Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.5 LQualified Make: LUMINOUS
Model: Nxi 308 29 SARPATAHI NAHER CHAORAHA ALLAHABAD FAIZABAD HIGHWAY MAUAIMA ALLAHABAD UTTAR PRADESH 212507 | PRAYAGRAJ | UTTAR PRADESH | 212507 | Make: LUMINOUS
Model: Nxi 308 | L1 | Qualified MII | |
| 2 | L2₹12.9 L+₹2.4 L (22.8%)Qualified Make: LUMINOUS
Model: Nxi 308 1226 1 SIHORA SIHORA BAPERA ROAD SIHORA BHANDARA MAHARASHTRA 441915 | BHANDARA | MAHARASHTRA | 441915 | Make: LUMINOUS
Model: Nxi 308 | L2 | Qualified MII | |
| 3 | L3₹13.7 L+₹3.1 L (30.0%)Qualified Make: LUMINOUS
Model: Nxi 308 1 RAJOURI WARD NO 8 RAJAURI JAMMU KASHMIR 185131 | RAJOURI | JAMMU AND KASHMIR | 185131 | Make: LUMINOUS
Model: Nxi 308 | L3 | Qualified MII | |
| 4 | L4₹14.0 L+₹3.5 L (33.4%)Qualified Make: LUMINOUS
Model: Nxi 308 00 KHILANGANJ GT ROAD SASARAM ROHTAS BIHAR 821115 | ROHTAS | BIHAR | 821115 | Make: LUMINOUS
Model: Nxi 308 | L4 | Qualified MII | |
| 5 | L5₹18.0 L+₹7.5 L (71.4%)Qualified Make: LUMINOUS
Model: Nxi 308 4TH FLOOR FLAT NO 302 SURYA RESIDENCY MARRIPALEM VUDA LAYOUT VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530009 | VISAKHAPATANAM | ANDHRA PRADESH | 530009 | Make: LUMINOUS
Model: Nxi 308 | L5 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
11 Dec 2025, 8:00 pmClosed
Solar Power Plant (Roof Top) for ONGRID System
Three Phase (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6976822 Dated : 08-12-2025 Bid Document 1/11
-- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Chief Executive Officer Ranikhet Cantonment Board Ranikhet
Department of Defence
DG of Defence Estate
Ministry of Defence (Chief Executive Officer)
8686532
GEM/2025/B/6976822
Two Packet Bid
Solar Power Plant (Roof Top) for ONGRID System
15 days
ALMORA
Total value wise evaluation
PRODUCT
6 documents required · 6 mandatory
Exempted
8 Dec 2025
8 Dec 2025
11 Dec 2025
Solar Power Plant (Roof Top) for ONGRID System
Three Phase (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6976822 Dated : 08-12-2025 Bid Document 1/11
-- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Chief Executive Officer Ranikhet Cantonment Board Ranikhet
Department of Defence
DG of Defence Estate
Ministry of Defence (Chief Executive Officer)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8686532.pdf
GEM_BID
SOLAR_8c05a078-4873-4e32-ae3f1765203953412_CBR01.pdf
OTHER
SOLAR_24bdeced-3144-497c-86141765204833557_CBR01.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .