Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC | ₹4.5 Cr Quoted ₹5.3 Cr | L1 | Accepted-AOC ok |
| 2 | Rejected-Technical ASSANDH ASSANDH KARNAL 132039 | KARNAL | HARYANA | 132039 | - | - | Rejected-Technical reject |
| Sl No | Description | Qty | Unit | M/s. Amrit Lal Nagpal L1 |
|---|---|---|---|---|
| 1.00 | S/o and C/o stone boulders of requisite size from approved quarry to site of work as per PWD specification No. 3.31 read with 23.8 and 23.9 loading, unloading and stacking as per recommended committee rate for the year 2025-2026 for Ambala, Panchkula, Kaithal and Kurukshetra. | 17,115.84 | Cum | 2,489 ₹4.3 Cr |
Tender Value
₹3.6 Cr
EMD Value
₹7.3 L
Closing Date
25 Feb 2026, 5:00 pmClosed
KRISHAN KUMAR
W.S. Divn. Ambala
constructing 5 tier stone steining along LMB Tangri D/S Narwana Branch at RD 34000 to protect the abadi area of village Bhunni from flood water ofRiver Tangri.
2026_HRY_503681_1
20267E20876A DD4C 4084 8E45 AE6EB2FAE1CC144IRR
Open Tender
Civil Works
120 days
BHUNNI
as per CBD
2 documents required · 2 mandatory
₹15,000
₹7.3 L
Yes
WS DIVISION AMBALA
16 Apr 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
18 Feb 2026 - 20 Feb 2026
24 Feb 2026
S/o and C/o stone boulders of requisite size from approved quarry to site of work as per PWD specification No. 3.31 read with 23.8 and 23.9 loading, unloading and stacking as per recommended committee rate for the year 2025-2026 for Ambala, Panchkula, Kaithal and Kurukshetra.
Percentage BoQ
BoQ_Ver3.0
Contact No: 0171-4023613
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[16.29]Weaving wire-netting for wire crates, including binding sides, and partition to make crate of 15 cm x 15 cm, or 25 cm x 7.5 cm mesh by mechanical/ mannual means. [Through Rate]
[16.32]Filing stones or spalls into crates, and hand-packing by mechanical/ mannual means. [Through Rate]
[2.B0046] B0046. Hard drawn steel wire [Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[16.39]Dumping stone by mechanical/ mannual means. [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_582370.pdf
techsummary_582370.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_582370.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid