelessness of the workcontractor to any item at site occurs, it will be
born by the contractor by replacement or repairs at his own cost and risk.
8. The contractor shall have to furnish list of staff employed by him with pasport size two nos. photograph and
obtain port entry pass/ identity card from port authority at own cost before starting the work.
9. The contractor shall have to arrange to ensure fully and adequately to meet claims under the workman s
compensation act and under any ammendments there of and claim of damages whether from injuries to
10 The persons engaged in work shall be considered to be workers of the contractor and not of GMB and GMB
will not entertain any claim of workers engaged by the contractor.
11. In case of natural calamities like floods,cyclone,earth quacke etc. contractor will be fully rensposible for
damages occuring to the contractors personnel and tools and tackels.
12. All testing charges for the materials required for test in govt. laboratory as on any of technical institution
shall be payable by the Department.
13. The contractor should obtain necessory insurence policy of adequate value to cover the compansation for
workers engaged by him.
14. The quantity of required materials mentioned in schedule-B is approximate quantity,hence payment will be
Made as on actual execution of work as per norms.
16. Contractor shall have to attend the repairing of system which are not functioning at immediately.
17. During the contract period if it is found that the contractor receive more than three letters from GMB
about unsatisfactory work and does not fulfil his obligation in respect of the work entrusted to him GMB
reserves the right to terminate the contract.
18. The period of the contract is 06 months from the date of work order issued by the authority .
20. Terms Of Payment:
The payment shall be made as follows:
payment shall be released by running account bill.
Signature of Executive Engineer (Mech.)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Approved Make List
Sr. NAME OF EQUIPMENT/ APPROVED MAKE
1. Solar PV Module ALMN approved
2. Solar Inverter Approved make or as directed by EIC
3. D C Cable Polycab, KEI , RR Kabel, Finolex, Havells
or any other equivalent make approved by
Engineer-in-Charge.
4. Switchgear like MCCB, MCB etc. C&S, Schneider, ABB , LTLK
5. Contactor L&T , C&S , BCH , T.C., Alstom
6. PVC cable/XLPE cable RR kabel/ Finolex / Polycab / KEC/ALLCAB
7. Meter Rishab/ mecco / selec/Secure
1. The approved makes given above are applicable in general. However final approval has to be
taken from the GMB before execution of any item. GMB has the right to choose any of the above
2. Another item will be as per concern SOR approval based. Contractor should bound for that.
Items that have been duly approved by the competent authority of the R&B Department shall
be considered, subject to the submission of the corresponding approval letter.
Signature of Contractor Executive Engineer (Mech.),
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
GENERAL CONDITION (Electrical works)
1. All Taxes, Royalty, Wharfage shall be paid by the contractor as applicable.
2. The all instructions, general conditions, specifications and requirements given in tender booklet for "Electrical
Works" published by R & B Dept. Govt. of Gujarat and followed by GMB as Bombay P.W.D. manual Vol. No. I
& II shall be strictly abided by the contractor.
3.The contractor has to execute the Electrical work by observing the Indian Electricity Act Rules and Regulations
as amended by the competent authority in Govt. of Gujarat/GMB.
4.Land for storing the contractor's materials and for labour hutments etc. shall be chargeable for at usual rate.
5.The contractor will provide all assistance labour and equipment for favour of work, wherever required at his
own responsibility of checking-up.
6.Work shall be executed with the regards to the prevailing local conditions and port regulations and in any way
not to cause hindrance to traffic or offices or Residence building etc.
7.If, in the opinion of the Executive Engineer (Mech.)PIU, GMB, Bhavnagar the contractor's representatives on
site of subordinate of workmen considered unift or misbehave on order from the Executive Engineer the
contractor shall remove him from the work site from with failing which action will be taken against him under
clause of the contractor.
8.The contractor shall be deemed to be fully acquainted with the prevailing site condition assess to the site
nature of ground, underground water and the tidal condition covers and above wind effect at this port site
necessitate restricted hours of work of certain item so no claim will be entertained by the department against
losses on account of any of the above reasons.
9. Claim for variation in cost of labour of materials will not be permitted.
10.All testing charges for the materials required for test in Govt. laboratory as on any of technically institutions
shall be payable by the GMB.
11.Port will not assure any supply of portable water to the contractor and contractor will have to make his own
12.The contractor shall have to obtain license under labour contractor Act,1970 from the Dy. Labour
Commissioner as applicable before starting the work.
13Contractor shall have to provide licensed person at site to maintain Electric power supply lines, appratus,
machineries, welding machines etc. and shall provide shockguard of ELCB and proper earthing as per Indian
Electricity Rules and Act in force as per instruction of Executive Engineer (Mech.) or his authorized
representative.
14.If any accident of any nature occurs to the labour employed by the contractor during the execution of work,
GMB will not be responsible for the same and compensation in this regard will be not made by department.
The contractor will be fully responsible for the same. Therefore the contractor shall have to make suitable
pre-arrangement for fully safety of labours employed by him at site.
15.The contractor shall have to get the existing High Tension (11KV) OR Low Tension 415 Volts) line/ cable
clearance/ shut down either from GMB or GEB as applicable to observe the Safety Rules and Regulations to
start the work as applicable.
16. The GST will be paid extra on the actual bill amount as per prevailing rate of GST at the time of payment.
17. The department may arrange to supply the Electric power to the contractor for repairs/execution of work if
possible otherwise agency has to arrange at own liability for completion of the work.
18. This is a work contract. The contractor shall take an open policy for the erection, insurance to cover the risks
by way of damages to property or person in the execution of the contract including third party liability. This
department will not be responsible for any damage or accident that may occur during the execution of work.
No compensation will be paid by this department for any accident for work man or others in the employment
of the contractor.
19. Guarantee/Maintenance: - The contractor shall warrant that the work is carried out in accordance with the
specification. The equipment, structure etc., supplied will be free from defects in materials and
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
20. Liquidated Damages
The supply & installation shall have to be completed within 06 (SIX) months from the date of issue of work
order, failing which compensation at the rate of 0.1 % per day shall be levied and for the delay beyond six
months compensation will be imposed upon the Bidder to the extent of 10% of the total contract value. (Not
only on the materials not supplied). Board shall have option to adopt one of the following options in
connection with delay.
To cancel order without any liability on the part of Board.
To get the work executed at the risk & cost of the Bidder, through other agency.
21. Inspection:
The Bidder shall have to give intimation before ten days of dispatching the materials. The tests as per IS and
as per specifications will have to be given by supplier in their laboratory OR at site OR both to Executive
Engineer (M), GMB or authorized representative of the Board (GMB)/ Third party appointed by GMB. The
contractor has to provide the relevant certificates of the IS codes for the material used/supplied for the
work. GMB reserves the right to call for certificates for all raw materials and equipments at any stages of
manufacture to prove its quality and originality.
Representative of GMB for inspection shall be given full assistance in the form of necessary tools,
instruments, equipments and qualified bidders including to & fro fare , accommodation facilities to facilitate
In the event of prevailing poor quality of goods, noticed during the inspection by the representative of GMB,
GMB shall be at liberty to specify additional inspection procedures, if required to ascertain Bidder’s
compliance with the equipment specifications.
Even though inspection is carried out GMB or his representative, such inspection shall not however relieve
Bidder of all his responsibilities for furnishing equipment conforming to the requirements of the contract,
no prejudice, any claim, right or privilege, which purchase may have, because of the use of defective or
unsatisfactory equipment.
A set of latest prints of the approved drawings shall be kept available by Bidder on the shop floor for
reference of GMB representative during inspection.
Necessary inspection charges of third party (other than GMB representative) will be borne by GMB and its
inspection report will be binding to the bidder.
Signature of the contractor Executive Engineer(Mech)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
GUJARAT MARITIME BOARD
Name of work: SITC of solar rooftop system on Trust Hospital Building at Alang
Office of the The Executive Engineer (M)
Gujarat Maritime Board
Sector10 A, Opp. Air Force Station
Gandhinagar - 382
Email: [email protected]
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Name of work :- SITC of solar rooftop system on Trust Hospital Building at Alang
Item Item Description Quantity Unit Tender Unit Amount.
No estimated Rate
1 ROOF TOP SOLAR PV MODULE
1 Supply, Installation, Testing & Commissioning 150 KW 39408.00 KW
of following size of Grid Tied Solar Power Plant
Solar Panels (ALMM approved): Frame
Material : Anodized Aluminum alloy Frame
With Twin Wall Profile, Front Cover : High
Transmission Low-Iron Tempered Glass (AR
Coated), High efficency and positive power
tolerance Pmax: 0/+5, Module Efficiency
should be approx. 19.5%-22%, Normal
operating temperature 45'C, Junction Box with
Waterproof IP67 & MC4 Compatible and
Enclosed with Bypass diodes, 100%
Electroluminescence test to ensure error free
Modules, Thep. temp. co-efficient of the PV
module shall equal or better than -
0.45%/degree C. Solar PV modules of minimum
fill factor 75% to be used. Unit Production:-
More than 4.5 Unit /kw /day (Actual)(1Year
Avg) With 10 year Product warranty and
year Linear Power Warranty includes all
mechanical and electrical parameters of the
Solar panel. Modules must be complied to the
DCR(Domestic content requirements). The
Ration of AC to DC is 5:6 for the Installation
capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-
1000 V , Max efficiency: 97.5% - 98.9%, O/p
Frequency: 50/60Hz, Operating Altitude (m)
≤4000, O/p Power Factor: ~1, O/P THDi: <3%,
Operating Tempreture Range: -25~60°C,
Integrated protection of Inverter are Anti-
islanding Protection, Input Reverse Polarity
Protection, Insulation Resistor Detection,
Ground fault protection, Residual Current
Monitoring Unit, Output Over Current
Protection, Output Short Circuit Protection,
Output Over Voltage Protection, PV array string
fault Protection. Protection Degree: IP65, User
Interface LCD & APP, Datalogger &
Communication: GPRS / Wi-Fi. Integrated, Input
Reverse Polarity Protection Integrated,
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
Insulation Resistor Detection Integrated,
Residual Current Monitoring Unit Integrated,
Output Over Current Protection Integrated,
Output Short Circuit Protection Integrated,
Output Over Voltage Protection Integrated,
Protection Degree: IP65, User Interface LCD &
APP,Datalogger & Communication: GPRS / Wi-
Fi, Module Mounting Structure: The mounting
(Rectangular pipe / square pipe / circular pipe)
with requisite cross bars, nuts and bolts, etc.
shall be Hot deep galvanized with minimum
80micron coating. The Rectangular / square
/circular hollow pipe section used for the
structure should have a minimum thickness of
2.0 mm. other than above, the material
thickness should be minimum 2.5 mm. A
certificate of a structural engineer certifying the
strength and stability of the mounting structure
to withstand the weight and wind speed of
km/hour throughout the life span of 25 years of
the system, shall be submitted by the vendors.
Hot Dipped Galvanized steel coils. suitable
arrangement for base plate for foundation
solar panel mounting, the structure should be
suitable for carry the load of solar panel,wiring,
sprinkler system etc. with necessary foundation
work/wall mount, j bolt, anchor fastner etc. the
nut bolt used for installtion of stucture should
be (SS 304) quality.The ground clearance of the
bottom most edge of solar panel shall not be
less than 300 mm to 1200 mm or as per site’s
technical/feasibility requirement.
a. Column –The minimum section (thickness)
should be 60MM*40MM
b. Rafter - The minimum section (thickness)
should be 60MM*40MM
c. Purlin - The minimum section (thickness)
should be 40MM * 40MM Balane of System
with necessary Swichgears (Suitabel size and
protection of ACDB & DCDB), inter connecting
wiring, earthing system as per the CEIG drawing
approval, lightining arrester system as per the
CEIG drawing approval, all liasoning work with
various gov. dipartment like state nodal
agency,DISCOM & CEIG is included in agency
(Excluding All charges namely GEDA
Application fees, Solar connectivity Charges,
Meter connectivity Charges, Meter testing
Charges and system stability/strenthning
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
(F) Grid Tied Solar Power System: 101 - 250 kW
2 DC Cable: Electron beam cross linked 400 MTR 76.00 MTR
compound,UV, Ozone, Temperature &
Hydrolysis resistant Flame Retardant, Low
Smoke Excellent Encapsulation
Very long / Service life >
Standards / Material Properties:
Fire performance : IEC 60332-1-2
Smoke emission : IEC 61034/ EN 50268-2
Halogen Free: EN 50267-2-1/-2, IEC 60754-2
Toxicity: EN 50305, ITC – Index <3
Ozone Resistant : EN50396
Weathering UV: HD 605/A1 or DIN
Approvals : EN 50618; H1Z2Z2-k
with suitable sized of PVC pipe(ISI Mark) and
Clamps,Shadels,Lugs.
(A) 1 core 4 sqmm copper DC cable Colour Red
3 Supplying & Errecting MC4 Connector Male - 170 MTR 52.00 MTR
Female Set for Solar DC Cable which is installed
in Solar PV-module/Inverter/DCDB etc.
4 Providing & erecting Automatic solar panel 150 PER 3518.00 PER
cleaning system for solar power projects which KW KW
includes necessary plumbing work (UPVC pipes
and accessories) from source of water to
project site (upto 30 meters),Suitable size of
sub mercible/ open well motor, necessary
wiring for motor and sprinkler system with
safety, timer circuit for automatically on/off the
sprinkler system, necessary size oand number
of nozzles/JET (minimum 1 Nozzle/Jet per
(F) 101KW-200KW Cleaning System
RELATED ANCILIERIES
5 Providing and erecting Approved make Four 1 NO 6112.00 PER
pole moulded case circuit breaker having NO
breaking capacity ICU of 25 KA. at 415 V,having
normal current rating up to 25 A to 100A. with
Fixed thermal & magnetic release suitable to
work on A.C. supply 50 c/s. with all internal
connections, spreader tinned copper &
complete erected in existing 16 G.M.S. housing.
. ICS=100% of ICU only Cat III
6 Supplying rubber matting of following 2 SQ 3051.00 PER
thickness as per IS:15652/IEC 61111 MTR SQ
7 Providing , erecting , fabricating the M.S. 50 KG 77.00 PER
structure as per requirement on site KG
incorporating proper size of M.S.
angles,square,round, flats, bars, channels,
sections complete with cutting, welding,
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
grinding & finishing duly painted with one coat
of red oxide with erection on site as per
direction of engineer in charge with necessary
grouting, cementing, plastering & finishing
8 Making trench in Hard Murrum / Tar Road of 150 MTR 74.00 PER
suitable width of 90 cm or required depth for MTR
laying any size of cable or locating the fault all
over the run and back filling the same and
making the surface as normal ground.
(B) If additional machinery like hammer driller 75 MTR 354.00 PER
or JCB use [Add] MTR
9 Providing & laying. R.C.C. Hume pipe for cable 24 MTR 340.00 PER
to be laid 90 cm. below ground across the road MTR
crossing or on floor with necessary material in
an approved manner and making the ground as
per original. (C) 300 mm Dia
10 Providing & laying approved make Double 100 MTR 73.00 PER
walled corrugated pipes (DWC) of MTR
polyethylene(conforming to IS 14930 II )with
necessary connecting accessories of same
material at required depth in existing trench for
laying of cable. below ground / road surface for
enclosing cable (B)63mm outer dia
11 Providing and erecting ISI mark Medium class 125 MTR 54.00 PER
RIGID PVC PIPES of following size complete to MTR
be erected on/in wall or ceiling erected with
necessary PVC fittings & Junction boxes fixed
with adhesive solution & Clamps with following
dia of pipes, in approved manner as directed
12 Providing and erecting Sheet Steel powder 1 NO 3379.00 PER
coated MCB distribution board - flush / surface NO
mounted fitted with busbar, neutral link, earth
bar and DIN rail, Conforms to IS 8623-1 & 3, IEC
61439-1 & 3 without MCB to house appropriate
nos. of MCBs.(The DBs should be used of same
company of MCB to be used) suitable fors
(B) three phase incoming and single phase
horizontal type outgoing Per phase isolation
Three phase 8 way SS Double door for
horizontal single phase outgoing
13 providing and erecting Approved make RCCBs 2 NO 2213.00 PER
conforming to IS: 12640 and having sensitivity NO
of 30 mA and Short Circuit withstand capacity
of 10 KA and suitable for operation on single
phase 240 V,50Hz. having characteristic of quick
action & tripping with all advance feature & do
not incorporate any electronic component. for
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
following Max. rating erected as directed (i)
Amps.DP Cat. III
14 Supplying and erecting Flexible PVC insulated 250 MTR 77.00 PER
multi strand multi core 1.1 kv grade ISI marked MTR
copper wires of following size to be erected as
directed. (h) 2.50 Sq.mm 3 core round PVC
15 Providing and erecting Annealed bare Copper 55 KG 787.00 PER
wire 8 to 16 SWG. KG
16 Providing and erecting HOT deep Galvanised 55 KG 77.00 PER
iron strip wire 8 to 16 SWG. KG
17 Supplying & erecting in earthpit of minimum 03 NOS 7025.00 PER
bore dia. 225mm size approved make Safe NO
Earthing Electrode consisting Pipe-in-Pipe
Technology as per IS 3043-1987 made of
corrosion free hot dipped G.I.Pipes having
Outer pipe dia of 80 mm having 80-200 Micron
galvanising, Inner pipe dia of 40 mm having 200-
250 Micron galvanising, connection terminal
dia of 14 mm with constant ohmic value
surrounded by highly conductive compound
with high charge dissipation suitable for
following type of applications with chamber
and heavy duty cover (A)(approved make OEM
has to submit test certificate including value of
earth resistance of installation duly stamped
and signed by agency and officer Incharge has
to ensure the value of earthing resistane
mentioned in test Certificate) & having back
filling compound of (B) Inner chemical (CCM
Compound)- Resistivity:- 0.2 ohm / meter
testing as per IEC 62561-2017, Voltage drop:- <
1 volt at no load & dry form, Sulphar content:-
<2%(C) Back fill Compound :- Earthing
compound should be capable to retain
moisture for long time Necessary test report
must be submitted by Agency.
[B] For Electrical installation up to 11 KV
located in other than normal soil i.e. Soft
Rock, Marshy Soil etc.
-Length of Pipe : 2 mtr
-Back filling Compound :1 no. Bag of 25 Kg.
(In Words…Sixty Six Lakh Forty Nine Thousand Seven Hundred Fourteen Only.)
(NOTE: GST to be paid extra as per prevailing norms of GST department & as per accounts norms of GMB
at the time of Billing)
SITC of solar rooftop system on Trust Hospital Building at Alang 2025-2026
I/ We am/are willing to carry out the work at…………………………………% above/below
Percent (should be written in figure and words) of the estimated rates mentioned above. Amount of
my/our tender works out as under.
Estimated Amount put to tender: Estimated Amount put to tender:
Deduct : _________% below Rs. Add : _________% above Rs.
NetRs. Total Rs.
* (Please strike out whichever is not applicable).
Note 1 - All work shall be carried out as per Public Works Department Handbook and other Specifications
of Division or as directed.
Note 2 - Rates quoted include clearance of site (prior commencement of work and at its close) in all
respects and hold good for work under all conditions, site, moisture, weather etc.
Note 3 - GST will be Applicable on the actual bill amount as per prevailing Government Rules.
Note 4 - All the columns is Schedule should be filled in ink and the total of the entries in the last Column
should be struck be the contractor under his signature.
Signature of Contractor Executive Engineer (Mech.),
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender paper of Solar rooftop system Alang.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .