Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 73 KOVILPATTI ROAD RAM SINGH NAGAR MANAPPARAI TRICHY DISTRICT | MANAPPARAI | TRICHY | TAMIL NADU | Admitted-Finance |
Tender Value
₹17.9 L
EMD Value
₹17,900
Closing Date
9 Oct 2024, 3:00 pmClosed
Block Development Officer BP
Panchayat Union Office Manapparai
Providing Extension of Pipe Line at K.Periyapatti H/O K.Periyapatti Panchayat Manapparai Block in Tiruchirappalli District under MLACDS- Srirangam 2024-25
2024_RDTN_490794_1
A2/1770/2024 dt 04.10.2024
Open Tender
Civil Works - Water Works
Works
60 days
Manapparai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹17,900
10 Oct 2024
4 Oct 2024
9 Oct 2024
4 Oct 2024
9 Oct 2024
4 Oct 2024
Amount
Providing Extension of Pipe Line at K.Periyapatti H/O K.Periyapatti Panchayat. 63 mm PVC Pipe 4 ksc Alakirireddiyapatti
63 mm PVC Pipe 4 ksc Kathikaranpatti
63 mm PVC Pipe 4 ksc Idayapatti
63 mm PVC Pipe 4 ksc Idayapatti Pudhur
63 mm PVC Pipe 4 ksc Therkkuserpatti
63 mm PVC Pipe 4 ksc Avalkamanayakkanpatti
63 mm PVC Pipe 4 ksc Kuppanarpatti
63 mm PVC Pipe 4 ksc Maravanur
63 mm PVC Pipe 4 ksc Sokkampatti
63 mm PVC Pipe 4 ksc Medukadu
63 mm PVC Pipe 4 ksc Thanimanikkampatti
63 mm PVC Pipe 4 ksc Vadakkuserpatti
63 mm PVC Pipe 4 ksc Kalarampatti
63 mm PVC Elbow
63 mm PVC Tee
63mm PVC bend
63mm PVC End Cap
PVC Adhesive Solution (100gm)
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Earthwork excavetion in all Soil for Layinng jointing of PVC Pipes and Specials including refilling the trenches after People laying Works (Earthwork 176.48+Laying 20.01+ Refilling 24.42) including all charges etc., 63 mm PVC Pipe
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CSR CONSTRUCTIONS (BID ID -1159898)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .