Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC AIKKARANAD G P 2024 25 P NO 245 KADAMATTOM SCHOO IMAINTENANCE WARD 7 | IDUKKI | KERALA | 685501 | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹1.4 L+₹1,010.05 (0.73%)Rejected-AOC IDUKKI | KERALA | 685501 | L2 | Rejected-AOC Second Lowest |
Tender Value
₹1.3 L
EMD Value
₹3,157
Closing Date
26 Oct 2023, 5:00 pmClosed
Assistant Executive Engineer
Minor Irrigation Subdivision Muvattupuzha
GENERAL-Madathikudy LI Scheme-Annual maintenance of Madathikudy LIS for the year 2023-24
2023_Irrig_608656_1
IRR/IA/TR/2966/2022_5_2_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Varappetty
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹3,157
Yes
28 Nov 2023
5 Oct 2023
28 Oct 2023
5 Oct 2023
26 Oct 2023
5 Oct 2023
Amount
Annual maintenance
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD16391/2023-2024:Engaging labour for cleaning of syphon/well of pump house including all charges.etc. complete.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.3:Supplying and fixing structural steel channel ISMC 75X40mm for holding shutter planks including cutting ,hoisting fixing in position with material and labour charges etc complete
60.4:Locking Arrangements - Supplying and Fixing lock and locking arrangements with suitable chain hooks,and padlock of 65mm size.
Georgekutty V P
Bidder Name
P.V.George
Georgekutty V P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_908519.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .