Loading…
Loading…
Tender Value
₹20.4 L
EMD Value
₹24,036
Closing Date
15 May 2026, 6:10 pmClosed
Executive Engineer (Mech.),Gandhinagar
Docking and Fabrication work of CSD Krishnamani at New Port-Bhavnagar (2nd attempt)
299755
02 of 2026-27
Open
Mechanical Works
Works
Gandhinagar
7 documents required · 7 mandatory
₹1,062
Gujarat Maritime Board NON PLD, Gandhinagar Payable at Gandhinagar.
₹24,036
1 May 2026
1 May 2026
1 May 2026
15 May 2026
1 May 2026
Name of work: Docking and Fabrication work of CSD Krishnamani at
New Port – Bhavnagar (2nd attempt)
Amount put to Tender: - Rs.20,36,886.43
The Executive Engineer (Mech.), PIU, Bhavnagar
Bortalav Port Colony No. 2, Near Bal Vatika, Bortalav
Bhavnagar- 364 003 (Gujarat) India
Name of work: Docking and Fabrication work of CSD Krishnamani at
New Port – Bhavnagar (2nd attempt)
Chapter Name Page No.
- TITLE PAGE 01 to
01 BID NOTICE 03 to
02 GENERAL INFORMATION 06 to
03 INSTRUCTIONS TO THE BIDDERS 08 to
04 PQ FORMS / ANNEXURES I to VI 17 to
05 TECHNICAL DETAILS OF THE VESSEL 24 to
06 SCOPE OF WORK 27 to
07 B-1 TENDER FORM OF WORKS 28 to
08 SCHEDULE – B (BILL OF QUANTITY) 83 to
09 ITEM TECHNICAL SPECIFICATION 89 to
10 GENERAL SPECIFICATION 99 to
11 GENERAL CONDITIONS 100 to
12 SPECIAL CONDITIONS 103 to
13 GENERAL ARRANGEMENT & DOCKING PLAN 104 to
Please read as :-
(1) GUJARAT MARITIME BOARD instead of GUJARAT STATE.
(2) Vice Chairman and Chief Executive Officer, GMB instead of Governor
Executive Engineer (M),
GMB, PIU-Bhavnagar
NOTICE INVITING TENDER (NIT)
Department Name : Gujarat Maritime Board
Superintending Engineer (M), GMB
Gandhinagar -382010
Executive Engineer (M), PIU Bhavnagar
Gujarat Maritime Board, Bhavnagar.
IFB No. : Tender Notice No. 02 of 2026-27
Docking and Fabrication work of CSD Krishnamani
Name of Project :
at New Port – Bhavnagar (2nd attempt)
Location : New port- Bhavnagar (Gujarat)
Docking and Fabrication work of CSD Krishnamani
at New Port – Bhavnagar (2nd attempt)
Estimated Contract Value : Rs.20,36,886.43
Period of Completion : 45 Days
Bidding Type : Open
Bid Call (Nos.) : 01 (One)
Tender Currency Type : Single
Tender Currency Settings : Indian Rupee (INR)
Joint Venture : Not Applicable
Rs. 1,062/- (Incl. GST)
Bid Document Fee :
In form of D.D. (Non-refundable)
Gujarat Maritime Board NON PLD, Gandhinagar
Bid Document Fee Payable To :
Payable at Gandhinagar.
Bid Security / EMD (INR) : Rs.24,036/- (Incl. GST) having Six Months Validity
Executive Engineer (Mech.), GMB Gandhinagar,
Bid Security / EMD in favour of :
payable at Gandhinagar.
Bid Document Downloading
Bid Document Downloading
Last Date & Time for Receipt
(Submission) of Bids
Bid Validity Period : 120 days after opening of price bid
The Bidder will have to submit the following
required documents in electronic format only
through online scanning and same has to submit
in Physical form send the same documents in a
sealed envelope through RPAD/Speed Post only,
from 16/05/2026 to 22/05/2026 during office
hours at the Office of Executive Engineer
(Mech.), Gujarat Maritime Board, 5th floor,
Sagar Bhavan, GMB Office Complex, Sector –
10 A, Opp. Air Force Station, CHH-Road,
Gandhinagar- 382010 (Gujarat) India
Submission of Documents etc. : mentioning the name of work on the envelop.
1. Letter of Application (As per Performa)
2. Tender Fee DD of Rs.1,062/-
3. EMD of Rs.24,036 /- in the form of FDR
5. Copy of GST Registration
6. Bank Solvency issued on or after
01/01/2026 from nationalized
bank/scheduled bank or govt. approved
bank for tendering purpose not less than
7. PQ Forms / Annexures I to VI (Along with
supporting documents
Vendor shall submit their offer only in electronic
format on website, after digitally signing the
same. Offers that are not digitally signed will not
Contact Information : [email protected],
Price Bid Opening Date : 25/05/2026 at 12:00 hrs (if possible).
Officer Inviting Bids : Executive Engineer (M), GMB, Gandhinagar
Superintending Engineer (M), GMB,
Bid Opening Authority :
Gandhinagar -382010.
GUJARAT MARITIME BOARD,
: 5 Floor, Sagar Bhavan, Sector 10,A, Opp. Air
Force," Chh Road, Gandhinagar-382010, GUJARAT,
(1) Bidders can download the tender document free of cost from the website
nprocure.com or www.gmbports.org
(2) Bidders have to submit the bid in Electronic form on www.nprocure.com
website till the Last Date & time for submission.
(3) For vendors free training camp is being organized every Saturday
between 4.00 to 5.00 P.M. at (n) code solutions-A Division of GNFC Ltd.,
Ahmadabad. Vendors are requested to take benefit of the same.
(4) Government of Gujarat, & Governor MAY BE READ AS GUJARAT
MARITIME BOARD, & CHAIRMAN respectively.
Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate as per Information Technology Act-2000 using
it they can sign their electronic bids. Bidders can procure the same from any of
license certifying Authority of India or can contact (n) code solutions-A division
GNFC Ltd, who are licensed Certifying Authority by Govt. of India.
All bids should be digitally signed, for details regarding Digital Signature Certificate
related training involved the below mentioned address should be contacted:
(n) Code Solutions, A division of GNFC,301, GNFC Info Tower, Bodakdev,
E-mail: [email protected], Web-site: www.gmb.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
Other Terms & Conditions as per detailed tender documents.
Executive Engineer (M),
GMB, PIU-Bhavnagar
GENERAL INFORMATION
The Gujarat Maritime Board (GMB) was set up on 5th April 1982 under Gujarat
Maritime Board Act, 1981, in order to develop, administer, operate and regulate the
state’s port sector. In 1998/99 GMB constructed the building of its Head Office as a
cornerstone for controlling and coordinating various Ports activities. Gujarat Maritime
Board (GMB) on behalf of Chairman invites online e-Tender offers for the work of
"Docking and Fabrication work of CSD Krishnamani at New Port – Bhavnagar (2nd
attempt)" Work details are given in the scope of work category of this tender. The time
limit considered is 45 Days.
2.2 Site Information
The contractor has to carry out the said work at site. Contractors are strongly advised to
visit the vessel and acquainted himself with the site condition, its surrounding etc. in
view of performing the scope of tender
2.3 Definitions:
In the contract as hereinafter defined, the following words and expressions shall
have the meaning hereby assigned to them except where the context otherwise
The Expression “Board” means Gujarat Maritime Board constituted under the
Gujarat Maritime Board Act
The expression “Work” where used in this document shall, unless there be
something in the subject or contest repugnant to such construction, be
constructed to mean the work or the work contracted and to be executed under
or in virtue of the contract, whether temporary or permanent and whether
originally or altered, substituted or additional. It shall include all extra or excess
works and variations and be subject to all commissions ordered in accordance
with these conditions.
“Site” means the land, jetty, dry-dock and/or other places on, stacking area,
under, in or through which works are to be executed or carried out and services
to be rendered any other lands or places provided by Gujarat Maritime Board
for the purpose of the contract together with such other places that may be
specifically designated in the contract as forming part of the site.
“Contract” means the notice inviting tenders, general conditions of contract,
terms and conditions of contract, specifications, price bid, tender and contract
agreement made at the time of awarding the work and also the mutual
agreement made jointly during contract period.
"Contract Price" means the sum named in the tender subject to such additions
thereto or deductions there from during negotiation as may be under the
provisions hereinafter contained.
“Contract Period” means total time limit allowed for completion of this work
by the Executive Engineer (M), PIU, GMB-Bhavnagar for this tendered work.
Contract Period shall be considered started after the date of commencement
given by competent authority OR representative of Engineer in charge.
“Bidder”/” Contractor”/”Agency” shall mean the person or persons, firm,
company or corporation who’s tender has been accepted by the GMB and
includes Bidder’s/ Contractor’s personal representative, successors and
permitted assignees or joint Bidders who shall be deemed to be bound jointly
and separately.
“Requirement” means total quantity or numbers of system required as per
tender requirement and accordingly order has placed by the Executive
Engineer (M), PIU, GMB-Bhavnagar or his authorized representative. The
requirement may be increased or decreased as mentioned in the tender
document which approved by the Competent authority.
“Engineer-in-charge” (EIC) shall mean the Executive Engineer (M), PIU, GMB-
Bhavnagar or his authorized representative who shall exercise only such
authority on behalf of the Executive Engineer (M) as may have been delegated
to him from time to time by the Executive Engineer (M) and powers delegated
to him by the Government/GMB Rules.
“Approved” means approval given in writing including verbal approval for
which subsequent written confirmation is given and “approval” means approval
in writing including as aforesaid.
“Competent authority” Officer or officers of the Gujarat Maritime Board
competent to exercise the powers conferred upon him/them by the
GMB/Government.
“Drawings” means the drawings referred to in the specifications and attached
with the agreement and any modifications of such drawings approved in
writing by the classification society / EIC or such other drawings as may, from
time to time be furnished or approved in writing by the EIC.
2.4 Abbreviations:
GMB / Board - Gujarat Maritime Board.
EIC - Engineer-In-Charge.
AR - Authorized Representative.
BOQ - Bill of Quantities.
BIS - Bureau of Indian Standard.
SE(Mech) - Superintending Engineer (Mechanical)
XEN(Mech) - Executive Engineer (M), PIU
DEE (Mech) - Deputy Executive Engineer (Mechanical)
GoI - Government of India
GoG - Government of Gujarat
IRS - Indian Register of Shipping
IV - Inland Vessel
GPCB - Gujarat Pollution Control Board
NIT - Notice Inviting Tender
Executive Engineer (M),
Signature of Contractor
GMB, PIU-Bhavnagar
GENERAL TERMS & CONDITIONS OF CONTRACT
On behalf of the Gujarat Maritime Board, the Executive Engineers (M), PIU GMB-
Gandhinagar invites tenders from reputed agencies having sound background and
experience in Marine vessel repairing work for “Docking and Fabrication work of CSD
Krishnamani at New Port – Bhavnagar (2nd attempt)”.
3.1 BID SUBMISSION :
a) The bid should be uploaded (submitted) through the official web site
www.nprocure.com “As per NIT”.
b) The physical documents shall be submitted through RPAD/Speed Post only “As
per NIT”. Beyond the last date physical submission will not be accepted/
considered in any case and it will be returned back to the bidder. The envelope
must be super-scribed with name of work. GMB is not responsible for the
tender process, if on the cover name of tender work is not mentioned.
c) The Board does not assume any responsibility for the supporting tender
documents being torn/ damaged during the postal transit. It is the
responsibility of the Bidder to see that the supporting tender documents reach
this office before due date as fixed and notified in the tender notice for the
purpose of receipt of the tender.
3.2 TENDER FEE (NON-REFUNDABLE):
Tender Document can be download from GMB website www.nprocure.com and the
tenderer have to pay tender fee in form of Demand Draft (DD) “As per NIT" payable
at Bhavnagar. Scanned copy of the same must be uploaded online as well as physical
submission as per NIT.
Tender without Tender fees, will be rejected outright.
3.3 EARNEST MONEY DEPOSIT (EMD) :
a) The Bidder shall submit Earnest Money “As per NIT” in form of Fixed Deposit
Receipt (FDR) with the tender, failing which the tender will not be considered.
b) The Earnest Money shall be submitted in the form of FDR of any scheduled/
nationalized bank as “Mentioned in NIT”. Cheque/D.D. will not be accepted
towards the Earnest Money Deposit.
c) The Earnest Money deposited by the unsuccessful Bidders will be refunded after
the finalization of tender. E.M.D. shall not bear any interest.
d) The Earnest Money deposited by the successful Bidder will be refunded on
receipt of Security Deposit and Performance Security.
e) If any party backs out after GMB has accepted his bid, it will be considered
default and in such case, necessary action against bidder will be taken by GMB
i. Forfeiting of EMD
ii. Black listing the agency for three years etc.
3.4 SECURITY DEPOSIT (SD) :
The successful bidder shall be required to furnish a Security Deposit (SD)
equivalent to 5% of the contract value plus GST in the form of FDR, having a
minimum validity of 12 months, in favour of the Executive Engineer (M), PIU,
The successful bidder shall be required to furnish a Security Deposit (SD)
equivalent to 2.5% of the contract value plus GST in the form of FDR, having a
minimum validity of 12 months, in favour of the Executive Engineer (M), PIU,
Bhavnagar. The remaining 2.5% of the contract value plus GST shall be withheld
from the running bills.
If the security deposit is not furnished within 15 days on issuing acceptance letter
or such extended period as may be permitted by the Executive Engineer (M), PIU,
Bhavnagar in writing, the Earnest Money deposit is liable to be forfeited and the
tender will be considered as cancelled. The board shall take penal action up to black
listing the agency for period of 03 years.
The GMB may at their option forfeit the Security deposit, if the bidder fails to affect
the supply or perform or observe the conditions of contract. The Board will also be
at liberty to deduct any sum that may be due to the GMB from the Security Deposit
or from any sums of money due or that may become due under any other contract
from the bidder. This is without prejudice to the rights of the Board under the terms
of the contract.
The said Security deposit shall not in any way be construed as a limitation of the
Contractor’s responsibility or liability pertaining to his obligations and/or
guarantees under the contract and shall be without prejudice and in addition to any
other remedies available to the Board in terms of the contract and/or the laws of
The Security Deposit will be released only after 12 months (Defect Liability
Perioud) from the date of work completion
3.5 TIME SCHEDULE:
The time allowed for the Completion of the work “Docking and Fabrication work
of CSD Krishnamani at New Port – Bhavnagar (2nd attempt)” is considered as
Days Months from the date of start.
3.6 RIGHT OF THE BOARD TO ACCEPT OR REJECT THE TENDER:
a) The Board does not bind itself to accept the lowest tender and reserves the right
to reject any or all tenders received without assigning any reason, whatsoever.
b) Tenders in which any of the particulars and prescribed information is
inadequate or incomplete in any respect and/or the prescribed conditions are
not fulfilled are liable to be rejected.
c) The Gujarat Maritime Board reserves the right to drop the entire tendering
process without assigning any reasons thereof.
d) The Gujarat Maritime Board reserves the right to reject any bidder on the basis
of past experience OR previous history of bidder under any contract of GMB.
3.7 PRE CUM TECHNICAL QUALIFICATION:
The bidder’s qualification shall be decided on the basis of information submitted in
the prescribed Annexure (I) to (VI) attached with this bid regarding their
experience, financial position, technical capabilities etc. as well as other documents
mentioned in NIT and hence all bidders are requested to fill the information
correctly strictly in prescribed Performa only with full knowledge and supporting
documents otherwise they will be disqualified for the work.
The information for financial data and project costs by the bidder should be
submitted in Indian Rupees only.
The competent authority of the Gujarat Maritime Board shall evaluate the pre-
qualification documents.
3.8 MINIMUM QUALIFICATION CRITERIA AND EVALUATION PROCEDURE :
1. PQ cum technical bid will be evaluated on the basis of following main criteria
as per details provided by the bidders in requisite Performa i.e. PQ- Form (I)
to (VI) along with prescribed application form given in this bid, without
which tender/application will not be considered for evaluation and opening
of price bid. On the basis of amount of experience for similar works, annual
turnover and solvency certificate. Bidders who fulfill the minimum criteria
will be qualified for opening of price bid.
2. Main criteria of evaluation:
A. General Criteria
B. Financial Criteria
C. Experience Criteria.
A. General Criteria:-
Submission of Tender FEE
Submission of EMD
Submission of GST certificate
Submission of PAN Card
Submission of PQ Form-VI : History of Litigation
B. Financial Criteria
Bank Solvency Certificate: Bank Solvency certificate of Rs.4.08 Lakh or
above issued from any Nationalized/Schedule bank or govt. approved bank
issued on or after 1st January
Annual Turnover: Annual turnover of any one of the last five immediately
preceding years, i.e. from 2021-22 will be considered for evaluation. It
should be minimum Rs. 21 Lakh or above and certified by Chartered
C. Experience Criteria:
Bidder should have experience successfully carried out *similar work
during last five years w.e.f. 01.04.2021, till last date of online bid
At least one similar work amounting to not less than Rs. 8.15 Lakh (Excl.
Details of work executed in last 5 years shall be considered, along with
Work order/work Agreement and work Completion certificates.
*Similar work means: - Experience of successfully completion of dry docking
repairs and steel fabrication work of Tug/Barges/ Dredgers/Launches.
3.9 BID OPENING :
a) The On-line tender for Pre-Qualification cum Technical bid shall be opened “As
b) During the process of Bid evaluation GMB may call the bidders for discussion
/clarification and also can ask for requisite support documents.
c) The Price bid shall be opened online for those Bidders who are pre-qualified and
technically qualified.
d) Tenders submitted by Bidders shall remain valid for acceptance for a period of
120 days from the date of opening of the price bid. The Bidder will not be
allowed during the declared period of validity to revoke or cancel his tender or
to vary any term thereof.
e) If any Bidder withdraws his tender before the date of validity as declared, the
earnest money deposited by the Bidder, shall be outright forfeited. There shall
be considered as breach of contract and action against bidder shall be taken
according to norms.
f) The work will be awarded to the lowest techno-commercial offer after approval
obtained from the competent authority.
g) Only the authorized representatives of the bidders will be allowed to be present
during bid openings.
3.10 COLLECTION OF DATA - BIDDER'S RESPONSIBILITY:
The Bidder shall visit the site and acquaint himself fully with the site and local
conditions and no claims whatsoever will be entertained on the plea of ignorance of
difficulties for execution of the work.
Before submitting the tender, the Bidder shall be deemed to have clearly
understood and satisfied himself regarding the work and services, all conditions
liable to be encountered during the execution thereof and that prices, rates and/or
compensation quoted in the offer are adequate and all-inclusive with respect to all
factors, circumstances and conditions likely to be incidental, both direct and
indirect, to the work and services
Contractor is strongly advised to visit the site and acquainted himself with the site
condition its surrounding etc. in view of performing the “Scope of Work”.
In general, Collection of DATA is Bidders responsibility.
3.11 ADDENDA / CORRIGENDA:
The Executive Engineer (Mech.), Gandhinagar shall have the right to revise or to
amend the contract documents prior to the date of receipt and opening of the
tender aforesaid such revision or amendments or extensions, if any, shall be
communicated through notice in the newspaper, as may be considered necessary.
Addenda/Corrigenda to the tender documents may also be published On-Line by
the Executive Engineer (M), GMB Gandhinagar prior to the date of opening of the
tenders, to clarify or reflect modifications in the contract terms and conditions.
3.12 AMBIGUITY:
In case of there be any ambiguity or doubt as to the meaning of any of the tender
clauses/conditions or, if any further information is required, the matter should
immediately be referred to the Executive Engineer (M), Gujarat Maritime Board,
Bhavnagar in writing, whose interpretation shall be final and binding.
3.13 TERMINATION
Gujarat Maritime Board shall be entitled to terminate this contract at no cost due to:
a) In the event bidder is adjudicated or found bankrupt of insolvent or any order is
made or resolution passed for the winding up, liquidation of dissolution of
b) This CONTRACT shall be deemed to have been automatically terminated on the
completion of guarantee/defect liability period.
c) If, GMB considers that the performance of the contractor is unsatisfactory or, not
up to the expected standard, the GMB shall notify the contractor in writing and
specify in detail the cause of such dissatisfaction. The GMB shall have right to
terminate this CONTRACT by giving 30 days’ notice in writing to the contractor,
if, contractor fails to comply with the requisitions contained in the said written
notice issued by the GMB.
d) If, contractor abandons this Contract or if he fails to perform or observe any of
the obligations OR its part to be performed and observed hereunder and refuses
to take steps to remedy the same within 7 (seven) days of written notice from
GMB Or for any other reason by giving 10 days written notice, stating the
reasons for termination.
e) Termination of this Contract shall be without prejudice to any rights or
remedies accrued to either Party prior to such termination.
f) No further payment shall become due to the contractor in respect of any period
after termination of this Contract with the exception only on any payment
previously accrued and due for payment to contactor for satisfactory service
under the terms of this Contract.
3.14 PERMITS, LAWS AND REGULATIONS
The Contractor shall carry out the work bound by all applicable laws, ordinances,
rules, regulations, bye-laws, decrees and orders whether of IRS/GMB/GOG/GOI or
other authority for Obtaining Permits etc.
Contractor shall be responsible for obtaining and maintaining all licenses, permits,
clearances, certifications and authorizations necessary for the performance of his
obligation under this Contract at his own cost.
The Contractor shall at his own expense arrange for all the safety provisions
normally called for by the nature of Marine Vessel Dry-dock repairing work and as
ordered by the competent Authority/EIC OR his authorized Representative in
respect of all personnel directly or indirectly employed for this contract.
The contractor shall be responsible to arrange for insurance of all labourers, skilled
and unskilled, workers, supervisors etc., employed by him for this work, as per
labour regulation of the State. The Contractor shall be responsible for the safety of
their Labours, Supervisor, own equipment/material during this Contract. The
Contractor shall also take such additional precautions as may be indicated from
time to time by the EIC or his authorized Representative with a view to prevent any
losses like theft, fire hazards, etc.
Before starting the work, the contractor will have to obtain the licence from the
District Assistant Labour Commissioner under the Contract Labour (Regulation and
Abolition) Act, 1970 and contract Labour (Regulation and Abolition) Gujarat Rules
1972 after paying necessary fees and deposit on the basis of the number of
labourers to be employed on the work at his own cost. If contractor fails to obtain
the same, it shall be solely contractor’s responsibility.
The Contractor shall take out and maintain at their own cost, insurance against the
risks and for the coverage as mentioned below, for the period of this contract.
a) Third Party motor vehicle liability in respect of motor vehicle used by the
contractor or his personnel.
b) Workers compensation insurance in respect of personnel of the contractor.
c) Insurance against loss or damages to the consultant's materials/machineries
used in this work.
Any accident/death of person/theft occurs during execution of this work, the GMB
has no liability for the same. It will be solely contractor’s responsibility.
3.16 LAWS GOVERNING THE CONTRACT
This Contract shall be subjected to the laws and regulation governed by the GMB &
Government of Gujarat that may be in force during the Contractual period.
3.17 JURISDICTION:
The award of contract is subject to the Bhavnagar (Gujarat State) jurisdiction.
3.18 SIGNING THE CONTRACT :
The successful Bidder shall be required to execute an Agreement on stamp paper of
the required value within 15 days from the date of issue of the notice of Letter of
Intent with submission of Security Deposit as per above stated clause 3.4 . In the
event of failure on the part of the successful Bidder to execute the agreement within
the above stipulated period, or the period agreed by the GMB, the Earnest Money
deposited by him will be forfeited and apart from that the GMB being in such
circumstances entitled to treat the successful Bidder as in breach of contract and
proceed accordingly.
3.19 INSTRUCTIONS TO BIDDERS TO FORM PART OF THE AGREEMENT :
All these instructions, conditions, special conditions, if any, Technical specifications
contained in the tender document and any correspondence related to this Contract
shall form part of the agreement.
1) Letter of Application shall be submitted in proper format. Incomplete offers shall
2) The bidder shall satisfy himself with regard to the nature of work to be carried
out, its scope, the conditions of the contract, etc. included in the bid document.
3) The cost associated with the preparation and submission of bid shall be borne by
the bidder and GMB shall in no case be responsible or liable for such costs.
4) The language for submission of bid should be in English.
5) The enclosed schedules should be filled in completely and all questions should be
answered. If any particular query is not relevant, it should be stated as "NOT
6) Financial Data, Projects Costs, value of work etc. should be given in Indian rupees
7) For any clarification, for site visit and information regarding relevant data will be
available at office of Executive Engineer (M), PIU, Bhavnagar, Bortalav, Balvatika
Bhavnagar-364003.
8) If a proprietary firm makes the application, it shall be signed by the proprietor
above his full name and the full name of his firm with its current address.
9) If the application is made by a firm in partnership, it shall be signed by all the
partners of the firm, above their full names and current addresses or by a partner
holding the power of attorney of the firm by signing of the application in which
case a certified copy of the power of attorney shall accompany the application A
certified copy of the partnership dead, current address of the firm and the full
names, and current of all the partners of the firm shall also accompany the
10) If limited company or a limited corporation makes the application, a duly
authorized person holding the power of attorney for signing the application in
which case a certified copy of the power of attorney shall accompany the
application shall sign it. Such limited company or Corporation will be required to
furnish satisfactory evidence of its existence before the contract is awarded.
11) Information furnished must be sufficient to show that the applicant is a capable
in all respects to successfully complete the envisaged contract works strictly on
the basis of the applicant, having already carried out satisfactorily works of
similar size, nature and complexity.
12) While submitting the schedules, duly filled in, the applicant shall enclose the
latest copies of brochures and technical documentation giving more information
about the firm and all the members.
13) The Gujarat Maritime Board reserves the right to reject any or all bids without
assigning any reasons and the Gujarat Maritime Board decision shall be final and
14) No costs incurred by bidder in making this offer like providing clarification or
attending discussions, conferences or site visits will be reimbursed by the
Gujarat Maritime Board.
15) During the tenure of profession, details of awards, if any and such additional
information shall be furnished.
16) The PQ cum Technical Bid should contain all other documents except the price
bid, like specifications, general conditions, etc. and Bidder’s letter regarding
deviations to the general terms & conditions, if any. It should be very clearly
understood that the PQ & Technical Bid should be restricted to only "Technical
Matters” and the tender quoted price must not be discussed in the PQ cum
Technical Bid. Conditions in "PQ cum Technical Bid" should be specific so as to
evaluate them correctly and to arrive at the correct financial effect.
17) The bidders will understand clearly that the rates quoted are for complete works
and include all costs due to POL, labor, plants & equipment’s, transportation,
supervision of GMB officials including lodging & boarding, various other services
like water, power, materials and all matters and things necessary for satisfactory
completion of the work and no claim for additional payment beyond the
offered/accepted rates will be entertained and the bidder will not be entitle
subsequently to make any claim on the ground of misrepresentations or on the
ground that he was supplied with wrong information given by any person (
whether the person is the employee of GMB or not ). Any failure on the part of
Bidder to obtain all necessary and correct information for the purposes of filling
his Bid and prices / rates therein shall not relieve him from any risks or liabilities
arising out of consequence upon the submission of the Bid.
18) The price bid should contain only rate and amount of the work. Any condition in
the price bid shall be liable for rejection of offer of that bidder.
19) No contract will be awarded except to the qualified and responsible bidders
capable of performing the classes of work contemplate.
20) No Bid shall be deemed fit for consideration unless, it is completed in all respect.
21) No conditional tender will be accepted.
22) No change or supplementary information (unless & until asked by GMB) in
respect of the offer shall be accepted after its submission. The bidder shall not
make any alteration in the bid documents.
23) The successful bidder shall have to enter in to an agreement with the Gujarat
Maritime Board in the prescribed format. The cost of stamp papers etc. for the
agreement shall be borne by the bidder.
24) All document submitted will be the property of GMB and GMB reserves the
right to use these documents without any prejudice.
Executive Engineer (M),
Signature of Contractor
GMB, PIU-Bhavnagar
CHAPTER-4: PQ FORMS / ANNEXURES
QUALIFICATION DATA SHEET TO BE FILLED UP BY THE BIDDER.
The qualification questionnaire contains the following forms:
P.Q. FORM-I : Letter of Application
P.Q. FORM –II : Document Fees & EMD Details
P.Q. FORM III : General Details
P.Q. FORM-IV : Turnover
P.Q. FORM–V : Details of experience
P.Q. FORM -VI : History of Litigation on Rs.300 non-judicial stamp
LETTER OF APPLICATION
Executive Engineer (Mech.),
Gujarat Maritime Board, 5th floor, Sagar Bhavan,
GMB Office Complex, Sector – 10 A,
Opp. Air Force Station, Chh-Road,
Gandhinagar- 382010 (Gujarat) India
Having examined the Bid documents including scope of works and time frame of the
aforesaid work, I/we hereby submit all necessary information and relevant documents
The application is made by us on behalf of................................ ………………………….duly
authorized to submit the offer.
The necessary evidence admissible in law in respects of authority assigned to us on
behalf of the firms for applying and for completion of the contract document is attached
It is certified that the information furnished in this document is correct & authentic.
I/We confirm that we have not been barred & blacklisted by any Government
organization OR Major Port Trust OR Minor Port Board in India for any such works in
last Five Years.
I/We shall make available to the GMB any additional information it may find necessary
or require for this tender purpose.
I/We promise that we will abide by all rules & regulation as laid down by G.M.B. time to
time for execution of any contract as may arise during this contract period
I/We have examined and have no reservation to these tender documents with any
addendum issued by GMB.
I/We undersigned accept that GMB reserves the rights to reject any or all tender for this
work without assigning any reason.
Place: Signature of the
(Name in bracket)
Encl: As per NIT
PQ Form No. II: Document Fees & EMD Details
Document Fees Detail
D.D./Banker’s cheque No.& date
Bank Name & Address
Bank Name & Address
Sign and Seal of contractor
PQ Form No. III: General Information
All individual firms applying for pre-qualification must complete the information in
1. Name of firm:
2. Head office address:
3. Local office address (if any):
4. Telephone: Contact:
5. Facsimile: E-Mail & Website:
6. Place of incorporation / registration: Year of incorporation/ registration:
9. Main lines of business:
10. Details of office set up with Key staff
name, designation, & other detail
11. Other information ( if any)
Sign and Seal of contractor
PQ Form No. IV: Turn over
All individual firms applying for pre-qualification must complete the information in
Particular Year Value (in INR)
Note: Copy of Chartered Accountant certificate shall be attached online with the Tender.
Sign and Seal of contractor
PQ FORM –V: Experience of similar works
Bidders should provide information showing their experience for similar works as
mentioned in the table below:
Actual experience during last 05 years till due date of bid for the proposed work as per
relevant clause of PQ bid shall be taken in to consideration.
A. Experience in Contracts of works completed:
Address Contact Detail Completion
Sr. with person Value of Order Certificate of
No Client phone / name & contract (copy Client
Fax No. Mobile no. Attached) (Attached/
Note: The above information should be filled in the table and supporting
documents (as per tender stipulations) in soft copies should be submitted
inclusive of work order and work completion certificate/ etc. in e-tender.
Sign and Seal of contractor
PQ FORM – VI: History of Litigation
(Undetaking must be notarized)
History of Litigation
(On 300 Rupees Non-judicial Stamp)
We here by undertakes and confirms that our agency M/s.
________________________________________________________ have been neither black listed nor
banned for tender participation or execution of the works by any Govt./PSU Authority
in last three year.
Yours faithfully,
(Name of Authorized signatory)
Sign and Seal of contractor
Note: This Undetaking must be notarized.
CHAPTER-5: TECHNICAL DETAILS OF VESSEL
(A) TECHNICAL DETAILS
01 Name of Dredger Cutter suction dredger
02 Year of Built
05 Manufactured by M/s IHC Holland JV with M/s
Startek Marine (Chennai) Pvt Ltd,
01 Length 18.50m
02 Length of Pontoon 19.00m
03 Breadth of Pontoon 6.69m
05 Draught 1.25m
06 Dredging Depth 12.0 maximum & 1.00 minimum
07 Type of Unit Non-Propelled Dismountable
08 Port of Registry BP No.
10 Model Beaver –
(C) MAIN ENGINE
01 Make Caterpillar
02 Engine Type 3508B CCW
03 BHP 867 HP (638 kw)
(D) MARINE GEAR BOX
01 Manufacturing Year
02 Order 70099/1
03 Type SV-320-C
(E) DREDGE PUMP
01 Make IHC Holland
02 Manufacturing Year 2005 NR-1211
03 DRW/Code 110-250-40 WA-200
05 Capacity @300 cum / hrs of solid
(F) AUXILARY ENGINE
01 Sr Number of Engine 64Z36181
02 Make Caterpillar
03 Engine Model No
04 BHP 228 KW @ 1800 RPM
(G) ALTERNATORS
01 Manufacturer Leroy Soner
07 Protection IP –
08 Grease Esso UNZREX N2
09 En Charge – Full Load 10.40 / 1.64 A
10 A Vide / at No Load
(H) WINCH STBD SIDE (SWING)
01 Make HytopHydraulink
03 Winch Type HW-57
(I) WINCH PORT SIDE (SWING)
01 Make HytopHydraulink
04 Weight 625 Kg
(J) WINCH FOR LADDER
01 Make HytopHydraulink
03 Winch Type HW-57
04 Weight 625 Kg
(K) HYDRAULIC PUMP (1)
01 Make Vickers
02 Type 35/25 VQ 30A1786 AA-20L
03 Engine No. DAF8
08 Fuel Oil 251-G/KW-H
09 Lube Oil HS Diesel
10 Governing Class B1
(L) FIRE PUMP (SELF-PRIMING PUMP
01 Make Ray Sons Engineering Pvt Ltd,
(M) SELF PRIMING MONOSET PUMP
01 Make Crompton Greaves
04 Speed 2780 RPM
05 Current 2.50 Amp
06 CAP Run 104F / 440V
07 Pump No EFPM05977
08 I Phase AC 450 Hz
09 Type Mini Elegance – II
10 Size 25 x 25mm
12 Head 6/25.5m
14 Insulation “B Class
01 Make Johnson Pump
03 NL 940088 AA Assen
04 CN-50-250 G ISILI
(O) HYDRAULIC COOLER PUMP
01 Make Johnson Pump
03 NL 9400 AA Assen
04 Type FRC-40-110
(P) HYDRAULIC RAM (JAK FOR SPUD LIFTING & LOWERING)
01 Make 046699/2 Hytop
02 Dimension 90 x 2100 MR
03 Maxi Press 21 MPA
04 Weight 275 Kgs
05 Test Press 27.5 MPA
(Q) LIST OF LSA / FFA ITEMS
01 Life Buoys 03 Nos
02 Life Jacket 06 Nos
01 Portable diesel driven pump for fire 01 No
fitting 15cum per capacity.
02 Fire hose with pain jet type and dual 02 Nos
purpose nozzles.
03 4.5 Kg Portable chemical powder fire 02 Nos
04 9 Ltr. Portable mechanical foam type 02 Nos
fire extinguisher (AFFF)
05 Fire bucket with tan yard 02 Nos
06 Sand Box with scoop 02 Nos
07 Fire man axe 01 No
08 First aid box 01 No
09 Safety belt 01 No
Executive Engineer (M),
Signature of Contractor
GMB, PIU-Bhavnagar
CHAPTER-6: SCOPE OF WORK
Dredger CSD Krishnamani is GMB owned dredger, which is working at New Port,
Bhavnagar. Hence, to maintain the vessel in good operating condition & for hassle free
dredging operation, general repairing is required to be carried out.
The contractor is strongly advised to visit the site and familiarize himself with the
vessel conditions and surroundings before executing the scope of work under this
tender. Any queries regarding the vessel shall be addressed to the Executive Engineer
(M), PIU-Bhavnagar.
Items of work includes renewal of steel hull, Pressure testing of valves, servicing of
pumps, anodes renewals, sand/Shot blasting, painting of hull, superstructures,
accommodation area repair work, sea chest area work, anchor work etc. including all of
items given in the here items of works in schedule B. All the items of work must have to
execute as per detailed specifications given in this bid in works specification.
The contractor has to procure the required material as mention in “Schedule-B” of this
tender document and should be got approved from EIC. All the items of work must have
to execute as per detailed Specification given in concern chapter of this tender
document. The entire work should be carried out as per Marine standard practice and
up to satisfaction of EIC.
Executive Engineer (M),
Signature of Contractor
GMB, PIU-Bhavnagar
Gujarat Maritime Board
GUJARAT STATE ROADS & BUILDING DEPARTMENT / WATER RESOURCES DEPARTMENT
U]HZFT ZFHI DFU" VG[ DSFG lJEFU v H/ ;\5ltT lJEFU
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS
SFDM DF8[G]\ 8SFJFZL NZJF/]\ 8[g0Z VG[ S\8=FS8
Name of work :-
8[g0Z :JLSFZJFGL
8[g0Z VF%IF TFZLBo
;DIo SR[ZL SFDSFHGF S,FSM ;]WL
Issued to :- zL G[ VF%I]\
lJEFULI lC;FAGLX
Please read “Chairman of GMB” in place of “Govt. of Gujarat
Opened by : On Date :
SFI"5F,S .HG[Z sIF\œFSf VlW1FS .HG[Z sIF\œFSf
lJEFULI SR[ZL4 JT]"/ SR[ZL4
ભાવનગર UF\WLGUZ
DATA SHEET FOR OFFLINE TENDERS
(1) Name of the work - SFDG]\ GFD As per first page of this Tender
(2) Estimated Cost - V\NFHL ÃSDT Rs. ..................
(3) Earnest Money - AFGFGL ZSD Rs. ..................
(90/120*) days from the stipulated date of
Receiving of tender but no modification shall be
(4) Validity period of tender offered
allowed after handing over tender to postal
8[g0Z :JLSFZJFGL lGWF"lZT TFZLBYL s)_q!Z_∙f lNJ;M ;]WL
s$f VMOZ S[8,F lNJ; B],,L ZC[X[P 5Z\T] 8[g0Z 5M:8, VF[YMlZ8LG[ ZJFGUL DF8[ ;M\%IF AFN sJ[,L0L8L
;DI 5}ZM YFI tIF\ ;]WLf SM. O[ZOFZ SZL XSFX[ GCÄP
(5) Security Deposite- HFDLGULZL VGFDT …. 5/10%
In the form of Small savings or
(i) Narmada Bonds (of minimum one year Rs. ..................
time limit) ……… 2.5%
GFGL ART ~5[ VYJF GD"NF lGUDGL AF\WL D]NTGL
YF56 :J~5[ sVMKFDF\ VMKL V[S JQF"GL D]NT JF/Lf
(ii) To deducted from bills ……… 2.5% Rs. ..................
sZf RF,] AL,MDF\YL SZJFGL S5FT ~P ..............
Performance bond of Schedule Bank
s#f VG];]lRT A[gSG]\ 5OM"D"g; AMg0 ~P ..............
Time allowed for completion of the work
(6) ………….. Months
from the date of written order to commence
SFD X~ SZJFGF C]SD D?IF TFZLBYL SFD 5]~ SZJF DF8[GM
(7) Other details - VgI lJUTM
(i) Date on or before which the tender Dt: 00/00/2022
s!f SR[ZLDF\ 8[g0Z 5CM\RT] SZJFGL TFZLB TFP __q__qZ_ZZ
(a) In sealed cover by Registered post only
(ii) Mode of sending the tender
sSf DCMZA\W SJZDF\ OST ZlH:80" 85F,YL H
(b) Tenders sent by ordinary post will be
sZf 8[g0Z DMS,JFGL 5wWlT outright rejected.
sBf ;FNL 85F,YL DMS,[, 8[g0Z ;LW] ZN SZJFDF\ VFJX[P
Description essential to be made on (a) Name of work
Sealed Cover sSf SFDG]\ GFD
(b) Last date of Receiving the Tender
s#f DCMZA\W SJZ 5Z NXF"JJFGL H~ZL lJUT
sBf 8[g0Z :JLSFZJFGL K[<,L TFZLB
In figures as well as in words.
(iv) Mode of quoting rate in Schedule B
(Premium / Rebate / At Par)
s$f VG];}lR cBc DF\ EFJ EZJFGL ZLTP VF\S0F T[DH XaNMDF\P s5|LDLIDqZLA[.8qV[8 5FZf
* Strike out which ever is not applicable * ,FU] G 50T] CF[I T[ K[SL GFBJ]P
Note : The normal rate of security Deposit is 5 percent for works upto Rs. 15 lacs and further 5% as
performance bond for works above Rs. 15 lacs. Out of 5% of Security Deposit 50% is payable at the
time of acceptance of tender and the balance by deduction from progress bills
1. DATA SHEET FOR OFFLINE TENDER
3. DATA SHEET FOR ONLINE TENDER
4. NOTICE INVITING TENDERS [OFFLINE]
5. NOTICE INVITING TENDERS [ONLINE]
6. DECLARATION CERTIFICATE
7. TENDER FOR WORK
9. TERMS & CONDITIONS OF CONTRACT
Clause 1 Security Deposit
Clause 2 Liquidated Damages for Delay
Clause 3 Default by Contractor
Action when the Progress of any particular portion of the work is
Clause 5 Non exercise of powers under clause 3 not a waiver
Powers to Seize Tools, Plants, Machineries, Materials and Stores of the
contractor on invocation of clause
Clause 6 Extension of Time Limit
Clause 7 Final measurement and final bill on completion of work
Clause 8 Intermediate and Final Payments
Clause 9 Payment at Reduced Rates
Clause 10 Bills to be Submitted Monthly
Clause 11 Bills and Rates Payable
Clause 12 Materials to be Supplied by the Department
Clause 12-A Consumption and return of materials supplied by the department
Clause 12-B Safe Custody of Materials Supplied by the Department
Drawings, Designs, Instructions of the Engineer-In-Charge and
Specifications, Order of Precedence in case of discrepancies
Clause 14 Excess over Tender Quantities, Extra Items and Variations
No Claim to any payment or Compensation for alterations of for
restrictions of work
Clause 15-A No claim for Delay in Supply of Materials by the Government
Clause 16 Claims under the Contract
Remedies for Inferior or Bad Work, Materials or Workmanship and
Maintenance clause
Clause 17-A Defect Liability Clause
Work to be open for Inspection - contractor's responsible agent to be
Clause 19 Notice to be given before work is covered up
Damage to contract work-in-progress and damages to Surrounding
Clause 20-A Damages due to acts of god and unprecedented floods
Contractor to Supply plant, Ladders, Scaffolding etc. and is liable or
damage arising from non-provision of lights, fencing etc.
Regulations for Scaffolds, Working Platforms, Gangways and
Clause 21-B Regulations for Hoisting Appliances
Clause 22 Measures for Prevention of Fire
Clause 23 Liabilities to Contractors for any damages done in or outside work
Clause 24 Compaction of Layers of works above Rs. One Crores
Clause 25 Deleted
Work not to be Sublet; Consequences for Unauthorised Subletting,
Bringing and Becoming Insolvent
Sums Payable by Way of Compensation to be Considered As
reasonable compensation without reference to actual loss
Clause 28 Changes in the constitution of firm to be notified
Clause 29 Works to be under directions of Superintending Engineer
Clause 30 Settlement of Disputes and Arbitration
Clause 31 Deleted
Clause 32 Lump Sums in Estimates
Clause 33 Action where no Specifications
Clause 34 Definition of Work
Contractors Percentage-whether applied to net or gross amount of the
Clause 36 Royalties
Clause 37 Compensation under the Workmen's Compensation Act.
Clause 37-A Liability of the contractor in case of Accidents
Clause 37-B Arrangements for personal Safety requirements and First-aid
Quantities in the Tender to be considered Approximate and they are
subject to variations
Clause 39 Employment of famine or other labour
Clause 40 Claim for Compensation for delay in starting the work
Clause 41 Claim for compensation for delay in the Execution of work
Clause 42 Entering upon or Commencing any portion of Work
Clause 43 Minimum Age of Persons Employed
Clause The payment of fair wages etc.
Clause 44 Method of payment
Clause 44-A Set off clause
Clause 45 Deleted
Clause 46 Employment of Scarcity Labour
Clause 47 Deleted
Clause 48 Application of GST Tax and Consequences thereof
Clause 49 Employment through employment exchange and local labour
Clause 50 Fair Wages
Clause 51 Deleted
Clause 52 List of Machinery
Liabilities of Contractor for Idleness of Road Rollers deployed by the
department on Contract work
Clause 54 Local labour on normal rates
Clause 55 Land on hire and rental charges
Clause 56 Vaccination to labourers
Clause 57 Camp facilities to workers
Clause 58 Gum boots, Hand gloves, Masks etc. to Labourers
Clause 59 No distinction between harijans and other workers
Clause 60 Price Escalation clause
Clause 61 Fencing and Lighting
Clause 62 Liabilities for Accidents to Persons
Clause 63 Access to Site and Work on site
Clause 64 Reports regarding Labour
Clause 65 Treasure Trove
Clause 66 Indemnity
Clause 67 Insurance of Labourers
Clause 68 Setting out
Clause 69 Cement Register
Clause 70 Materials, Works Test Register and Core cutting Machine
Clause 71 Progress schedule
Clause 72 Secured Advance
Clause 73 Advance Payment
Clause 74 Advance against Machineries
Clause 75 Mobilization Advance
Clause 76 Licence for contract labour
Clause 77 Recovery of Testing Charges and Handing over empty Cement bags
Clause 78 Deleted
Clause 79 Recovery of Workers Welfare Cess
Annexure-1 Declaration regarding Income tax, Addresses, etc.
Annexure-2 Basic rates considered by the contractor
Annexure-3 Performance Bond
Annexure-4 List of works already completed by the tenderer
Annexure-5 List of Plant and Machinery
Annexure-6 Declaration regarding works on hand
Annexure-7 Special Conditions of Contract
Schedule ‘A’ Materials to be supplied from P.W. Store
Schedule ‘B’ Memorandum showing items of works to be carried out
Schedule ‘C’ Time schedule of completion
DATA SHEET FOR B-1 E-TENDERING
(A) Details of Tender Item:
Sr. Tender EMD in Period of
Name of Work fee Security of
No. Value in (Rs. _______) Completion
As per NIT & Tender Documents
(B) Eligibility : Registere in ________ Class or above / Pre-qualification.
(C) Schedule of E-Tendering is fixed as under:
(i) Site Visit (If any) On Date : 00/00/2022 ; 00:00 hrs.
Downloading of tender From Date : 00/00/2022
documents Start & End Date Upto Date : 00/00/2022 Till 00:00 hrs.
(iii) Online submission of bid Upto Date : 00/00/2022 Till 00:00 hrs.
(iv) Submission of EMD & Tender Submission in electronic format only through online
fee and other documents by scanning and then the same should be sent in
original to Tender Opening Authority at the time of
Tender Opening or sent the same through R.P.A.D. So
As perasNIT & Tender Documents
to reach Executive Engineer (M), GMB, Bhavnagar
within 7 days from last date of Opening.
If Tender fee and E. M.D. is not paid as shown in bid
document, action to hold his registration in abeyance
shall be taken and his E-tendering code will be
cancelled for One year.
(v) Online Opening of Bid
90/120* Days counted from the date of opening of
(vi) Bid Validity period
online tenders.
Bidders can download the tender documents free of cost from the website.
www.gmb.nprocure.com
Bidders have to submit bid in Electronic format only on above mentioned website till the
Date & time shown above.
Offers in physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure/ should have legally
valid Digital Certificate (Class-III) as per Information Technology Act-2000 using which they
can sign electronic bids. Bidders can procure the same from any of the license certifying
Authority of India or can contract (n) code solution - a division of GNFC Ltd., who are licensed
Certifying Authority by Govt. of India.
(D) (i) Bid Inviting Authority As per NIT
(ii) Bid Opening Authority As per NIT
Percentage premium or rebate in words and
(E) Mode of Quoting Rate
figures at the end of Schedule B
The list of certifying agencies are as mentioned under :
Sr. No. Name of Certifying Agency Website Address
1. (n) Code solution (G.N.F.C.) www.gnvfc.com.
2. Safecrypt www.safescrypt.com.
3 TCS www.tcs.-ca.tcs.co.in
4. MTNL www.mtnltrustline.com
NOTICE INVITING TENDERS (OFFLINE)
1. Tenders are invited on behalf of Governor of State of the Gujarat for work as per page number one of
this Booklet. The work is estimated to cost of “As per NIT”. This estimate however, is given as a
2. The works are required to be completed within “As per NIT” as per the terms of the contract
3. The contractor, whose names are borne of the approved list of contractors of Gujarat State R & B
Deptt./W.R.D. in _______ Class and above on the date of opening tenders only will be permitted to
tender. Not more than one tender shall be submitted by a contractor or by a firm of contractors. No
two or more concerns in which an individual is interested as a proprietor and / or a partner shall
tender for the execution of the same works. If they do so, all such tenders shall be liable to be
4. Applications for issue of tender documents shall be submitted to __________________ so as to reach his
office not letter than ______________.
5. Tender documents consisting of conditions, specifications, Schedule(s) of quantities of the various
classes of work to be done, the conditions of contract etc. will be issued /sold on (date)_____________ to
_____________ (date) up to 4 p.m on payment of “As per NIT”.
6. Copies of other drawings and documents pertaining to tender and signed for the purpose of
identification by the Accepting Officer or his accredited representative will be open for inspection by
tenderers at the following offices during working hours between the dates mentioned in clause
7. Tenderers are advised to visit the site sufficiently in advance of the date fixed for submission of the
tender. A tenderer shall be deemed to have full knowledge of all the relevant documents samples,
site etc. whether he inspects them or not.
8. Submission of a tender by a tenderer implies that he has read this notice and all other contract
documents and has made himself aware of the scope and specification of the work to be done and of
conditions and rates at which stores, tools and plant etc. will be issued to him, by Government and
local conditions and other factors bearing on the execution of the works.
9. A tendered should quote in figures as well as in words the rate(s) tendered. Special care shall be
taken to write rates in figures as well as in words and the amounts in figures only and in such a way
that interpolation is not possible. The total amount shall be written both in figures and In words. In
that interpolation is not possible. The total amount shall be written both in figures and In words. In
case of figures the words Rs. Should be written before the figure of rupees and the words ‘paise’
after the decimal figure e.g. Rs.2.15 p. and in case of words the words ‘Rupees’ should proceed and
the words ‘paise’ should be written at the end. Unless the rate is in whole rupees and followed by the
word ‘only’, it should invariably be upto two places of decimal.
10. All rates shall be quoted on the tender form.
11. The tender for the works shall not be witnessed by a contactor or contractors who himself /
themselves has/have tendered or who may and has/have tendered for the same works. Failure to
observe this condition shall render the tender of the contractor tendering, as well as of those
witnessing the tender liable rejection.
12. Receiving and opening of tender: Tender shall be received by Registered post A.D by
________________________ up to Office Hours upto the __________ (date) and shall be opened at _________
hours on _______________ in the presence of tenderers who may be present.
13. In the case of contractors who have not furnished standing security, the tender shall be accompanied
by earnest money (unless exempted from depositing it) of Rs._________ Treasury Chalan / Deposit at
call Receipt issued in favour of ______________________ by a scheduled or Nationalized bank or
Narmada/Shrinidhi F.D. Rs. the amount being credited to ___________________ A contractor exempted
from depositing earnest money/security in individual case(s) shall attach with the tender an
attested copy of the letter exempting him from depositing earnest money/ security and shall
produce the original when called upon to do so.
14. A tenderer shall submit the tender which satisfies each and every condition laid down in this notice
and tender documents, failing which the tender will be liable to be rejected.
15. The Governor of the State of Gujarat does not bind himself to accept the lowest or any tender or to
give any reasons for the decision.
16. This notice of tender shall form part of the contract documents.
For and on behalf of Governor for the State of Gujarat.
Designation __________________
NOTICE INVITING TENDERS (E-PROCURE)
1. Tenders are invited on behalf of Governor of State of the Gujarat for work as per page number two of
this Booklet. The work is estimated to cost of “As per NIT”. This estimate however, is given as a rough
2. The works are required to be completed within “As per NIT & Tender Documents” as per the terms of
the contract conditions.
3. The contractor, whose names are borne of the approved list of contractors of Gujarat State R & B
Deptt./W.R.D. in “As per NIT & Tender Documents” on the date of opening Tenders only will be
permitted to tender. Not more than one tender shall be submitted by a contractor or by a firm of
contractors. No two or more concerns in which an individual is interested as a proprietor and / or a
partner shall tender for the execution of the same works. If they do so, all such tenders shall be liable
to be rejected.
4. Bid document can be downloaded & Submitted in Electronic Format on online website
www.gmb.nprocure.com “As per NIT”.
5. Tender documents consisting of conditions, specifications, Schedule(s) of quantities of the various
classes of work to be done, the conditions of contract etc. will be shown on above Web Site.
6. Copies of other drawings and documents pertaining to tender and signed for the purpose of
identification by the Accepting Officer or his accredited representative will be open for inspection by
tenderers at the following offices during working hours between the dates mentioned in clause
7. Tenderers are advised to visit the site sufficiently in advance of the date fixed for submission of the
tender. A tenderer shall be deemed to have full knowledge of all the relevant documents samples,
site, etc. whether he inspects them or not.
8. Submission of a tender by a tenderer implies that he has read this notice and all other contract
documents and has made himself aware of the scope and specification of the work to be done and of
conditions and rates at which stores, tools and plant etc. will be issued to him, by Government and
local conditions and other factors bearing on the execution of the works.
9. The bidder should quote his bid premium or rebate at the end of Schedule-B. It he do not wish to
quote premium or rebate, he should Indicate “at par” in the blank space preceding “%above/below”
in Schedule-B. Thereafter, he should work out and indicate the offered bid amount both in words and
figures in Schedule B.
10. All rates shall be quoted on the tender form.
11. The tender for the works shall not be witnessed by a contactor or contractors who himself /
themselves has/have tendered or who may and has/have tendered for the same works. Failure to
observe this condition shall render the tender of the contractor tendering, as well as of those
witnessing the tender liable rejection.
12. The electronically offered bids will be opened “As per NIT” the presence of bidders who may choose
to remain present in the office of the Bid opening Authority Specified in bid documents.
13. “Demand Draft for Tender fee & FDR for EMD shall be submitted in electronic format only through
online (by scanning) while uploading the bid. This submission shall mean that E.M.D. & tender fee are
received for purpose of opening the bid. Accordingly offer of those shall be opened whose E.M.D. &
tender fee is received electronically. However for the purpose of realization of D.D. bidder shall send
the D.D. in original to Tender Opening Authority at the time of tender opening or send the same
through R.P.A.D. So as to reach “As per NIT” before last date of opening. If Tender fee and E.M.D. is not
paid as shown in bid document, action to hold his registration in abeyance shall be taken and his E-
tendering code will be cancelled for One year. DD for Exemption Certificate is not necessary.
However, Exemption Certificate shall have to be submitted electronically through online
Any documents in supporting of tender bid shall be submitted in electronic format only through
online (by scanning etc.) & hard copy will not be accepted separately.”
14. The Governor of the State of Gujarat does not bind himself to accept the lowest or any tender or to
give any reasons for the decision.
15. This notice of tender shall form part of the contract documents.
For and on behalf of Governor for the State of Gujarat.
Designation __________________
ROAD & BUILDINGS / WATER RESOURCE DEPARTMENT
Contract for works
INFORMATION & INSTRUCTION FOR TENDERERS:
1.0 Mode of Submitting Tender:
The tenders in the form referred to in notice inviting Tender shall be submitted in Electronic
format only on online web-site www.gmb.procure.com till the date & time shown “As per NIT”.
Offers in physical form will not be accepted any case.
Bidders who wish to participate in online tenders will have to procure / should have legally valid
Digital Certificate (Class-III) as per Information Technology Act-2000 using which they can sign
their electronic bids. Bidders can procure the same from any of the license certifying Authority of
India are as mentioned under:
Sr. No. Name of Certifying Agency Website Address
1. (n) Code solution (G.N.F.C.) www.gnvfc.com
2. Safecrypt www.safescrypt.com
3. TCS www.tcs.-ca.tcs.co.in
4. MTNL www.ntnltrustline.com
2.0 Competency of Tendered:
No contract will be awarded except to responsible bidders capable of performing the class of
work completed. Before the award of the contract, any bidders may be required to show that he
has the necessary facilities, experience, ability and financial resources to perform the work in
satisfactory manner within the time stipulated. Tenderer may be required to furnish the tender
inviting authority with the statements as to their experience and their financial status. Tenderer
shall be a registered contractor in appropriate class of the Roads & Buildings Department or
Water Resources Department of Government of Gujarat. The tenders of only those contractors
who process the general and special class and category of approved contractors for Government
of Gujarat on the specified date of opening tenders (Technical Bid in the case of two or more bid
system) will be opened. However this will not be applicable to Tenders / Bidders who are
registered in other states or Central Government, Railways, M.E.S. and who have applied for
registration in Gujarat State or before submitting tenders/bids. The tenders/bids of such
contractors will be opened subject to the condition that they get registration certificate before
issue of work-order in case they emerge as L-1 Bidder. (R&B circular No.TNC-10-2019 (FA-591-
3.0 Tenderer to inform Himself:
Tenderer will be deemed to have inspected the site and to have satisfied himself as to the nature
of all works, all existing roads, water-way and other means of communications and access to and
from the site of the work and the building that may be required for temporary purpose in
connection with the construction, completion and maintenance of the works and must make his
own inquiries as to work, yard sites and depot, and dumps as to acquisition of such additional
sites, rates and areas as may be necessary for temporary purpose for constructing, completing
and maintaining the works and availability of water for construction activities, power, quarries
4.0 Payment of Tender Fee and Earnest Money Deposit: “Demand Draft for E.M.D. & Tender fee
shall be submitted in electronic format only through online (by scanning) while uploading the
bid. This submission shall mean that E.M.D. & tender fee are received for purpose of opening the
bid. Accordingly offer of those shall be opened whose E.M.D. & tender fee is received
electronically. However for the purpose of realization of D.D. bidder shall send the D.D. in original
to Tender opening Authority at the time of tender opening or send the same through R.P.A.D so
as to reach “As per NIT”. Any documents in supporting of tender bid shall be submitted in
electronic format only through online (by scanning etc.) & hard copy will not be accepted
separately. Any documents in supporting of tender bid shall be submitted in electronic format
only through online (by scanning etc.) (R & B Circular No.5ZRv–!_Z__(v54 dated 19-1-2019 &
5.0 Payment: The tenderer must understand clearly that the rates quoted are for completed works
and include all costs due to labour, scaffolding plant, supervision, service work, power, royalties
and octroi etc., and include all extras to cover the cost of night work if and when required and no
claim for additional payment beyond the price/rates quoted and accepted will be entertained
and the tenderers will not be entitled subsequently to make any claim on the ground of
misrepresentation or on the ground that he was Supplied with information given by any person
(whether the member is the employee of Public works Department or not). Any failure on his
part to obtain all necessary information for the purpose of making his tender and filling the
several prices and rates therein shall not relieve him from any risks or liabilities arising out of or
consequent upon the submission of the tender.
6.0 Tender Forms: The form will state work to be carried out as well as the date of submitting and
opening tenders and the time allowed for carrying out the work, also the amount of earnest
money to be deposited with the tender and the amount of the security deposit to be paid by the
successful tenderer and percentage, if any to be deducted from bill. It will also state whether a
refund of quarry fees, royalties, octroy dues and ground rents will be granted. Copies of the
specification, designs and drawing and estimated rates, and any other documents required in
connection with work which shall be signed by the Executive Engineer (M) for the purpose of
identification shall also be open for inspection by contractor at the office of the Executive
Engineer (M) during office hours. However every ‘blank’ in the form of the E-Tender and in the
Schedule and Annexures must be filled up by the tenderer and must be submitted online.
7.0 The bidder should quote his bid premium or rebate at the end of Schedule B. If he do not wish to
quote premium or rebate, he should indicate "at par" in the blank space preceding "%
above/below" in Schedule B. Thereafter he should work out and indicate the offered bid amount
both in words and figures in Schedule B.
8.0 Earnest Money : Earnest money in specified form @ 1% of the estimated cost + GST must be
sent as specified in Instruction No.4 preceding electronically Tenderer may pay earnest money
upto Rs.50000/- in the form of Crossed Demand Draft or fixed deposit or fixed deposit-at-call
receipts with a validity period of not less than six months of Nationalized or Scheduled bank or
Narmada/Shrinidhi F.D.Rs. drawn in favour of Executive Engineer (M)/Divisional Officer
concerned. Earnest money by cheque & Bank Guarantee shall not be accepted. (vide R&BD G.R.
No.TNC/ 1090(100)(4)-C, dated 4.11.2019). However in respect of the works estimated to cost
above Rs.50 lacs, the amount of earnest money in excess of Rs.50000/- can be offered by the
contractor, at his choice, in the form of Bank Guarantee of the Scheduled or nationalized Bank or
other banks approved for Government business only. The Bank Guarantee in such cases will be
furnished in the following form. In such cases also the amount of earnest money first Rs. 50,000/-
will be paid only in the form of crossed demand drafts or fixed deposit receipts or deposit at call
receipts worth the validity period of not less than 6 months of the nationalized or Scheduled or
Narmada/Shrinidhi F.D.Rs.
The Contractors who have secured exemption certificate for payment of earnest money by
depositing Lump Sum earnest money Deposit need not pay earnest money, but produce the
certified copy of the exemption certificate along with the tender electronically. If the contractor
does not remit the tender fee & the earnest money within the specified time his registration will
be held in abeyance for one year & his tendering code will be cancelled for one year. If the
contractor does not turn up to pay the Security Deposit and execute contract agreement within
specified (or extended) time after intimation to him about acceptance of his offer, the earnest
money paid for this work will be forfeited and such tenderer's tender shall be rejected and then
according aforesaid provision of tender, action to blacklist the Contractor will be initiated
without Delay. (Vide R&B D G.R. No. Misc-1097-90-1091/97-Z/C dated 4-10-1997 & Parach-10-
2008-5C Part file dtd. 27-11-2008)
Bank Guarantee is applicable only when the estimated cost of work is more than Rs.50 lacs.
Where as M/s._________________________________________________ (hereinafter called the Tenderer) is
desirous and preferred to tender for works in accordance with the terms and conditions of
tender for the work of _________________ and where as We, Bank, agree to give the tenderer a
guarantee for the Earnest Money.
1. Therefore, we hereby affirm that we are guarantors on behalf of the Tenderer upto total rupees
_________________________________ in words) Rs. ______________ (in figures) and we undertake to pay to
Executive Engineer (M), _______________ Division ________________ Department of Government of
Gujarat the ________________________ upto his first written demand, without demur, without delay
and without the necessity of a previous notice of judicial or administrative procedures and
without the necessity to prove to the Bank the defects or short comings or debits of the
contractor any sum within the limit of Rs.______________________.
2. We further agree that the Guarantee herein contained, shall remain in full force and effect during
the period that would be taken for the acceptance of tender.
However, unless a demand of claim under this guarantee is made on us in writing on or before
the _________________________ (Date to be specified - will not be less than 180 days from the
stipulated date of receiving the tender) we shall be discharged form all liabilities under the
guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of
the Executive Engineer (M) ___________________________ Division __________________________in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the tenderer or
Date Signature & Seal of Guarantor _______________________________
8.2 The Earnest Money submitted in the form of Deposit-At-call receipt shall need minimum validity
of six months from the last date of online submission of tender. Tender not supported with
tender fee, Earnest Money & documents and not submitted in electronic format (by scanning)
while uploading the bid shall be rejected as NON Responsive. If the tenderer modifies or
withdraws his tender, the Earnest Money (in case of EMD exemption certificate, proportionate
amount equivalent to EMD of a particular tender) shall be forfeited and the tenderer may be
disqualified from tendering for future works under the Government.
8.3 The Earnest Money will be returned to the unsuccessful tenderers. The Earnest Money will be
returned to the successful tenderer after he furnishes security deposit and duly enters into the
8.4 Within Ten days or within such time as may be decided by the Tender Inviting Authority from
date of receipt of the letter accepting his tender, the successful tenderer shall furnish the
required security deposit and attend the office of the Tender inviting Authority for execution of
the contract documents. If he fails to furnish the security deposit or execute the contract
document, his Earnest Money (in case of EMD exemption certificate equivalent amount there
from) shall be forfeited and action to blacklist the contractor bill be initiated without delay (Vide
R & B D G.R. No.Misc.1097-90-1091-97-Z/C dated 4.10.1997)
9.0 Accompaniments of Tender : (to be submitted in electronic format only through on line
(by scanning) as duly certified true copies)
The contractor shall have to furnish:
(i) Demand Draft of Tender fee and Earnest Money Deposit.
(ii) Copy of Partnership Deed or Memorandum as well as Articles of Association in case of the
company and intimate permanent addresses of his partners/Directors of Company. All copies
submitted shall be duly attested.
(iii) Copies of certificate regarding previous experience, as required.
(iv) Declaration showing all works completed during preceding 5 years and works on hand with the
Contractor and the value of works that remained to be executed in each case.
(v) A certificate of Registration as approved contractor of prescribed category from authorities
stipulated in Notice Inviting Tenders.
(vi) P.A.N. issued by Income Tax Department.
(vii) Copy of Provident Fund Registration - Code No.
(viii) Duly filled in and digitally signed declaration form as provided after as last item of section-1 &
Memorandum duly filled in & digitally signed as given in section-2.
(ix) A solvency certificate of an Amount of 20% (Twenty Percent) of estimated cost put to tender will
have to be produced along with tender. It shall be of Scheduled Bank or Nationalized Bank or
Bank Approved for Government business. Solvency Certificate shall have validity of same
calendar year as that of date in which tender is issued.
(x) Required Annexures duly filled in when prequalification in involved.
Required documents are to be submitted in electronic format only as part of tender
document failing which the tender will be rejected outright and will be considered as NON-
10.0 Tender liable to be Invalid:
It may please be noted that the tender is liable to be considered invalid especially, if the
requirements as per Instruction No.(1) to (9) above are not complied with.
11.0 Right of rejection of tenders.
(i) Right is reserved by the Tender Inviting Authority to reject any or all tender(s) without assigning
any reason thereof.
(ii) In addition to the above, the tender will also be liable to be rejected outright if:
(a) The tenderer proposes any alteration in the work specified or in the time allowed for
carrying out the work or in any condition.
(b) The tenderer or in the case of a firm, each partner or the person holding the power of
attorney thereof does not digitally sign section-2 or signature/s is/are not attested by a
(c) If the tenderer adopts unhealthy / mal practice / corrupt practice for securing and
performing contract.
12.0 Method of Tendering :
12.1 If the tender is made by an individual, it shall be digitally signed by the proprietor above his full
name and the full name and current address.
12.2 If the tender is made by a proprietary firm, it shall be digitally signed by the proprietor above his
full name and current name of his firm with its current address.
12.3 If the tender is made by a firm of partnership, it shall be digitally signed by a partner of the firm
holding the power of attorney and digital certificate for the firm. A certified copy of the power of
attorney shall be provided in physical form along with other documents. A certified copy of the
partnership deed, full name and current address of the firm and full names and the current
addresses of all the partners of the firm shall also be provided along with other documents.
12.4 If the tender is made by a limited company or a limited corporation, it shall be digitally signed by
a duly authorized person holding digital certificate for the company/corporation and power of
attorney for signing the tender in which case a certified copy of the power of attorney shall be
provided separately in physical form along with other documents. Such limited Company or
Corporation may be required to furnish satisfactory evidence of its existence before the contract
12.5 All digital signatures in the tender document shall be dated.
13.0 Eligibility and qualification requirement :
To establish acceptability of the offer to the satisfaction of Tender Inviting Authority the tenderer
shall provide the following:
13.1 Details of plant and machinery immediately available with tenderer for use on the works.
13.2 Details of plant and machinery proposed to be procured for the works.
13.3 Details of technical, supervisory and administrative personnel already employed by the tenderer
that he proposed to utilize for this work and such other personnel he proposes to employ further
13.4 Copies of registration certificate and P.A.N. allotted by income Tax Office.
13.5 List of works already completed by the Tenderer during last 5 Years.
13.6 List of works on hand on the date of submitting tender.
13.7 In respect of Road works estimated to cost above Rs.7.50 Crores, bridges as well as building
works estimated to cost above Rs.7 Crores. The offers of bidders fulfilling the pre-qualification
requirements only shall be considered.
14.0 Deviation or modifications in Tender Documents :
14.1 All tenderers are cautioned that tender containing any condition and/or deviation from the
contractual terms and conditions, specifications, quoting offering rates/prices in different
manner than specified in the tender and/or any other requirements of tender shall make the
tender liable for outright rejection shall be considered as non-responsive for all practical
purposes. However in respect of Tenders under Two cover Bid system, proposals for deviations
on issues stated in the Clause of two cover bids, can be suggested. The decision of the tender
inviting authority in this regard shall be final and binding to the tenderer.
14.2 Alternative tenders are not acceptable.
15.0 Submission of tender
15.1 Tender shall be submitted in an online manner only on website www.gmb.nprocure.com
Last date & time of online submission: “As per NIT”
15.2 Tender fee, EMD and other documents should be submitted in electronic format only through on
line (by scanning) while uploading the bid. However for the purpose of realization of D.D. the
bidder shall send the D.D. in original to Tender opening Authority/inviting authority which ever
case may be send the same through R.P.A.D/speed post only So as to reach “As per NIT”
mentioning the name of work on the envelop (R&B D Circular No.5ZRv102008-; Dt. 18-1-2008 &
16.0 Evaluation of Tenders :
16.1 Evaluation will be made to determine the acceptability, adequacy and reasonability of rates, his
past performance and present resourcefulness.
16.2 To assist in the examination, evaluation and comparison of tender, the tender inviting authority
may ask tenderer individually for clarification of their tenders including breakdown of unit rates.
The request for clarification and response shall be in writing but no change in substance of the
tender shall be sought, offered or permitted at that stage.
16.3 Award may be made to the tenderer whose responsive tender is determined to be the lowest
evaluated tender and who meets the appropriate standards of capacity and financial resources.
17.0 Receipt of Payments: Receipt of payment made on account of any work, when executed by a
firm shall be signed by all the partners except where the contractors are described in their tender
as firm in which case the receipt shall be signed in the name of the firm by one of the partners or
by some other person having authority to give effectual receipts for the firm.
18.0 Bids should be Off Line (Not) only.
19.0 General rules and directions:
19.1 No receipt for any payment made by a contractor will be entertained by the Government in
regard to any matter relating to this tender or the contract shall be valid and binding on the
Employer unless it is signed by the Authorized staff members of the Government.
19.2 All works shall be measured net by standard measure and according to the rules and customs of
the R&B/ Water Resources Department or any other method approved by the R & B/Water
Resources Department without reference to any local custom. The measurements of work will be
taken according to the usual method in use in the Roads & Buildings Department and no proposal
to adopt alternative method will be accepted. The Executive Engineer (M)’s decision as to what is
the usual method in use in the Roads & Building Department will be final.
19.3 In the event of any error or discrepancy in write up to tender documents the contractor will not
take any undue advantage of such error or discrepancy and Engineer-in-charge shall have
powers to interpret and decide correct meaning of contradictory erraneous writing.
19.4 The contractor shall not be permitted to tender for the work in which his near relative is working
as the officer in the sphere of his jurisdiction in the Tender inviting authority.
Note : By term “near relative” is meant wife, husband, parents, children, brothers, sisters, uncles,
aunts, cousins, and in laws.
19.5 The contractor should compulsorily furnish his latest address(es) including the latest address of
his Partners and the place(s) of filling his/their income tax returns along with the tender. Any
changes, in such addresses, during the tenure of contract should invariably and forthwith be
intimated by the Contractor to the Executive Engineer (M).
20.0 Submission of additional information/documents : In addition to various specified
documents and information required to be submitted along with tender, the bidder may be
required to provide any other document/relevant information as considered necessary by the
tender inviting authority and the tenderer shall be required to provide the same as per the
requirement of the tender inviting authority. Even the successful bidder may be required to
provide the same and when required by the authority during subsistence of the contract.
21.0 Bank: Wherever the word “Bank” is used in this document, it would mean Schedule or
Nationalized Bank or other banks approved for Government business only. (R & B D.G.R.
22.0 Tender validity period: The tender for the work shall remain open for a period for 120 days
counted from the date of opening on line tenders. During this period if any tenderer withdraws
or makes any modifications or additions in the terms and conditions of his tender not acceptable
to the Government (Public Woks Department) then the Government shall without prejudice to
any right remedy. be at liberty to foreit in full the said earnest money absolutely. In this
connection G.R, R & BD No.TNC-IIB-22(10)-C, dated 24/5/90 and G.R No.TNC-10-2013(02)-C
dated 10/5/2013) should be referred to.
23.0 The successful contractor shall exhibit the board in prominent place of work site showing the
brief details of project/ work under execution, financier, cost of work and board details of
inputs/ specifications and targeted goals (R & B D. GRs Nos.TNC-1090-24-C dated 18.11.1991,
24.0 The contractor will not use the premises of project/ work under construction for his staff,
labourers or for any other purpose. If he do so, market rent for such unauthorized used will be
recovered. The marker rent will be decided by the Engineer in charge.
25.0 All statutory taxes deductible at source under various acts and notification by Government shall
be deducted while making payment for which T.D.S. certificate shall be issued.
26.0 Declarations: The tenderer will have to make declaration enlisted in the form attached herewith
and shall affix his signature to the form in token of correctness of declarations made therein. (G.R.
R & B D. No.TNC-IIB-22(10)-C dated 24.05.1990 should be referred to).
DECLARATION FORM
(i) I/We hereby declare that I/we have visited the site and fully acquainted myself/ourselves with
the local situations regarding materials, labour and other factors pertaining to the work before
submitting this tender.
(ii) I/We hereby declare that I/We have carefully studied the conditions of contract, specifications
and other documents of this work and agree for executing the same accordingly. DECLARATION
CERTIFICATE (G.R. dated 4/2/89 as revised by GR No.TNC-1083/6681/4/C Dt.31/8/1994)
(iii) I/We hereby declare that my/our near relative are not working in this Division or in its sub
division as an Executive Engineer (M), Deputy Executive Engineer, Assistant Engineer, Additional
Assistant Engineer, overseer, Divisional Accountant, Store Keeper, Manager of Atithi/ Vishram
Gruha and in the circle as a Superintending Engineer in addition for Panchayat works not
working as chairman of P.W. committee or as incumbunt in Jilla Panchayat at today.
27.0 SFDGM JS"VM0"Z .xI] YIF 5KL T]T"H SFDGF :Y/ p5Z T[ SFDGL GLR[GL lJUTM NXF"JT] \ AM0" .ÔZNFZ[ 5MTFGF BR[" 5|NlX"T SZJFG]\
~FP 5F\R ,FBYL JWFZ[ lS\DTGF Z:TFq5],MqDSFGMGF\ SFDM p5Z SFDGL lJUT NXF"JTF\ AM0"ov
!P SFDG]\ GFD sSFDGM 5|SFZf o &P ;]5ZJF.hZL :8FOGF\ GFD o
ZP lJEFUG]\ GFD o *P SFD X~ SZJFGL TFZLB o
#P 5[8F lJEFUG]\ GFD o (P SFD 5]Z]\ SZJFGL TFZLB o
$P 8[g0ZGL ZSD o )P SZJFGF\ SFDGL 8\}SL lJUT o
5P .ÔZNFZzLG]\ GFD o
v DF8L SFDGL Ô0F. _______________ ;[PDLP v D[8,GF 5|YD :TZGL Ô0F. _______________ ;[PDLP
v 0FDZGL ;5F8LG]\ SFD ____________ ;[PDLP v D[8,GF ALÔ :TZGL Ô0F. _______________ ;[PDLP
v 0FDZGL ;L,L\U ;ZO[;G]\ SFD _______________ ;[PDLP
v 5],GF\ ________ ,\AF.GF ________ UF/F v 5],GF\ 5FIGF SMgÊL8G]\ 5|DF6 __________ s;LD[g84 S5RL4 Z[TLf
v 5],GF\ YF\E,FqV[A8D[g8GF SMgÊL8G]\ 5|DF6 ________________ s;LD[g84 S5RL4 Z[TLf
v ;]5Z :8=SRZGF SMgÊL8G]\ 5|DF6 __________________________ s;LD[g84 S5RL4 Z[TLf
v VgI lJX[QF Ô[UJF.P
v 5FIFGF SMgÊL8G]\ 5|DF6 ________ s;LD[g84 S5RL4 Z[TLf
v .\8MGF R6TZDF\ ;LD[g8qZ[TLG]\ 5|DF6 _______ s;LD[g84 Z[TLf
v EMITl/IFGF SMgÊL8G]\ 5|DF6 _______________ s;LD[g84 S5RL4 Z[TLf
v EM\ITl/I[_______________ ;[PDLP Ô0F.GL _______________ ;[DLP ;F.hGL DMh[S 8F.<;
v AFZL AFZ6Fv;FUL ,FS0FGFq:8L, Ë[DqVgIP
VgI SFDMo IMHGFGM C[T] TYF 8}\SDF\ ;FDFgI HGTFG[ HF6JF HMU U]6J¿F WMZ6MGL lJUTP
VFZP;LP;LP SFDM o
VFZP;LP;LP SFDDF\ SMgÊL8G]\ 5|DF6 _______________ s;LD[g84 S5RL4 Z[TLf
GM\Wv! o VF SFDGF lJUTJFZ :5[XLOLS[XG GFIA SFI"5F,S .HG[ZzL4_______________ 5[8F lJEFU _______________ GL
SR[ZLVM VMlO;GF ;DI NZdIFG SM.56 ;DI[ Ô[. XSX[P VF SFDGL DFl,SL ÔC[Z HGTFGL K[ VG[ SFDDF\ SM. 1FlT S[ VlGIlDTTF
H6FI4 TM T[ AFATDF GLRF SM.56 VlWSFZLGM ;\5S" SZJF TYF T[DG]\ wIFG NMZJF lJG\TL K[P s!f GFIA SFI"5F,S .HG[ZzLGL
SR[ZLPPPPPPPPPPPPPPPPP sZf SFI"5F,S .HG[ZzLGL SR[ZLPPPPPPPPPPPPPPPPP s#f VlWÙS .HG[ZzLGL SR[ZLPPPPPPPPPPPPPPPPP
GM\WvZ o DSFG H[JF ;LlDT 1F[+O/ DF8[ V[S AM0" D]SJ]\ H~ZL K[P HIFZ[ Z:TF4 5],MDF\ 5F6LGL 5F.5 ,F.G4 U8Z ,F.G4 S[GF,
lJU[Z[ SFDMDF\ ,\AF.GM jIF5 JW] CMI tIFZ[ VFJF SFDMDF\ V[S SZTF\ JW] AM0" sHGTFGL VJZHJZ JW] CMI tIF\ T[DH A\G[ K[0F p5Z
VG[ JrR[f 8=FOLS ;,FDTLG[ wIFG[ ZFBL AM0" D]SJFGF ZC[X[P sDFPDPlJP 9ZFJ G\P8LPV[GP;LP!_)_vZ$v;4 TFP!(v!!v!))!4
TFP!*v(vZ__Z TYF TFPZ5v!_vZ__Z4 TFP5v#vZ_!!GM 9ZFJf
28.0 Additional Instruction regarding Security Deposit (Clause-1)
28.1 The full amount of Security Deposit deducted in cash from running bills will be released
proportionally as indicated in table below on production of Bank Guarantee of schedule Bank
provided the contractor produces Bank Guarantee for the period of six months beyond the
stipulated period of completion of work. Further if the time limit of contract is extended the
period of Bank Guarantee shall have to be extended for six months beyond the proposed
extension of time limit and the contractor shall have to furnish the undertaking for this alongwith
the application for extension in time limit.
Table of Proportionate release of Security Deposit:
Against production of
Sr. Monetary Progress Portion of Security Deposit to be released
Bank guarantee of
Equal to the amount retained from
Equal to the amount
1. 25% of Tender cost Running Bills or 0.625% of the estimated
cost of work, whichever is less.
Equal to the amount retained from
Equal to the amount
2. 50% of Tender cost Running Bills or 1. 25% of the estimated
cost of work, whichever is less.
Equal to the amount retained from
Equal to the amount
3. 75% of Tender cost Running Bills or 1.88% of the estimated
cost of work, whichever is less.
28.2 It will have to be ensured that the ten percent amount of security deposit in any form as
permissible above is kept available with the employer till the actual date of completion of work.
(Vide as per R & B Circular No.TNC-10-2013-3-(Part-2)-C Dt.20.11.2013)
29.0 Erasures - Persons tendering are informed that no alterations by them in the next of the
document sent herewith will be allowed and any such alterations will be disregarded.
30.0 The percentage in Schedule B must be given in words and figures. Amount this worked out must
also be entered in column and grand total of amount must be struck out by the tenderer.
also be entered in column and grand total of amount must be struck out by the tenderer.
31.0 Discrepancies and adjustment of Errors:
Any error in quantity or amount in Schedule 'B' showing items of work to be carried out shall be
adjusted in accordance with the following rules.
(a) In the event of a discrepancy between description in words and figures quoted by a tenderer
in the rates column, the description in words shall prevail.
(b) In the event of an error occurring in the 'amount' column of the Schedule 'B' showing items if
work, as a result of wrong multiplication of the unit rate and quantity; the unit rate shall be
regarded as firm and multiplication shall be amended on the basis of the rate.
(c) All errors in totalling in 'amount' column in carrying forward totals shall be corrected.
(d) Any rounding of amount against "items" or in "totals" shall be ignored
The tendered sum so altered shall for the purpose of the tender be substituted for the sum
originally tendered and considered for acceptance.
32.0 (i) It may please be noted that the tender will be considered as invalid, especially, if the
requirements as per instruction No.1 to 9 above are not complied with before submitting the
tender. Also please read carefully the face sheet and 'General Rules and Directions for the
guidance of contractor's of this form.
33.0 All corrections and additions or pasted slips should be initialled.
34.0 The tenders shall be received only under "Registered Post" No other system, namely receiving of
tenders by Hand Delivery 'or' by Express Delivery 'or' in person, should be adopted under any
circumstances. (Vide GR No.TNC-1872(106)-C, dated 12.02.1974)
(i) Late tenders (i.e. tender received after the specified time of opening), delayed tenders. (i.e.
tenders received before the time of opening but after due date and time of receipt of
tenders) and post tenders offers shall not be opened and considered at all.
(ii) The tenders received (by registered post) after time & the date specified in the tender notice
shall not be received by the concerned office from the postmen, for which, date and time
may be recorded on the cover of the tender as to when tender was refused by the Divisional
Accountant or the Divisional head or any other person in charge.
(iii) Necessary records should be maintained for refusal of such tenders in the registers for
receiving tenders and should be initialled by the concerned Executive Engineer (M).
35.0 The above instructions are applicable when B-1 Tender are invited On Line (E -procure) B-
Tender are invited Off Line i.e. in hard Copy in the above instruction, where-ever. The words
"ONLINE" electronically by scanning are used the same may be understood as the same may be
understood as "OFFLINE" in hard copy by registered post etc. This change will affect in formation
and instruction to tenderers section instruction 1, 4, 7, 8.9.11.12. 13.5, 15, 16, 18, 22 and
(Digital Signature of Contractor with Seal)
TENDER FOR WORK - SFD DF8[G]\ 8[g0Z
I/ We hereby tender for the execution for the Governor of Gujarat (hereinbefore and hereinafter referred
to as Government) of the work specified in the underwritten memorandum within the time specified in
such memorandum at + _____________________________ percent below/ above the estimated rates specified in
Schedule 'B' (memorandum showing item of works to be carried out) and in accordance in all respects
with the specifications, designs, drawings and instructions in writing referred to in this tender and in
Clause-13 of the annexed conditions of contract and agree that when materials for the work are provided
by Government, such materials and the rates to be paid for them shall be as provided in Schedule 'A'
VFYL C]\qVD[ VG];l} R cBc CFY WZJFGF SFDGL AFATM NXF"JTL IFNLDF\ lGlN"Q8 V\NFHL NZ SZTF\ + _____________________ 8SF GLRFvp\RF NZ[
IFNLDF\ 9ZFJ[, D]NTGL V\NZ VG[ VF 8[g0ZGL ;FY[ Ô[0[,L S\8=FS8ZGL XZTMGF B\0 !#DF\ H6FJ[,L ,[lBT lJUTM4 l0hF.GM4 0=M.\U VG[
;}RGFVM VG];FZ AWL ZLT[4 GLR[ H6FJ[,L IFNLDF\ NXF"J[,]\ SFD SZJF DF8[ U]HZFTGF ZFHI5F, sH[DG[ VCL\ VUFp VG[ CJ[ 5KL c;ZSFZc TZLS[
H6FJ[, K[f DF8[ 8[g0Z ZH} SZ]\ K]\qSZLV[ KLV[ VG[ T[ SFD DF8[ ;ZSFZ TZOYL DF,;FDFG VG[ T[ DF8[ R}SJJFGF NZ ;FY[GL VG];}lR cScDF\
Ô[UJF.VM SIF" D]HAGL ZC[X[ T[ DG[qVDG[ SA}, K[P
* Strike out whichever is not applicable * ,FU] G 50T] CF[I T[ K[SL GFBJ]P
+ In figures as well as words + V\FS0F T[DH XaN[FD\F
MEMORANDUM - IFNL
H]NF\ H]NF 5[8F SFDMGM ;DFJ[X SZFIM CMI TM T[GL lJUT
sSf s!f ;FDFgI J6"G D]B5'Q9 5FGF G\P V[S DF\ NXF"jIF D]HA
V,U IFNLDF\ VF5JLP
sBf V\NFHL SÄDT ~P sBf V\NFHL SÄDT ~P PPPPPPPPPPPPPPPPPPPPPPPPPPPPP
sUf AFGFGL ZSD sUf AFGFGL ZSD 1 % ~P PPPPPPPPPPPPPPPPPP
sWf ÔDLG VGFDT* s5F\R 8SFf
sWf s!f ;ZNFZ ;ZMJZ GD"NF lGUDGL AsV[S S[per
GL Tender Documents
D]NTJF/L YF56 s0L5MhL8
:J~5[f VYJF GFGL ART :J~5[ sS], l05MhL8 ZSDGF 5_ 8SF ;]WLf 2.5 % ~P PPPPPPPPPPPPPPPPPP
sWf sZf V\NFHLÒ SL\DTGF ZP5@ HFDLG VGFDTGL ZSD .ÔZNFZGF ZGL\U lA,MDF\YL
YI[, SFDGL R}SJJFGLP ZSDDF\YL S5FT SZJFDF\ VFJX[P DC¿D ZSD S5FIF AFN 2.5 % ~P PPPPPPPPPPPPPPPPPP
ZGL\U lA,DF\YL S5FT A\W SZJFDF\ VFJX[P
sRf VG];]lRT A[gSG]\ 5ZOMZDg; AMg0 s~l5IF #_ ,FB p5ZGF SFDDF\ V\NFHL SÄDTGF
5 % ~P PPPPPPPPPPPPPPPPPP
;ZJF/M S], 5/10 % ~P PPPPPPPPPPPPPPPPPP
* Vide R & BD G. R. No. TNC – 1088 – 1B/1 (13) / C dated 4-5-1993 & revised vide G.R. No. TNC-
AL,DF\YL SF5[, ZMS0 HFDLG VGFDT GFGL ART 5|DF65+ S[ V[OP0LPVFZP DF\ ~5F\TZ SZJF SMg8=FS8Z ,[BLT H6FJX[ TM T[ D]HA ~5F\TZ
SZFJL XSX[P VF D]HAGL ~5F\TZLT HFDLG VGFDT TYF SZFZGFD]\ SZTL JBT[ ZH] SZ[, jIFH]SL HFDLG VGFDTGL D]NT 5FSTF V[S DCLGF
VUFp SMg8=FS8Z ,[BLT H6FJX[ TM T[ VGFDT SMg8=FS8Z H6FJ[ T[8,F ;DI DF8[ ZLgI] SZFJL V5FX[P
(i) Time allowed for the completion of work from date of written order to commence “As per NIT”.
sKf SFD X~ SZJFGF ,[lBT C]SDDF\ lGIT SZ[, TFZLBYL 5}~\ SZJF DF8[ VF5[,L D]NT “As per NIT” P
Give Schedule where necessary showing dates by which the various items are to be completed.
H[ TFZLBM ;]WLDF\ H]NL H]NL AFATM 5}ZF SZJFGL CMI T[ TFZLBM NXF"JJL VG];}lR H~Z CMI tIF\ VF5JL o
(ii) Should this tender be accepted, I/We hereby agree to abide by fulfil all the terms and provisions of the
conditions of the Contract annexed here to so far as applicable and in default thereof to forefeit and
pay to Government in Office the sums of money mentioned in the said conditions.
sHf VF 8[g0Z :JLSFZJFDF\ VFJX[ TM ,FU] 50TL CX[ tIF\ ;]WL4 VF ;FY[ Ô[0[,L S\8=FS8GL AWL XZTMGL Ô[UJF.VMG]\ 5F,G SZJF VG[ T[G[
5lZ5}6" SZJF C]\qVD[ A\WFp\ K]\ q A\WF.V[ KLV[ VG[ T[D SZJFDF\ S;}Z YI[ pST XZTMDF\ NXF"J[, ZSD ;ZSFZDF\ HDF SZFJJF VG[ R}SJJF C]\
q VD[ ;\DT YFp\ K]\ q Y.V[ KLV[P
(Receipt No. ___________ dated _______________ from the Government Treasury or Sub-Treasury at _____________
in respect of sum Rs.* _________________________________ is forwarded herewith representing the earnest
money + (a) the full of value of which is to be absolutely forfeited to Government should 1/We not deposit
the full amount of security deposit specified in the above memorandum in accordance with Clause-I of the
said conditions, otherwise the said sum of above Rs. ______________________________shall be refunded).
The tender is hereby accepted by me on behalf of the Governor of Gujarat.
EXECUTIVE ENGINEER (M) (or his authorized assistant ………………………………………… Division.
+ Strike out (a) if no cash Earnest Money is to be taken * Amount to be specified in words and figures.
x Signature of Contractor before submission of tender x 8[g0Z ZH} SZTF 5C[,F S\g8=FS8ZGL ;CL
Note: The normal rate of Security Deposit is 5 percent for works upto Rs. 30 lacs and further 5 % as
performance bond for works above Rs. 30 lacs. Out of 5 % of Security Deposit 50 % is Payable at the time
of acceptance of tender and the balance by deduction from progress bills.
TERMS & CONDITIONS OF CONTRACT
CLAUSE 1 - Security Deposit:
1.1 Security Deposit is required to be furnished by the contractor as guarantee money for performance
of the contract and observance of Contract Conditions.
1.2 The person/ persons whose tender is accepted (hereinafter called the “Contractor” which expression
shall, unless excluded by, or repugnant to the context include his Legal heirs, executors,
administrators and assignees shall pay the total amount of Security Deposit:
administrators and assignees shall pay the total amount of Security Deposit:
(a) In respect of the tender up to Rs. Thirty lacs, equal to 5 (Five) percent of the estimated cost of
the work put to tender.
(b) In respect of the work above thirty lacs, equal to 10 (Ten) percent of the estimated cost of the
work put to tender.
1.3 In respect of the tenders up to Rs.30 lacs the contractor shall pay Five percent of Security deposit in
two parts as tender:
Part-I : 2.5 percent in the from of Narmada Bond of Sardar Sarovar Narmada Nigam Ltd. or in any
As per Tender Documents
form of National Small saving (N.S.S.) Schemes or F.D.R. of any Schedule Bank to be paid within
days from the date of receipt of Acceptance letter of his offer.
Part-II : 2.5 percent in the form of cash/ Security Deposit to be deducted from Running Bills that
become payable to the contractor from time to time.
1.4 In respect of the tenders above Rs. Thirty lacs the contractor shall pay first five percent of Security
Deposit as specified in part 1.3 above and for the remaining five percent, the contractor shall have to
give Performance Bond to be produced within 10 days from the date of receipt of acceptance letter
1.5 The work-order to commence to work shall be issued only after the security deposit as per Para
and 1.4 is paid/ furnished by the tenderer. If the tenderer fail to produce the security deposit as
above the earnest money paid by him shall be forfeited and his registration shall be held in abeyance
for three years from the date of such default as per Clause-3.
1.6 All compensation, liquidated damages or other sums or money payable by the contractor to
Government under the terms of this contract shall be deducted from or recouped by the realization
of a sufficient part of his security deposit, or from the interest arising there from or performance
bond or from any sums which may due or may become due by Government to the Contractor on any
account whatsoever and whether in respect of this contract, any other contract, or otherwise. In the
event of his security deposit being reduced by reason of any such deduction or recoupment as
aforesaid, the contractor shall within ten days thereafter, make good in cash or in Government
securities transferred as aforesaid any sum or sums required to make good the shortfall in the
amount of the security deposit.
1.7 The portion of security deposit deducted at 2.5 percent from running bills as security deposit can be converted
in to interest bearing securities or F.D.R. of Schedule Bank in the Name of Executive Engineer (M) provided that
the recovery of full amount of 2.5% is made and that the contractor has expressly desired this in writing.
1.8 Fifty percentage of the Security Deposit along with performance bond shall become refundable within fifteen
days after the final completion certificate is issued as per Clause-7. This action will be taken by the Executive
Engineer (M) and no proposal from Deputy Executive Engineer will be necessary. All dues under this contract or
other contract, or otherwise shall be recovered from the aforesaid amount of fifty percentage of the said
security deposit and the balance shall be refunded within fifteen days after the final certificate is issued as per
clause 7. The remaining fifty percentage As per
security Documents
deposit shall be refunded after the expiry of the Defect
Liability period as per clause 17 and 17-A after deducting there from the amount of expenses, if any, due to
Government under this contract. However before release of balance of Security Deposit, the undertaking should
be obtained from the contractor that he has paid royalty on mining materials and still if any dues for royalty
charges are to be paid, he undertakes to pay the same to the concerned authority. "No due certificate" from
Royalty collecting authority should not be insisted upon. (See Performance Bond on Page No.44) (Modified as
per R&B Circular No.TNC-10-2013-3-(Part-2)C dated 20-11-2013), No. CON 10-2016-02-C dated 24-10-2017
and No.TNC-10-2013-(4)-C dated 24-10-2017.
Also refer instruction 25 under Section I General Rules & Directions for the guidance of contractors.
CLAUSE 2 - Liquidated damages for delay: (i) If the Contractor fails to complete the work under
contract by the stipulated date, he shall pay liquidated damages of Rs. 0.1* percentage of the contract
value per day from the date of delaying the said work upto the date of completion and handling over to
the Government.
*As corrected vide- B & CD GR No. TNC - 1091 -1B – 10 / (11) - C, dated 29-6-92.
** Normal rate of Security Deposit is 5% for work upto Rs.30 Lacs & further 5% in form of performance bond for
work above Rs.30 Lacs.
(ii) However also it the contractor fails to complete any part of the work as designed in Schedule (c) by
the time indicated against such part, he shall pay Liquidated damages per day from the date of
delaying the said part of the work up to the date of completion of the said designated part at the
rates shown in the said schedule of the contract value of such part for such failure till the said
designated part is completed.
(iii) The aggregate maximum of liquidated damages payable under clause No.2 shall not exceed Rs. o.1
percentage of contract value per day and shall be subject to the maximum amount of ten percentage
of the estimated amount put to tender.
(iv) Delays requiring payment of ten percentage liquidated damages of the amount put to tender for
performance shall be sufficient causes for termination of contract and for forfeiture of security
deposit including amount of performance bond in respect of works estimated to cost more than Rs.
30 lacs, for performance and registration of the contractor shall also be kept in abeyance for three
years from the date as fixed in all cases. (See Schedule(C) on Page No.48)
CLAUSE 3 - Default by Contractor: If the Contractor shall neglect or fail to proceed with the work with
due diligence or if he violates any of the provision of the Contract, the Engineer-in-charge shall give the
Contractor a notice, identifying deficiencies in performance and demanding corrective action. Such notice
shall clearly state that it is given under the provision of this clause. After service of such notice, the
contractor shall not remove any plant, equipment and material from the site. The Government shall have
a lien on all such plant, equipment and material from the date of such notice till the said deficiencies have
been corrected as mentioned in the said notice.
If the contractor fails to take satisfactory corrective action within ten days after receipt of such notice, the
Engineer-in-charge on behalf of Governor of Gujarat shall terminate the contract in whole. In case, the
entire contract is terminated, the amount of security deposit and performance bond if any together with
the value of the work done but not paid for, shall stand forfeited to the Government. The plants,
equipment and materials, held under this clause shall then be at the disposal of the Government to
recover the amount equivalent to the liquidated damages and registration of the contractor shall be kept
in abeyance for three years from the date as fixed in all such cases.
The Engineer- in-charge if necessary shall direct that a part or the whole of such plant, equipment and
material be removed from the site within a stipulated period. If the Contractor fails to do so, the Engineer-
in- charge shall cause them or any part of them to be sold holding the net proceeds of such sale to the
credit of the Contractor. After settlement of accounts, the lien by the Government of the contractor's
remaining plant equipment and balances of materials shall be released.
Termination of the contract in whole shall be an adequate authority for the Engineer-in-charge to demand
discharge of the obligations from the guarantors of the security for the performance.
CLAUSE 4 : If the progress of any particular portion of the work under Contract is unsatisfactory, the
Engineer-in-charge shall, notwithstanding that the general progress of the work is satisfactory, in
accordance with Clause 2 be entitled to take necessary action under Clause 3, after giving the Contractor
ten day's notice in writing and the contractor shall have no claim whatsoever for any compensation for
any loss caused to him due to such action.
(Clause 1,2,3, and 4 are substituted vide GR No.TNC-1091/IB-10/(l 1)-C, dated 15-10-91 &
modified by GR dated 29-10-91 & G.R.No.TNC-1088/IB/18/(13)-C dated 31-8-94 and
CLAUSE 5: In any case in which any of powers conferred upon the Engineer-in -charge by clause 3 hereof
shall have become exercisable and the same shall not have been exercised, the non-exercise thereof shall
not constitute waiver of any of the conditions hereof and such powers shall notwithstanding be
exercisable at any future date.
CLAUSE 5A: In the event of the Engineer-in-charge taking action under clause 3, he may, if so desire, take
possession of all or any tools, plants, machineries, materials and stores in or upon the work or the site
thereof or belonging to the contractor or procured by him and intended to be used for the execution of the
work or any part thereof, by paying or allowing for the same in account at the contract rate or in case of
contract rates not being applicable at such reasonable rates, as may be comparable to current market
rates where ascertainable of similar articles and comparable condition, to be certified by the Engineer-in-
charge. In the alternative the Engineer-in-charge may by notice in writing to the contractor or his clerk of
the works foreman or other authorized agent require him to remove such tools, plants, machineries,
materials or stores from the premises within a time to be specified in such notice and in the event of the
contractor failing to comply with any such requisition, the Engineer-in-charge may remove them at the
contractor's expense or shall remove them by auction or private sale at the risk and cost of the contractor
in all respects, and the certificate of the Engineer-in-charge as to the expenses of any such removal and
the amount of the proceeds and expenses of any such removal shall be final and conclusive against the
CLAUSE 6 - Extension of time : If the contractor shall desire an extension of the time for completion of
the work on the ground of his having been unavoidably hindered in its execution or any other ground he
shall apply in writing to the Engineer-in-charge before the expiration of the period stipulated in the
tender or before the expiration of 30 days from the date on which he was hindered whichever is earlier
and the Engineer-in-charge may, if in his opinion, believe that there are reasonable grounds for granting
an extension, grant such extension, as he thinks necessary or proper. The decision of the Engineer-in-
charge in this matter shall be final.
B\0v& o D]NTDF\ JWFZM o SFD SZJFDF\ SM. VlGJFI" V\TZFI pEM YJFGF ALÔ SM. SFZ6;Z SFD 5]Z]\ SZJF DF8[ S\8=FS8Z D]NT JWFZM D[/JJF
DFUTF CMI4 TM 8[g0ZDF\ H6FJ[,L D]NT 5]ZL YFI T[ 5C[,F\ VFU/ H6FjIF D]HA T[ TFZLB[ T[G[ SM. V\TZFI G0IM CMI T[ TFZLB VUZ TM D]NT
,\AF. VF5JF DF8[GL DF\U6L SZJFG]\ SFZ6 p5l:YT YT]\ CMI T[ TFZLB A[DF\YL H[ JC[,L CMI T[ TFZLB #_ lNJ; 5]ZF YTF\ 5C[,F T[6[ SFDGF
CJF,FGF .HG[ZG[ ,[lBT VZÒ SZJFGL ZC[X[ VG[ SFDGF CJF,FGF .HG[ZGM VlE5|FI V[JM YTM CMI S[4 D]NT JWFZJF JFHAL SFZ6 K[ TM T[DG[
CJF,FGF .HG[ZG[ ,[lBT VZÒ SZJFGL ZC[X[ VG[ SFDGF CJF,FGF .HG[ZGM VlE5|FI V[JM YTM CMI S[4 D]NT JWFZJF JFHAL SFZ6 K[ TM T[DG[
H~ZL S[ IMuI H6FI T[ D]HA JWFZL VF5X[P VF AFATDF\ SFDGF CJF,FGF .HG[ZGM lG6"I VFBZL U6FX[P
CLAUSE 7 : As soon as the work is completed, the contractor shall give a notice of such completion to the
Engineer-in -charge and on receipt of such notice the Engineer-in-charge shall inspect the work and if he
is satisfied that the work is completed in all respects then:-
(i) For all works costing upto Rs. 50 lakhs (amount put to tender) the final measurements shall be
recorded within 45 days from the date of physical completion of the work and the final bill shall be
prepared within 45 days from the date of recording final measurement. The completion certificate
shall be issued within one month from the date of final measurements subject to the contractor
fulfilling his obligation as provided in the contract and subject to the work being complete in all
(ii) In respect of works costing more than Rs. 50 lakhs (amount put on tender), the final measurements
shall be recorded within 75 days from the date of physical completion of the work and the final bill
shall be prepared within 75 days from the date of recording final measurements subject to the
contractor fulfilling his obligations as provided in the contract and subject to the work being
complete in all respects.
When separate period of completion have been specified for items or groups of items, the Engineer-in-
charge shall issue, separate completion certificate for such items or groups of items.
No certificate of completion shall be issued nor shall the work be considered to be complete till the
contractor shall have removed from the premises, on which the work has been executed, all scaffoldings,
sheds and surplus materials, except such, as are required for rectification of defects; rubbish and all huts
and sanitary arrangements required for his workmen on the site in connection with the execution of the
work, as shall have been erected by the contractor for the workmen and cleared all dirt from all parts of
building(s) in, upon or around which the work has been executed or of which he may have possession for
the purpose of the execution thereof and cleared floors, gutters and drains, cased doors and sashes, oiled
locks and fastenings labelled keys clearly and handed them over to the Engineer-in-charge or his
representative and made the whole premises fit for immediate occupation or use to the satisfaction of the
Engineer-in -charge. If the contractor shall fail to comply with any of the requirements, of these
conditions as aforesaid, on or before the date of completion of the works, the Engineer-in-charge may, at
the expense of the contractor, fulfil such requirements and dispose of the scaffolding, or surplus materials
and rubbish et--. as he thinks fit and the contractor shall have no claim in respect of any such scaffolding
or surplus materials, except for any sum actually released by the sale thereof less the Cost of fulfilling the
requirements and any other amount that may be due from the contractor. It the expenses of fulfilling such
requirements is more than the amount realized such disposal as aforesaid the contractor shall forthwith,
on demand, pay such excess. The Engineer-in-charge shall also have the rights to adjust the amount of
excess against any amounts 'that may be payable to the contractor.
CLAUSE 8 : No payment shall be made for any work, estimated to cost less than rupees one thousand till
after the whole of the said work shall have been completed and a certificate of completion given. But in
the case of works estimated to cost more than rupees one thousand, the contractor shall on submitting a
monthly bill therefore, be entitled to receive payment proportionate to the part of the work then
approved and passed by the Engineer-in -charge, whose certificate of such approval and passing of the
sum so payable shall be final and conclusive against the contractor. All such intermediate payments shall
be regarded as payments by way of advance against the final payments only and not as payments for
work actually done and completed and shall not preclude the Engineer-in-charge from requiring bad,
unsound, imperfect or unskilled work to be removed and taken away and reconstructed, or re-erected,
nor shall any such payment be considered as an admission of the due performance of the contractor or
any part therefore in any respect or the accruing of any claims, nor shall it conclude, determine, or affect
in any way the power of the Engineer-in-charge as to the final settlement and adjustment of the accounts
or otherwise or in any other way vary or effect the contract. The final bill shall be submitted by the
contractor within one month of the completion of the work, otherwise the Engineer-in-charge's certificate
of the measurements and of the total amount payable for the work shall be final and binding on all
of the measurements and of the total amount payable for the work shall be final and binding on all
CLAUSE 9 : The rates for items of works shall be valid only when the items concerned is accepted as
having been competed fully in accordance with the sectional specifications, In cases where the items of
work are accepted as not so completed, the Engineer-in-charge may make payment on account of such
items at such reduced rates as he may consider reasonable in preparation of final or on account bill.
CLAUSE 10 - Bills to be submitted monthly: A bill shall be submitted by the contractor each month on
or before the date fixed by the Engineer-in-charge for all works executed in the previous month and
Engineer-in-charge shall take or cause to be taken the requisite measurement for the purpose of having
the same verified and the claim, so far as it is admissible, shall be adjusted, if possible, within ten days
from the presentation of the bill. If the contractor does not submit the bill within the time fixed as
aforesaid, the Engineer-in-charge may depute a subordinate to measure up the said work in the presence
of the contractor or his duly authorized agent whose countersignature to the measurement list shall be
sufficient warrant and the Engineer-in-charge may prepare a bill from such list which shall be binding on
the contractor in all respects.
B\0v!_ o lA, NZ DlCG[ ZH} SZJF AFAT o VFU,F DF;DF\ SZL VF5[,F AWF SFD DF8[ CJF,FGF .HG[Z[ GÞL SZL CMI T[ TFZLB[ VYJF T[
5C[,F NZ DlCG[ S\8=FS8Z[ lA, ZH} SZJFG]\ ZC[X[P VG[ V[ SFDGL BZF. SZJFGF pN[XYL CJF,FGF .HG[Z H~ZL DF5 ,[X[ VYJF ,[J0FJX[ VG[
XSI CX[ TM lA, ZH} YIFGF N; lNJ;GL V\NZ D/JF5F+ ZSDGM lC;FAD[/ SZJFDF\ VFJX[P p5Z H6FjIF D]HAGF lGIT ;DIGL V\NZ
S\8=FS8Z[ lA, ZH} GlC SZ[ TM CJF,FGF .HG[Z 5MTFGF TFAFGF SM. 56 VlWSFZLG[ S\8=FS8Z[ VlWS'T SZ[, V[Hg8GL CFHZLDF\ pST SFDG]\ DF5
,[JF DMS,X[ VG[ T[JL DF5IFNL 5ZGL S\8=FS8ZGL S[ T[GF V[Hg8GL ;CL4 T[GF VG]DMNG DF8[ 5]ZTL U6FX[ VG[ CJF,FGF .HG[Z VFJL IFNLDF\YL
lA, AGFJX[4 H[ S\8=FS8ZG[ AWL AFATDF\ A\WGSTF" ZC[X[P
CLAUSE 11 : The contractor shall submit all the bills on the printed forms to be had on application at the
office of the Engineer-in-charge. The charges to be made in the bills shall always be entered at the rates
specified in the agreement or at the partly reduced rates subject to the approval by the Engineer-in-
charge in the case of Items not completed/executed as per agreements or in the case of any extra work
ordered in pursuance of these conditions and not mentioned or provided for in the tender, at the rate
here in after provided for such work.
CLAUSE 12 : If the specification of the work provides for the use of any special description of materials to
be supplied from the Departmental Store or if it is required that the contractor shall use certain stores to
be provided by the Engineer-in-charge (such materials and stores and the prices to be charged therefore
as here in after mentioned being so far as practicable for the convenience of the contractor but not so as
in any way to control the meaning or effect of this contract specified in the schedule or memorandum
here to annexed) the contractor shall be supplied with materials and stores as may be required from time
to time to be used by him for the purpose of the contract only, and the value of the full quantity, of
materials and stores so supplied shall be set off or deducted from any sum then deposit, or the proceeds
of sale thereof, if the deposit is held in govt. securities, the same or a sufficient portion thereof shall, in
that case be sold for the purpose. All materials supplied to the contractor shall remain the absolute
property of Govt. and shall on no account be removed from the site of the work, and shall at all time, be
open to inspection by the Engineer-in-charge. Any such materials, unused and in perfectly good condition
at the time of completion or termination of the contract, shall be returned to the Departmental store if the
Engineer-in-charge so requires by a notice in writing given under his hand, but the contractor shall not be
entitled to return any such materials except with the consent in writing of the Engineer-in-charge and he
shall have no claim for compensation on account of any such material supplied to him as aforesaid but
remaining unused by him or for any wastage in or damage thereto.
For materials provided in Schedule-A and consumed in excess quantities, the rates provided in Schedule-
A shall be increased/decreased corresponding to the increased/decrease in the new rate payable for
excess quantity as compared to the tender-rates. The rate for materials provident in extra items will be
the issue rates plus storage charge ruling on the date of issue of such quantity of materials.
CLAUSE 12A : The contractor shall be entitled to use the materials supplied by the Department only to
the extent of quantities of such materials required for execution of the work as per theoretical
calculations. The Engineer-in- charge may however, on being satisfied that a large quantity of such
materials is required for the execution of the work, permit the contractor to use such larger quantity of
the materials. Such permission shall be given in writing.
The contractor is bound to return in good condition such materials issued in excess of the requirements
so worked out or in excess of the quantities so permitted to be used by the Engineer-in-charge. If the
contractor fails to return such extra materials within a period of 15 days from the date of the demand in
writing of such materials being made by the Engineer-in -charge, he shall be charged for the excess
materials at double the issue-rate for such materials specified in Schedule-A of the contract Agreement.
CLAUSE 12B : All stores and materials such as cement, if the consumption of which exceeds 25 tons and
steel etc., supplied to the contractor by Government shall be kept by the contractor in separate godown
provided with a double lock. The key of one of the lock shall remain with the Engineer-in-charge or his
agent. The godown shall be accessible to the Engineer-in-charge or his agent at all times. No materials
shall be allowed to be removed from the site of the work and any material required for the execution of
the work shall be taken out from the godown only in the presence of a duly authorized agent of the
Engineer-in-charge.
CLAUSE 13 : (1) The contractor shall execute the whole and every part of the work in the most
substantial and workman-like manner and both as regards materials and in other respects in strict
accordance with specifications.
The contractor shall also conform exactly, fully and faithfully to the design, drawings and instructions in
writing for the work signed by the Engineer-in-charge. The design and the drawings shall we lodged in
the office of the site Engineer-in-charge to which the contractor shall be entitled to have access for the
purpose of inspection at such office during office hours.
Where the instructions referred to above are not contained in separate letters addressed to the
contractor the same shall be recorded in the work-order book, which shall be maintained and kept on the
site of the work. The contractor shall be required to sign such entries in the work-order book in token of
having noted the instructions. However, if the contractor fails to sign the work-order book for any reason
whatsoever, the entry of the instructions in the work-order book shall be deemed to be the due notice to
him of the said instructions. The work-order book shall be open for inspections to the contractor on the
site of the work during office hours.
(2) The contractor will be entitled to receive one copy of the accepted tender along with the work order
free of cost and will also be entitled to receive three sets of contract and working drawings according to
the progress of work as and when needed, free of cost.
(3) The several documents forming the contract are essential parts of the contract and requirements
occuring in one is binding as through occuring in all. They are intended to be mutually explanatory and
complimentary and to describe and provide for a complete work.
In the event of any discrepancy in the several documents forming the contract or in any one documents,
the following order of precedence should apply:
(a) Dimension and quantities: (i) Drawings (ii) Schedule-B of the Tender form (iii) specifications.
On drawings, figure dimensions, unless obviously incorrect, will be followed in preference to scaled dimensions.
(b) Description: (i) Schedule-B of the Tender form:- (ii) Drawings (iii) Specifications.
In the case or detective description or ambiguity, the Engineer-in-charge is entitled to issue further
instructions directing in what manner the work is to be carried out. The contractor cannot take any
advantage of any apparent error or omission in drawings or specifications and the Engineer-in-charge
shall be entitled to make corrections and interpretations as necessary to fulfill the plans and
CLAUSE 14.1 : The Engineer-in-charge shall have power to make any alterations in or addition to the
original specifications, drawings, designs and instructions that may appear to him to be necessary or
advisable during the progress of the work and the contractor shall be bound to carry out the work in
accordance with any instructions in this connection which may be given to him in writing signed by the
Engineer-in-charge and such alternation shall not invalidate the contract and any additional work which
the contractor may be directed to do in the manner above specified as part of the work shall be carried
out by the contractor on the same conditions in all respects on which he agreed to do the main work and
at the same rate as are specified in the tender for the main work.
14. 2 Except that when the quantity of any item exceeds the quantity as in the tender by more than 10%
the contractor will be paid for the quantity in excess of 10% at the rate entered in the S.O.R. of the year
during which the excess in quantity is first executed or tender rate whichever is less. (Modified as per R &
B G.R. No.TNC-10-2017-01-C, Dated 11-7-2017)
14.3 If the additional or altered work includes any class of work for which no rate is specified in this
contract, then such class of work shall be carried out.
(i) At the rate derived from the item within the contract which is comparable to the one involving
additional or altered class of work; where there are more than one comparable items, the item of the
contract which is nearest in comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer as to the nearest comparable item shall be
final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried out at
the rate entered in the Schedule of Rates of the Division for the year in which the tender was
received, increased or decreased by the percentage by which the tender amount is more or less as
compared to the amount arrived at the rates in the "Schedule of Rates" of the Division in the year in
which the tender was received. If the Schedule of rates of the Division does not contain all the items,
the percentage increase or decrease of the tender shall be calculated considering such items which
were included in the "Schedule of Rates" of the Division for the year and for materials consumed on
such item the rate to be charged would be the basic rate taken into account for fixing the rate in
S.O.R. referred to above, instead of the rate. Stipulated in Schedule-'A'.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work shall be carried out
at the rate decided by the competent authorities on the basis of detailed rate analysis after hearing
the contractor before a Committee of two Superintending Engineers stationed at the same place or
the nearest place.
14.4 If the additional or altered work, for which no rate is entered in the "Schedule of Rates" of the
Division is ordered to be carried out before the rate is agreed upon, then the contractor shall within seven
days of the date of receipt by him of the order to carry out the work, inform the Engineer-in-charge of the
rate, which it is his intention to charge for such class of work and if the Engineer in charge does not agree
to this rates, he shall by notice in writing be at liberty to cancel his order to carry out such class work and
arrange to carry it out in such manner as he may consider it advisable, provided always that if the
contractor shall commence work or incur any expenditure in regard thereof before the rates shall have
been determined as lastly herein before mentioned, then in such cases he shall only be entitled to be paid
in respect of the work carried out or expenditure incurred by him prior to the date of the determination
of the rate as aforesaid according to such rate or rates as shall be fixed by the Engineer-in-charge. In the
event of the dispute, the decision of the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and specifications
recommended by the contractor and accepted by the competent authority, the alternation above referred
to shall be within the scope of such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the increase in the
cost occasioned by alternations bears to the cost of the original contract work and the certificate of the
Engineer-in-charge as to such proportion shall be final and conclusive.
14.5 For excess in item of well sinking, the rates for sinking in depth beyond the designed depth shall be
as per the rate quoted by the contractor in the statement of variation. If no rates of variation in sinking
are quoted the rate payable shall be the tender rate for sinking at designed level increased by the
difference of schedule of rates for sinking at designed depth and sinking at the final depth.
CLAUSE 15 - No claim for any payment of compensation for change or restriction of work : If at any
time after the execution of the contract documents the Engineer-in-charge shall for any reason
whatsoever, require the whole or part of the work, as specified in the tender, be stopped for any period or
shall not require the whole or part of the work to be carried out at all or to be carried out by the
contractor, he shall give notice in writing, stating the fact to the Contractor who shall thereupon suspend
or stop the work totally or partially, as the case may be. In any such case, except as provided hereunder,
the Contractor shall have no claim to any payment or compensation whatsoever except as provided
hereunder on account of any profit or advantage which he might have derived from the execution of the
work in full but which he did not so derive in consequence of the full amount of the work not having been
carried out, or on account of any loss that he may be put to on account of materials purchased or agreed
to be purchased or for unemployment of labour required by him. He shall not have also any claim for
compensation by reason of any alterations having been made in the original specifications, drawings,
designs and instructions which may involve any curtailment of the work as originally contemplated.
(1) However, the contractor will be entitled for compensation for loss, if any on the date of notice, for
the purchased materials or for the contract executed for the material to be purchased for such work.
Such compensation will be paid only for actual loss for materials, if such materials so purchased or
agreed to purchase is of required quantity/quality and was purchased / contracted to be ' purchased
only for the same work. But no compensation shall be granted to contractor on material for which
advance has been given to contractor by Government. The amount of loss for such claim will be
decided by incharge Engineer-in-charge.
(2) The contractor also will be entitled for compensation of unemployed labourers for 7 days from the
date of notice provided that in that opinion of Engineer-in-charge such labourers were working for
days prior to the notice and would not be in a position to get employment elsewhere within 7 days
from the date of such notice. The contractor should try to employ such unemployed labourers at
other places from the date of such notice.
In case the Contractor does not agree with the decision of Executive Engineer (M) regarding the amount
of compensation or loss; it will be open for the contractor to appeal to Superintending Engineer-in-charge
within one month from the date of knowledge of such decision. In such case the decision of
Superintending Engineer will be final and binding to the Contractor.
The Contractor shall not be entitled for loss of any expected profit of such work.
(Vide G. R. No. SSR / 1090 /IB / 247 (2) / C, dated 28-6-1993 as amended by GR of even number dated 11 -2-1999).
B\0v!5 o SFDGF O[ZOFZ S[ lGI\+6 DF8[ SM. R]SJ6L S[ J/TZ V\U[ SM. CSNFJM D\H]Z G SZJF AFATP
5|EFZL .HG[ZG[ SZFZGF N:TFJ[Ô[ SIF" 5KL SM.56 ;DI[4 SM.56 SFZ6;Z 8[g0ZDF\ BF; p<,[B SIF" D]HAGF ;\5]6" S[ V\XTo AF\WSFDG[
SM.56 D]NT ;]WL A\W SZJ]\ H~ZL H6FI VYJF ;\5]6" S[ V\XTo SFD 5]Z] SZJFGL H~ZLIFT H G H6FI VYJF SMg8=FS8Z £FZF SZJFGF SFDGL
H~ZLIFT G H6FI TM T[JF SMg8=FS8ZG[ CSLST NXF"JTL ,[lBT GM8L; VF5X[ VG[ SMg8=FS8Z VF GM8L; D?IF AFN TZT H VF SFDG[ IYF 5|;\U
;\5]6" S[ V\XTo :YlUT SZX[ S[ A\W SZX[P
VFJF S[;DF\ VCL\ GLR[ SZ[, Ô[UJF. l;JFI SMg8=FS8Z T[6[ SFD 5]Z]\ SI]"\ CMI TM H[ GOM S[ OFINM T[G[ D/T4 5Z\T] SFD 5]Z]\ G YJFGF 5lZ6FD[ T[ G
D?IFYL YI[, G]SXFG VYJF T[6[ BZLNL CMI V[JL S[ H[ BZLNJF T[ ;CDT YIM CMI V[JL DF,;FDU|LGL AFATDF\ YI[, G]SXFG VYJF T[G[ T[GF
SFD DF8[ H[ DH]ZMGL H~Z CTL T[ DH]ZMG[ SFD G VF5L XSJFG[ SFZ6[ YI[,F G]SXFG V\U[ SM. R]SJ6L S[ J/TZGM CSNFJM SZL XSX[ GCL\P D]/
lJUT J6"G4 VF,[BG4 GSXF VG[ ;]RGFVMDF\ SZJFDF\ VFJ[, SM. O[ZOFZG[ SFZ6[ D}/E}T ZLT[ lJRFZFI[, SFDDF\ SM. SF5 VFJ[ TM 56 T[JF
SFZ6;Z T[ SM. J/TZ DF8[ CSNFJM SZL XSX[ GCL\P
s!f VFD KTF\ VFJF SFD DF8[ BZLN[,L DF,;FDU|LG[ SFZ6[ S[ DF,;FDU|L BZLNJF DF8[ SZ[, SMg8=FS8G[ SFZ6[ Ô[ SMg8F=S8ZG[ GM8L;GL TFZLB
;]WLDF\ SM. G]SXFG YI]\ CMI TM T[GF DF8[ J/TZ D[/JJF T[ CSNFZ AGX[P Ô[ VFJL ZLT[ BZLN[, VYJF BZLNJF ;DH}TL YI[, DF,;FDU|L DF\uIF
5|DF6[GF HyYFDF\ VG[ U]6J¿FI]ST CMI VG[ T[ OST V[ H SFD DF8[ BZLNFI[,L CMI S[ BZLNJF SZFZ YI[, CMI TM T[JL DF,;FDU|L V\U[ BZ[BZ
G]SXFG DF8[ H VFJ]\ J/TZ R]SJJFDF\ VFJX[P 5Z\T] H[ DF,;FDU|LGL BZLNL V\U[ ;ZSFZzL TZOYL .ÔZNFZG[ V[0JFg; VF5JFDF\ VFJ[, CMI
T[ DF,;FDU|L p5Z SM.56 ÔTGF G]SXFGG]\ J/TZ R]SJJFDF\ VFJX[ GCL\P
VFJF CSNFJF DF8[ G]SXFGGL ZSD 5|EFZL SFI"5F,S .HG[Z £FZF GÞL SZJFDF\ VFJX[P
sZf GM8L;GL TFZLBYL ;FT lNJ; DF8[ SFD[ G ZFBL XSFI[, DH}ZMGL AFATDF\ 56 Sg8=FS8Z J/TZ D[/JJF DF8[ CSNFZ AGX[P 5Z\T] VF DF8[
5|EFZL SFI"5F,S .HG[ZGM V[JM VlE5|FI CMJM Ô[.V[ S[ VFJF DH}ZM GMl8;GF ;FT lNJ; 5C[,F\ SFD SZTF CTF VG[ pST GMl8;GL TFZLBYL
;FT lNJ;GL V\NZ VgI+ ZMHDNFZ D[/JJFGL l:YlTDF\ G CTFP Sg8=FS8Z[ VFJL GM8L;GL TFZLBYL ;FT lNJ;GL V\NZ VgI+ ZMHUFZ
D[/JJFGL l:YlTDF\ G CTFP S\g8=FS8Z[ VFJL GMl8;GL TFZLBYL VFJF SFD[ G ZFBL XSFI[, CMI T[JF DH}ZMG[ VgI :Y/[ SFD[ ZFBJFGM 5|ItG
G]SXFGGF J/TZGL ZSD AFATDF\ SFI"5F,S .HG[ZGF lG6"I ;FY[ Sg8=FS8Z ;\DT G CMI V[JF S[;DF\4 VFJF lG6"IGL Ô6 YIFGL TFZLBYL V[S
DlCGFGL V\NZ 5|EFZL VlW1FS .HG[ZG[ V5L, SZJF DF8[ Sg8=FS8Z D]ST ZC[X[P VFJF S[;DF\ VlW1FS .HG[ZzLGM lG6"I Sg8=FS8Z DF8[ VFBZL
VG[ A\WGSTF" ZC[X[P VFJF SFDGF SM. V5[l1FT OFINFGL G}SXFGL DF8[ Sg8=FS8Z CÞNFZ AGX[ GlCP
CLAUSE 15A : The contractor shall not be entitled to claim any compensation from Govt. on account of
delay by Government in the supply of materials entered in Schedule 'A' where such delay is caused by (i)
Non-supply due to short allotment of quota in case materials available under quota regulations. (ii)
Difficulties relating to the supply of railway wagon (iii) Force majeure. (iv) Act of God. (v) Act of the
country's enemies or any other reasonable cause beyond the control of Government.
In the case of such delay in the supply of materials, Government shall grant such extension of time for the
completion of the works as shall appear to the Engineer-in-charge to be reasonable in accordance with
the circumstances of the case. The decision of the Engineer-in-charge as for the extension of time shall be
accepted as final by the contractors. (As modified Vide R & B D. G.R. No. TNC-1096-IB-143-(16)-C dated 11-1-19).
CLAUSE 16 - Time limit for unforeseen claims: The contractor shall not be entitled to any
compensation from Government on any account unless where allowed by the conditions of this contact. In
such cases, the contractor shall have to submit a claim in writing to the Engineer-in-charge within one
month of the cause of such claim occurring.
CLAUSE 17 - Action & compensation in case of bad work: If, at any time before the expiry of Defects
Liability period as detailed in Clause 17-A. It shall appear to the Engineer-in-charge or his sub-ordinate in
charge of the work that/any work has been executed unsound, imperfect or unskilled workmanship or
with materials of inferior quality or that any materials or articles provided by him for the execution of the
work are unsound, or of a quality inferior to that contracted for or are otherwise not in accordance with
the contract, it shall be lawful for the Engineer-in-charge to intimate this fact in writing to the contractor
and then notwithstanding the fact that the work, materials or articles complained of may have been
passed, certified and paid for the contractor shall be bound forthwith to rectify, or remove and
reconstruct the work so specified in whole or in part as the case may require, or if so required, shall
remove the materials or articles so specified in whole or in part and provide other proper and suitable
materials or articles at his own charge and cost, and in the event of his failing to do so within a period to
be specified by the Engineer-in-charge in the written intimation aforesaid, the contractor shall be liable to
pay compensation at the rate of one percent on the amount of the estimate of the rectification for every
day not exceeding ten days during which the failure so continues, and in the event of any such failure as
aforesaid continuing beyond ten days, the Engineer -in-charge may rectify or remove, and re-execute the
work or remove and replace the materials complained of as the case may be at the risk and expense in all
respects of the contractor. Should the Engineer-in-charge consider that any such inferior work or
materials as described above may be accepted or made use of, it shall be within his descration to accept
the same at such reduced rates as he may fix therefore.
However, the contractor shall be responsible for normal maintenance of the work till the final bill for the
work is prepared by the Departmental Officer.
CLAUSE 17A - Defect liability period : The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion. The Engineer-in-charge shall give the contractor a notice
in writing about the defects and the contractor shall make good the same within 15 days of receipt of the
notice. In the case of failure on the part of the contractor, the Engineer-in-charge may rectify or remove or
re-execute the work at the risk & cost of the contractor. The Engineer-in-charge shall be entitled to
appropriate the whole or any part of the amount of security deposit towards the expenses, if any,
Incurred by him in rectification, removal or re-execution. The Defects Liability period except original
building works shall be as under:
(a) For all works costing upto Rs.50000/- (amount put to tender), the period shall be 3 months from the
certified date of completion.
(b) For all works costing more than Rs. 50,000 and upto Rs. 1 crore (amount put tender), the period
shall be 12 months from the certified date of completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, (amount put to tender) the period shall be
months from the certified date of completion or three monsoons whichever is later.
For the purpose of deciding the monsoon period, the 30 th September may be treated as the last date.
(Modified vide R & BD Circular No.PAC-11-102008-2076-N 31-8-2019, PRCH-102013(2076)2759-N Dated
27/05/2013 and Circular No. TNC/10/2019/Clause 17A (Correction/(1)C dated 12/05/2016.)
CLAUSE 17A - Defect liability period: (Applicable to Tenders for Works of Narmada, Water
resources, Water Supply and Kalpsar department only):-
A. For works other than Buildings
(A) For all works costing up to Rs.50000/- (Amount put to Tender) the period shall be Three Months.
(B.1) for works of Check Dams, Canals, Drainage and road structure estimated to cost more than
Rs.50000/- but up to Rs.10.00 lacs the period shall be Six months.
(B.2) for works other than Check Dams, Canals, Drainage and road structure estimated to cost more than
Rs.50000/-but up to Rs.10.00 lacs the period shall be Six months.
(C.1) for works of check Dams, Canals, Drainage and road structure estimated to cost more than Rs.10.00
lacs the period shall be Three Years.
(C.2) for works of check Dams, Canals, Drainage and road structure estimated to cost more than Rs.10.00
lacs but up to Rs. One Crore the period shall be Twelve Months.
(D) All works estimated to cost more than Rs. One Crore the period shall be Three Years.
B. For Building Works: (i) For buildings estimated to cost up to Rs.50000/- the period shall be three
years. (ii) For buildings works other than original building estimated to cost up to Rs.50000/- but up to
Rs. One crore the period shall be Twelve Months (iii) For original building works the period shall be one
year or elapse of one monsoon period whichever is later.
In above works the period shall be counted from the certified date of completion 30th September shall be
treated as last date of monsoon. (N.W.R. WS. & Kalpsar Department Order No.
DT;q!_Z_!#qZqV[DqV[DPVF.P;[,qS[P!TFP!#v!ZvZ_!#))
CLAUSE 17B - Free maintenance guarantee period of three years for works of constructing B.T.
(1) Contractor shall have to give three years free maintenance guarantee for period from the certified
date of taking over. During this period contractor shall have to repair the damaged portion or the
any portion of road and B.T. surface of road including pot holes, depressions, cuts or worn out
portion at his risk and cost as per directions of Engineers. Five percent of value of B.T. items in each
running bill shall be with held and released after this period is over. Provided for this amount the
contractor shall be allowed to convert it in to F.D.R. or Bank Guarantee Obtained in the name of
Executive Engineer (M).
(2) Not Specified.
(3) Two percent of the amount eligible for payment bituminous items shall be withheld till the
miscellaneous items like earthwork in embankment/ cutting for side shoulders, side gutters,
kilometer/ indicator/ guard stones, sign boards etc. are completed in all respect by the contractor.
After completion of the miscellaneous items, the above said 2% withheld amount shall be released.
(R&B Circular No.TNC-10-2013-3(Part-III)-C, dated 13-12-2013).
(1) For each work costing above Rs. 1 crore the contractor shall have to engage minimum 1 graduate
engineer. He will be given identity card by the contractor. The copy of identity card shall be
furnished for the office of Dy. Executive Engineer, Executive Engineer (M) and Superintending
Engineer. The identified engineer should remain present on the site of the work. The contractor will
have to produce the notarized certificate periodically (at least in the beginning and in the month of
completion of the work to the effect that the said designated graduate engineer has not been
appointed on any other work. If not found on site, the engineer in charge will give notice of this
default to the contractor. If in spite of this notice default continues, the action to hold the registration
of defaulter contractor in abeyance for three years will be initiated. (R&B D Circular No. SSR-10-
2008-18-C dated.13-10-08 and no. 5ZRv!_Z_!5v55 ;L dated 04-11-2015)
(2) Work to be open to inspections- Contractor or responsible agent to be present :- All works
under or in course of execution or executed in pursuance of the contract shall, at all times be open to
the inspection and supervision of the engineer in charge and his sub ordinates and the contractor
shall, at all times during the usual working hours and all other times for which reasonable notice of
the intimation of the engineer in charge or his subordinates to visit the works shall have been given
to the contractor, either himself be present to receive the orders and instructions or have a
responsible agent duly accredited in writing present for that purpose. Orders given to the
contractor’s duly authorized agents shall be considered to have the same force in effect as if they had
been given to the contractor himself.
CLAUSE 18A - Employment of qualified site engineer by the Contractor:
For works estimated to cost above rs.100 lacs within 15 days of issue of work order the contractor will
have to furnish to the Dy. Executive Engineer in charge of the work the name, qualifications, copy of mark
sheet, color photograph and the appointment order issued to such engineers engaged for this contract
work. If 15 days after issue of work order such designated site engineers do not resume or do not remain
present on site of work, the recovery at the rate of rs.15,000 per month per engineer will be made from
the bills/ deposit/ dues of the contractor. Such recovery shall be non-refundable.
The engineer so employed for the government work must have sufficient experience to handle the work
independently such an engineer shall have to stay at the site of work and he shall not be entrusted with
other duty except this work. In case the contractor or partner of the contractor firm is a civil graduate
engineer, employment of a separate engineer will not be necessary provided that the engineer partner
himself attends the execution of the work on the site. (G.R.B and CD no. RGN-602006-(35)-C-
dated.31/05/07).
CLAUSE 19 - Notice to be given before work is covered up : The contractor shall give not less than five
day's notice in writing to the Engineer-in-charge or his subordinate in charge of the work before covering
up or otherwise placing beyond the reach of measurement any work in order that the same may be
measured and correct dimensions there of taken before the same is so covered up or placed beyond the
reach of measurement and if any work shall be covered up or placed beyond the reach of measurement
without such notice having been given or consent obtained, the same shall be uncovered at the
contractor's expense and in default thereof, no payment or allowance shall be made for such work or for
the materials with which the same was executed.
CLAUSE 20 : If the contractor or his workmen, or servants shall break, deface, injure or destroy any part
of the building or the work in question in/on which they may be working or any building, road, fence,
enclosure or grass-land or cultivated ground contiguous to the premises on which the works or any part
thereof is being executed or if any damage shall be done to the work from any cause whatever before
damage occurred/caused due to normal flood or rain or if any imperfections become apparent in it within
three months from the grant of a certificate of completion, final or otherwise by the Engineer-in-charge,
the contractor shall make good the same at own expenses or in default, the Engineer-in-charge may cause
the same to be made good by other contractor, and deduct the expenses (of which the certificate of the
Engineer-in-charge shall be final) from any sums that may thereafter become due to the contractor or
from his security deposit or the proceeds of sale thereof or a sufficient portion thereof.
CLAUSE 20A : Neither party shall be liable to the other for any loss or damage occasioned by or arising
out of acts of God, such as Unprecedented flood, Volcanic eruption, earthquake or other convulsion of
nature and other acts such as but not restricted to general strike, invasion, the acts of foreign countries,
hostilities, or war like operations before or after declaration of war, rebellion, military or Usruped power
which prevent performance of the contract and which could not have been foreseen or avoided by a
prudent person.
Note : "Unprecedented flood" means the flood crossing the High Flood Level of the past _______ year(s)
which is on the available record.
(Modified Vide R & B D. G. R. No.TNC-1096-IB-143-(16)-C dated 11-1-99)
CLAUSE 21 - Contractor to supply plant, ladders, scaffolding etc. and is liable for damage arising
from non-provision of lights, fencing etc. : The contractor shall supply at his own cost all materials
(except such special materials if any, as may, in accordance with the contract to be supplied from the
Public Works Department Stores), plant, tools, appliances, implements, ladders, cordage, tackle,
scaffolding, and any temporary works which may be required for the proper execution of the work
whether in the original, altered or substituted form and whether included in the specifications, or other
documents forming part of the contract or referred to in these conditions or not and which may be
necessary for the purpose of satisfying or complying with requirements of the Engineer- in-charge as to
any matter or to which under these conditions he is entitled to be satisfied or which he is entitled to
require together with carriage therefor to and from the work. The contractor shall also supply without
charge the requisite number of persons with the means and materials necessary for the purpose of
settings out works and counting, weighing and assisting in the measurement or examination at any time
and from time to time, of the work or the materials, failing this, the same may be provided by the
Engineer -in-charge at the expense of the Contractor and the expenses may be deducted from any money
due to the Contractor under the contract or from his security deposit, or proceeds of sale thereof or of a
sufficient portion thereof. The contractor shall provide all necessary fencing and lights required to protect
the public from accident and shall also be bound to bear expenses of defence of every suit, action or other
legal proceeding at law that may be brought by any person for injury sustained owing to neglect of the
above precautions and to pay any damages and costs which may be awarded in any such suit, action or
proceedings to any such person, or which may, with the consent of the Contractor, be paid in
compromising any claim by any such person.
CLAUSE 21A: The Contractor shall provide suitable scaffolds and working platforms, gangways and
stairways, and shall comply with the following regulations in connection therewith.
B\0vZ! S o S\8=FS8Z[ IMuI 5F,BM VG[ SFRF DF\R0F4 HJFvVFJJF DF8[GF\ 5Fl8IF VG[ ;L0LGL Ô[UJF. SZJFGL ZC[X[ VG[ T[ V\U[ GLR[ D]HAGF
lGIDMG]\ 5F,G SZJFG]\ ZC[X[P
(a) Suitable scaffolds shall be provided for workmen for all works that cannot be safely done from a
ladder or by other means.
sSf ;L0L p5ZYL VYJF ALÔ SM. ;FWG £FZF ;,FDlT5}J"S G SZL XSFI T[JF AWF\ SFD DF8[ SFDNFZM ;F~ IMuI 5F,BMGL Ô[UJF. SZJFGL
(b) A scaffold shall not be constructed, taken down or substantially altered except –
(i) Under the supervision of a competent and responsible person.
(ii) Appointed by contractor and by competent workers possessing adequate experience in this
sBf s!f SFI"1FD VG[ HJFANFZ jIlSTGL N[BZ[B C[9/ T[ l;JFI4
sZf S\8=FS8Z £FZF lGDFI[, VG[ VG]EJ WZFJTF SFI"1FD SFDNFZM £FZF YT]\ CMI T[ l;JFI4 SM.56 AF\WJL GCL\4 pTFZJL
GCL S[ T[DF\ DCtJGF O[ZOFZ SZJF GlC\P
(c) All scaffolds and appliances connected therewith and all ladders shall –
sUf AWL 5F,BM VG[ T[GL ;FY[ ;\S/FI[, ;FDU|L VG[ AWL H ;L0LVMv
(i) be of sound material
s!f DHA}T RLHJ:T]GL AG[,L CMJL Ô[.V[P
(ii) be of adequate strength having regard to the loads and strains to which they will be subjected,
sZf T[GF 5ZGF VFJGFZF JHG VG[ 3;FZFG[ BDL XS[ T[8,L DHA}T CMJL Ô[.V[4 VG[
(iii) be maintained in proper condition.
s#f T[G[ ;FZL l:YlTDF\ ZFBJFGL ZC[X[P
(d) Scaffolds shall be so constructed that no part thereof can be displaced in consequence of normal use.
s3f 5F,BM V[JL AF\WJFGL ZC[X[ S[ ;FDFgI J5ZFXYL T[GM SM. 56 EFU K}8M 50L G ÔIP
(e) Scaffolds shall not be overloaded and so far as practicable the load shall be evenly distributed.
sRf 5F,BM 5Z JWFZ[ 50T]\ JHG D}SJ]\ GlC VG[ XSI CMI tIF\ ;]WL T[ JHG ;DU| 5F,B 5Z V[S;ZB]\ JC[\RL GF\BJ]\P
(f) Before installing the lifting gear on scaffolds, special precaution shall be taken to ensure the strength
and stability of the scaffolds.
sKf 5F,BM 5Z DF, pRSJF DF8[GF lUIZ UM9JTF\ 5C[,F 5F,BMGL DHA}TF. VG[ 8SFp56FGL BFTZL SZJFGL BF; ;FJR[TL ,[JLP
(g) Scaffolds shall be periodically inspected by a competent person.
sHf SFI"1FD jIlST £FZF JBTMJBT 5F,BMGL T5F; SZJFGL ZC[X[P
(h) Before allowing a scaffold to be used by his workmen, the Contractor shall, whether the scaffold has
been erected by his workmen or not, take steps to ensure that it complies fully with the regulation
herein specified.
shf T[GF SFDNFZMV[ 5F,BM AF\WL CMI S[ G CMI TM 56 5MTFGF SFDNFZMG[ T[ 5F,BGM p5IMU SZJF N[TF\ 5C[,F\ S\8=FS8Z[ T[JL 5F,BM VCL\
H6FJ[, lJlGIDM VG];FZ AZFAZ CMJF AFATL BFTZL SZJFGL ZC[X[P
(i) Working platforms, gangways shall
s8f SFRF DF\R0F\ HJFvVFJJF DF8[GF 5Fl8IF VG[ ;L0LVM AF\WTL JBT[ GLR[GL AFATM bIF,DF\ ZFBJFGL ZC[X[P
(i) be so constructed that no part thereof can dag unduly or unequally,
s!f T[GM SM. 56 EFU JW] 50TM S[ V;DFG ZLT[ h}SL G HJM Ô[.V[P
(ii) be so constructed and maintained having regard to the prevailing conditions as to reduce as far
as practicable risks of persons tripling or slipping and-be so constructed that no part thereof
can dag unduly or unequally,
sZf DF6;M UA0L S[ ,5;L 50[ T[J]\ Ô[BD AG[ T[8,]\ VMK]\ ZFBJF DF8[ 5|JT"TF ;\Ô[UM VG];FZ T[ AF\WJF VG[ Ô/JJF T[4 VG[
(iii) be kept free from any unnecessary obstruction.
s!f SM. 56 ÔTGF lAGH~ZL VJZMWYL D]ST ZFBJF
(j) In the case of working platforms, gangways working places and stairways at a height exceeding
metre (to be specified) sH6FJJLf
s9f ZP__ DL8ZYL JW] pRF.JF/F SFRF DF\R0F4HJFvVFJJF DF8[ 5Fl8IF SFDGL HuIF VG[ ;L0LVMGL GLR[ D]HAGL Ô[UJF. ZC[X[P
(i) Every working platform and every gangway shall be closely boarded unless other adequate
measures are taken to ensure safety.be so constructed that no part thereof can dag unduly or
s!f ;,FDTLGF ALÔ 5}ZTF\ 5U,F\ G ,[JFIF\ CMI TM NZ[S SFRM DF\R0M VG[ HJF VFJJF DF8[G]\ NZ[S 5Fl8I]\ ,UM,U H0[,]\
(ii) Every working platform and every gangway shall have adequate width, and
sZf NZ[S SFRF DF\R0F VG[ HJFvVFJJF DF8[GF 5Fl8IF\4 5}ZTL 5CM/F.JF/F CMJF Ô[.X[4 VG[
(iii) Every working platform, gangway, working place and stairway shall be suitably fenced.
s#f NZ[S SFRF DF\R0F VG[ HJFvVFJJF DF8[GF 5Fl8IF\ SFDGL HuIF VG[ ;L0LVMG[ IMuI S9[ZF CMJF Ô[.V[P
(k) Every opening in the floor of a building or in a working platform shall, except for the time and to the
extent required to allow the access of person or the transport or shifting of materials be provided
with suitable means to prevent the fall of persons or material.
s0f DF6;M VFJL H. XS[ VYJF DF,;FDFGGL C[ZO[Z Y. XS[ S[ V[S :Y/[YL ALH[ :Y/[ ,. H. XSFI T[8,F JBT VG[ T[8,F 5}ZTL DSFGGL
OZ; S[ SFRF DF\R0F 5ZGL 5|tI[S B]<,L HuIF 5Z V[JF IMuI ;FWGM D}SL ZFBJF S[ H[YL SM. DF6; S[ DF,;FDFG 50L G ÔIP
(l) When persons are employed on a roof where there is danger of falling from a height exceeding
(to be specified) meters suitable precaution shall be taken to prevent the fall of persons or material.
s-f HIF\YL 50L HJFGM EI CMI T[JL #P__ sH6FJJLf DL8ZYL JW] p\RF.GF KF5ZF\ 5Z DF6;MG[ SFD[ ZFBJFDF\ VFjIF CMI tIF\YL DF6;M S[
DF,;FDFG 50L G ÔI T[ DF8[ ;FJR[TLGF IMuI 5U,F\ ,[JFGF\ ZC[X[P
(m) Suitable precautions shall be taken to prevent persons being struck by articles which might fall from
scaffold or other working places.
sTf 5F,BM S[ SFDSFHGL ALÒ HuIFVM 5ZYL 50[ T[JL RLHJ:T]VMYL DF6;G[ .Ô G YFI T[ DF8[ ;FJR[TLGF\ IMuI 5U,F\ ,[JFP
(n) Safe means of access shall be provided to all working platforms and other working places.
sYf AWF SFRF DF\R0F VG[ SFDGL ALÒ HuIFVMV[ ;C[,F.YL HJF DF8[ ;,FDT DFUM"GL Ô[UJF. SZJFGL ZC[X[P
CLAUSE 21B: The contractor shall comply with the following regulations as regards the hoisting
appliances to be used by him-
B\0vZ!vB o S\8=FS8Z JHG pRSJFGF ;FWGM JF5Z[ T[ ;\A\W DF\ T[6[ GLR[GF lJlGDIMG]\ 5F,S SZJFG]\ ZC[X[P
(a) Hoisting machines and tackle including their attachments, anchorages and supports shall –
sSf JHG pRSJFGF\ I\+M VG[ UZU0LJF/F I\+4 T[DGL ;FY[GF Ô[0F6M4 ,\UZ DF8[GF ;FDFG VG[ 8[SF GLR[ D]HAGF CMJF Ô[.X[P
(i) be of good mechanical construction, sound material and adequate strength and free from patent
s!f ;FZL IF\l+S ZRGFJF/F\4 DHA}T J:T]GF T[DH 5}ZTL TFSFTJF/F VG[ N[BLTL SM. BFDL lJGFGF¸ VG[
(ii) be kept in good repair and in working order.
sZf ;FZL N]Z:T CF,TDF\ VG[ RF,] l:YlTDF\ ZFBJF Ô[.X[P
(b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of suitable
quality and adequate strength and free from patent defect.
sBf DF,;FDFGG[ p\R[ R0FJJF S[ GLR[ pTFZJF VYJF ,8STM ZFBJFGF ;FWG TZLS[ J5ZFT]\ NMZ0]\ IMuI ÔTG]\ VG[ 5}ZTL DHA}TF.JF/]\ T[DH
N[BLTL bFFDL lJGFG]\ CMJ]\ Ô[.V[P
(c) Hoisting machines and tackles shall be examined and adequately tested after erection on the site and
before use and be re-examined in position at intervals to be prescribed by Engineer-in-charge.
sUf JHG p\RSJFGF\ I\+M VG[ UZU0LJF/F\ I\+G[ SFDGF :Y/[ UM9jIF AFN VG[ p5IMUDF\ ,LWF 5C[,F\ T5F;L Ô[.G[ 5}ZTF 5|DF6DF\ RSF;L
,[JFGF ZC[X[4 T[DH CJF,FGF .HG[Z lGIT SZ[ T[JF\ ;DIF\TZ[4 UM9J[,L l:YlTDF\ T[GL O[Z T5F; SZJFGL ZC[X[P
(d) Every chain, ring, hook, shackle, swivel and pulley block used in hoisting or lowering materials or as
a means of suspension shall be periodically examined.
s3f DF,;FDFG p\R[ R0FJJFGF S[ GLR[ pTFZJF S[ ,8STM ZFBJFGF ;FWG TZLS[ J5ZFTF 5|tI[S ;F\S/4 ZL\U4 VF\S0M S0L4 GS}RF VG[ 5],La,MS
JBTMJBT T5F;JFP
(e) Every crane driver or hoisting - appliance operator shall be properly qualified.
sRf 5|tI[S Ê[.G 0=F.JZ S[ JHG pRSJFGF I\+GF RF,S IMuI ,FISFTJF/F CMJF Ô[.V[P
(f) No person who is below age of 15 years shall be in control of any hoisting machine, including any
scaffolds, nor shall give signals to the operator.
sKf !5 JQF"YL GLR[GL SM. 56 jIlSTG[ SM. 5F,B ;lCT JHG pRSJF SM. I\+GF lGI\+S TZLS[ VYJF VM5Z[8ZG[ lGXFGLYL ;}RGF VF5JF4
SFD[ ZFBL XSFX[ GCL\P
(g) In the case of every hoisting machine and of every chain ring hook shackle, swivel and pulley block
used in hoisting or lowering or as a means of suspension the safe working load shall be ascertained
by adequate means.
sHf JHG pRSJFGF 5|tI[S I\+ VG[ DF,;FDFG p\R[ R0FJJFGF S[ GLR[ pTFZJFGF S[ ,8SFJL ZFBJFGF ;FWG TZLS[ J5ZFTL 5|tI[S ;F\S/4 ZL\U4
S0L4 GS}RF VG[ 5],Lva,MSGL ;,FDT ZLT[ JHG p9FJJFGL XlST S[8,L K[ T[ IMuI ;FWGM J0[ GSSL SZJFG] \ ZC[X[P
(h) Every hoisting machine and all gears referred to in preceding regulation shall be plainly marked with
the safe working load.
shf VFU/GF lJlGIDDF\ H6FJ[, JHG pRSJFGF 5|tI[S I\+ VG[ AWF H lUIZ 5Z T[ ;,FDT ZLT[ S[8,]\ JHG p9FJL XS[ T[D K[P T[ RMbB]\
,B[,]\ CMJ]\ Ô[.V[P
(i) In the case of hosting machine having a variable safe working load, each safe working load and
conditions under which it is applicable shall be clearly indicated.
s8f H]NF\ H]NF\ JHG ;,FDT ZLT[ pRSL XSTF4 pRSJFGF I\+ 5Z4 ;,FDT ZLT[ pRSL XSFT]\ 5|tI[S JHG VG[ S. CF,TDF\ I\+G[ T[ ,FU] 50X[ T[
:5Q8 NXF"JJFG]\ ZC[X[P
(j) No part of any hoisting machine or gear referred to in regulation 'g' above shall be loaded beyond the
safe working load except for the purpose of testing.
s9f p5ZGF lJlGDI H[DF\ H6FJ[, JHG pRSJFGF SM. 56 I\+ S[ lUIZGF SM. 56 EFU 5Z RSF;6L DF8[ H~ZL CMI T[ l;JFI4 ;,FDT
JHG SZTF\ JW] JHG ,FNJ]\ GlCP
(k) Motors, gears, transmissions, electric wiring and other dangerous parts of hoisting appliances shall
be provided with sufficient safeguards.
s0f JHG pRSJFGF ;FWGGL DM8ZM4 lUIZ4 lJn]TJFCS ;FWGM4 JLH/LGF TFZ VG[ Ô[BDL EFUM DF8[ 5}ZL ;,FDTLGL Ô[UJF. SZJFGL
(l) Hoisting appliances shall be provided with such means as will reduce to a minimum the risk of the
accidental descent of the load.
s-f SM. JHG VS:DFT GLR[ ;ZSL 50[ T[J]\ Ô[BD VMKFDF\ VMK]\ ZC[ T[ 5|SFZGL SM.S ;UJ0 JHG pRSJFGF ;FWGDF\ SZJFGL ZC[X[P
(m) Adequate precautions shall be taken to reduce to minimum the risk of any part of a suspended load
becoming accidentally displaced.
sTf ,8STF ZFB[,F JHGDF\YL SM.56 EFU VS:DFT K}8M 50L HJFG]\ Ô[BD VMKFDF\ VMK]\ ZC[ T[ DF8[ 5]ZTL ;FJR[TL ZFBJFGL ZC[X[P
CLAUSE 22: Measures for Prevention of Fire: The contractor shall not set fire to any standing jungle,
trees, bush wood or grass without a written permit from the Engineer- in-charge.
When such permit is given, and also in all cases when destroying cut or dug up tress, bush wood, grass
etc. by fire, the contractor shall take necessary measures to prevent such fire spreading to or other-wise
damaging surrounding property. When such permit is given, and also in all cases when destroying cut or
dug up tress, bush wood, grass etc. by fire, the contractor shall take necessary measures to prevent such
fire spreading to or otherwise damaging surrounding property.
CLAUSE 23 - Liability of contractors for any damages done in or outside work area : Compensation
for all damage done intentionally or unintentionally by Contractor's labourers whether in or beyond
limits of Government property including any damage caused by the spreading of fire mentioned in the
clause 22, shall be estimated by the Engineer-in-charge., or such other Officer as he may appoint and the
estimates of the Engineer- in-charge, subject to the decision of the Superintending Engineer, on appeal,
shall be final and the contractor shall be bound to pay the amount of the assessed compensation on
demand, failing which the same will be recovered from the Contractor as damages in the manner
prescribed in clause 1 or deducted by the Engineer-in-charge from any sums that may be due or become
due from Government to the contractor under this contract or otherwise.
B\0vZ# o SFDGF lJ:TFZ VYJF T[GF ACFZ YI[, SM. 56 G]SXFG DF8[ SMg8=FS8Z HJFANFZ CMJF AFATo B\0vZZDF\ H6FjIF 5|DF6[ VFU
5|;ZJFYL YI[, SM.56 G]SXFG ;lCT S\8=FS8ZGF DH}ZMV[ .ZFNF5}J"S S[ VÔ6TF\ ;ZSFZL lD,STGL CNGL V\NZ S[ ACFZ SZ[,F\ AWF H
G]SXFGGF J/TZGM V\NFH CJF,FGF .HG[Z VYJF V[D6[ GLD[,F ALÔ SM. VlWSFZL SF-X[ VG[ CJF,FGF .HG[ZGM VF V\NFH4 V5L, YI[4
VlW1FS .HG[ZGF R]SFNFG[ VFlWG4 VFBZL U6FX[ VG[ DFU6L SZTF\ VFSFZFI[,L J/TZGL T[JL ZSD R}SJJF DF8[ S\8=FS8Z A\WFI[, ZC[X[ VG[
T[D SZJFDF\ S;}Z SZX[ TM T[JL ZSD B\0v!DF\ 9ZFJ[,L ZLT[ G]SXFGL TZLS[ S\8=FS8Z 5F;[YL J;}, SZJFDF\ VFJX[ VYJF VF S\8=FS8 C[9/ VgIYF
;ZSFZ 5F;[ ,[6L YTL S[ CJ[ 5KL ,[6L YFI T[JL ZSDDF\YL CJF,FGF .HG[Z SF5L ,[X[P
The Contractor shall bear the expenses of defending any action or other legal proceeding that may be
brought by any person for injury sustained by him owing to neglect of precautions to prevent the spread
of the fire and he shall also pay the damages and cost that may be awarded by the court in consequence.
VFU 5|;ZTL V8SFJJF ;FZ]\ ;FJR[TLGF 5U,F\ ,[JFDF\ YI[,L A[NZSFZLG[ 5lZ6FD[ SM. jIlSTG[ YI[, .Ô DF8[ SM. 5U,F\ ,[ S[ ALÒ SFG}GL
SFI"JFCL SZ[ TM T[GL ;FD[GF ARFJG]\ BR" S\8=FS8Z[ EMUJJFG]\ ZC[X[ VG[ T[JL SFI"JFCLG[ 5lZ6FD[ SM8" TZOYL R}SFNM VF5TF\ T[ G]SXFGL VG[ BR"
EZJFG]\ YFI T[ T[D6[ R}SJJFG]\ ZC[X[P
B\0vZ$o ~l5IF V[S SZM0YL JW] ZSDGF JF.0GL\U VG[ :8=[gWGL\UGF SFDMDF\ NZ[S :TZG]\ SMd5[SXG jIJl:YT ZLT[ YFI T[ DF8[ GLR[GL SFI"JFCL
VG];ZJFGL ZC[X[o
Z$P! o Z:TFGL 5CM/F.DF\ WFZFWMZ6 D]HA SMd5[SXG YFI T[ DF8[ A[AL ZM,Z OZHLIFT ZLT[ ,FJL SMd5[SXG SZJFG] \ ZC[X[P
Z$PZ o VFJF SFDMDF\ NZ[S :TZG]\ SMd5[SXG WFZFWMZ6 D]HA YI]\ K[4 T[GL NZ[S ,[IZ[ OZHLIFT56[ 0[g;L8M DL8ZYL U|L0 5|DF6[ YIFGL RSF;6L
.HFZNFZ[ SZL T[G]\ ZHL:8Z lGEFJJFG]\ ZC[X[P VFJL RSF;6L ;\A\lWT GFIA SFI"5F,S .HG[ZzL4 VG[ DNNGLXqVlWS DNNGLX .HG[ZzLV[
56 SZJFGL ZC[X[P .HFZNFZ[ SZ[, SFDGL 0[g;L8L 5]Z[5]ZL D?IF AFN H S,LIZg; V5FI VG[ tIFZAFN H ALHF ,[IZGL SFDULZL CFYWZFI T[
HMJFG]\ ZC[X[P sDFPDPlJP 5lZ5+ G\P V[;PV[;PVFZq!_qZ__(q!(q;L4 TFP!#q!_qZ__(4 DFPDPlJP 5lZ5+
G\PV[;PV[;PVFZq!_qZ_!*q5_q;L4 TFPZ)q(qZ_!* TYF TFP!!q)qZ_!*fP
CLAUSE 25: Deleted.
CLAUSE 26 - Work not to be sublet. Contract may be rescinded and security deposit forfeited for
subletting it without approval or for bribing a public officer or if contractor becomes insolvent:
The contract shall not be assigned or sublet without the written approval of the Engineer-in-charge. And
if the contractor shall assign or sublet his contract or attempt to do so or become insolvent or commence
any proceeding to get himself be adjudicated an insolvent or make any compromisation with his creditors
or attempt to do so, the Engineer-in -charge may, by notice in writing rescind the contract, Also if any
bribe, gratuity, gift, loan, perquisite, reward or advantage, pecuniary or otherwise, shall either directly or
indirectly be given, promised or offered by the contractor, or any of his servants or agents to any public
officer or person in the employ of Government in any way relating to his office or employment, or if any
such officer or person shall become in any way directly or indirectly interested in contract, the Engineer-
in-charge may thereupon by notice in writing rescind the contract. In the event of contract being
rescinded, the security deposit of the contractor shall thereupon stand forfeited and be absolutely at the
disposal of Government and the same consequence shall ensure as if the contract had been rescinded
under clause 3 hereof and in addition the contractor shall not be entitled to recover or be paid for any
work there for actually performed under the contract.
B\0vZ& o AF\WSFD 5[8F EF0[ G VF5JF AFATP D\H}ZL lJGF 5[8FEF0[ VF5JFYL VYJF ;ZSFZL VlWSFZLG[ ,F\R VF5JF DF8[ VYJF
S\8=FS8Z GFNFZ YI[YL S\8=FS8 ZN YFI VG[ ÔDLG VGFDT H%T YJF AFAT o CJF,FGF .HG[ZGF l,lBT 5ZJFGUL l;JFI S\8=FS8 SM.G[
V[;F.G SZL XSFX[ S[ 5[8FEF0[ VF5L XSFX[ GlC4 VG[ S\8=FS8Z T[DGM S\8=FS8Z V[;F.G SZX[ VYJF 5[8FEF0[ VF5X[ S[ T[D SZJFGM 5|ItG SZX[ S[
GFNFZ AGX[ S[ 5MTFG[ GFNFZ SZFJJF DF8[GL SM. SFI"JFCL SZX[ S[ 5MTFGF ,[6NFZM ;FY[ SM. 5TFJ8 SZX[ S[ T[D SZJFGM 5|ItG SZX[ TM
CJF,FGF .HG[Z l,lBT GM8L; VF5LG[ S\8=FS8 ZN SZL XSX[P J/L S\8=FS8Z S[ T[DGF SM. GMSZ S[ V[Hg8 SM. ;ZSFZL VlWSFZLG[ VYJF ;ZSFZL
GMSZLDF\ GF SM. 56 jIlSTG[ T[GF CMNF S[ GMSZLGL ~V[ SM.56 5|SFZGL ,F\R4 Al1F;4 E[84 VG],FE4 .GFD S[ VFlY"S ALÔ SM. 5|SFZGF ,FE
5|tI1F S[ 5ZM1F ZLT[ VF5X[4 VF5JFG]\ JRG VF5X[ S[ VF5JFGL T{IFZL ATFJX[ VYJF VFJF SM. VlWSFZL S[ jIlST 5|tI1F S[ 5ZM1F ZLT[ S\8=FS8DF\
lCT WZFJTF YX[ TM CJF,FGF .HG[Z l,lBT GM8L; VF5LG[ S\8=FS8 ZN SZL XSX[P VFJL ZLT[ S\8=FS8 ZN YTF\ S\8=FS8ZGL ÔDLG VGFDT H%T
YI[, U6FX[4 VG[ T[ ;\5}6"56[ ;ZSFZ C:TS ZC[X[ VG[ VF SZFZGF B\0v# C[9/ Ô6[ S[ S\8=FS8 ZN SZJFDF\ VFjIM CMI T[JF H T[GF 5lZ6FDM
VFJX[ VG[ JW]DF\ S\8=FS8 C[9/ BZ[BZ SZ[,F SM. 56 SFD DF8[ SM. ZSD J;}, SZJFG[ S[ R}ST[ ,[JFGM S\8=FS8ZG[ CÞ ZC[X[ GlCP
CLAUSE 27 - Sums payable by way of compensation to be considered as reasonable compensation
without reference to actual loss: All sums payable by a contractor by way of compensation under any of
these conditions shall be considered as a reasonable compensation to be applied to the use of
Government without reference to the actual loss or damage sustained and whether any damage has or
had not been sustained.
B\0vZ* o BZ[BZ UI[, BM8G[ ,1FDF\ ,LWF l;JFI J/TZ~5[ R}SJJFGL YTL ZSDG[ JFHAL J/TZ U6JF AFAT o BZ[BZ BM8 S[
G]SXFGG[ ,1FDF\ ,LWF l;JFI VG[ SM. G]SXFG YI]\ CMI S[ G YI]\ CMI TM 56 VF XZTMDF\YL SM.56 XZT C[9/ S\8=FS8Z[ J/TZ~5[ R}SJJFGL YTL
TDFD ZSDG[ JFHAL J/TZ U6JFDF\ VFJX[ VG[ T[G[ ;ZSFZ DF8[ p5IMUDF\ ,[JFX[P
CLAUSE 28 - Change in the constitution of firm to be notified: In the case of a tender by partners, any
change in the constitution of a firm shall be forthwith notified by the Contractor to Engineer-in-charge for
his information.
B\0vZ( o 5[-LGF A\WFZ6DF\ SM. O[ZOFZ YI[ T[GL Ô6 SZJF AFATo EFULNFZMV[ 8[g0Z EI]"\ CMI T[ S[;DF\ 5[-LGF A\WFZ6DF\ SM. O[ZOFZ
YTF\ S\8=FS8Z[ CJF,FGF .HG[ZG[ T[DGL Ô6 VY[" T[JF O[ZOFZ V\U[ TZT DFlCTUFZ SZJFGF ZC[X[P
CLAUSE 29 - Works to be under directions of Superintending Engineer: All works to be executed
under the contract shall be executed under the direction and subject to the approval in all respects of
Superintending Engineer of the Circle for the time being, who shall be entitled to direct at what point or
points and in what manner they are to be commenced and from time to time carried on.
B\0vZ) o VlW1FS .HG[ZGL ;}RGF C[9/ SFDM SZJF AFATo S\8=FS8 C[9/ SZJFGF AWF H SFD ;S",GF H[ T[ JBTGF VlW1FS .HG[ZGL
;}RGF VG[ C[9/ TDFD AFATM DF8[ T[DGL D\H}ZLG[ VFWLG ZCLG[ SZJFGF ZC[X[P VF SFD SIF :Y/[ S[ :Y/MV[ VG[ S[JL ZLT[ X~ SZJF JBTMJBT
S[JL ZLT[ VFU/ W5FJJF T[ V\U[ ;}RGF VF5JF VlW1FS .HG[Z CÞNFZ ZC[X[P
(1) Disputes to be referred to Tribunal: The disputes relating to this contract, so far as they relate to
any of the following matters, whether such disputes arise during the progress of the work or after the
completion or abandonment thereof, shall be referred to the Arbitration Tribunal, Gujarat State.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or upon the works of the
site thereof or belonging to the contractor or procured by him and intended to be used for
execution of the work or any part thereof possession of which may have been taken by the
Engineer-in-charge under the said clause-5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the items of works not
accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rate of payment for any class of work which is included in the additional or altered work
carried out by the contractor in accordance with the instructions of the Engineer-in-charge under
clause 14 and the rates for which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased by the contractor
before receipt of notice given by the Engineer-in-charge under clause 15, and/or the amount of
compensation payable to the contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in the
event of his failure to rectify, remove or reconstruct the work within the period specified in the
written intimation or the amount of expenses incurred by the Engineer-in-charge under the said
clause 17 in rectifying, removing or re-executing the work or in removing and replacing the
materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause 17 for the interior
work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimated and assessed
(viii) The amount payable to the contractor for the work carried out under clause 33 in accordance with
the instructions and the requirements of the Engineer-in-charge in a case where there are no
specifications.
(2) The provision of Section-21 of the GPW dispute Arbi. Tribunal Act-92 & order issued by the Govt. in
connection with this Act will now apply for Arbitration (As per Government in N. & W.R.D. letter No.
(3) The provision of Arbitration Act., shall in so far as they are inconsistent with the provision of this act
cease of to apply to any dispute arising from a works contract and all arbitration proceedings in relation
to such dispute before an arbitrator, court of authority shall stand transferred to the Tribunal.
(4) The awards declared by the arbitrator should be speaking award, giving reasons and calculations for
every item of claims. The decision will have to be implemented by all the departments of the State
Government and Public Sector Enterprises of Gujarat. (Resolution F. D.
No.PB/1088/735/KT/Sachivalaya/Gandhinagar 5th Octobers 1988.)
(5) Incase of dispute leading to the contractor or Government of Gujarat approaching to Court of Law, It
shall be within the jurisdiction where the site of work is situated.
(6) The reference to arbitration proceeding under this clause shall not:
(i) Affect the right of the Engineer-in-charge under clause 5 to take possession of all or any tools
plants, materials and stores in or upon the works of site thereof belonging to the contractor or
procured by him and intended to be used for the execution of the work or any part thereof.
(ii) Preclude the Engineer-in-charge from utilising the materials purchased by the contractor in any
work or from removing such materials to other places, during the period the work is stopped or
suspended in pursuance of notice given to the contractor under clause
(iii) Entitle the contractor to stop the progress of the work or the carrying out the additional or
altered work in accordance with the provisions of clause 14 or as the case may be, of clause
CLAUSE 31 - Deleted.
CLAUSE 32 - Lump sum in estimates: When the estimate on which a tender is made includes lump sum
in respect of part of the work, the contractor shall be entitled to payment in respect of the items of work
involved or the part of the work in question at the same rates as are payable under this contract for such
items, or if the part of the work in question is not in the opinion of the Engineer-in-charge capable of
measurement, the Engineer-in-charge may, as his discretion, pay the lump sum amount entered in the
estimate and the certificate in writing of the Engineer-in-charge shall be final and conclusive against the
contractor with regard to any sum or sums payable to him, under the provisions of this clause.
B\0v#Zo V\NFHDF\GL prRS ZSDM o H[ V\NFHGF VFWFZ[ 8[g0Z T{IFZ SZJ]\ CMI T[DF\ Ô[ SFDGF VD]S EFUM V\U[ prRS ZSDGM ;DFJ[X YTM
CMI TM VFJL AFATM DF8[ VF S\8=FS8 C[9/ R}SJJF5F+ CMI T[ H NZ[4 YI[, SFDGL AFATM DF8[ pST SFDGF SM. EFU DF8[ R}SJ6L D[/JJF S\8=FS8Z
CÞNFZ ZC[X[4 VYJF CJF,FGF .HG[ZGF DT[ pST SFDGF T[ EFUG] \ DF5 ,. XSFI T[D G CMI4 TM CJF,FGF .HG[Z 5MTFGF :JlJJ[S VG];FZ
V\NFHDF\ GM\WFI[,L prRS ZSD R}SJL XSX[ VG[ VF B\0GL Ô[UJF. C[9/ S\8=FS8ZG[ R}SJJF5F+ YTL ZSD S[ ZSDMG[ ,UT]\ CJF,FGF .HG[ZG]\
l,lBT 5|DF65+ T[GF DF8[ VFBZL VG[ lG6F"IS ,[BFX[P
CLAUSE 33 - Action where no specifications: In the case of work for which there is no such
specification, such work shall be carried out in accordance with the Divisional Specification and in the
event of there being no Divisional Specifications, then, in such case the work shall be carried out in all
respects in accordance with the instructions and requirements of the Engineer-in-charge.
B\0v##o SM. lJUTM G VF5L CMI tIFZ[ ,[JFGF\ 5U,F\o SM. lJUTM G CMI T[JF 5|SFZGF SFDGL AFATDF\ T[J]\ SFD l0lJhGGL lJUTM
VG];FZ CFY WZJFG]\ ZC[X[ VG[ l0lJhGGL lJUTM G CMI tIFZ[ T[J]\ SFD TDFD ZLT[ CJF,FGF .HG[ZGL ;}RGFVM VG[ H~lZIFT VG];FZ CFY
CLAUSE 34 - Definition of work: The expression "work" or "works" where used in these conditions
shall, unless, there be something in the subject or context repugnant to such construction be construed to
mean the work, or the works, contracted to be executed under or in virtue of the contract. Whether
temporary or permanent and whether original, altered, substituted or additional.
B\0v#$o SFDGL jIFbIF o VF XZTMDF\ J5ZFI[, SFD VYJF XaN5|IMU lJQFIGF ;\NE"DF\ SX]\ lJ~â G CMI TM SFDR,Fp S[ SFIDL VG[ D}/
;]WFZ[,F4 AN,JFDF\ VFJ[,F S[ JFWFZFGF S\8=FS8 C[9/ S[ S\8=FS8ZGL ~V[ SZJFGF YTF\ SFD S[ SFDM V[JM YX[P
CLAUSE 35 - Contractor's percentage whether applied to net or gross amount of the bill: Percentage
referred to in the tender shall be deducted from/added to the gross amount of the bill before deducting
the value of any stock issued. (This clause shall be Applicable only for B-1 tender)
B\0v#5 S\8=FS8ZGL 8SFJFZL lA,GF RF[bBL V[S\NZ[ ZSDG[ ,FU] 5F0JLo VF5JFDF\ VFJ[, SF[.56 DF,;FDFGGL lS\DT AFN SZTF\ 5C[,F\
8[g0ZDF\ NXF"J[, 8SFJFZL lA,GL V[S\NZ ZSDDF\YL AFN SZJFDF\ VFJX[P T[DF\ pD[ZJFDF\ VFJX[P sVF B\0 ALv! 8[g0ZG[ H ,FU] 50X[Pf
CLAUSE 36 - Non refund of quarry fees & Royalties:
(I) On receipt of the work order, the contractor will identify the sources of procurement of quarried
construction materials like metal, kapchi, grit, sand etc. and seek the permission of the Engineer-in-
charge about the sources. The Engineer-in-charge will issue orders approving the sources of
procurement of quarried construction materials. The contractor will there after procure the
materials from approved sources for use in the contract work. The Dy. Executive Engineer will
verify this with reference to the copies of gate passes before recording the measurement of such
(II) The contractor shall pay the royalty to the competent authority/local body as per rules. The
contractor shall furnish quarterly the statement showing quantity of quarried materials, from
whom purchased (with full address of the seller) and copies of bills for purchase to the District
Officer of the Mining and Geology Department or authority competent to levy royalty in the area of
work. Contractor shall also furnish such additional information as regards royalty payment to the
Royalty authority. The royalty charges paid shall be borne by the Contractor and shall not be
reimbursed by the Executive Engineer (M) (Authority:- R & BD Circular No.TNC-2286-UO-39 (19)-
pnMU4 BF6 VG[ pÔ" lJEFUGF p5ZMST lJQFI 5ZtJ[GF TFP!v!v(*GF 9ZFJ ÊDF\S V[D;LVFZvZ!&(v&&(5vK DF\ H6FjIF 5|DF6[
SFI"JFCL SZJFGL ;]RGFov
(III) SFI"5F,S .HG[ZzL SFDGM JS"VM0"Z VF5[ S[ T]ZT H SFDGF XL0I],vAL GL GS, H[ T[ lJ:TFZGF DNNGLX lGIFDS VYJF HLVF[,MHL:8
VYJF VF;L:8g8 ÒVM,MÒ:8 VYJF E]:TZ VG[ BGLH XFBFGF Ò<,F SR[ZLGF J0F H[VM S,[S8ZzLGL SR[ZLDF\ A[;[ K[ T[DG[ VF5JFGL
ZC[X[P sZf ~FPZP__ sA[ ,FBf YL p5ZGF SFDMGF SMg8=FS8ZMV[ T[VMV[ BZLN[, BGLHGM HyYM VG[ T[ SIF\YL BZLN[, K[ T[ J[\RGFZGL
lJUTM NXF"JTF\ AL,MGL GS,M TYF 5+SGF ~5DF\ DFlCTL NZ +6 DF; p5Zs!fDF\ NXF"J[, VlWSFZLG[ 5]ZL 5F0JFGL ZC[X[P VF AL,MDF\
DF, J[RGFZG]\ GFD4 :Y/4 TFZLB VG[ DF, ,[GFZG] \ GFD VG[ HyYM4 JU[Z[ NXF"J[,F CMJF Ô[.V[P s#f H~Z 50I[ H~ZL lS:;FDF\ p5Z
s!fDF\ NXF"J[, VlWSFZLzL TZOYL JW] DFlCTLvlJUT DF, S[ AL,GF\ ;\A\WDF\ DF\UJFDF\ VFJ[ TM T[ H[ T[ SFI"5F,S .HG[ZzL BGLH
BFTFGF VlWSFZLG[ T[ lJUTM SMg8=FS8Z 5F;[YL D[/JJFDF\ DNN SZX[ Ô[ VFJL DFlCTL ;DI;Z VF5JFDF\ G VFJ[ T[ SM. SFI"5F,S
.HG[ZzL TZOYL VF V\U[ ;CSFZ G D/[ TM4 BGLH lJEFUGF VlWSFZL T]T" H VF AFAT lGIFDSzLGF wIFG p5Z D]SX[P H[VM VF V\U[
pnMU4 BF6 VG[ pÔ" lJEFU TYF H[ T[ ;\A\lWT lJEFUGF ;lRJzLGF wIFG p5Z D]SX[ VG[ VFJM 5+ D?I[YL ;\A\lWT lJEFUGF
;lRJzL4 H[ T[ SFI"5F,S .HG[ZzLG[ TFtSFl,S DFlCTL 5]ZL 5F0JF ;]RGF VF5X[P VF 5|YF VD,L AGTF VF 5lZ5+GL TFZLBYL
;LSIMZL8L 0L5MhL8 5ZT SZJF DF8[ ZMI<8L EIF" V\U[GF 5|DF65+GM VFU|C ZFBJFGM ZC[X[ GCL\P ZFHI ;ZSFZGF AF\WSFD DF8[
J5ZFTF UF{6 BlGHGL ZMI<8L EZJF AFATPPPP
(IV) VF SFDDF\ HIFZ[ ;FNL DF8L sVM0L"GZL S,[f VG[ s;MO8f D]ZD JF5ZJFDF\ VFJ[ T[GF p5Z 56 ZMI<8L R]SJJF5F+ K[P lJX[QFDF\ UF{6
BGLH AFATDF\ U]PUMPBPlG\P !)&& VG[ T[GF VG];\WFGDF\ JBTMJBT ACFZ 5F0JFDF\ VFJ[,F 9ZFJM4 ,FU] 50X[4 VG[ T[ D]HA ,Lh S[
5ZDL8 ,[JFG]\ VG[ ZMI<8L EZJFGL ZC[X[P spnMU4 BF6 VG[ pÔ" lJEFU 9ZFJ ÊDF\S o V[DPV[DPVFZPq!!Z___qZ_!#qK
TFP!v)v_$ ccSFD 5}~\ YI[ OF.G, AL, AgI[ T[GL GS, lH<,F E}:TZ XF:+LG[ DMS,L ZMI<8L 5[8[ HM ZSD J;], SZJFGL AFSL CMI TM
S[8,L ZSD J;}, SZJFGL K[ T[ H6FJJF 5+ ,BJMP VF 5+ E}:TZ XF:+LG[ D?IF AFN $5 lNJ;DF\ SM. 5|tI]¿Z G D/[ TM ZMI<8L 5[8[
SM. ZSD J;}, SZJFGL GYL T[D DFGL OF.G, AL, R]SJL N[JFG] \ ZC[ K[Pcc lJX[QFDF\ .HFZNFZzL £FZF ZMI<8L EIF" V\U[GF ZH] SZ[,
N:TFJ[HM V5}ZTF ,FU[ TM SFDDF\ J5ZFI[, UM{6 BlGHMGL ZMI<8L EZJFGL AFSL CX[ TM T[ EZ5F. SZJF .HFZNFZzL A\WFI K[ T[JL
AF\C[WZL .HFZNFZ 5F;[YL D[/JL ;LSIMZL8L l05MhL8 5ZT SZJFGL SFI"JFCL SZJFGL ZC[X[P sDFPDPlJPGF 5lZ5+ ÊDF\S
8LPV[GP;LPq!_qZ__Zqs!$f; TFZLB Z(q$qZ__# TYF Z*q$qZ__5 VG[ DFPDPlJP 5lZ5+ ÊDF\S 8LPV[GP;LPq!_q Z_!#qs$f;L
TFZLB (q(qZ_!$4 TFPZ_q*qZ_!& VG[ TFP$q!!qZ_!5 GM DFPDPlJP 5lZ5+ ÊDF\S 5ZRq!_qZ_!5q55q;Lf
CLAUSE 37 - Compensation Under the workmen's compensation Act : The contractor shall be
responsible for and shall pay compensation to his workman payable under the Workmen's Compensation
Act.1923 (VIII of 1923) hereinafter called the said Act) for-injuries caused to the workmen, If such
compensation is paid by Government as principal under sub section 12(1) of the said Act on behalf of the
Contractor it shall be recoverable by Government from the contractor und sub-section 12 (2) of the said
section. Such compensation shall be recovered in the manner laid down in clause 1 above.
B\0v#*o SFDNFZ J/TZ VlWlGID C[9/ J/TZo SFDNFZMG[ YI[, .ÔVM DF8[ !)Z#GF SFDNFZ J/TZ VlWlGID s!)Z#GF VF9DF\f
sCJ[ 5KL H[G[ pST VlWlGID SæM K[ T[f C[9/ R}SJJF5F+ SM. 56 J/TZ R}SJJF S\8=FS8Z HJFANFZ ZC[X[P pST VlWlGIDGL S,D !ZGL 5[8F
S,D s!f C[9/4 S\8=FS8Z JTL ;ZSFZ[ D]bI 51FSFZ TZLS[ VFJ]\ J/TZ R}SjI]\ CMI TM ;ZSFZ T[ ZSD pST S,DGL 5[8FvS,D sZf VgJI[ S\8=FS8Z
5F;[YL J;}, SZL XSX[P VFJ]\ J/TZ p5ZGF B\0 ! DF\ H6FJ[,L ZLT[ J;}, SZJFDF\ VFJX[P
CLAUSE 37A: The contractor shall be responsible for and shall pay the expenses of providing medical aid
to any workmen who may suffer a bodily injury as a result of an accident. It such expenses are incurred by
Government, the same shall be recoverable from the contractor for with and be deducted, without
prejudice to any other remedy of Government from amount due or that may become due to the
B\0v#*vSo VS:DFTG[ 5lZ6FD[ SM. SFDNFZG[ XFZLlZS .Ô YFI TM T[G[ TALAL ;CFI 5}ZL 5F0JF DF8[ S\8=FS8Z HJFANFZ ZC[X[ VG[ T[ V\U[G]\
BR" T[D6[ R}SJJFG]\ ZC[X[P VFJ]\ BR" ;ZSFZ[ SI]"\ CMI TM S\8=FS8Z 5F;[YL T[ TZT H J;], SZJF 5F+ ZC[X[ VG[ ;ZSFZGF ALÔ SM. 5U,FG[ AFW
G VFJ[ V[ ZLT[ S\8=FS8ZGL ,[6L VYJF CJ[ 5KL ,[6L YGFZ ZSDDF\YL T[ SF5L ,[JFX[P
CLAUSE 37B : The contractor shall provide all necessary personal safety equipment and first aid
apparatus available for the use of the person employed on the site and shall maintain the same in suitable
condition for immediate use at any time and shall comply with the following regulations in connection
(a) The workers shall be required to use the equipment so provide by the Contractor and Contractor
shall take adequate steps to ensure proper use of the equipment by those concerned.
(b) When work is carried on in approximity to any place where there is a risk of drowning all necessary
equipment shall be provided and kept for use and all necessary steps shall be taken for the prompt
rescue of any person, in danger.
(c) Adequate provision shall be made for prompt first aid treatment of all injuries to be sustained during
the course of the work.
CLAUSE 38: The quantities shown in the tender are approximate and no claim shall be entertained for
quantities of work executed being less than those entered in the tender. In the case of increase in the
quantities by more than 10% the new rate will be paid to the contractor for the quantities in excess of
10%. The rates for the increased quantities as aforesaid will be fixed in the manner specified in Clause-
14..2 (Corrected as per R&B G.R.No TNC-10-2017-01-C,dt 11-07-2017)
CLAUSE 39: Employment of famine or other labour: The contractor shall employ any famine, convict or
other labour or particular kind or class, if ordered in writing to do so by the Engineer-in-charge.
B\0v#) o N]QSF/U|:T lJ:TFZGF VYJF ALÔ DH}ZMG[ SFD[ ZFBJF AFAT o CJF,FGF .HG[Z V[JM ,[lBT C]SD SZ[ TM N]QSF/YL V;ZU|:T4
U]G[UFZ TZLS[ ;Ô 5FD[, VYJF VD}S RMÞ; 5|SFZGF S[ JU"GF ALÔ DH}ZMG[ S\8=FS8Z[ SFD[ ZFBJFGF ZC[X[P
CLAUSE 40: No compensation shall be allowed for any delay caused in the starting of the work on
account of delay in making available the full site of land at a time.
CLAUSE 41: No claim for compensation shall be allowed for any delay in execution of the work on
account of water standing in borrow pits or compartment. The rates are inclusive of hard or cracked soil,
excavation in mud, sub soil water or water standing in borrow-pits and no claim for an extra rate shall be
entertained unless otherwise expressly specified.
B\0v$! o SFD SZJFDF\ YI[, lJ,\A DF8[ J/TZ V\U[GM CÞ NFJMo RMS0LDF\ VYJF SM. EFUDF\ 5F6L HJFG[ SFZ6[ SFD SZJFDF\ lJ,\A V\U[ SX]\
J/TZ V5FX[ GlCP VF NZDF\ ;BT VYJF lTZF0JF/L HDLG DF8[GF\ SFNJ VG[ E}UE" H/JF/F EFUDF\ 5F6L EZF. ZC[T]\ CMI T[JL RMS0LGL
HuIFDF\ BMNSFD DF8[GF NZGM ;DFJ[X YFI K[ VG[ T[YL VgIYF :5Q8 H6FjI] \ CMI T[ l;JFI4 JWFZFGF NZ DF8[ SM. CS NFJM wIFGDF\ ,[JFX[ GlCP
CLAUSE 42: Entering upon or commencing any portion or work: The Contractor shall not enter upon or
commence any portion or work except with the written authority and instruction of the Engineer- in-
charge or of his subordinate in charge of the work. Failing such authority, the Contractor shall have no
claim to ask measurement of or payment for work.
B\0v$Z o SFDGM SM. EFU GJ[;ZYL CFY WZJF S[ X~ SZJF AFATo CJF,FGF .HG[ZG[ VYJF TFAFGF SFDGF CJF,FGF VlWSFZLGM l,lBT
C]SD VG[ ;}RGF l;JFI S\8=FS8 SFDGM EFU GJ[;ZYL CFY WZL S[ X~ SZL XSX[ GlCP VFJM C]SD G D?IM CMI TM SFDGF SM. DF5 ,[JF V\U[ S[
R]SJ6L DF8[ S\8=FS8Z SXM CÞNFJM SZL XSX[ GlCP
CLAUSE 43: Minimum age of person employed : (I) No Contractor shall employ any person who is under
the age of 15 years.
B\0v$# o SFD[ ZBFI[, jIlSTVMGL VMKFDF\ VMKL JI o S\8=FS8Z !5 JQF"GL GLR[GL p\DZGL SM. 56 jIlST SFD[ ZFBL XSFX[ GlCP
CLAUSE 43 (I) (A) - The employment of donkeys and / or other animals and the payment of fair
wages: For Asphalt work(s) as far as possible, only the adult persons should be employed by the
contractor. If the adult persons are not available, then the children below the age of 15 (Fifteen years)
should not be employed under any circumstance.
(ii) No contractor shall employ donkeys or other animals with breaching of string or thin rope. The
breaching must be at least three inches wide and should be of tape. (Nawar).
sZf S\8=FS8Z UW[0F VYJF ALÔ 5|F6LVMGF 5L9GF EFU 5Z hL6L NMZL VYJF 5FT/] \ NMZ0]\ AF\WLG[ T[DG[ SFD[ ,. XSX[ GlCP 5L9 EFU 5Z
AF\WJF VMKFDF\ VMKL # .\R 5CM/L OLT sGJFZf SFDDF\ ,[JLP
(iii) No animal suffering from sores, lameness or emaciation or which is immature shall be employed
s#f WFZFJF/F\4 BM0\UFTF VYJF S'X S[ GFGF 5|F6LG[ SFD[ ZFBL XSFX[ GlCP
(iv) The Engineer-in-charge or his agent is authorized to remove from the work any person or animal
found working which does not satisfy these conditions and no responsibility shall be accepted by
Government for any delay caused in the completion work by such removal.
s$f VF XZTM D]HA G CMI T[JL SM. 56 jIlST S[ 5|F6L SFD SZTLqSZT]\ DF,}D 50[ TM T[G[ SFD 5ZYL N}Z SZJFGL ;¿F CJF,FGF .HG[ZG[ S[
T[DGF V[Hg8G[ K[ VG[ VFJL ZLT[ SM. jIlST S[ 5|F6LG[ N}Z SZJFYL YI[, SM. 56 lJ,\A DF8[ ;ZSFZGL SM. HJFANFZL ZC[X[ GlCP
(v) The contractor shall pay fair and reasonable wages to the workman employed by him in the
contract undertaken by him. In the event of any dispute arising between the Contractor and his
workmen on the grounds that the wages paid are not fair and reasonable, the dispute shall be
referred without delay to the Engineer-in-charge who shall decide the same. The decision of the
Engineer-in-charge shall be conclusive and binding on the Contractor, but such decision shall not in
any way affect the conditions in the contract regarding the payment to be made by Government at
the sanctioned tender rates.
s5f 5MT[ CFY WZ[,F S\8=FS8 DF8[ SFD[ ZFB[, SFDNFZMG[ S\8=FS8Z[ JFHAL J[TG R}SJJFG]\ ZC[X[P R}SJ[, JFHAL G CMJFGF D]NF 5Z S\8=FS8Z VG[
T[DGF SFDNFZM JrR[ SM. h30M pEM YFI TM V[ h30M lJGF lJ,\A[ CJF,FGF .HG[ZG[ ;M\5JFDF\ VFJX[ VG[ T[ V\U[ T[VM lG6"I VF5X[P
CJF,FGF .HG[ZGM lG6"I S\8=FS8Z DF8[ lG6F"IS VG[ A\WGSTF" ZC[X[P 5Z\T] VF lG6"IYL D\H}Z SZ[,F 8[g0ZGF NZ[ ;ZSFZ[ SZJFGL YTL
R}SJ6LG[ ,UTL S\8=FS8DF\GL XZTMG[ SXL V;Z YX[ GlCP
(vi) The contractor shall provide drinking water facilities to the workers / labourers employed on
Government works. Amenities relating to sanitation shall also be provided to the
workers/labourers employed on works (in urban areas). If the contractor fails to comply with
these provisions, the Engineer-in-charge shall give notice in writing and if the contractor does not
provide this facility to the workers/labourers within a period of ten days from the date of the
notice in writing, the Engineer-in-charge shall thereupon make the arrangement for drinking water
at the cost of the contractor.
s&f ;ZSFZL SFD[ ZFB[,F SFDNFZM v DH}ZMG[ 5LJFGF 5F6LGL ;JU0 S\8=FS8Z[ 5}ZL 5F0JFGL ZC[X[P sXC[ZL lJ:TFZMDF\f SFD[ ZFB[,F
SFDNFZMG[ :JrKTF lJQFIS ;UJ0M 56 5]ZL 5F0JFGL ZC[X[P S\8=FS8Z VF Ô[UJF.G]\ 5F,G SZJFDF\ lGQO/ HX[ TM CJF,FGF .HG[Z T[G[
,[lBT GMl8; VF5X[ VG[ S\8=FS8Z VFJL ,[lBT GM8L;GL TFZLBYL lNG N;GL D]NTDF\ SFDNFZMvDH}ZMG[ VF ;UJ0 GlC VF5[ TM
CJF,FGF .HG[Z S\8=FS8ZGF BR[" 5LJFGF 5F6LGL jIJ:YF SZX[P
(vii) The contractor shall provide the amenity of proper shade and shelter to the workers/labourers
and their children on Government works as soon as the work starts. If the contractor fails to
provide shed and shelter, the Engineer-in-charge shall provide the same at the cost of contractor.
s*f SFD X~ YFI S[ TZT H S\8=FS8Z[ ;ZSFZL SFD 5ZGF SFDNFZMvDH}ZM VG[ T[DGF AF/SMG[ IMuI X[0 VG[ VFzI VF5JFGL ;JU0 5}ZL
5F0JFGL ZC[X[P X[0 VG[ VFzI:YFG 5}ZF 5F0JFDF\ S\8=FS8Z lGQO/ HX[ TM S\8=FS8ZGF BR[" CJF,FGF .HG[Z 5}ZF 5F0X[P
CLAUSE 44 - Method of payment: Payment to contractor shall be made by cheque drawn on any
treasury within the division convenient to them, provided the amount exceeds Rs. 10 Amount not
exceeding Rs. 10 will be paid in cash.
B\0v$$ o R}SJ6LGL ZLT o R}SJ6LGL ZSD ~FP !_ SZTF\ JW] CMI TM4 S\8=FS8ZG[ VG]S}/ CMI T[JL l0lJhGGF lJ:TFZGL SM.56 lTÔ[ZL
5ZGF R[S £FZF T[DG[ R}SJ6L SZFX[P ~FP !_ YL JW] G CMI T[JL ZSD ZMS0[YL R}SJJFDF\ VFJX[P
CLAUSE 44-A : Any sum of money due and payable to the Contractor (including the security deposit
returnable to the contractor) executing any Government work or work of any District Panchayat wholly
financed as grant-in-aid under this contract shall be appropriated by any District Panchayat /
Government and shall be set off against any claim of the Government/District Panchayat of Gujarat state
by the District Panchayat of Gujarat State/Government for the payment of a sum of money arising out or
under any other contract made by the contractor with the Government/District Panchayat of Gujarat
State for the work wholly financed as grant-in-aid by Government of Gujarat State. When no such amount
for purpose of the recovery from the contractor against any claim of the Government/District Panchayat
of Gujarat state is available, such a recovery shall be made from the contractor as arrears of land revenue.
CLAUSE 45: Deleted.
CLAUSE 46 - Employment of scarcity labour : If Government declares a state of scarcity or famine to
exist in any village situated within 16 kilometers of the work, the Contractor shall employ upon such
parts of the work, as are suitable for unskilled labour any person certified to him by the Engineer-in-
charge or by any persons to whom, the Engineer-in-charge may have delegated this duty in writing to be
in need of relief and shall be bound to pay to such persons, wages not below the minimum which
Government may have fixed in this behalf. Any disputes which may arise in connection with the
implementation of this clause shall be decided by the Engineer-in-charge whose decision shall be final
and binding on the contractor.
B\0v$& o VKTU|:T lJ:TFZGF DH}ZM SFD[ ZFBJF AFATo SFDGF :Y/[YL !& lS,MDL8ZGL V\NZ VFJ[,F SM. 56 UFDDF\ VKTGL VYJF
N]QSF/GL l:YlT 5|JT"TL CMJFG]\ ;ZSFZ ÔC[Z SZ[4 TM H[DF\ S]X/ SFZLUZMGL H~Z G CMI T[JF SFDGF SM. 56 EFU p5Z S\8=FS8Z[4 CJF,FGF
.HG[Z VYJF T[D6[ T[ V\U[GL OZH H[G[ ,[lBT ZLT[ ;M\5L CMI T[JL jIlSTV[ H[ jIlSTV[ H[ jIlSTVMG[ ZFCTGL VFJxISTF CMJFG]\ 5|DF65+
VF%I]\ CMI T[DG[ SFD[ ZMSJFGF ZC[X[ VG[ VF V\U[ ;ZSFZ[ H[ NZ GÞL SIF" CMI T[YL VMKF G CMI V[JF NZ[ VFJL jIlSTVMG[ J[TG R}SJJF T[
A\WFI[,F ZC[X[P VF B\0GF VD, 5ZtJ[ SM.56 TSZFZ p5l:YT YFI TM T[GM lG6"I CJF,FGF .HG[Z SZX[ VG[ T[ lG6"I S\8=FS8Z DF8[ VFBZL
VG[ A\WGSTF" ZC[X[P
CLAUSE 47: Deleted.
CLAUSE 48: The rates to be quoted by the Contractor must be inclusive of all taxes prevailing on due date
of bid submission. However any subsequent changes in the tax structure by Government after due date of
bid submission will be compensated (+) on availability or submission of actual documentation. Contractor
has to intimate Engineer in charge regarding changes occurred in the tax structure after bid submission. If
contractor fails to provide such information and if any financial obligation may arise due to change in tax
structure, same will be recovered from the contractor.
The contractor shall apply fair means of stock maintenance and shall adopt accounting standards as may
be prescribed under GST. For arriving at the difference in procurement prices due to introduction of GST,
it will be open for the Government to ask for original invoices, LR weigh bridge slips, payment details and
such other documents as may be required for the purpose. If there is reduction in overall tax burden then
proportional benefit of that shall be passed on to the Government. (TNC-10-2017-01-C Dt.29-8-2017)
CLAUSE 49: The Contractor should, as far as possible, obtain his requirement of labourers skilled and
unskilled, from the nearest Employment Exchange so as to utilise the local employment potential. If there
are no local Employment Exchange or such Exchanges are not able to provide the required labour locally,
suitable labourers should be utilised to the maximum extent possible.
B\0v$) o S\8=FS8Z[ Ô[.TF S]X/ VG[ lAGS]X/ DH}ZM XSI CMI tIF\ ;]WL GÒSDF\ GHLSGL ZMHUFZ SR[ZLV[YL D[/JJF4 H[YL :YFlGS ZMHUFZ
XlSTGM p5IMU Y. XSX[P :YFlGS ZMHUFZ SR[ZLVM G CMI VYJF VFJL SR[ZLVM H~ZL DH}ZM :YFlGS ZLT[ 5}ZF 5F0L XS[ T[D G CMI TM IMuI
DH}ZMGM AG[ T[8,F JW] 5|DF6DF\ p5IMU SZJMP
CLAUSE 50 - Fair Wages : If a Contractor fails to pay within '7' (Seven) days to the
labourer(s)/worker(s) the minimum wages prescribed by the Government under the Minimum Wages
Act, 1948 as in force from time to time, the Engineer-in-charge shall be at liberty to deduct the amount
payable to the labourer/workers from his (Contractors') bills or deposit(s) payable by the Contractor
after making due inquiries and establishing the claim(s) of the labourer(s)/worker(s).
The Contractor shall not be entitled to any payment of compensation on account of any loss that the
Contractor may have to incur on account of the action as aforesaid. Before the action as aforesaid, is
enforced, a notice in writing to the Contractor shall be issued by the Engineer-in-charge to pay the wages
as per Minimum Wages Act in force at the relevant time. If Contractor does not act as afore said within
seven days, then the action contemplated as above shall be taken against him.
B\0v5_ o JFHAL J[TG o JBTMJBT VD,DF\ CMI T[ D]HA !)$(GF ,3]TD J[TG VlWlGID C[9/ ;ZSFZ[ lGIT SZ[,F ,3]TD J[TG DH}Z
sDH}ZMfG[ SFDNFZ sSFDNFZMfG[ ;FT lNJ;DF\ S\8=FS8 G R}SJ[ TM CJF,FGF .HG[ZG[ IMuI T5F; SZL T[DH sDH}Zf DH}ZMGM SFDNFZ sSFDNFZMfGM
CSNFJM :YFl5T SZLG[ DH}Z sDH}ZMfG[ SFDNFZ sSFDNFZMG[f R}SJJF5F+ ZSD S\8=FS8ZGF lA,M VYJF S\8=FS8Z[ R}SJJF5F+ VGFDTvVGFDTMGL
ZSDDF\YL SF5L ,[JFGL K}8 ZC[X[P p5Z H6FjIF D]HA ,[JFDF\ VFJ[,F 5U,FG[ SFZ6[ S\8=FS8ZG[ SM. 56 G]S;FG ÔI TM T[ DF8[ T[G[ SM.56
R}SJ6L VYJF J/TZ D/JF5F+ ZC[X[ GlCP p5Z H6FjIF D]HAG] \ 5U,]\ VD,DF\ D}SJFDF\ VFJ[ T[ 5C[,F\ CJF,FGF .HG[Z T[ ;DI[ VD,DF\ CMI
T[ ,3]TD J[TG VlWlGID VG];FZ J[TG R}SJJFDF\ S\8=FS8ZG[ l,lBT GM8L; VF5X[4 S\8=FS8Z p5Z H6FjIF D]HA ;FT lNJ;DF\ JT"X[ GlC TM T[GL
;FD[ p5Z lJRFIF" D]HAGF\ 5U,F\ EZJFDF\ VFJX[P
CLAUSE 51: Deleted.
CLAUSE 52 - List of Machinery: The contractors shall also give a list of machineries in his possession and
which they propose to use on the work.
B\0v5Z o I\+ ;FDU|LGL IFNL o S\8=FS8Z[ 5MTFGF SAÔDF\GL VG[ SFD DF8[ p5IMUDF\ ,[JF lJRFZ[, I\+;FDU|LGL IFNL 56 VF5JFGL ZC[X[P
(i) In case, the roller deployed by Department for the use on contract work is kept idle by the contractor
for want of adequate labour and materials, the contractor will have to pay rental charges as per
prevailing rules even though the items of rolling and watering are to be carried out by the
(ii) If the contractor does not plan his programme so as to suit the requirement of the Department, the
proportionate rental charges on roller shall be recovered from the contractor.
CLAUSE 54 - Local labour on normal rates: The contractor shall have to engage local labour and person
seeking employment where available on normal rate.
B\0v5$ o ;FDFgI NZ[ :YFlGS DH}ZM o ;FDFgI NZ[ D/L XS[ T[D CMI tIF\ ZMHUFZ JF\K] :YFlGS DH}ZM VG[ :YFlGS jIlSTVMG[ S\8=FS8Z[ SFD[
CLAUSE 55: Rent will be recovered from the contractor for the land given to them for stacking materials
as well as for construction of temporary hutments etc.
Land measuring Charges
1. One hectare or less Rs. 5 per Month
2. More than 1 hectare & upto 2 hectares Rs. 10 per Month
3. More than 2 hectare & upto 3 hectares Rs. 15 per Month
4. More than 3 hectare & upto 4 hectares Rs. 20 per Month
CLAUSE 56: The contractor shall employ only such labour who shall produce a valid certificate of having
been vaccinated against small -pox within a period of last three years.
B\0v5& o S\8=FS8Z K[<,F # JQF"GL D]NT NZlDIFG XLT/FGL Z;L V5F. CMJF AFATG]\ :JLSFI" 5|DF65+ ZH} SZGFZ DH}ZMG[ H SFD[ ZFBX[P
1. Huts: The contractor shall build sufficient number of huts on a suitable plot of land for the use of the
laborers according to the following specifications:
(1) Huts of bamboos and grass may be constructed.
(2) A good site shall be selected. High ground removed from jungle but well provided with trees shall
be chosen wherever it is available. The neighborhood of rank jungle, grass or weeds should
particularly be avoided. Camps should not be established close to large cuttings of earth-work.
(3) The lines of huts shall have open spaces of at least 10 m. between rows. When a good natural site
cannot be procured, particular attention should be given to the drainage.
(4) There should be no over-crowding. Floor spaces at the rate of 2.8 Sq.m. per head shall be provided.
Care should be taken to see that the huts are kept clean and in good order.
(5) The contractor must find out his own land. If he wants Government land, he should apply for it and
pay assessment for it.
2. Drinking Water: The contractor shall as far as possible. Provide an adequate supply of chlorinated
pure potable drinking water for the use of labourers. This provision shall be at the rate of not less than
liters per head. No provision need-be made where there is a suitable nalla, river or well within 0.4 krn of
the camp. However arrangement should as far as possible, be made to chlorinate- water by chlorinated
tablets before it is allowed for drinking purpose.
3. The contractor shall construct semi-permanent latrines for the use of Labourers on the following scale,
(a) Where females are employed, there shall be at least one latrine for every 25 females
(b) Where males are employed, there shall be at least one latrine for every 25 males
Provided that where the number of males or female exceed 100, it shall be sufficient if there is one latrine
for every 25 males or females, as the case may be upto the first 100 and one for every 50 thereafter.
4. Privacy in latrines: Every latrine shall be under cover and so partitioned off as to secure privacy, and
shall have a proper door and fastenings.
5. Notice to be displayed outside latrines and urinals:
(1) Where workers of both sexes are employed there shall be displayed outside each block of latrine and
urinal a notice in the language understood by the majority of the workers For Men Only or For Women
Only: as the case may be.
(2) The notice shall also bear the figures of a man or of a women, as the case may be.
6. Urinals: There shall be at least one urinal for male/female workers upto 50 employed at a time.
Provided that where the number of male or female workmen, as the case may be, exceeds 500. It shall be
sufficient if there is one urinal for every 50 males or females upto the first 500 and one for every
males or females or part thereof.
7. Latrines and Urinals to be accessible:
(1) The latrines and urinals shall be conveniently situated and accessible to workers at all times at the
(2) (i) The latrines and urinals shall be adequately lighted and shall be maintained in a clean and sanitary
condition at all times.
(2) (ii) Latrines and urinals other than those connected with a flush sewage system shall comply with the
requirements of the Public Health Authorities.
8. Water for latrines and urinals: Water shall be provided by means of pipes or tanks or the rwise, so
also be conveniently accessible in or near the latrines and urinals.
9. Bathing and washing places:
(1) The contractor shall construct sufficient number of bathing places; every unit of 20 persons being
provided with a separate bathing place.
(2) Washing places should also be provided for the purposes of washing clothes. Every unit of 30 persons
shall have at least one washing place.
(3) such bathing and washing places should be suitably screened and separate places provided for male
and female workers.
(4) Such facilities shall be conveniently accessible and shall be kept in clean and hygienic condition.
10. Drainage: The contractor shall make sufficient arrangement for draining away the sewerage water as
well as water from the bathing and washing places and shall dispose-off this waste water in such a way as
not to cause nuisance. The contractor should obtain a permission from the Gujarat Water Pollution
Control Board, Gandhinagar, if Water is so be drained in river or near the well. The contractor would put
malarial oil once in a week in stagnant water round about the residence.
11. Medical facilities: The contractor shall engage a medical officer with a traveling dispensary for a
camp having 500 or more persons if there is no Government or other private dispensary situated within
k.m. from the camp.
12. Conservancy and cleanliness: The contractor shall provide the necessary staff for effecting the
satisfactory conservancy and cleanliness of the camp to the satisfaction of the Engineer-in-charge. At least
one sweeper per 200 persons should be engaged. Conservancy staff should dump refuge in compost pit,
away from the labour camp.
13. Health Provisions: The District Health Officer of the District or the Deputy Director of Health
Services shall be consulted before opening a labour camp and his instructions on matters, such as the
water supply, sanitary convenience, the camp-site, accommodation and food supply shall be followed by
the contractor.
14. Precautions against epidemic:
(a) The authorities in charge of the colonies should get the labourers; inoculated against cholera and
plague and Vaccinated against smallpox at the time or recruitment, if they are not inoculated or
vaccinated within 6 months or 3 years respectively prior to the date of recruitment.
(b) When, in any labour camp there is an epidemic disease or is threatened with such an outbreak, the
authorities in charge of the labour camps should ensure that all the inmates of the labour colonies
are inoculated or vaccinated as the case may be, depending on the diseases, within 72 hours after the
(c) The authorities in charge of the labour colony should arrange to communicate by wire regarding the
outbreak of the epidemic diseases on the very day of the outbreak, to the Mamlatdar of the Taluka,
the District Health officer or to the Deputy Director of Public Health in charge of that area and the
Director of Public Health. Thereafter they should continue to send daily reports to the above officers
in the prescribed form regarding the progress of the epidemic disease.
(d) When the authorities in charge of the labour colony suspect or have reason to believe that any
immate of the labour colony is suffering from the infectious or contagious disease, they shall
forthwith arrange for the segregation of such persons to isolated huts to be specifically provided for
the purpose and also for their treatment.
(e) As regional malaria epidemic outbreaks are likely to occur in such project areas, the authorities in
charge of the labour colonies should report promptly the occurrence of unusual incidence of cases of
malaria and also inform the District Health Officers of the District, Deputy Director of Public Healthy
(Malaria) and the Director of Public Health and also arrange to institute all necessary antimalarial
measures as may be advised by the officials of the Public Health Department.
(f) The authorities in charge of the colonies should also arrange to carry out any other measures that
may be recommended by the officials of the Public Health Department necessary to prevent or
control the spread of disease.
15. Rest rooms:
(1) In every place where in contract labour is required to halt at night in connection with the contract
works and in which employment of contract labour is likely to continue for three months or more,
the contractor shall provide and maintain rest rooms or other suitable alternative accommodation
within fifteen days of the employment of contract labour.
(2) If the amenity referred to in sub rule is not provided by the contractor within the period prescribed,
the employer shall provide the same within a period of fifteen days of the expiry of the period laid
down in the sub-rule(1).
(3) Separate rooms shall be provided for women employees.
(4) Effective and suitable provision shall be made in every room for securing and maintaining adequate
ventilation for the circulation of fresh air and there shall also be provided and maintained sufficient
and suitable natural or artificial lighting.
(5) The rest room or other suitable alternative accommodation shall be of such dimensions as to provide
at least a floor area or 1. Sq.mt. for each person making use of rest rooms.
(6) The rest room or other suitable alternative accommodation shall be so constructed as to afford
adequate protection against heat, wind, rain and shall have smooth, hard and impervious surface.
(7) The rest rooms or other suitable alternative accommodation shall be at a convenient distance from
the establishment and shall have adequate supply of whole some drinking water.
16. Canteen Facilities:
(1) In every establishment of contract work and wherein work regarding the employment of contract
labour is likely to continue for six months and wherein contact labour numbering one hundred or
more are ordinarily employed, the adequate canteen facilities shall be provided by the contractor for
the use of such contract labour within sixty days of the commencement of the employment of
contract labour.
(2) If the contractor fails to provide the canteen facilities within the time laid down the same shall be
provided by the principal employer within sixty days of the time allowed to the contractor.
(3) The Canteen shall be maintained by the contractor or principal employees as the case may be in an
efficient manner.
17. Accommodation in canteen:
(1) The canteen shall consist of at least dining hall, kitchen, storeroom, pantry and washing places
separately for workers and for utensils.
(2) (i) The canteen shall be sufficiently lighted at all times where any person has access to it.
(ii) The floor shall be made of smooth and impervious materials and inside walls shall be lime-
washed or colour-washed at least once in each year, provided that the inside walls of the kitchen
shall be lime-washed every four months.
(3) (i) The premises of the canteen shall be maintained in clean and sanitary condition.
(ii) Waste water shall be carried away in suitable covered drains and shall not be allowed to
accumulate so as cause nuisance.
(iii) Suitable arrangements shall be made for the collection and disposal of garbage.
18. Accommodation in dining hall:
(1) The dining hall shall accommodate at a time, atleast 30% of the contract labour working at a time.
(2) The floor area of the dining hall excluding the area occupied per dinner to be accommodated shall as
prescribed in subrule (1).
(3) (i) A portion of the dining hall and service counter shall be partitioned and reserved for women
workers, in proportion to their numbers.
(ii) Washing places for women shall be separate and screened to secure privacy.
(4) Sufficient table, stools, chairs or benches shall be available for the number of diners to be
accommodated as prescribed in sub rule
19. Equipment in canteen:
(1) (i) There shall be provided and maintained sufficient utensils, crockery, cutlery, furniture and any
other equipment necessary for the efficient running of the canteen.
(ii) The furniture utensils and other equipment shall be maintained in a clean and hygienic
(2) (i) Suitable clean clothes for the employees serving in the canteen shall also be provided and
(ii) A service counter, if provided, shall have a top of smooth and impervious materials.
(iii) Suitable facilities including an adequate supply of hot water shall be provided for the cleaning of
utensils and equipment.
20. Food stuff to be served: The food stuff and other items to be served in the canteen shall be in
conformity with the normal food habits of the contract labour.
21. Prices to be displayed: The charges for food stuffs, beverages and any other item served in the
canteen shall be based on "no profit, no loss" and shall be conspicuously displayed in the canteen.
22. Canteen to be run on "No profit no loss" basis: In deriving the prices of food stuffs and other
articles served in the canteen, the following items shall not be taken into consideration as expenditure,
(g) The rent for the land and building.
(h) The depreciation and maintence charges for the building and equipment provided for in the canteen.
(i) The cost of purchase, repairs and replacement of equipment including furniture, crockery, cutlery and
(j) The water charges and other charges incurred for lighting and ventilation.
(k) The interest on the amount spent on the provisions and maintenance of furniture and equipment
provided for in the canteen.
The local officers should checkup whether facilities as offered and which are admissible under the
existing rules and orders are made available to the workers and enforce upon the contractors the
necessity of adhering to the instructions for promotion of welfare of the workers according to the terms
of the contract.
23. BOOKS OF ACCOUNTS AND REGISTERS OF THE CANTEEN: The books of accounts and registers and
other document used in connection with the running of the canteen shall be produced on demand to an
24. AUDIT OF THE ACCOUNTS OF THE CANTEEN: The accounts pertaining to the canteen shall be
audited once every 12 months by registered accountants and auditors, provided that the Labour
Commissioner may approve of any other person to audit the accounts; if he is satisfied that it is not
feasible to appoint a registered accountant and auditor in view of the site or the location of the canteen.
CLAUSE 58: Contractor shall have to arrange for the supply of gumboots. Hand gloves, mask etc.
invariably to the labourers workers engaged by the contractor on asphalt work.
CLAUSE 59: The Contractor shall not show any distinction between Harijan and other class of labourers/
workers employed to carry out the Government work.
CLAUSE 60 - Price variation clause: Price variation: For (A) Labour (B) Materials and (C) P.O.L The
amounts payable to the contractor for the work done shall be adjusted for increase or decrease in the
rates of labour/ materials excepting those materials supplied by Government as per Schedule-A and P.O.L.
(A) Labour: Increase or decrease in the cost due to labour shall be calculated quarterly in accordance
with the following formula.
VI =increase or decrease in the cost of work during the quarter under consideration due to change in
rates for labour.
R =the value of work done in rupees during the quarter under consideration, after excluding the
value of extra items and after deducting the cost of.
(i) Materials supplied from the Departmental store to the Contractor at fixed rate as specified in
schedule-A and.
(ii) Value of cement, steel and asphalt brought by the contractor valued at star rate plus the
increase/decrease for which price adjustment is done under clause 60/A below:-
io = The average consumer price index for industrial workers for the quarter in which tenders were
opened (as published in *__________________)
i = the average consumer price index for industrial workers for the quarter under consideration.
pl = Percentage of labour components (specified in Schedule ______________ %) of the item.
* This refers to average consumer's price-index (wholesale) for industrial workers as applicable to
Ahmedabad/ Bhavnagar as published by Government of India, Ministry of Labour Bureau.
(B) Materials other than Cement, Steel and Asphalt : The increase or decrease in cost of materials
other than cement and steel shall be calculated quarterly in accordance with the following formula:
Vm = Increase or decrease in the cost of work during the quarter under consideration due to change
in the rates of material.
R =the value of work done in rupees during the quarter under consideration, after excluding the
value of extra items and after deducting the cost of.
(i) Materials supplied from the Departmental store to the Contractor at fixed rate as specified in
schedule-A and.
(ii) Value of cement, asphalt and steel brought by the contractor valued at star rate plus the
increase/decrease for which price adjustment is done under clause 60/A below:-
io = The average wholesale price index *(all commodities) for the quarter in which tenders were
opened. (As published in @ __________________)
i = the average wholesale price index*(all commodities) for the quarter under consideration.
Pm = Percentage of material components (specified in Schedule ______________ %) of the item.
@ = for materials
Wholesale price index as published by Reserve Bank of India should be referred to.
(C) P.O.L. : The increase or decrease in the cost of petrol, diesel, oil and lubricants shall be calculated
quarterly in accordance with the following formula:
Vd =Increase or decrease in the cost of work during quarter of consideration due to change in the
rates of petrol, oil and lubricants (P.O.L.).
R = The value of work done in rupees during the quarter under consideration, after excluding the
value of extra items and after deducting the cost of.
(i) Materials supplied from the Departmental store to the Contractor at fixed rate as specified in
schedule-A and.
(ii) Value of cement, steel and asphalt brought by the contractor valued at star rate plus the
increase/decrease for which price adjustment is done under clause 60/A below:-
Do = The average price of high speed diesel (HSD) fixed by I.O.C. for the district in which the work is
to be carried out for the quarter in which the tenders were opened.
D = the average price of HSD fixed by the I.O.C. for the district in which the work is to be carried out
for the quarter under consideration.
Pd = Percentage of P.O.L component (specified in schedule) ________ % of the item.
Conditions for variation except for Cement, Steel and Asphalt:
(1) No adjustment shall be done for the work done in the first twelve months of the time limit.
Adjustment payable/ recoverable will be calculated for the remaining work done during the
subsequent period.
(2) The sum total price adjustment for A, B and C will be limited (5/6/7)* % of the estimated cost of
work put to tender less the cost of Materials supplied from the Departmental store to the
Contractor at fixed rate as specified in schedule-A and cement, steel and asphalt valued at input
rates mentioned as under on which the sanctioned estimate is based. When clause 60A (B-1) is not
Quantity Input Rate per Ton
Mild Steel : ______________ M.T. Rs. ______________ per M.T.
TMT/HYSD Bars : ______________ M.T. Rs. ______________ per M.T.
(3) The quarter referred to in the above formula shall mean the quarter of the calendar year January to
March, April to June, July to September and October to December. Even if the tenders are opened in
the middle of a quarter, the average index for the calendar quarter will be considered. The same
principle would apply for identifying the quarter when the work is completed in the middle of
calendar quarter.
(4) The value of extra items will be excluded for working out the value of 'R' in the above formula in all
(5) Intermediate payment of escalation to be made under this clause on each occasion shall be limited
in such a manner that the total up-to-date payment of escalation will not exceed the proportionate
percentage of the ceiling of escalation as related to the proportionate value of the contract cost.
(6) Price adjustment shall be applicable only for the work that is carried out within the stipulated time
or extensions thereof as are not attributable to the contractor. No claims for price adjustment other
than those provided herein shall be entertained.
(7) This clause will be applicable in respect of works which of the estimated cost put to tender is above
Rs.25.00lacs and the time limit involved is more than 12months.
* Guideline for ceiling: 5% in case where time limit of contract is 3 years, 6% in case where time limit of
contract exceeds 3 years but is upto 4 years & 7% where time limit is more than 4 years.
CLAUSE 60A - Price Variation for Cement, Steel and Asphalt brought by Contractor : The amounts
payable to the contractors for the work done involving use of cement, steel and asphalt when these
materials are not supplied by the Government as for scheduled A shall be adjusted for increase or
decrease in the rates of these materials as under:-
(4) Price variation for cement, steel and asphalt brought by the contractor.
The star rates for cement, mild steel and for steel & asphalt to be brought by the Contractor shall be
considered Ex-supply Depot/Godown as under:-
Quantity STAR RATE
Cement : ______________ M.T. Rs. ______________ per M.T. Month in which
Mild Steel : ______________ M.T. Rs. ______________ per M.T. DTP is Approved
TMT/HYSD Bars : ______________ M.T. Rs. ______________ per M.T.
[The above star rates are linked with Reserve Bank of India price index for steel and cement & asphalt for
the month in which the DTPs are approved.
The month in which DTPs are approved will be specified in the tender document.
Star rates should be mentioned in the tender copy as under:
I. For cement, Price of cement from authorized dealer should be obtained for the month in which
the D.T.P.s are approved & mentioned as star rate before issue of tender copy.
II (a). For steel & H.Y.S.D. bars, rate of SAIL should be obtained for the month in which the DTPs. Are
approved and mentioned as star rate before issue of tender copy.
II (b). For asphalt the Star Rate is based on the Koyali Refinary prevailing in the month in which D.T.P.
is approved and should be mentioned before issue of tender copy.
III. For basic index specific month in which the DTPs are approved should be mentioned before issue
of tender copy.] The fluctuations in rates of cement and steel shall be adjusted in the bills payable
to the contractors as under:
A = Difference of Amount payable or recoverable B = Star rate of steel/cement/asphalt.
C1 - The (quarterly) average corresponding index for steel, cement, asphalt for the quarter under
consideration (as published in monthly bulletion or Reserve Bank of India)
Co. – Price index of cement/steel asphalt for the month in which the DTPs are approved
published in monthly bulletin of Reserve Bank of India.)
D- - Qty. of cement/steel/asphalt actually brought by the contractor on site of work and
consumed in the work during the quarter duly supported with bill as recorded in cement
consumption register or MB (for steel).
Conditions for variation prices of cement and steel only:-
1. No ceiling escalation for difference in the cost of steel and cement will be applicable.
2. This clause shall be operative from the date of issue of work order and up to the expiry of original
and extended time limit, if the delay for the reasons attributable to the contractor, Star rate is not
payable, however recovery will be effected.
3. This formula shall be used individually for cement/mild steel and Tor steel for calculation
4. The cement and steel brought by the contractor on site of work shall be used only after the same in
tested by the Department.
5. If such materials are not found as per the requirement of I.S. specification, the same shall be
removed by the contractor for which no claim shall be entertained.
6. This Cause will be applied to the work inspective of the cost of the work.
Conditions for variation prices of Asphalt only:-
1. The Contractor shall procure asphalt directly from refinery only.
2. The Contractor will not be furnished "P" form for purchase of quantity of asphalt required for this
3. The Contractor will have to produce in original all the gate passes issued by the refinery and also
the bill in original to the Engineer-in-charge.
4. The number of transport tanker carrying the asphalt shall be furnished by the contractor.
5. The test certificate regarding the grade of asphalt as well as test result of asphalt from GERI
Laboratory or other Laboratory approved by R & B Department shall have to be produced.
6. The difference between the actual rate of purchase as per original bill of the refinery produced and
the star rate shown above in this clause shall be payable/recoverable for the quantity of asphalt
actually used in this work. This difference shall be payable/recoverable for the asphalt consumed
in the work executed during original & extended time limit, if time limit is extended for reasons of
delay attributable to the department. This difference shall not be payable for the work executed in
extended time limit, when extension Is given for the reasons of delay attributable to the contractor,
however in case if price of asphalt is decreased during the extended time limit then difference
between the actual rate of purchase and the quoted star rate shall be recovered from the
7. (A) The difference will be payable/ recoverable for the asphalt procure on and after the date of
issue of work order and this price variation will not be subjected to any celling. In case the
contractor has procured the asphalt, before issue of work order either of original purchase rate or
the prevailing rate of asphalt at the time of actual consumption in the work, whichever is less, will
be considered for calculating the difference payable/recoverable.
(B) Variation in rates of asphalt shall be payable only after cross verification of refinery gate passes
of asphalt with the issuing refinery or in case of imported asphalt invoices shall be cross verified
with the statutory documents of the authorized dealer and authorized importer.
8. No advance payment or secured Advance will be payable against asphalt.
9. This part of clause for price variation of asphalt will be applicable for works estimated to cost
above Rs. 5 Lacs and involving use of asphalt.
10. It is permissible to use asphalt product by Private Companies like ESSAR and imported asphalt
also. If the contractor opt to use asphalt produced by Private Companies or imported asphalt.
a. The Contractor can procure asphalt produced by Private Company of India or imported asphalt
and use in the work.
b. The Contractor will have to produce in original, the purchase invoice of asphalt.
c. All the conditions for variation in rates of asphalt shall be applicable for the imported asphalt
d. For calculation of variation in the rates of asphalt, the rate prevalent at Indian port at the time
of purchase in case of imported asphalt or the rate as per purchase invoice in case of asphalt
purchased from private Indian company or EX. Refinery rate of Indian public sector
undertaking refinery (I.O.C, HPCL, BPCL) on the date of purchase, whichever is less, shall be
considered for working out the difference and for comparison of the star rate shown above in
this clause. This difference shall be payable/recoverable for the asphalt consumed in the work
executed during original and extended time limit if time limit is extended for reasons of delay
attributable to the department. This difference shall not be payable for the work executed in
extended time limit, when extension is given for the reason of delay attributable to the
contractor, however in case if price of asphalt is decreased than difference between the actual
rate of purchase and the quoted star rate shall be recovered from the contractor.
11. If the contractor use imported Asphalt, it will be verified that the imported Asphalt to be used is of
specified viscocity Grade before permitting to use imported Asphalt. Grade Certificate of Refinery
from which Asphalt is imported only must be obtained Grade Certificate of any other
Laboratory/institution should not be accepted. For testing of imported asphalt, six conditions
stipulated in R&B circular No.STR/ 102006/1577/8/H Dated 22-11-2017 should also be compiled
(Authority R & B D GR No.TNC-1089(4)-C, dated 31-08-1991 modified Vide G.R.s of even numbers,
2-07 and STR/102006-1577-8-H dated 2-9-08 and dated 8-12-08 of R&B D.No.5ZRv!_Z_!5v55v;L
TFP$q!!qZ_!5 STR/10-2016/1/H/ dt.3-10-16 and R & B circular No.PRC-10-2015-55 (PT-1)C Dated 8-
CLAUSE 61 - FENCING AND LIGHTING:
(a) The contractor shall, unless otherwise specified, be responsible for the proper fencing, lighting
grading and taking of the necessary safety measures for all works comprised in the contract and for
the proper provision of temporary road, way, foot-way, guards, fences, caution notices etc. as far as the
same may be rendered necessary by reasons of the work for the accommodation of workmen, foot
passengers or other traffic and of owners and occupiers of adjacent property and the public and shall
remain responsible for any accidents that may occur on account of his failure to take proper & timely
(b) All the arrangements made for fencing and lighting shall be maintained by the contractor through the
currency of the contract till the physical taking over of the work by department.
CLAUSE 62 - LIABILITY OF ACCIDENTS TO PERSONS: Responsibilities and liabilities of the contractor
under Workmen's Compensation Act are given in clause No. 37 In addition following shall also apply:
(a) On the occurrence of an accident, which result in death of workmen employed by the contractor or
which is so serious as is likely to result in death of any such workmen, the contractor, shall within
hours of happening of such accident(s) intimate, in writing to the Engineer-in-charge the fact of such
accident(s). The contractor shall indemnify Government against all loss or damage sustained by the
Government resulting directly or indirectly from his failure to give intimation in the manner aforesaid
including the penalties or fines, if any, payable by the Government as a consequence of Government's
failure to give notice under the Workmen's Compensation Act or otherwise to conform to the
provisions of the said act in regard to such accident(s).
(b) In the case of an accident, in respect of which compensation may become payable under Workmen's
Compensation Act, whether by the contractor or by the Government as principal Employer, it shall be
lawful for the Engineer-in-charge to retain out of money due and payable to the Contractor, such sum
or sum of money as may, in the opinion of the Engineer-in-charge, be sufficient to meet such a liability.
The opinion of the Engineer-in-charge shall be final in regard to all matters arising under this clause.
CLAUSE 63 - ACCESS TO SITE AND WORK ON SITE : The Engineer may, if he considers fit from to time,
enter upon any land(s) which may be in possession of the contractor this contract for the purpose of
executing any work not included in this contract and may execute such works not included in this
contract by agents or by other contractors, at his opinion and the contractor shall, in accordance with the
requirements of the Engineer-in- charge, afford all reasonable facilities for execution of the work
including occupation of lands by structure or otherwise for any other contractor employed by the
Government and his workmen or for the workmen of the Government who may be employed in the
execution on or near the site of the work not included in the contract or of any contract in connection
with or ancillary to the work and in default, the contractor shall be liable to the Government for any delay
or expense incurred by reason of such default. Provided always that if damage arising, make a statement
of the same to the Engineer-in-charge who shall from time to time, assess the value in his judgment of
such damage and the Government shall from time to time pay to the contractor the amounts (if any)
accepted as justified by the Engineer-in-charge:
CLAUSE 64 - REPORTS REGARDING LABOUR: The Contractor shall submit the following reports to the
Engineer-in-charge: (a)
(i) A daily report in the suitable form of the strength of labour both skilled and unskilled employed by
him on the work(s). The contractor shall increase or decrease the strength both skilled and
unskilled. If directed by the Engineer-in-charge. The submission of such reports shall not. However,
relieve the contractor of his responsibilities and duties regarding progress or any other obligations
under the contract.
(ii) A classified weekly return in the suitable form of the number of person employed on the works
during the preceding week.
(iii) A weekly medical report in the suitable form showing the health of the contractor's camp, the
number of persons ill or incapacitate and the nature of their illness.
(iv) A report of any accident, which may have occurred, to be sent within 24 hours of the occurrence.
(v) Such other report as may be prescribed.
CLAUSE 65 - Treasure Trove : In the event of discovery by the contractor or his employees, during the
progress of work of any gold, silver, oil or other minerals of any description and precious stones,
treasures, coils, antiquities, relic, fossils or other articles or value of interest whether geological,
archaeological or any other such treasure & other things shall be deemed to be the absolute property of,
the Government and the contractor shall duly preserve the same to the satisfaction of the Engineer-in-
charge, from time to time, and relieve the same to such persons as the Engineer-in-charge may appoint.
The contract shall take all reasonable precautions to prevent his workmen or any other person from
removing or damaging, any such articles or things, immediately after the discovery thereof and before
removal acquaint the Engineer- in-charge with such discovery and carry out his orders for the disposal of
CLAUSE 66 - Indemnity: The contractor shall indemnity the Government against all actions, suits, claims
& demands through or made against the Department in respect of work of this contractor against any loss
damage to Department in consequence of any action or suit being brought against the contractor for
anything done or omitted to be done in execution of the work of this contract.
CLAUSE 67 - Insurance of Labours: The contractor shall be responsible to arrange for insurance of all
labourers, skilled and unskilled, workers, and supervisors etc., employed by him as per labour regulation
CLAUSE 68 - Setting Out: The contractor shall be responsible for the true and proper setting out of the
works and the correctness of positions, levels, dimensions and alignments of all parts of the work and for
the provisions of all necessary instruments, appliance and labour in connection therewith. If , at any time,
during the progress of the work, any errors, appear or arise in the position, levels, dimensions or
alignments of any part of the work, the contractor, on being required to rectify such errors by the
Engineer-in-charge shall at his own expense do so to the satisfaction or the Engineer-in-charge. If
however, such error is based on incorrect data supplied in writing by the Engineer-in-charge, the
expenses of rectifying the same shall be borne by the Department. The checking of and setting out of any
line or level by the Engineer-in-charge or his representative shall not in any way, relive the contractor of
his responsibilities for the correctness of the error. The contractor shall carefully protect and observe all
bench-marks, site-nails, page and other things used in setting out of the work(s).
CLAUSE 69 - Cement Register: A register in the prescribed form showing day-to-day receipt,
consumption and balance of cement on site of work will be maintained by the Department, which shall
invariably be signed daily by the contractor or his authorised representative in token of its correctness.
(1) Materials, Works Test Register and Core cutting Machine : A register in the prescribed from
showing day-to-day receipt, consumption and balance of cement on site of work by the Department and
every entry thereof shall invariably be signed by the Contractor or his authorised representative in taken
of its correctness.
(2) Contractors registered in Special Category-1 (Roads) will have to procure and keep available on site
two core cutting machines, similarly those registered in Special Category-2 (Roads) will have to procure
and keep available on site one core cutting machine on ownership basis. The thickness of sub base and
base layers of road will be tested by taking cores and recording results of layer thickness in paver site
register. (R & B.D. Circular No.RGN-60-2006-35-C dated 26/05/06)
(3) In case of asphalt items (other than BSG & BBM) having total thickness of more than 50mm, the
contractor will take two to four core samples by his core cutting machine at the interval of 250m distance
at each cross section in the presence of Dy. Executive Engineer. These samples will be sealed and will be
sent for testing of thickness, density & bituminous content in the approved laboratory. Five percent of the
amount payable for asphalt items will be withheld till the results are received. If the results are not
satisfactory, the action as per conditions of contract will be taken (R & B.D. Circular No.RGN 602006 (35)-
C dated 31/05/07)
CLAUSE 71 - Progress Schedule: (a) The contractor shall furnish within one month (unless extended by
the Engineer-in-charge) order to start the work, the progress schedule in quadruplicate indicating the
date of staring, the monthly expected to be achieved and the anticipated completion date of each major
item of work to be done by him, also indicating dates of procurement and setting up the materials, plants
and machinery. The schedule should include a statement of proposed general and detailed arrangements
for carrying out works, and of item, order and manner in which it is proposed general and detailed
arrangements for carrying out works and of item, order and manner in which it is proposed that these
shall be executed. The schedule should be framed keeping requirement of the clause 2 of tender form in
view and be such as in practice to the achievement towards completion of the work in the time limit and
of the particular items on the dates specified in the contract and shall have the approval of the Engineer-
in-charge. Further, the dates for the progress, as in this schedule shall be adhered to.
(a) In case it is found necessary, at any stage to alter the schedule, the contractor shall submit in, good,
time a revised schedule incorporating necessary modification proposed and get the same approved
from the Engineer-in-charge. No revised schedule shall be operative without such acceptance in
writing. The Engineer-in-charge is further empowered to ask for more detailed schedule or
schedules, any week by week, for any items and the contractor shall supply the same as and when
(b) The Engineer-In-charge shall have, at all times, the right, without in any way vitiating this contract
forming grounds for any claim, to after the order of the work of any part thereof and the contractor
shall after receiving such direction, proceed in the order directed. The contractor shall also revise
the progress, schedules accordingly and submit four copies of the revised schedule to the Engineer
in-charge within seven days of the said Engineer's direction to alter the order of works.
(c) The contractor shall furnish sufficient plant, equipment and labour and shall work such hours and
shifts as may be necessary to maintain the progress of the work as per approved progress schedule.
The working and shift hours shall comply with all the Government regulations in force and shall be
such, as may be approved by the Engineer-in-charge and the same not be varied without the prior
approval of Engineer-in--charge.
(d) The contractor shall from time to time, as may be required by the Engineer-in-charge, furnish the
Engineer-in-charge with a statement in writing of the arrangements he proposes to adopt for the
execution of this contract and the Engineer-in-charge may, if he considers necessary at any time
advice alternation in the same, which the contractor shall adopt on notice thereof.
(e) The progress-schedule(s) shall be in the form of progress chart, forms, statements and/or reports as
any be approved by the Engineer-in-charge.
The contractor shall submit four copies showing the progress of the work in the form of a chart etc.,
at periodical intervals as may be specified by Engineer-in-charge.
(f) The approval of the progress schedules by the Engineer-in-charge shall not relieve the contractor of
schedule required by the Engineer-in-charge shall not entitle the contractor to any extra payment.
CLAUSE 72 - Secured Advance to Contractor:
(1) Before any secured advance for metal is paid to the contractor, the metal shall have to be tested for
its quality in the laboratory. Contractor’s request for such secured advance will be considered only
after test results of metals are received and results are satisfactory. (As per Government circular
(2) Advance on security of materials brought to site will not exceed 75 % of the value (As assessed by
the Executive Engineer (M)) of such material provided that they are of imperishable nature.
(3) Recovery of advances will not be postponed until the whole of the work entrusted is completed.
Secured advance will be recovered within 3 month from the month in which secured advance is
given even if material is not utilized in the work.
(4) Secured advance is permissible on materials which are all actually brought on site and are required
by the contractor for use on items of works for which rates for finished work have been agreed upon.
(5) Secured advance will be given only on materials for which the full value is paid by the contractor to
(6) HIFZ[ ;LSIF[0" V[0JFg; VF5\, ;ZSFZL DF,;FDFGDF\ SFDGL ;F.8 p5Z 38 DF,}D 50[ tIFZ[ T[GF[ VC[JF, SZJFGL HJFANFZL
.HFZNFZGL ZC[X[P VFJL 38GL HF6 .HFZNFZ wJFZF CJF,FGF .HG[ZG[ TFtSFl,S SZJFGL ZC[X[ VG[ HF[ VFJL HF6 .HFZNFZ wJFZF
CJF,FGF .HG[ZG[ TFtSF,LS GCL SZJFDF\ VFJ[ TF[ SFDGL ;F.8 p5Z DF,]D 50[, 38 S[ RF[ZLGF AGFJDF\ .HFZNFZ 5F[T[ 56 51FSFZ K[
T[D U6L T[GL ;FD[ 5U,F\ ,[JFDF\ VFJX[P p5ZF\T SFD p5ZGF TF\l+S SD"RFZLVF[ H[JF S[ SFZS]G4 JS" VF;L:8g8 H[JF[GL 56 ZL5F[8" SZJFGL
HJFANFZL K[P T[VF[V[ DF,;FDFG SFDGL ;F.8 p5ZYL p50L G HFI T[ HF[JFG] \ ZC[X[ T[DGL HF6 ACFZ HF[ VF DF,;FDFG p50L HFI TF[
T[JF AGFJ AgI[ +6 lNJ;DF\ ZL5F[8" SZJFDF\ lGQO/ HX[ TF[ T[VF[ ;FD[ 56 HJFANFZL GSSL SZJF 5U,F\ ,[JFDF\ VFJX[P sDFPDPlJEFU
9ZFJ S|DF\So 5LP0A<I]PV[DP!_)_vI]PVF[P !#s5f TFPZ$v!_v)_Pf
(7) HIFZ[ SF[g8|FS8Z TFZ6JF/L 5[XUL ,[JF .rKTF[ CF[I tIFZ[ T[G[ VZHL SZL GD]GFv#!DF\ ULZF[BT SZJFGF[ ZC[X[ VF VZHL HF[0[
DF,;FDFGGL BZLNLG]\ AL, VYJF .gJF[.;q 0L,LJZL R,6 VZHL ;FY[ ZH] SZJFG]\ ZC[X[P VFJF ULZF[BTYL ;ZSFZG[ TFZ6JF/F
DF,;FDFG p5Z c,LVGc 5|F%T YX[ VG[ SF[g8=FS8Z SFD BF[Z \E[ 5F0[4 DF,;FDFGDF\ 384 N]~5IF[U S[ RF[SLNFZL TYF ;,FDTLGL jIJ:YFGF
VEFJ[ BF[8 S[ BR" YFI T[ ;FD[ ;ZSFZG[ Z1F6 D/X[P
(8) ~l5IF 5_4___ YL JW] ZSDG]\ l;SIF[0" V[0JFg; VF5JFG]\ CF[I tIFZ[ VFJF DF,;FDFGGL 5]Z[5]ZL RSF;6L SFI"5F,S .HG[ZzLV[ SZJFGL
ZC[X[P (R&B D.G. R. No.P.W.M.-1090-40-13(5)-C dated 24-4-92)
(9) l;SIF[0" V[0JFg;GL ZSD H[8,L A[\gS U[Z\8L .HFZNFZ[ ZH] SIF" AFN H l;SIF[0" V[0JFg; R]SJJFDF\ VFJX[P sDFPDPlJPGF[ TFZLB
$v!_v)*GF[ 9ZFJ S|DF\S 5LP0A<I]PV[DPv!_)_qI]PVF[P !#s5fv;
CLAUSE 73 - Advance Payment : Advance payment for the work done, but not measured, may be made
up to 80 % of the approximate value of the work done as shown in the progress reports of approximate
measurement sheets with location furnished by the Sub-Divisional Officer subject to the following
(1) That in the case of advance payment on the item of earth work payment should be made on the basis
of detailed measurement except during the monsoon period (June to September)
(2) That the detailed measurements should be recorded within the month from the date of payment of
the bill incorporating the advance payment. However in the case of sectional measurements of earth
work, detailed measurement should be recorded within three months instead of one month
stipulated above.
(3) If on recording of the detailed measurements, it is found that the advance payment was made for
more amount than the value of work now measured, excess payment shall be refunded forth with by
the contractor on demand, if it cannot be adjusted from the bill in which the items on which advance
payment was given are recorded by measurements.
CLAUSE 74 - Advance Against Machineries:
1. Secured advance on plants and machineries brought to the site of work is admissible for the
contracts estimated to cost more than Rs. Ten Lacs.
2. Simple interest in such advance granted to contractor against plants and machineries brought to
work sites be charged at the rate of…………………………………… % per annum.
3. The recovery of the advance shall be affected from the second month from the month in which
advance is given and full recovery will be completed by the time seventy five percent of scheduled
time is completed.
4. Such advance will be limited to 5 percent of the estimated amount put to tender.
5. The advance will be granted for the plant and machinery actually brought to the site of work.
6. The machinery and equipment on which the advance is granted shall be of full undisputed
ownership of the contractor, and they shall be hypothecated to Government and also
comprehensively insured till the advance granted is fully recovered. The hypothecation deed shall be
executed separately before the advance is actually given.
7. The advance will be granted as 75 percent of the cost of new equipment for which the contractor is
able to produce purchase-vouchers and other documents. This will not be applicable in the case of
second-hand equipment purchased the contractor.
8. In the case of used or second-hand equipment brought by the contractor advance will be allowed at
50 percent of the value of the equipment arrived at in the following manner:-
(a) For used equipment for which the records of original purchase price and past utilization are
available, depreciated value, so worked out will be subject to the confirmation by Mechanical
wing of the Department.
(b) For used equipment for which proper records of purchase price and past utilization are not
available, the value will be assessed by a committee of Executive Engineer (M)s of Civil and
Mechanical Wings. The value assessed will be based on the probable age of the equipment, its
present condition and its probable depreciated value. In working out depreciation age of the
equipment, its present condition and its probable department of spares, repair, reconditioning
of the equipments shall not be taken in to account towards the capital cost. The value arrived at
by the committee will be final.
9. No advance may be allowed for equipment which is more than 8 years old or which has already
worked for more than 80 percent of its life.
10. No advance shall be given on transport-vehicles like jeeps, station-wagons, estate-car and such other
vehicle ordinarily required for transport purposes.
11. The recovery will have to be completed within the stipulated period of completion of work i.e.
[Specified advance on plant and machinery brought on site of work can be given to contractor only after
prior approval of the Government (G.P.W. Vol.–I Para 344–C(i)]
CLAUSE 75 - Mobilization Advance:
1. Mobilization advance to the extent of 5 % of the Estimated cost may be granted at the
commencement of the work after the contractor has set up camp on site has brought machineries,
equipment and centring, etc., for well sinking and has completed the work of service road, water-
supply and lighting arrangements on the site of works which are estimated to cost over Rs. 40 Lacs.
2. The advance will carry a simple interest at the rate of …………………………… % per annum.
3. The recovery of advance shall commence from the sixth month from the month in which the advance
is paid, and full recovery of advance and interest shall be completed by the end of ……......month from
the date of issue of work order, in other works, the recovery of advance and interest will spread over
a spell of …………months or less as above in equal instalments.
4. A bank guarantee from a scheduled commercial bank shall have to be produced for the amount of
advance applied for the bank guarantee can be scaled down to the extent of recovery of advance.
5. Mobilization advance will be treated as interest bearing refundable loan for the purpose. The
responsibility of the contractor for the refund of Mobilization Advance is absolute and not
dependent up on the completion of the work. The contractor will have to refund the advance with
accrued interest irrespective of the fact whether the contract is breached by either partly or
abandoned or finalized prematurely. (Govt. R&B Dept. Reso. No.TCF-1382/(8)J dated 22-4-1985)
CLAUSE 76: Before starting the work, the contractor will have to obtain the licence from the District
Assistant Labour Commissioner under the Contract Labour (Regulation and Abolition) Act, 1970 and
contract Labour (Regulation and Abolition) Gujarat Rules 1972 after paying necessary fees and deposit on
the basis of the number of labourers to be employed on the work and will have to supply two true copies
of the said licence to the Deputy Executive Engineer before the work is started.
CLAUSE 77.1: The contractors registered in special categories of Roads, Bridges and Buildings are
required to equip their companies by establishing test laboratories as under:
Special Category - 1: Three field laboratories with all road material testing and asphalt testing.
Special Category - 2: Two field laboratories with road material testing and asphalt testing.
Special Category - 3: One field laboratory with all road material testing and asphalt testing.
For Asphalt testing the contractor will construct pucca structure of minimum 25 square meter area duly
connected with water and electric supply to house site testing laboratory and install the instruments as
per following I.S. standard to carry out the test prescribed therein.
1. Penetration test as per I.S. 1203 2. Softening point test as per I.S.
3. Ductility test as per I.S. 1208 4. Viscosity test as per I.S.
5. Specific gravity test as per I.S.
The instruments provided should be as per I.S. Standard, so certified and be regularly and periodically
calibrated. Frequency of tests will be as indicated in specifications and as referred in R. & B. D.G.R.
No.SSR-1099-IB/91(9)-C, dated 26.7.1999.
Special Category-1 and 2: One field laboratory with testing of all materials to be used in work and
concrete testing instruments.
Special Category-1 and 2 : One field (Copy as above) (R & B Circular No.RGN-40-2017-01-C dated 23 -3-
2017) When the contractor is awarded contracts for such works as contractor registered in special
category he will have to shift one such laboratory on this site of work or will have to provide mobile
Works other than Roads, Bridges and Buildings:
In respect of works other than Roads, Bridges and Buildings the contractor will have to establish site
laboratory equipped with instruments and facilities for testing of all materials and workmanship of items
to be executed under this contract. This will include facilities of testing of (A) Aggregates (B) Murrum -
Soil (C) Sand (D) Bricks (E) Concrete including non-destructive tests like ultrasonic test (F) Bituminous
mix if these are relevant items to be executed (Para-1 of R&B Circular 5ZRv!_vZ__*vZ(v; TFP!&qZqZ__)f
77.2: The schedule showing number and type of lists to be carried out under this contract is attached
with this tender. Out of total number of such tests, 80% tests will be carried out in site laboratory, 10% in
Government approved laboratories and 10% in GERI laboratories. However minimum one test of all types
of tests shall have to be carried out in GERI laboratories only.
77.3: Site laboratory tests will be carried out by qualified Engineer of the contractor to whom I card is
given by the Executive Engineer (M) and in the presence of Section Officer / Dy. Executive Engineer or
Executive Engineer in charge of the work.
77.4: 80% of site tests will not be carried out at one time but will be related to the progress of work and
consumption of materials.
77.5: Prescribed Registers for recording details and results of tests will be maintained on site of work.
77.6: The tests which are not done in GERI laboratories e.g. electrometric bearing etc. will be carried out
in the laboratory consented by the Executive Engineer (M), (R&B Circular No. PARCH-102007-28-C, Dated
77.7 : One percentage of estimated cost of work put to tender for this work after deducting the cost of
materials as per Schedule A valued at basic rates in the sanctioned estimate will be deducted from the
Running Account Bills of contractors for testing of materials and workmanship. (G.R. B&C No.TNC-
1085(4)-C Dated 10-5-85 read with R&B D Circular No. U]lGHGq5lZ5+qZ_!5qU]lG TFP$q!Zq!5f
Clause No 78 - Deduction of GST from Bill: The following tax deduction shall be made from each bill
payable to the contractor (1) 1% of the value of amount payable towards SGST. (2) 1% of the value of
amount payable towards CGST. TDS certificate for taxes deducted will be issued to the contractor
(F.D.G.R. No GST/1017/1097/GST Cell dated 15-09-2018)
B\0v*) o R]SJ6FGF AL,DF\YL YI[, SFDGL lS\DTGF V[S 8SF ,[B[ ccAL<0L\U V[g0 VWZ Sg:8=SXG JS";" J[<O[Z ;[; V[S8cc VG[ T[ C[9/ 30FI[,
U]HZFTGF\ !))(GF\ lGIDMGF\ lGID 5 GL HMUJF. D]HA pST ;[;GM OF/M J;], SZJFDF\ VFJX[P szD VG[ ZMHUFZ lJEFUGL TFZLB
#!v!v_5 GL VlW;}RGF S|DFF\So HLV[RVFZqZ__5q_$q0L0A<I]V[qZ__$q($!qDv# VG[ T[ lJEFUGM TFZLB )v!Zv_5 GM 9ZFJ S|DF\S o
;L0A<I]V[qZ__$q!(#!qDv#f TYF DFPDPlJEFUGM TFZLBo Zv!Zv_&GF 5lZ5+ S|DF\So V[;V[;VFZv!_Z__$vVF.ALv$!sZ$f;
B\0v(_ o ccSM8=FS8ZGF DFU"NX"G DF8[GL ;}RGF !)cc D]HA .HFZNFZzL lGIT :Y/[ AM0" ,UFJLG[ OM8MU|FO ;lCTGM VC[JF, VF SFD ;\A\lWT
GFIA SFI"5F,S .H[GZzLG[q SFI"5F,S .HG[ZzLGL HF6 C[9/ JS"VM0"Z .:I] SIF"GL TFZLBYL V[S DlCGFDF\ SZX[P HM T[D SZJFDF\ lJ,\A YFI
TM\ lJ,\lAT ;DIDF\ R]SJJFGF ZGL\U AL,DF\YL 8[g0ZGL ZSDGF _PZ5@ YL !@ H[8,L ZSD ZMSJFDF\ VFJX[P sDFPDPlJPGF TFPZ&v$v*(GF
5lZ5+ TYF TFPZ*v!!v)_4 !(v!!v)!4 ZZv*v)( TYF TFP5v#vZ_!!GF 9ZFJ S|DF\So 8LV[G;Lv!_)_vZ$v;4 VFWFlZTf
Annexure: The information in the following annexures specimens should be furnished on separate letter
pad if necessary.
(Referred to in Condition No.2 General Rules and Direction for the guidance of contractor.)
The Executive Engineer (M) PLACE:
Division: DATE:
Details regarding my our partners our Company (in the case of limited company) Names, address(es),
telephone numbers(s), income tax etc. are as under:
Name(s) of Full address of Full address of
Telephone Residential
Sr. person/partner the place of Telephone Income tax office
No.(s) address(es)
No. director of the business (with No.(s) ward where income
(office) (Resi).
company pin code tax return is filed
I/We hereby agree to intimate to you about change if any, in the above-mentioned address (es) and
telephone no. (s) Within Fifteen days of its occurrence till my/our deposit, for the said work paid by
me/us is not returned to me/us.
Dated Signature of Tenderer
8[g0Z VF.8DMGF EFJM EZTL JBT[ U6TZLDF\ ,LW[, DH}ZL TYF :5[XLOLS[XGDF\ H6FjIF D]HA DF,;FDFG V\U[GF SFDGF :Y/GF 50TZ EFJM
sNZf V\U[GL lJUTP sVF lJUT #_ ,FB SZTF p5ZGF\ SFDDF\ EZL ZH} SZJL OZHLIFT K[Pf
sVf DH}ZLGF N{lGS NZ s!f S0LIF4 ;]YFZv%,dAZ :SL<0 SFZLUZMGF NZ ~FP
sZf EL:TL4 C[<5Z JU[Z[ ;[DL :SL<0 SFZLUZMGF NZ ~FP
s#f DH]ZM s:+Lv5]~QFf VG:SL<0 DH]ZMGM NZ ~FP
VPG\P 8[g0Z VF.8D G\AZ DF,;FDFGGL lJUT I]lG8 NZ
ZP 5yYZ R6TZGM 3PDLP ~FP
S5RL !Z DLPDLP YL
$P ,L0 SLPDLP ~FP
Z[TL 5|Fl%T :YFG ,L0 SLPDLP
5P ,FS0]\ ;FULgS8 ;F.h
s;Z[ZFX IFNL DF8[f
sVf AFZL RMPDLP ~FP
sAf AFZ6F\ RMPDLP ~FP
&P O,MZL\U 8F.<; RMPDLP ~FP
*P 5M,L; SM8F :8MG HF0F. DLPDLP RMPDLP ~FP
sVf Z5 DLPDLP NZ DLP ~FP
sAf !Z DLPDLP NZ DLP ~FP
sZf sZ:TFVMf SFDGF :Y/ p5ZGF EFJ o
8[g0Z BF6 5|Fl%T :YFGG]\
VPGP DF,;FDFGGL lJUT ,L0 SLPDLP I]lG8 NZ ~FP
VPG\P GFD s;Z[ZFXf
ZP CF0" D]ZD 3PDLP
!Z DLPDLP YL Z_ DLPDLP 3PDLP
& 5yYZ 5LRL\U DF8[ 3PDLP
s#f CM8DL1FGF SFDM DF8[ SFDGF\ :Y/ p5ZGF 50TZGF EFJ o
VPGP 8[g0Z VPG\P lJUT I]lG8 NZ ZLDFS";
!P S5RL 3PDLP BF6
ZP U|L8 3PDLP BF6
$P 0FDZ SFDGL DH}ZL D[P8G
s$f 5],MGF SFD o SFDGF :Y/ p5ZGF EFJ o
VPGP 8[g0Z VPG\P DF,;FDFGGL lJUT BF6 5|Fl%T :YFG ,L0 SLPDLP s;Z[ZFXf I]lG8 NZ ~FP
DXLG Ê:0 D[8, 3PDLP
CF. 8[g;F.,JFIZ D[P8G
p5ZMST 5lZlXQ8MDF\ VF5[, NZ 8[g0ZDF\ EZ[, EFJMGL RSF;6L V\U[ CM. T[ BFTFG[ A\WGSTF" ZC[X[ GCL\ T[DH T[GF\ NXF"J[, BF6 DYS[YL
:5[;LOLS[XG D]HAGM DF,;FDFG GCL D/[ TM T[ :5[;LOLS[XG 5|DF6[GM DF,;FDFG BFT] \ DFgI SZ[ T[ VgI HuIFV[YL ,FJL VF5LX]\P H[ DF8[ SM.
J/TZGM S,[.D D]SJFDF\ VFJX[ GlCP
PERFORMANCE BOND
(See Clause No. 1)
(The date of this bond must not be prior to the date of the instrument in connection with which it is given).
Principal (Contractor)
Surety (Scheduled or Nationalized Bank)
Sum of bond (express in words and figures)
Contract No. and date of contract
KNOW ALL MEN BY THESE PRESENTS, THAT WE, THE PRINCIPALS AND SURETY above named are held
and firmly bound upto the______________________ hereinafter called the Employer in the amount stated for
payment of which sum, well and truley to be made, we bind ourselves, our heirs, executors, administrators and
successors jointly and severally, firmly by these presents subject to the provisions of which the aforesaid
Contractor on demand and without demand on a claim being made by the Employer.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the principals have entered in to a contract
with the Employer numbered and dates as shown above and hereto attached for the execution of work
NOWTHEREFORE, if the Principal shall well and truly perform and fulfil all the undertakings, convenants,
terms, conditions and agreements of said contact during the original terms of the said Contract and any
extensions thereof that may be granted by the Employer with or without notice to the surety and during the life
or any guarantee required under the contract and shall also well and truly perform and fulfil all the
Undertakings, convenants, terms, conditions and agreements of any all duty and unduly authorized
modifications of said Contract that may hereafter be made, notice of which modifications to the surety being
hereby waived or shall pay over, make good and reimburse to the Employer all loss and damages which the
employer may sustain by reason of failure or default on the part of said Principal so to do.
We _____________________________________ further agree that the guarantee herein Contained shall remain in full force
and effect during the period that would be taken for the validity of the said Contract, and that it shall continue
to be enforceable till all the dues of the employer under or by virtue of the Contract have been fully paid and its
claims satisfied or discharged or till the Employer certifies that the terms and conditions of the Contract have
been fully and properly carried out by the said Contractor and accordingly discharges the guarantee. Unless a
demand or claim under this guarantee is made on us in writing on or before the ____________________ we shall be
discharged from all liability under this guarantee thereafter.
IN WITNESS WHERE OF, the above bounded parties have execute this instrument under their several seals on
the date indicated above the name and corporate seal of each corporate partly being hereto affixed and these
presents duly signed by its undersigned representatives, pursuant to authority of its governing body.
In the presence of witness individual
by ______________________________ affix Corporate Seal
Attested Corporate surety
Business address
For and on behalf of the Employer
ANNEXURE – 4 : LIST OF WORKS ALREADY COMPLETED BY THE TENDERER
.HFZNFZ[ 5}ZF\ SZ[, SFDMGL IFNL
Time taken in months to
Name of Work Place Cost on Completion complete the work Remark
SFDG]\ GFD :Y/ 5}ZF\ YI[, SFDGL lS\DT SFD 5]Z]\ SZJF DF8[ ,LW[, ;DI lJX[QF GM\W
Note : Necessary certificate from officer concerned shall be attached with the tender.
GM\W o ;\A\lWT VlWSFZLG]\ H~ZL 5|DF65+ 8[g0Z ;FY[ ZFBJ]\P
Dated Signature of Tenderer / .HFZNFZGL TFZLB ;FY[GL ;CL
ANNEXURE – 5 : LIST OF PLANT AND MACHINERY IN GOOD WORKING ORDER
AVAILABLE WITH THE TENDERER
.HFZNFZ 5F;[ ;FZL VG[ RF,] CF,TDF\ CMI T[JF I\+M VG[ VMHFZMGL IFNL
Sr. Plant or Approximate
Location Machinery Make Capacity Remark
No. Machinery Value
:Y/ DXLGZL S[8,F AGFJ8 1FDTF lJX[QF GM\W
ÊDF\S VMHFZM VYJF I\+M V\NFHL lS\DT
Dated Signature of Tenderer / .HFZNFZGL TFZLB ;FY[GL ;CL
ANNEXURE – 6 : DECLARATION REGARDING WORKS ON HAND WITH TENDERER
.HFZNFZGF CFY 5Z CMI T[JF SFDMGL lJUT
Amount of Brief details
Date of Stipulated
work done of delay if any
Sr. Name of Estimated issue of period of
Place on date of -L, HM YI[, CMI Remark
No. Work Value work order completion
:Y/ filling tender TM T[GF\ 8]\SDF\ lJX[QF GM\W
ÊDF\S SFDG]\ GFD V\NFHL lS\DT SFD X~ SZJFGF SFD 5]Z]\ SZJFGL
8[g0Z EIF" SFZ6
C]SDGL TFZLB lGIT D]NT
Dated Signature of Tenderer / .HFZNFZGL TFZLB ;FY[GL ;CL
Note 1 : Amount of work in column 6 should be given up to the month previous to the month in which
tenders are invited.
GM\W o VF;G & DF\ H[ DF;DF\ 8[g0Z DF\UJFDF\ VFjI]\ CMI T[ 5C[,FGF DF;GF V\T ;]WL SZ[, SFDMGL ZSD NXF"JJLP
Note 2 : Necessary certificate from the officer concerned shall be attached with the tender.
ANNEXURE – 7 : Special Conditions of Contract
Special Condition No.-1: If bids are invited by District Panchayat the words " By order of " or " On behalf of
the Governor of Gujarat" shall be read as " On behalf of the President of District Panchayat" In Place of
designations of State Engineers other than Executive Engineer (M), the words "P.W.D. Committee of
District Panchayat/lH<,F 5\RFITGL AF\WSFD ;lDlT will be read and so under stood.
Special Condition No.-2: If the item Sprcifications provide for mixing wetmix Macadam at plant site, the
three Registers Preacribed to be maintained for Asphalt items on the basis of Hot-Mix Plant as per P.W.D.
Circular No. U]lGJqHGZ,q((qC TFP*q(q!)(_ Shall be maintained which the detail of Gate Pass, Weight etc. shall
be recorded however mixing on site will not be permitted and no payment will be made for mixing on
site. The payment for such item will not be made on the basis of weight of wetmix as per Gate Pass but
will be made on the basis of thickness of layer achived after density test of volumetric quantity. As
provided in the specifications of such item (R & B circular No.5ZRv!_Z_!5v55v;L TFP$q!!qZ_!5f
SCHEDULE ‘A’ VG];}lR —S
Schedule showing (approximately) the materials to be supplied from the public works store for
work contracted to be executed and the rates at which they are to be charged for
H[ SFD CFY WZJF DF8[ S\8=FS8 SZFIM CMI T[ SFDDF\ AF\WSFD lJEFUGF :8MZDF\YL 5}ZM 5F0JFGM DF,;FDFG sVFXZ[f VG[ T[
V\U[ J;], ,[JFGF NZ NXF"JTL VG];}lR
Particulars Approximate Rate at which the materials will be Place of delivery
lJUT quantity Charged to the Contractor l0l,JZLG]\ :Y/
V\NFHL HyYF S\8=FS8Z 5F;[YL DF,;FDFG DF8[ ,[JFGM YTM NZ
Unit Rate in Rupees
V[SD EFJ ~l5IFDF\
GM\W ! o VF SFDDF\ JF5ZJF ;LD[g8 VYJF :8L, TYF SM.56 SFDDF\ DF,;FDFG SFDDF\ lJEFU TZOYL 5]ZM 5F0JFDF\ VFJX[ GCL\P
sDFPDPlJP 9ZFJ S|DF\So8LV[G;Lv!_((vIBvZZ_v!(v; TFP#!v#v_5f 5Z\T] GD"NF4 H/;\5l¿ VG[ 5F6L 5]ZJ9F
lJEFU £FZF SFDDF\ JF5ZJF H~ZL :8L, lJEFU £FZF 5]~ 5F0JFGL HMUJF. TFPZ#v&v)*GF\ lJEFUGF 9ZFJ S|DF\So
V[;P8LPV[,q!_)qS[q5(qEFUsCf £FZF RF,] ZFBJFDF\ VFJ[ K[P VF V\U[ ;[0I],vV[ DF\ H[ HMUJF. SZJFDF\ VFJ[ T[ VFBZL
GM\W Z o ;LD[g8 o HIFZ[ ;LD[g8 .HFZNFZ £FZF SFDDF\ JF5ZJF ,FJJFDF\ VFJ[ tIFZ[ VFJM ;LD[g8 .HFZNFZ VF.PV[;P 5|DF65+JF/F
TYF D]/ pt5FNS S\5GLDF\YL ;LWL ZLT[ D[/JJFGM ZC[ K[ VG[ T[GL BZF. DF8[ T[ GF\ R]SJ6FGF\ AL,M SFP.PzLG[ ZH} SZJFGF\
ZC[X[P VFJM ;LD[g8 S\5GLGF VlWS'T lJÊ[TF 5F;[YL BZLNL XSFX[ GCL\4 5Z\T] EFJvJWFZFGF\ :8FZ Z[.8 D]HA R]SJ6]\ SZJF
V\U[GL U6TZLDF\ ,[JFGF ;LD[g8GF\ EFJM VlWS'T lJS|[TF 5F;[YL D[/JL XSFI4 5Z\T] VlWS'T lJS|[TF 5F;[YL BZLN SZL XSFI
GCL\P sTFP&v$v)(GM DFDlJ 5lZ5+S 8LV[G;Lq!_((vVF.ALqs!(fv;f
GM\W # o ,MB\0 o HIFZ[ ,MB\0 .HFZNFZ £FZF ,FJJFDF\ VFJ[ tIFZ[ T[ V\U[G]\ AL, V;,DF\ SFP.PG[ ZH} SZJFG]\ ZC[X[ VG[ VJF :8L,G]\
U[ZL ,[AMZ[8ZL S[ .HG[ZL SM,[H S[ 5M,L8[SGLSDF\ 8[:8L\U SZFjIF AFN H :8L, SFDDF\ JF5ZJF N[JFDF\ VFJX[P
GM\W $ o 0FDZ o HIFZ[ SFDDF\ JF5ZJF 0FDZ .HFZNFZ £FZF ,FJJFGM CMI tIFZ[ T[ 0FDZ .HFZNFZ[ VM., ZLOF.GZLDF\YL 5{;F EZL
tIF\YL H ;LWM BZLNJFGM ZC[X[P VF V\U[ .HFZNFZ[ 5]ZL SZJFGL XZTM GLR[ D]HA ZC[X[P s!f .HFZNFZ 0FDZ SIF\YL ,FjIF T[
V\U[G]\ AL, V;,DF\ SFP.PG[ ZH} SZJFG]\ ZC[X[P sZf ZLOF.GZLGF\ U[85F; 56 AL, ;FY[ ;FD[, SZJFGF\ ZC[X[P s#f 0FDZ H[
8[gSZDF\ ,FJJFDF\ VFJ[ S[ 8[gSZGM JFCG G\AZ ATFJJFGM ZC[X[P s$f 0FDZ p5Z .HFZNFZzLG[ V[0JFg; 5[D[g8 VYJF
l;SIM0" V[0JFg; D/L XSX[ GlCP s5f .HFZNFZ[ ZH} SZ[, V;, AL,DF\ 0FDZGM U|[0 sSJM,L8L V\U[f p<,[B CMJM HM.V[P VF
V\U[ .HFZNFZ[ 0FDZGF\ U|[0 V\U[G]\ 8[:8 ZLh<8qU|[0 V\U[G]\ 5|DF65+ ZH] SZJFG]\ ZC[X[P s&f .HFZNFZ[ 0FDZGL
VFJSqJ5ZFXqART V\U[G]\ ZHL:8Z %,Fg8q;F.8 p5Z lGEFJJFG]\ ZC[X[P sDFPDPlJP 5lZ5+ ÊDF\S
V[;P8LPVFZPv!_)*v(ZvC4 TFPZ*v!!v)* VG[ Z!v!!v)(f
Note 5: The person or firms submitting the tender should see that the rates in the above schedule
are filled up by the Engineer-in-charge before the issue of the form prior to the submission of
GM\W 5 o 8[g0Z ZH} SZGFZ jIlST S[ 5[-LV[ 8[g0Z ZH} SZTF 5C[,F\ T[G[ VF5JFDF\ VFJTF\ OMD"DF\ CJF,FGF .HG[Z[ p5ZGL VG];}lRDF\ NZ
EZL VF%IF CMI T[GL BFTZL ,[JLP
Note 6: Store to be supplied to contractor’s for a work free of cost should be mentioned in Schedule
‘A’ in addition to schedule ‘B’ and the specification attached to the contract agreement form.
GM\W & o SM. SFD DF8[ S\8=FS8ZG[ lJGFD}<I[ 5}ZM 5F0JFGM DF,v;FDFG VG];}lR —B˜ T[DH S\8=FS8ZGF SZFZ ;FY[ HM0[,L lJUTMGL IFNL
p5ZF\T VG];}lR —S’˜ DF\ H6FJJ]\P
SCHEDULE ‘B’ VG];}lR —B
Memorandum showing items of works to be carried out:
CFY WZJFGF SFDGL AFATM NXF"JTL IFNL
Items Quantities Item of Estimated Rates Unit Total amount
Items Quantities Item of Estimated Rates Unit Total amount
No. estimated Work V\NFH NXF"J[, NZ according to
but may be In figures In words V[SD estimated quantities
AFAT more or less SFDGL AFAT VF\S0FDF
G\AZ XaNMDF\ V\NFHL HyYF VG];FZ S],
V\NFH[, HyYM H[
VMKMvJ¿M Y. Rs. Ps. ZSD
-------- As per Separate sheet attached ---------
I/ We am/are willing to carry out the work at…………………………………% above/below
Percent (should be written in figure and words) of the estimated rates mentioned above. Amount of
my/our tender works out as under.
Estimated Amount put to tender: Rs. ________________ Estimated Amount put to tender: Rs. ________________
* (Please strike out whichever is not applicable).
Note-1: All works shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
GM\Wv! o AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0lJhGGL ALHLÒBF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note-2: All the columns is Schedule should be filled in ink and the total of the entries in the last column
should be struck by the contractor under his signature.
GM\WvZ o VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL S\8=FS8Z[ 5MTFGL ;CL SZJLP
Note-3: Rates quoted include clearance of site (prior commencement of work and at its close)in all
respects and hold good for work under all conditions, site, moisture, weather etc.
GM\Wv# o 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5]~ YFI T[ JBT[f NZ[S ZLT[ ;FO;}OL SZJFGM ;DFJ[X YFI K[4 VG[ T[ NZ TDFD
5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[ C[9/ SFD DF8[ VD,DF\ ZC[X[P
Note-4: To be continued on additional sheets, if found necessary.
GM\Wv$ o H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
sTFP!5v_#vZ_ZZ ;]WLGF ;]WFZF ;FY[f
(See clause No.2)
Time Schedule, for completion of different designated parts of the work and rate of liquidated damages to
be paid by the Contractor, if he fails to complete the part of work within stipulated time limit is as detailed
Time Schedule of Completion
Percentage of time Rate of liquidated
Percentage of work
of the total time limit damages Per day.
(As corrected vied B & CD GR. No.TNC–1091–IB–10/(11)–C, dated 29-6-92).
Executive Engineer (M),
Signature of Contractor
GMB, PIU-Bhavnagar
CHAPTER-8: SCHEDULE-B / BILL OF QUANTITY
Name of Work :- Docking and Fabrication work of CSD Krishnamani at New Port -
Bhavnagar (2nd attempt)
Item description Rate/Unit Oty. Unit Total
Jacking and unjacking operation of
vessel including, Providing hydraulic
jacks of appropriate capacity and
Nos., Providing wooden blocks of
required size and Nos. MS angle of
appropriate size & Nos., Fabrication 2,95,738.00 1.00 Job
and installation of L-bracket having
sufficient capacity, Provide man
power during whole work, Providing
suitable crane for placing jacks in the
Mech Dredg SOR 2025: Chapter-02,
Slipway hire charges per day for the
vessel up to - 500 DWT
Mech Dredg SOR 2025: Chapter-02,
Renewal of Hull steel by 3.15-20 MM
IRS Approved Steel Plat Including
Cutting, Removal, Grinding, Gouging,
Inspection and Consumables for
Welding steel including steel material
and labour upto 5000 Kg.
Mech Dredg SOR 2025: Chapter-05,
Providing & fitting twinpost bollard
having 200mm dia x 0.4m height
from 10mm thick plate, including MS
base plate, bracket, top plate with 30,044.00 4.00 Job
round bar fitted complete in all
respect with labour and material (185
Mech Dredg SOR 2025: Chapter-05,
Eyepad renewal after removing old
one on ship hulls with all necessary 460.00 32.00 No
materials and labour
Mech Dredg SOR 2025: Chapter-19,
Painting to Draft Marks, Ships name,
port of registry and line cutting 5,330.00 4.00 Each
between DLL & LLL
Mech Dredg SOR 2025: Chapter-34,
Painting to Different names for
indication and identification at
different places including Marking, 426.00 15.00
surface preparation, but with paints
material Min 05 Names
Mech Dredg SOR 2025: Chapter-34,
Hull Cleaning, Chipping, Scraping
Hull Cleaning by Sand/Shot Blasting Sq.
-Above 200 Sq Mtr Mtr.
Mech Dredg SOR 2025: Chapter-3,
Labour Scrapping, Cleaning, painting
to Hull/Superstructures/decks/E/R 79.00 460.67 Sq.M.
etc for First coat
Mech Dredg SOR 2025: Chapter-44,
Labour Scrapping, Cleaning, painting
to Hull/Superstructures/decks/E/R 29.00 4,967.35 Sq.M
etc for additional coat
Mech Dredg SOR 2025: Chapter-44,
Cathodic Protection
Alluminium Anodes Size: 400 X
X 25 mm having Strips, removing 2,190.00 20.00 No
and fitting with labour and material.
Mech Dredg SOR 2025: Chapter-34,
F.W. Ballast tank: Applying coat of
cement wash inside the tank,
cleaning the tank after cement 479.00 10.05 Ton
washing and bailing out water after
Mech Dredg SOR 2025: Chapter-17,
Pipes and Flange
Renewal of Only pipe 25 mm NB after
removing by gas cutting and re-fitting
by welding with C class MS
Pipe/seamless C class pipe of 406.00 2.10 Mtr
standard make ISI approved,
including labour and material in all
Mech Dredg SOR 2025: Chapter-11,
Renewal of Only pipe 50 mm NB after
removing by gas cutting and re-fitting
by welding with C class MS
Pipe/seamless C class pipe of 620.00 2.60 Mtr
standard make ISI approved,
including labour and material in all
Mech Dredg SOR 2025: Chapter-11,
Flange for Pipe 200 mm NB 1,256.00 8.00 No
Mech Dredg SOR 2025: Chapter-37,
Sounding pipe: Crop and re-newal
above deck level with labour and
material in all respect (max. Up to
Mech Dredg SOR 2025: Chapter-21,
Renew rubber packing by removing
oldone with consumables. Size: 40 440.00 3.82 R. Mtr
Mech Dredg SOR 2025: Chapter-25,
Labour for Servicing and Repairing
Pressure testing of Valve up to
mm NB including No consumables 634.00 3.00 Each
and hardwares. Spares cost
likespindles, seat excluded.
Mech Dredg SOR 2025: Chapter-12,
Labour for Servicing and Repairing
Pressure testing of Valve of 26-50mm
NB including No consumables and 920.00 1.00 Each
hardwares. Spares cost likespindles,
Mech Dredg SOR 2025: Chapter-12,
Labour for Servicing and Repairing
Pressure testing of Valve of 51-75mm
NB including Each consumables and 1,288.00 3.00 Each
hardwares. Spares cost likespindles,
Mech Dredg SOR 2025: Chapter-12,
Labour for Servicing and Repairing
Pressure testing of Valve of 76-
100mm NB including Each 1,574.00 5.00 Each
consumables and hardwares. Spares
cost likespindles, seat excluded.
Mech Dredg SOR 2025: Chapter-12,
Cleaning, servicing of pump with dis-
assembling & assembling including
all consumables materials in all 2,640.00 2.00 No
respect. Except spares, machining
etc. works. SIZE: Above 1-3 HP
Mech Dredg SOR 2025: Chapter-08,
Lagging of Engines exhaust pipes
with ropes/clothes of insulating
material (excluding metallic sheets)
Mech Dredg SOR 2025: Chapter-34,
Anchor Chipping, Scrapping,
Cleaning and rousing after removing
from vessel and Re-fitting with chain
Anchor. Up to 150 Kgs
Mech Dredg SOR 2025: Chapter-14,
Paint Marine Epoxy Primer 410.00 101.00 Ltr.
Mech Dredg SOR 2025: Chapter-35,
Paint Marine Enamel Primer 300.00 201.00 Ltr.
Mech Dredg SOR 2025: Chapter-35,
Paint Marine Epoxy Anticorrosive 445.00 151.00 Ltr.
Mech Dredg SOR 2025: Chapter-35,
Paint Marine Epoxy Tie Coat 400.00 76.00 Ltr.
Mech Dredg SOR 2025: Chapter-35,
Paint Marine Antifouling SPC (For
Mech Dredg SOR 2025: Chapter-35,
Paint Marine Synthetic Enamel
Finish - (Any Shade)(Dark Blue/Dark 425.00 103.00 Ltr.
Green/Grey/Black/white/ Red)
Mech Dredg SOR 2025: Chapter-35,
Marine Thinner 180.00 137.00 Ltr.
Mech Dredg SOR 2025: Chapter-35,
Crane Hire charge
Hire Charges for Crane 35 Ton Hour 5,635.00 12.00 Hour
Mech Dredg SOR 2025: Chapter-46,
Dry Penetration testing/Magnetic
Particle testing /Ultrasonic testing for
weld joints/Propeller blades, shafts,
etc. from IACS/IRS approved agency
including labour, material,
transportation, hotel charges in all
respect. IACS/IRS surveyor fees is
Mech Dredg SOR 2025: Chapter-29,
Seachest cleaning, scrapping and
painting with primer, with
consumables and labour charges 7,754.00 1.00 Each
only, excluding servicing of valves.
Vessel LOA: 24 mtrs & above
Mech Dredg SOR 2025: Chapter-13,
Removing and re-fitting sea chest
gratings. 8,579.00 1.00 Each
Vessel LOA: 24 mtrs & above
Mech Dredg SOR 2025: Chapter-13,
The GST shall be paid extra, as per norms & prevailing rates, on above rate.
I/We am/are willing to carry out the work at__________________________ above/ below than the
amount put to tender total amount of my/our tender work out as under.
amount put to tender total amount of my/our tender work out as under.
Estimated Amount put to tender : Estimated Amount put to tender :
Add._________% above Rs.___________ Deduct__________% below Rs._________
Total Rs.____________ Total Rs.___________
Executive Engineer (M),
Signature of Contractor
GMB, PIU-Bhavnagar
ITEM SPECIFICATIONS
Jacking and Un-jacking operation of vessel including… Providing hydraulic jacks
of appropriate capacity and Nos., Providing wooden blocks of required size (size:
0.3 x 0.3 x 9 mtr) or appropriate size and Nos. Fabrication of MS angle of
appropriate size & Nos., Fabrication and installation of L-bracket having sufficient
capacity, Provide man power during whole work, Providing suitable crane for
placing jacks in the dock.
This work includes providing….. Hydraulic jacks of appropriate capacity and Nos.,
wooden blocks of required size (size: 0.3 x 0.3 x 9 mtr) and Nos., tools of M.S. angle of
appropriate size and Nos., etc. and fabricating & installing the L-brackets having
sufficient capacity and Nos. at the bottom of vessel with crane of suitable capacity for
placing jacks in the dock.
Also, work includes jacking and Un-jacking of Vessel to the sufficient height to facilitate
gauging, inspection, Painting and repairing of the unit underneath structure like bottom
plates & chine plate etc. and for EIC’s inspection.
Item includes beaching of the vessel either at dry dock OR slip way or at any suitable
place the time of execution of the work. Contractor have to safely dry docked the vessel
as docking plan/General arrangement plan and as directed by EIC.
The job includes providing man power for removing and rearrange the jacks as per
requirement during execution of fabrication work.
The job includes the providing the man power during the fabrication work of vessel.
The arrangement and removing of jacks, wooden packing's is to be carried out as and
when required for fabrication work of bottom. During re-arrangement of jacks and
wooden blocks, due care has to be taken for vessel as well as labour engaged during the
whole work. If any damaged occurs or any accident occurs, than it should be rectified
without any extra cost and to the satisfaction of EIC.
All precautions should be carried out for the safety of vessel as well as labor engaged for
execution of this job, including insurance of laborers.
During above operations, the contractor has to take care of the unit/vessel and there
should be no damaged to the unit and surrounding assets, otherwise, the contractor
have to repair/restore the same at his own cost.
The measurement shall be taken and paid per Job basis.
Slipway hire charges per day for the vessel up to 500 DWT
Slip way OR dry dock hire charges shall be paid on per day basis for the period units
actually docked on slipway OR in dry dock. Maximum payable Slipway hire charges for
the said unit are 30 days. The work required to be carried out in dry-dock/slipway.
The contractor will to try his best to complete the docking work in time. If the
contractor fails to repair it within time frame as shown above than no hire charges is
payable for any extra days.
During vessel on the slipway OR dry dock, the contractor will have to take all necessary
step for the safety of the vessel. Any mishap occurs during repairing than it will solely
on contractor's risk & cost.
Measurement will be taken and paid on actual day basis OR Maximum 30 days
whichever is less.
Plate mild steel 3.15-20mm IRS.
The Item includes renewal of Steel material required for execution of the work like MS
plate, Angles, Flat bar, Round bar, etc. of various thickness and size as may be required
and directed by EIC.
The supplied Steel plate must be as per IS-2062 Grade A or B / IRS approved marine
quality. It should be purchased from reputed seller, conforming to IS-2062.
The Manufacturer’s Certificate for physical and chemical test for supplied steel material
as per above said IS standard shall be submitted by contractor to EIC. The inspection of
the steel shall be done at site by EIC or his authorized representative and if not found as
per IS standard, then it will be rejected.
If necessities arise & if required, the sample shall be drawn from the supplied Lot of
steel material at the site and this sample would be sent to Government recognized
laboratory for testing purpose for physical as well as chemical test analysis, so as to
confirm to IS standard as stipulated above. Entire cost towards testing will be borne by
The result of laboratory report will be final and binding to the contractor. If testing
report do not match the IS 2062 standard, then all supplied steel material will be
outright rejected and no payment shall be made to the contractor for this rejected
material. In that case, the contractor has to load the rejected material at his own cost &
supply the new material, which is again subject to confronting the IS standard stipulated
The rate considered, should be inclusive of taxes, duties, transportation, loading,
unloading, stacking at proper place, removal old steel material, necessary fabrication
work for fitting new steel material at required places/locations with necessary
cutting/welding gases, welding rods, etc. as well as tools/equipment like welding
transformers, rectifier, chain pulley block, other accessories, Skilled & unskilled labours,
etc. complete in all respect.
The bidder should procure all steel material as per actual requirement for
fabrication/execution because whatever remains unutilized along with entire wastage
will be contractor’s responsibility for which no payment shall be made. The contractor
shall have to make his own arrangement to stake the materials at site at his own cost.
Item also includes removal of old and deteriorated steel structure fitted with the vessel
& fitting the new steel material to the vessel with cutting, cropping, fairing, gas cutting,
chipping, edge preparation, etc. as directed by EIC. It also includes cost of Gas cutting,
welding etc. with material and labour complete in all respect.
The surface cleaning should be done by wire brushing only. All the steel material should
be cleaned thoroughly, either by chipping or cleaning as directed by EIC. The surface
should be cleaned and free from any paints, foreign materials etc.
The edge preparation should be made as per Marine Standard. The gap between joint
should not be more than 2 to 3 mm, in between the fabrication of plates. The tack/ full
welding should be done as per standard Marine Practice. The minimum 2/3 continuous
run must be made in full welding. No pores/ holes should be present in welding lines.
The Welding electrodes of standard make approved by EIC shall be used & it should be
according to IS-814 standard.
During entire steel renewal work, if, welding is found out of weaker quality during the
inspection of EIC, then complete re-welding will have to be carried out by the contractor
without aiding any extra cost to the GMB up to the satisfaction of EIC.
The Entire steel renewal & fabrication work shall be carried out by IRS Approved
Welder as per standard marine practice and as per direction and satisfaction of EIC.
Old-Removed MS material should be taken back by contractor as a MS scrap & the cost
of MS scrap would be recovered from the contractor on Kg basis as per rates mentioned
in the “Recovery Statement (Mechanical)” of this tender document.
The measurement shall be taken and paid on Kilogram (Kg) basis. The standard weight
of the steel will be considered for tonnage calculation & payment purpose.
Providing & Fitting of Twin Post Bollard
The work includes providing, fabricating, supplying, and fitting of twin post bollard of
the specified size and material. Bollard should have proper grouting, cementing and
align with the supporting frames. Bollard should have proper welded both the side of
deck plate with supporting frames to withstand with operation jerk and force.
The work shall include complete fabrication, welding, grinding, cleaning, painting,
transportation, handling, and fixing in position at site with all labour, tools, tackles, and
consumables required for proper completion of work.
The Welding electrodes of standard make approved by EIC shall be used & it should be
according to IS-814 standard.
The bollard shall be installed at the designated location with finishing works as directed
by the EIC to ensure the bollard is securely fitted and ready for operational use.
The measurement shall be taken and payment shall be made on Job basis.
Eye pad renewal after removing old one on ship hulls with all necessary materials
The item includes renewal Eye pad for tyre fendering purpose, as per suitable size & as
per instruction of EIC.
It includes removing the broken/old Eye pad & fitting the new Eye pad with proper
welding method as per standard marine practice.
This item includes cost of new Eye pad, Removal of broken/old Eye pad & fitting of new
Eye pad inclusive of cost of labour, material & equipments in all respect.
The measurement shall be taken and paid per Number (No.) basis
Painting to Draft Marks, Ships name, port of registry and line cutting between DLL
Item includes Painting to Draft marks, Ships name, Port of registry, Load line, etc. as per
class survey requirement with all types of labour, materials, tools, paint brushes, paints,
etc. in all respect.
Painting should be done with proper line cutting between DLL & LLL, as per original &
as per satisfaction of EIC.
The measurement shall be taken and paid per each basis.
Painting to Different names for indication and identification at different places
including Marking, surface preparation, but with paints material Min 05 Names.
Item includes Painting different names, for indication and identification at different
places including Marking, Surface preparation, but with paints material as per class
survey requirement with all types of labour, material, paints in all respect, painting
should be done as per original or as per class requirement as per satisfaction of EIC.
Painting shall have to be done with proper line in all respect.
The measurement shall be taken and payment should be made on per Name basis.
Hull Cleaning by Sand/Shot blasting.
Item includes the sand blasting of all exterior surfaces like hull, bottom, Deck, Bulwark
only of the vessel with required material and equipment. Before sand blasting the sand
should be screened for required size and after sand blasting the surface shall be shown
to the EIC. Contactor will use the best quality of sand so that all the corrosion coatings
get away from the bottom and hull & Deck portion of vessel. Required area to be sand
blat will be suggested by the EIC.
The entire work shall be carried out under the supervision and as directed by EIC. The
payment shall be made on per paid per Square Meter (Sqm) basis of actual area sand
Labor Scrapping, Cleaning, Painting to Hull/ Superstructure/ Deck/E/R etc. For
The Item includes providing Labor for Scrapping, Cleaning, Painting to Hull, Bottom,
Deck, Superstructure, Hopper, Tanks, Pipelines, valves, Engine room, railing, stairs,
doors, Engine & DG, air vents, bollards, etc. for applying First coat of
Epoxy/Primer/Tie-coat/Antifouling as per ‘measurement' & as per instruction of EIC.
Each & every surface has to be thoroughly chipped, scrapped and cleaned by the
chipping hammer and wire brush, so as to remove complete rust, scale, etc. from the
surface as per standard marine practice & up to satisfaction to EIC.
Before commencing painting to the surface, the surface should got approved from EIC &
then after, 1st coat of Epoxy/Primer/Tie-coat/Antifouling shall be apply as per ‘Paining
Sheet’ & as per instruction of EIC.
However, contractor should liable to arrange supervision of manufacturer company
technician/authorized person at site during painting for proper guide for standard
If any Dry Film Thickness (DFT) regarding measurement arise or asking by the EIC, then
agency has to provide it at free of cost & if any irregularities observed than contractor
have to rectify it at free of cost.
This item includes machinery/equipment, labour, tools, wire brush, paint brush, etc. for
cleaning of painting surface as stated above, but excludes cost of Epoxy/Primer/Tie-
coat/Antifouling only.
The measurement shall be taken and paid per Square Meter (Sqm) basis.
Labor Scrapping, Cleaning, Painting to Hull/ Superstructure/ Deck/E/R etc. For
Second and additional Coat.
The Item includes providing Labor for Cleaning & Painting to Hull, Bottom, Deck,
Superstructure, Hopper, Tanks, Pipelines, valves, Engine room, railing, stairs, doors,
Engine & DG, air vents, bollards, etc. for applying Second to Fourth coat of Epoxy,
Primer, Anticorrosive, Synthetic Enamel Paints, etc. as per ‘Measurement’ & as per
instruction of EIC.
Each & every surface has to be cleaned as per standard marine practice & up to
satisfaction to EIC, so as to remove dust from previously painted surface. Then after, 2nd
Coat to 4th Coat of Epoxy, Primer, Anticorrosive, Synthetic Enamel Paints, etc. shall be
apply as per ‘Paining Sheet’ & as per instruction of EIC.
After applying the Second coat, the third coat shall be apply only after drying out of
second coat & subsequently, same procedure/method has to be followed upto sixth
This item includes machinery/equipment, Labour, tools, spraying equipments/paint
brush, etc. but excludes cost of Epoxy, Primer, Anticorrosive, Synthetic Enamel Paints,
The measurement shall be taken and paid per Square Meter (Sqm) basis.
Aluminum Anodes Size: 400 X 100 X 25 mm having Strips, removing and fitting
with labour and material.
Item includes Supply & fitting of anodes at underwater portion of the vessel for cathodic
The supplied anode shall be in accordance with IS 8062 standard. The anodes shall have
minimum design life shall be 03 years.
The anodes shall have to be in size of 400mm in length x 100mm in width x 25mm in
thickness. The sacrificial anodes shall be moulded with MS strip of size 3mm thick and
The materials and moulded anodes shall have to offer for inspection before fitting the
same with the satisfactions of EIC. The works shall be carried out to the satisfaction of
Item includes providing and fitting Aluminium anodes of 400x100x25mm of standard
quality after removing old and existing one. The item includes cost of Aluminium anode,
MS strip and complete labour charges required to execute this job.
The measurement shall be taken and paid per each basis.
F.W. Ballast tank: Applying coat of cement wash inside the tank, cleaning the tank
after cement washing and bailing out water after inspection.
Item includes applying coat of cement wash inside the tank & cleaning the tank after
cement washing. After drying out of cement wash, the water shall be filled up inside the
tanks for carrying out pressure testing of the tank & after satisfactorily inspection by
EIC, bailing out the water from tanks.
The cost includes cost of cement, all type of equipment, tools-tackles, labours, etc. in all
respect to complete this work. The works shall be carried out to the satisfaction of EIC.
The measurement shall be taken and paid per Ton basis.
Item No. 13 & 14:
Renewal of Only pipe 25 mm & 50 mm NB after removing by gas cutting and re-
fitting by welding with pipe of ISI make including labour and material in all
Item includes renewal of pipe by replacing deteriorated/corroded pipe. Item includes
removal of old pipe & fitting of new Class- C Mild Steel pipe of different sizes of 25 mm &
50 mm nominal bore diameter into unit in place of old-removed pipe by necessary
scrapping, bending, threading, flanges fitting with welding, facing, marking, cutting,
bends fitting etc. for straight/shaped pipe line of different sizes with required new joint,
consumables, etc. and offer for inspection to EIC.
The pipes shall be supply as per ISI Standard & as per standard marine practice, for
which necessary certification shall be provided by the contractor, if required.
Item includes cost of new pipe, tools-tackles, nut-bolts, packing, consumables,
equipments, etc. with all type of labours charges to complete the job of removal & fitting
the pipe line, as directed by the EIC.
The measurement shall be taken and paid per Meter (Mtr.) basis.
Re-newal of Flange 200 mm NB after removing by gas cutting and re-fitting by
welding with Pipe of ISI make, including labour and material in all respect.
Item includes Flanges of pipe by replacing deteriorated/corroded pipe. Item includes
supplying new Class-C Mild Steel pipe of different sizes of 200 mm nominal bore
diameter into unit by different sizes with required new joint, consumables, etc. and offer
for inspection to EIC.
The contractor has to supply the Flanges as per requirement & as per instruction of EIC.
It is necessary to supply the flanges as per standard marine practice & as per direction
and satisfaction of EIC.
The Flanges shall be supply as per ISI Standard & as per standard marine practice, for
which necessary certification shall be provided by the contractor, if required.
The measurement shall be taken and paid per Number (Nos.) basis.
Sounding Pipe: Crop and re-newel above deck level with labour and material in all
Providing all labour, materials, tools, and equipment for Cutting and removal (cropping)
of the existing damaged portion of sounding pipe. Preparation of edges and cleaning of
adjoining surfaces for welding. Supply, fabrication, and fitting of new MS pipe of
required diameter and thickness matching the existing arrangement. Welding and
alignment of the renewed pipe section with proper penetration and finishing.
Grinding, leak testing, and surface preparation and Removal of debris and cleaning of
the work site after completion as directed by the EIC, ensuring quality safety and
The measurement shall be taken and paid per No basis.
Re-new rubber packing by removing old one with consumables.
SIZE: 40 mm X 25 mm
Item includes renewal of rubber packing of size 40 mm x 25 mm at various Doors,
Windows, Skylight doors, etc. of the vessel, as per original.
The Item includes removal of old and existing rubber packing, Supply of new rubber
packing & fitting of new rubber packing at various Doors, Windows, Skylight doors, etc.
of the vessel, as per original.
The rubber packing should be fitted with the help of suitable adhesive solution. The
item includes cost of rubber material, adhesive solution, tool-tackles, etc. and all type of
labour charges required to execute this job, complete in all respect. The work shall be
carried out as per instructions of EIC.
The measurement shall be taken and paid per Running Meter (R. Mtr.) basis.
Labour for Servicing and Repairing Pressure testing of Valve of up to 25 mm, 26-
50 mm, 51-75 mm & 76-100 mm NB including Each consumables and hardware.
Spares cost like spindles, seat excluded.
Item includes Servicing, Repairing, Overhauling & pressure testing of various valves of
different sizes i.e. up to 25 mm, 26-50 mm, 51-75 mm & 76-100 mm Nominal Bore
diameter, situated at the various location in the vessel.
Item includes labour charges for dismantling, opening, servicing, overhauling, and
testing leakage of GM/MS valves of all pipe line system of the vessel. Item also includes
servicing, repairing and pressure testing of Fire hydrants of various sizes.
The necessary pressure testing shall be carried out by the contractor in presence of EIC.
The cost of hiring/purchase of suitable size pressure testing machine/equipment shall
be borne by the contractor.
Item includes servicing of all valves with labour, all type of consumable items, required
equipments, tools-tackles, etc. complete in all respect.
If, parts like spindle & valve seat are required to be replaced, it shall be supplied by the
department as per actual requirement. The work shall be carried out as per the
direction of EIC.
The measurement shall be taken and paid per each basis.
Cleaning, servicing of pump with dis-assembling and assembling
including all consumables materials in all respect. Except spares,
machining etc. works.
Size: above 1-3 HP
Item includes dismantling the various size pumps/motors (Ranges above to
1-3 HP) at workshop of the contractor, then its cleaning, checking, servicing
& overhauling of pump with all necessary tools, consumables, renewal of oil
seal/retainer seal, renewal of bearings, etc. & assembling the same as per
The entire pump should be disassembled by the contractor and overhaul the
same by replacing warn out parts such as mechanical oil seal, bearings,
packing, nut-bolts & other consumables except machining cost. All type of
labour charges are included in this item.
If parts like impeller, shaft, stage covers, end covers, etc. in the pump, are
required to be replaced, then it shall be supplied by the department as per
actual requirement.
After assembling the pump, satisfactory test-trial shall be given by the
contractor up to the satisfaction of IRS/EIC at workshop as well as in fitted
condition on the vessel.
The measurement shall be taken and paid per Number (No.) basis.
Lagging of Engines exhaust pipes with ropes/clothes of insulating material
(Excluding metallic sheets) with labour
Lagging of engine exhaust pipes refers to wrapping the exhaust pipes
with insulating materials such as ropes or insulating cloth (excluding
metallic sheets) to reduce heat loss and surface temperature.
Supplying and wrapping exhaust pipes with approved insulating
rope/cloth material
Proper binding and securing of insulation
Providing necessary labour, tools, and tackles
Ensuring uniform thickness and neat finishing
Anchor Chipping, Scrapping, Cleaning and rousing.
The item includes complete chipping, scraping, cleaning, and rousing of the anchor after
its removal from the vessel, followed by refitting with the chain and anchor assembly.
All associated labour, tools, and materials required for the execution of this work shall
be included in the contractor’s scope.
The anchor shall be properly roused to ensure smooth movement from the pin. For
achieving this, necessary heating, cleaning, or mechanical treatment shall be carried out
entirely at the contractor’s own cost. The contractor shall ensure proper alignment and
free movement of the anchor assembly after refitting.
The measurement shall be taken and paid per number basis, duly certified by the EIC.
(25) Paint Marine Epoxy Primar
(26) Paint Marine Enamel Primer
(27) Paint Marine Epoxy Anticorrosive
(28) Paint Marine epoxy tie coat
(29) Paint Marine antifauling SPC (for 60 months)
(30) Paint Marine Synthetic Enamel Finish (Any shades)
(31) Marine thinner
The item includes supply of Epoxy Primar, Enamel Primer, Epoxy
Anticorrosive, Synthetic Enamel Paints of various shade, Tie-coat,
Antifouling SPC, Thinner, etc. as per Item No. 10 to 16, as per quantity &
shades mentioned in “Schedule-B” of this tender document & as directed by
EIC. The paint should be of brand like Akzonobel, Sigma, Jotun or any other
equivalent brand/Paint approved by IRS (Indian Register of Shipping) or
ABS (American Bureau of Shipping) or DNV-GL (Det Norske Veritas and
Germanischer Lloyd) or any other Marine Classification Society.
The contractor has to submit Marine Class Approval Certificate from
IRS/ABS/DNV-GL or any other marine classification society along with
detailed manufacturing test report for Paints supplied by him. In this
regard, the decision of EIC shall be final & binding to the contractor.
The contractor has to supply the paints as per actual requirement of work in
consultation with EIC. No payment for paint that has remained surplus will
be done by GMB.
The application of supplied paints shall be started only after approval of
The Empty paint drums should be taken back by contractor as a scrap &
the cost of scrap would be recovered from the contractor as per rates &
units mentioned in the “Special Conditions (Mechanical)” of this tender
The measurement shall be taken and paid per Liter (Ltr.) basis, as per the
actual consumption of paint certified by the EIC.
Hire charges of Crane 35 Ton Hour
Item inclide providing of 35 ton capacity superior quality hydra crane or any
other suitable type for Lifting, Shifting & Fitting back of CSD Krishanamani
spud during the repairing work.
The measurement shall be taken and paid per as per the actual work done.
The work and crane is the responsibility of the contractor. Hence, any
accident occurs during the work will be the responsibility of the contractor
Dry Penetration testing/Magnetic Particle testing /Ultrasonic testing for weld
joints/Propeller blades, shafts, etc. from IACS/IRS approved agency including
labour, material, transportation, hotel charges in all respect. IACS/IRS surveyor
fees is not included.
Sea chest cleaning, scrapping and painting with primer, with consumables and
labour charges only, excluding servicing of valves. Vessel LOA: 24 mtrs & above
The Item includes Cleaning, Scrapping and Painting of Sea Chest valve with necessary
tools/equipments, Consumables, Primer, etc. with labour charges only, but excluding
servicing of valves.
Item includes labour charges for removal of Sea chest valves after disconnection of
pipes, accessories, etc. & refit back after connecting pipes, accessories, etc.
Item include Sea chest cleaning, scrapping & painting with primer with consumables &
labour charges with….
I. Opening of sea grids
II. Opening of sea suction Main valve and
III. Opening of sea suction Main line filter & fitting back all these including packing etc.
Item also includes the work of cleaning the surface & exterior to the sea chest with the
scrapper. After scrapping, cleaning with wire brushing shall be carried out &
subsequently, washing out the surface with fresh water. After drying out the surface
area, two coats of Anticorrosive Red Primer IS 1404 shall be applied. The second coat
should be applied after drying out of first coat. The cost includes cost of labour for
chipping, scrapping, washing, cleaning, painting, etc. & cost of Primer, Wire brush, Paint
Brush, Scrapper, etc. complete in all respect.
The Measurement shall be taken and paid per each basis.
Removing and re-fitting sea chest gratings.
Vessel LOA: 24 mtrs & above
The Item includes removing and refitting of sea chest grating. Item includes the
provision of labour work for removing and refitting, including chipping, cleaning,
painting work and consumables, complete in all respect as per requirements,
instruction & satisfaction of EIC.
After scrapping, cleaning with wire brushing shall be carried out & subsequently,
washing out the surface with fresh water. After drying out the surface area, two coats of
Anticorrosive Red Primer IS 1404 shall be applied. The second coat should be applied
after drying out of first coat. The cost includes cost of labour for chipping, scrapping,
washing, cleaning, painting, etc. & cost of Primer, Wire brush, Paint Brush, Scrapper, etc.
complete in all respect.
The necessary testing should be given by the contractor, if required and demanded by
the EIC without any extra cost.
The measurement shall be taken and paid per each basis.
Executive Engineer (M),
Signature of Contractor
GMB, PIU-Bhavnagar
GENERAL SPECIFICATIONS
1. The work includes Docking and fabrication of “CSD Krishnamani” as per standard
requirement working at New Port-Bhavnagar. It includes provision for Supplying
M.S. Plates, Angles, Round bars, Flat bars and fitting the same as per the instruction
of Engineer-in-charge. The work also includes painting work and other fabrication
related works required for Annual survey of the vessel.
2. The required structural steel like M.S. Angle, Round bar and Flat bars etc. The
contractor shall have to obtain the materials from market at their own cost and risk
for which the department will not entertain any cost for transportation, loading -
unloading and any price escalation. The contractor also will have to bring all the
required materials at work site as per schedule-B at their own cost and risk.
3. The contractor shall have to use the materials of best quality and shall be got
approved by the EIC or his authorized representative before starting of the work or
utilization of the materials/spares.
4. The contractor shall have to carry out entire work as per the specification and
agreement and instruction of the EIC or his authorized representative.
5. The dismantled scrap material such as structural steel, rubber fender and other
debris as generated from the work shall have to accept by the contractor as per the
rates shown in Special Conditions (Mechanical).
6. The contractor shall have to arrange and to erect scaffolding etc. for the work at its
own cost for which no payment will be made by the department.
7. The Welding electrodes of standard make approved by EIC shall be used & it should
be according to IS-814 standard.
8. The contractor shall make his own arrangements for tools, plants, jigs and fixtures
required for the work.
9. The contractor cannot make any modification and change in the design structure of
the unit without permission of EIC in writing.
10. The wastage/unutilized material supplied by the contractor should be the property
of the contractor and contractor has to take this unused material i.e. payment will
be made only for the actual usage of the material for the work of unit.
11. The entire work shall be carried out under inspection and direction of EIC. The
contractor shall have to modify/add/alter the work as per the recommendations by
12. The contractor shall have to provide necessary test certificate of materials or
components etc. if required by EIC.
13. A test for checking the leakages through welding will be given by an applying a jet
of water under pressure before painting where-ever Engineer-in-charge will
suggest. The result will be binding to the contractor for necessary rectification
without any extra payment.
14. All welding will be carried out in accordance with the code of practice for metal arc
All materials proposed to be used shall be subjected to prior approval of the Engineer-
in-charge (EIC) before execution.
Executive Engineer (M),
Signature of Contractor
GMB, PIU-Bhavnagar
GENERAL CONDITIONS
1. The Contractor has to take the separate Electric connection for the repairing work
at his own cost. Department will give the electric supply, if available, otherwise
contractor has to make his own arrangement without any extra cost to the GMB for
2. If any premature failure or Defect noticed during the Execution of the work or
During the First 12 (Twelve) Months from the date of actual Completion of the
work. The contractor must have to attend the same at their own cost for which are,
decision of the E.I.C. of the work will be final binding to the contractor.
3. Any dispute relating to this contract shall be filed in any court of law having
territorial jurisdiction in Bhavnagar district.
4. All Octroi, Royalty, Wharf age of material required in work shall be paid by the
5. The General Specification for relevant items as given in Bombay P.W.D. Vol-II and
shall be applicable.
6. Land for the storing the contractor's materials and for labour hutments etc. shall be
chargeable at prevailing rate at concern port and contractor has to make this
arrangement at his own cost.
7. Contractor has to provide required facilities to EIC, while they are on inspection of
8. The contractor will provide all assistance, labour and equipment for favor of work,
where-ever required at his own expenses.
9. Error in giving line and level or in drawing by the department will not absolve the
contractor of his final responsibility of checking-up.
10. Work shall be executed with the regards to the prevailing local condition and port
regulations and in any case should not cause hindrance to traffic at concern port.
11. If, in the opinion of the E.I.C. or his authorized representative, the contractor's
representatives on site or subordinate of the workmen considered unfit or
misbehave, on orders from the EIC, the contractor shall have to remove him from
the work site, failing which action will be taken against him under clause of the
Contract Agreement.
12. The contractor shall be deemed to be full acquainted with the prevailing site
condition, access to the site nature of ground water and the tidal condition over and
above wind effect at port site necessitate restricted hours of work of certain items
so no claim for losses on account of any of the above cause will entertained by the
13. Claim for variation in cost of labour, material and spares will not be permitted.
14. Contractor will have to make his own arrangement for health, safety and welfare of
worker as per government laws.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2nd attempt Tender - CSD_Docking.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .