Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹49.7 LAdmitted-Finance | -38.99% | ₹49.7 L | L1 | Admitted-Finance |
| 2 | L2₹63.3 L+₹13.6 L (27.4%)Admitted-Finance | -22.30% | ₹63.3 L+₹13.6 L (27.4%) | L2 | Admitted-Finance |
| 3 | L3₹64.0 L+₹14.3 L (28.7%)Admitted-Finance | -21.50% | ₹64.0 L+₹14.3 L (28.7%) | L3 | Admitted-Finance |
| 4 | L4₹73.4 L+₹23.6 L (47.5%)Admitted-Finance | -9.99% | ₹73.4 L+₹23.6 L (47.5%) | L4 | Admitted-Finance |
| 5 | L5₹80.7 L+₹31.0 L (62.3%)Admitted-Finance VILLAGE GWARAU KALAN HATHRAS HATHRAS UTTAR PRADESH 204212 | HATHRAS | UTTAR PRADESH | 204212 | -1.00% | ₹80.7 L+₹31.0 L (62.3%) | L5 | Admitted-Finance |
Tender Value
₹81.5 L
EMD Value
₹1.9 L
Closing Date
7 Jul 2026, 5:00 pmClosed
GM JAL
Sector-5, Noida
Strengthening of Sewerage (P/L Damaged Sewer Line in B Block Sector-92), Noida.
2026_NOIDA_1165434_1
15/SM-JAL-3/ET/26-27
Open Tender
Civil Works - Others
Fixed-rate
180 days
NOIDA
Please refer to tender document
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.9 L
3 Aug 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required. | |||||
| 1.01 | bituminous portion | 588 | Cum. | 2,613.34 | ₹15,36,643.92 |
| 1.02 | Water bound macadam | 882 | Cum. | 1,500.55 | ₹13,23,485.1 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m,disposed earth to be levelled and neatly dressed. .The contractor has to detect different utilities like sewer line,water supply line, electric cable,telephone cable,gas pipe line etc.using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | 6,909 | Cum. | 136 | ₹9,39,624 |
| 3Centring and shuttering including strutting, propping etc. and removal of form for | |||||
| 3.01 | Foundation, footings, bases of columns etc. for mass concrete. | 637 | Sqm | 181.64 | ₹1,15,704.68 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources ) | 73.08 | Cum. | 5,820 | ₹4,25,325.6 |
| 5Providing & Laying Non Pressure NP-3 class RCC Spigot Socketed pipe confirming to 458:2003 with latest ammendment laying in true alignment & Position on Craddle i/c rubber rings (Confirming to IS :5382 with latestammendmen) testing of laid pipe as per direction of Engineer in Charge complete in all respect. | |||||
| 5.01 | b) 300 mm dia NP-3 | 1,750 | Mtr | 993.37 | ₹17,38,397.5 |
| 6Constructing brick masonry circular type manhole 0.91 m internal dia at bottom and 0.56m dia at top in cement mortar 1:4 (1 cement : 4 coarse sand), inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement, foundation concrete 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size), and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design : | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
TD15.pdf
Tender Documents • 2.51 MB
C15.xls
Additional Documents • 0.05 MB
BOQ_2185789.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .