| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.2 CrAccepted-AOC | ₹42.2 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹43.1 CrRejected-Finance | ₹43.1 Cr | L2 | Rejected-Finance Second Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Vide order No.HECE/480/2023-DR2 dated 05/03/2024 |
Tender Value
₹38.6 Cr
EMD Value
₹5 L
Closing Date
27 Jan 2024, 6:00 pmClosed
Superintending Engineer, HE NORTH CIRCLE,Kozhikode
O/o Office of the Superintending Engineer, NORTH CIRCLE,Kozhikode-673303
GENERAL-PMMSY-Expansion of Kasaragod Fishery Harbour-Extention of Breakwater,Rehandling of Existing Stones,Approach road to existing breakwater and Environmental mitigation work on south General Civil Work
2023_HED_599073_3
HED/CEHED/TR/401/2023_5_1_1/1
Open Tender
Civil Works - Others
365 days
Kasaragod Fishery Harbour
Please refer Tender documents.
16 documents required · 16 mandatory
₹16,540
Yes
₹5 L
Yes
22 Mar 2024
5 Jan 2024
29 Jan 2024
5 Jan 2024
27 Jan 2024
5 Jan 2024
Amount
Extension of Breakwater-NBW
65.49:Supplying granite quarry run from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 5 kg to 10 kg category stones of approved quality with specific gravity ranging from 2.65 to 2.8 for forming the filter layer of breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater including conveyance from sorting platform and dumping stones using tippler (3.5x2.5 sqm size) or any suitable methods installed at site on a moving crane having a capaciaty of not less than 20T and placing the stones at sea bed in uniform layer of design thickness for forming filter layer of breakwater as per the approved drawing and design and inspecting the profile once in a week including hire and operational charges of T & P, tippler, crane and all incidental charges etc. complete as per the direction of departmental officers at site. Kasaragode District
65.50:Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 10kg to 200kg category stones of approved quality having specific gravity ranging from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and rehandling and forming the core of the break water to the lines and levels as per the approved drawings and inspecting the profile once in a week with tolerance of +/- 20cm in final levels including all cost and labour charges, hire and operational charges of light crane and cost of spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br>Kasaragode District
65.51:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Kasargode District
65.52:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 500kg and above category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Kasargode District
OD2769/2023-2024:Moulding and supplying 1.6 cum(4T) tetrapod with graded aggregate of 40% 75mm to 40mm, 30% 40mm to 20mm and 30% 20mm to 6mm using 380kg cement/ m3 of concrete as per approved mix design of mix proportion 0.5:1:1. 46:3.22 by weight of water cement, fine aggregate, coarse aggregate (specific gravity of fine aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively) and the cement shall be 43 grade or higher) minimum cube strength requirement (i) @7 day - 20 N/mm2 (ii) @ 28 day - 30 N/mm2 and minimum density of concrete 2.5 g/cc including hire and operational charges of tools and plants, mould, curing, rehandling and stacking charges etc., complete as per the instruction of departmental officers at site .
OD2770/2023-2024:Conveying 1.6cum (4T) tetrapod from stacking yard and placing in position in two layers according to specification and forming the armour layer of breakwater to lines and levels over the secondary armour layer including hire and operational charges of tools and plants etc., complete as per the direction of the departmental officers at site
65.114:Moulding and supplying cement concrete 2m3 (5T) tetrapod with graded aggregate of 40% 75mm to 40 mm, 30% 40 to 20mm, 30% 20 to 5mm using 380 kg cement /m3 pf cpmcrete as per approved mix design of mix proportion 0.5:,1.46:3.22 by weight of water cement, fine aggregate, course aggregate ( specific gravity of fine aggregate and course aggregateshould not be less than 2.73 and 2.5 respectively) and the cement shall be 43 grade or higher) minimum cube strength requirement (i) @ 7 day - 20N/mm2 (ii) @ 28 day - 30N/mm2 and minimum density of concrete 2.5 g/cc. including hire and operational charge of tools and plants moulding and rehandling and stacking charge etc complete according to specification and instructions of Engineer
65.115:Conveying 2 m3 (5T) tetrapods from stacking and placing in two layer according to specification and forming the armour layer of break water to lines and levels at depth of water 8m and above including hire and operational charges of tools and plants etc complete
Extension of Breakwater-SBW
OD2771/2023-2024:Conveying 1.6cum (4T) tetrapod from stacking yard and placing in position in two layers according to specification and forming the armour layer of breakwater to lines and levels over the secondary armour layer including hire and operational charges of tools and plants etc., complete as per the direction of the departmental officers at site
OD2772/2023-2024:Moulding and supplying 1.6 cum(4T) tetrapod with graded aggregate of 40% 75mm to 40mm, 30% 40mm to 20mm and 30% 20mm to 6mm using 380kg cement/ m3 of concrete as per approved mix design of mix proportion 0.5:1:1. 46:3.22 by weight of water cement, fine aggregate, coarse aggregate (specific gravity of fine aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively) and the cement shall be 43 grade or higher) minimum cube strength requirement (i) @7 day - 20 N/mm2 (ii) @ 28 day - 30 N/mm2 and minimum density of concrete 2.5 g/cc including hire and operational charges of tools and plants, mould, curing, rehandling and stacking charges etc., complete as per the instruction of departmental officers at site .
65.114:Moulding and supplying cement concrete 2m3 (5T) tetrapod with graded aggregate of 40% 75mm to 40 mm, 30% 40 to 20mm, 30% 20 to 5mm using 380 kg cement /m3 pf cpmcrete as per approved mix design of mix proportion 0.5:,1.46:3.22 by weight of water cement, fine aggregate, course aggregate ( specific gravity of fine aggregate and course aggregateshould not be less than 2.73 and 2.5 respectively) and the cement shall be 43 grade or higher) minimum cube strength requirement (i) @ 7 day - 20N/mm2 (ii) @ 28 day - 30N/mm2 and minimum density of concrete 2.5 g/cc. including hire and operational charge of tools and plants moulding and rehandling and stacking charge etc complete according to specification and instructions of Engineer
65.115:Conveying 2 m3 (5T) tetrapods from stacking and placing in two layer according to specification and forming the armour layer of break water to lines and levels at depth of water 8m and above including hire and operational charges of tools and plants etc complete
65.49:Supplying granite quarry run from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 5 kg to 10 kg category stones of approved quality with specific gravity ranging from 2.65 to 2.8 for forming the filter layer of breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater including conveyance from sorting platform and dumping stones using tippler (3.5x2.5 sqm size) or any suitable methods installed at site on a moving crane having a capaciaty of not less than 20T and placing the stones at sea bed in uniform layer of design thickness for forming filter layer of breakwater as per the approved drawing and design and inspecting the profile once in a week including hire and operational charges of T & P, tippler, crane and all incidental charges etc. complete as per the direction of departmental officers at site. Kasaragode District
65.50:Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 10kg to 200kg category stones of approved quality having specific gravity ranging from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and rehandling and forming the core of the break water to the lines and levels as per the approved drawings and inspecting the profile once in a week with tolerance of +/- 20cm in final levels including all cost and labour charges, hire and operational charges of light crane and cost of spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br>Kasaragode District
65.51:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Kasargode District
65.52:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 500kg and above category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Kasargode District
Replenishment of South Breakwater
65.49:Supplying granite quarry run from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 5 kg to 10 kg category stones of approved quality with specific gravity ranging from 2.65 to 2.8 for forming the filter layer of breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater including conveyance from sorting platform and dumping stones using tippler (3.5x2.5 sqm size) or any suitable methods installed at site on a moving crane having a capaciaty of not less than 20T and placing the stones at sea bed in uniform layer of design thickness for forming filter layer of breakwater as per the approved drawing and design and inspecting the profile once in a week including hire and operational charges of T & P, tippler, crane and all incidental charges etc. complete as per the direction of departmental officers at site. Kasaragode District
65.50:Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 10kg to 200kg category stones of approved quality having specific gravity ranging from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and rehandling and forming the core of the break water to the lines and levels as per the approved drawings and inspecting the profile once in a week with tolerance of +/- 20cm in final levels including all cost and labour charges, hire and operational charges of light crane and cost of spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br>Kasaragode District
65.51:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Kasargode District
65.52:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 500kg and above category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Kasargode District
Rehandling of existing stones
OD549/2023-2024:Charges for Rehandling , placing and packing 500 kg and above stones already supplied to other<br>chainages<br>Assuming that 200 T can be unloaded using a hydraulic excavator<br>Unloading stones<br>above 500 kg from lorries, rehandling and placing stones and forming the section as per the approved<br>drawings (20t crane is used and average out turn 200t/day)(Ref Data OD Harbour 65.16)
OD550/2023-2024:Charges for , Lifting placing and packing 300Kg to 500 Kg stone alreary Supplied to other chainages<br>(Rehandling ,placing and packing)- Details for 100 tonne(Ref orignal Data 65.15 OD Harbour
OD1442/2023-2024:Charges for unloading,placing and packing 10Kg to 200 Kg stone, For Unloading tippers are used no cost is involved in unloading Assuming that 50% of the stones to be re-handled (Rehandling ,placing and packing)- Details for 100 tonne
Approach road to Existing BW
OD561/2023-2024: od1668/2018_2019 :GSB using Quarry Waste&lt;br&gt;Construction of granular sub-base by providing local material like quarry waste spreading in uniform layers with motor grader on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete. (Arrived vide LSGD OD no. 51.78.4) (Approved as per TS NO 331/2019-20 dated 26-09-2019)
GEOMETRY CONSTRUCTION COMPANY
Bidder Name
pkmco constructions pvt ltd
GEOMETRY CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf