| 1 | L1₹2.4 LAccepted-AOC | ₹2.4 L | L1 | Accepted-AOC Vide accepted Order No. DB1-AM/3817/2025-26, Dated 20-12-2025 |
| 2 | L2₹2.6 LRejected-AOC | ₹2.6 L | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | SABU K.S. L2 | VARGHESE MATHEW L1 |
|---|---|---|---|---|---|
| 1.00Kattodu LI | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 210 | sqm | 16.27 ₹3,416.70 | 18 ₹3,780 |
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 75 | sqm | 120.05 ₹9,003.75 | 134 ₹10,050 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.55 | cum | 8,262.5 ₹70,644.38 | 7,482 ₹63,971.10 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 102.6 | sqm | 345.46 ₹35,444.20 | 289 ₹29,651.40 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.39 | cum | 9,383.25 ₹41,173.70 | 8,210 ₹36,025.48 |
| 1.01 | 5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars | 307.16 | kg | 99.78 ₹30,648.42 | 95 ₹29,180.20 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.98 | cum | 7,464.09 ₹59,563.44 | 6,464 ₹51,582.72 |
| 1.01 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 2.7 | cum | 2,274.07 ₹6,139.99 | 2,500 ₹6,750 |
| 1.01 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 1.62 | cum | 5,523.56 ₹8,948.17 | 3,087 ₹5,000.94 |
Tender Value
₹3.0 L
EMD Value
₹7,405
Closing Date
27 Oct 2025, 5:00 pmClosed
The Assistant Executive Engineer
Assistant Executive Engineer Minor Irrigation Subdivision Revenue Tower4th Floor Thiruvalla 689101
GENERALMI PTA ANNUAL MAINTENANCE CIVIL 202526 Kattodu LI Maintenance of Kattodu LI Station Under MI Section ThiruvallaGeneral Civil Work
2025_Irrig_811376_1
DB1-AM/3817/2025-2026
Open Tender
Civil Works - Others
270 days
Thiruvalla
Please refer Tender documents.
9 documents required · 9 mandatory
₹655
Yes
₹7,405
Yes
24 Feb 2026
17 Oct 2025
29 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
Amount
Kattodu LI
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
SABU K.S. (BID ID -2411599)
Bidder Name
VARGHESE MATHEW
SABU K.S.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1354777.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BIDKATTODU.pdf
Tender Documents • 1.63 MB
BOQ_1354777.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid