The Superintending Engineer City Circle Bilaspur
Estimate for Extenstion of 07 no LT PCC pole through AB Cable at various location of ward no 46 Under Sirgitti Zone City Dn 1(East) Bilaspur in Mukhyamantri Shahri Vidyutikaran Yojana for the the year 2025-26 Estimate for Extenstion of 09 no LT PCC pole through AB Cable at Various Location of Ward no 10 under sirgitti zone city dn-1 East Bilaspur in Mukhyamantri shahri vidyutikaran yojana for the year 2025-26 Estimate for Shifting of LT pole at bangali hotel to pandav Bhawan at sirgitti ward no 11 (As per single line diagram of under scheme of mukhyamantri shahari vidhyutikaran yojana under Sirgitti zone bilaspur.under Ctiy Dn-1 (East) CSPDCL bilaspur Estimate for extension of 03 no PCC Pole for bannak chouk to sahu dukan on pcc pole through AB Cable under scheme of Mukhyamantri Shahari Vidhyutikaran Yojana under Basant Vihar Zone Bilaspur under City Dn-1 (East) CSPDCL Bilaspur.
105644
NIT-31
Electrical Works; Electrical and Electronics
Bilaspur, Chhattisgarh
4 Sept 2026
4 Sept 2026
27 Aug 2026
Materials for LT LINE Estimate for Extenstion of 07 no LT PCC pole through AB Cable at various location of ward no 46 Under Sirgitti Zone City Dn 1(East) Bilaspur in Mukhyamantri Shahri Vidyutikaran Yojana for the the year 2025-26
5315/30.03.2026 154,833.00 WITH GST WITHOUT GST
S.NO B43020251309 QTY UNIT GST+RATE TOTAL Ex.RATE TOTAL
2 SUSPENSION CLAMP 3 NO 569.12 1,707.36 482.31 1446.92
3 INSULATING PIERCING CONNECTOR AB CABLE(S 4 NO 97.13 388.52 82.31 329.25
4 INSULATING PIERCING CONNECTOR FOR AB CAB 6 NO 126.53 759.18 107.23 643.37
5 INSULATING PIERCING CONNECTOR FOR ABC TO 9 NO 176.36 1,587.24 149.46 1345.12
6 UDC- UNIVERSAL DISTRIBUTION CONNECTOR 6 NO 158.95 953.70 134.70 808.22
7 ANCHOR CLAMP/ DEAD END CLAMP 4 NO 784.09 3,136.36 664.48 2657.93
8 LT 3PH 5 WIRE AERIAL BUNCHED CABLE OF SI 0.3 KM 148,104.56 44,431.37 125512.34 37653.70
9 STAY SET WITHOUT STAY WIRE16mm Paint11KV 2 NO 585.42 1,170.84 496.12 992.24
11 Stay clamp LT/Pair 2 NO 334.5 669.00 283.47 566.95
13 M S NUTS AND BOLTS: - 16x40mm 2 KG 87.55 175.10 74.19 148.39
14 M S NUTS AND BOLTS: - 16x65mm 2 KG 86.09 172.18 72.96 145.92
15 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M 6 NO 149.25 895.50 126.48 758.90
16 DISTRIBUTION BOX 3 PH 4 CONNECTOR 6 EA 1,583.04 9,498.24 1341.56 8049.36
17 Service ring made of 16 mm 6 NO 457.5 2,745.00 387.71 2326.27
18 ALUMINIUM 1C 16 SQ MM UNARMOURED LT PVC 36 M 28.37 1,021.32 24.04 865.53
19 END CLAMP CAP FOR 50/70 SQMM 2 NO 38.39 76.78 32.53 65.07
20 CABLE TIE FOR AB CABLE (UV PROTECTED BLA 150 NO 7.14 1,071.00 6.05 907.63
21 G.I. WIRES: - Barbed wire. 6 KG 86.44 518.64 73.25 439.53
INCIDENTIAL CHARGES 0.075 6636.57
S.NO SERVICES UNIT QTY GST+RATE TOTAL Ex.RATE TOTAL
2 Tree cutting Km.
3 Approach Clearance Km.
5 Shifting of materials to pole pits No. 7 70.01 490.09 59.33 415.33
6 Stay pit digging No. 2 334.05 668.11 283.10 566.19
7 Transportation of pole from road side to pole pit for a lead of 1 Km. No. 7 345.57 2,419.00 292.86 2050.00
8 Fixing of LT 5 Pin cross arm with insulator No. 0 83.90 0.00 71.11 0.00
9 Pole erection complete with earthing No. 7 894.18 6,259.23 757.78 5304.43
10 Concreting of supports Cft. 0 25.36 0.00 21.49 0.00
11 Stay erection complete No. 2 230.38 460.76 195.24 390.48
12 Painting of cross arm, pole and numbering of poles No. 7 460.76 3,225.33 390.48 2733.33
13 Diamond guarding Pair 0 70.01 0.00 59.33 0.00
15 transportation charges LS 1 2000.00 2,000.00 1,694.92 1694.92
TENDER AMOUNT 115925.86
Executive Engineer (O)
O/o Superintending Engineer
City Circle CSPDCL, Bilaspur
Materials for LT LINE Estimate for Extenstion of 09 no LT PCC pole through AB Cable at Various Location of Ward no 10 under sirgitti zone city dn-1 East Bilaspur in Mukhyamantri shahri vidyutikaran yojana for the year 2025-26
5317/30.03.2026 214,499.00 WITH GST WITHOUT GST
S.NO B43020251295 QTY UNIT GST+RATE TOTAL Ex.RATE TOTAL
2 SUSPENSION CLAMP 2 NO 569.12 1,138.24 482.31 964.61
3 INSULATING PIERCING CONNECTOR AB CABLE(S 4 NO 97.13 388.52 82.31 329.25
4 INSULATING PIERCING CONNECTOR FOR AB CAB 8 NO 126.53 1,012.24 107.23 857.83
5 INSULATING PIERCING CONNECTOR FOR ABC TO 9 NO 176.36 1,587.24 149.46 1345.12
6 UDC- UNIVERSAL DISTRIBUTION CONNECTOR 9 NO 158.95 1,430.55 134.70 1212.33
7 ANCHOR CLAMP/ DEAD END CLAMP 14 NO 784.09 10,977.26 664.48 9302.76
8 LT 3PH 5 WIRE AERIAL BUNCHED CABLE OF SI 0.382 KM 148,104.56 56,575.94 125512.34 47945.71
9 STAY SET WITHOUT STAY WIRE16mm Paint11KV 6 NO 585.42 3,512.52 496.12 2976.71
11 Stay clamp LT/Pair 6 NO 334.5 2,007.00 283.47 1700.85
12 BOLT WITH NUT M S 12X100 MM 1 KG 87.55 87.55 74.19 74.19
13 M S NUTS AND BOLTS: - 16x40mm 3 KG 87.55 262.65 74.19 222.58
14 M S NUTS AND BOLTS: - 16x65mm 3 KG 86.09 258.27 72.96 218.87
15 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M 9 NO 149.25 1,343.25 126.48 1138.35
16 DISTRIBUTION BOX 3 PH 4 CONNECTOR 9 EA 1,583.04 14,247.36 1341.56 12074.03
17 Service ring made of 16 mm 9 NO 457.5 4,117.50 387.71 3489.41
18 ALUMINIUM 1C 16 SQ MM UNARMOURED LT PVC 54 M 28.37 1,531.98 24.04 1298.29
19 END CLAMP CAP FOR 50/70 SQMM 2 NO 38.39 76.78 32.53 65.07
20 CABLE TIE FOR AB CABLE (UV PROTECTED BLA 190 NO 7.14 1,356.60 6.05 1149.66
21 G.I. WIRES: - Barbed wire. 8 KG 86.44 691.52 73.25 586.03
INCIDENTIAL CHARGES 0.075 9370.00
TOTAL 134303.27
S.NO SERVICES UNIT QTY GST+RATE TOTAL Ex.RATE TOTAL
2 Tree cutting Km.
3 Approach Clearance Km.
5 Shifting of materials to pole pits No. 9 70.01 630.12 59.33 534.00
7 Transportation of pole from road side to pole pit for a lead of 1 Km. No. 9 345.57 3,110.14 292.86 2635.72
8 Fixing of LT 5 Pin cross arm with insulator No. 0 83.90 0.00 71.11 0.00
9 Pole erection complete with earthing No. 9 894.18 8,047.58 757.78 6819.98
10 Concreting of supports Cft. 0 25.36 0.00 21.49 0.00
11 Stay erection complete No. 6 230.38 1,382.29 195.24 1171.43
12 Painting of cross arm, pole and numbering of poles No. 9 460.76 4,146.86 390.48 3514.29
13 Diamond guarding Pair 0 70.01 0.00 59.33 0.00
15 transportation charges LS 1 2900.00 2,900.00 2,457.63 2457.63
TENDER AMOUNT 162906.01
Executive Engineer (O)
O/o Superintending Engineer
City Circle CSPDCL, Bilaspur
Materials for LT LINE Estimate for Shifting of LT pole at bangali hotel to pandav Bhawan at sirgitti ward no 11 (As per single line diagram of under scheme of mukhyamantri shahari vidhyutikaran yojana under Sirgitti zone bilaspur.under Ctiy Dn-1 (East) CSPDCL bilaspur
5316/30.03.2026 242,529.58 WITH GST WITHOUT GST
S.NO B43020251312 QTY UNIT GST+RATE TOTAL Ex.RATE TOTAL
4 BOLT WITH NUT M S 12X100 MM 2 KG 87.55 175.10 74.19 148.39
5 M S NUTS AND BOLTS: - 16x40mm 3 KG 87.55 262.65 74.19 222.58
6 M S NUTS AND BOLTS: - 16x65mm 2 KG 86.09 172.18 72.96 145.92
7 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M 8 NO 149.25 1,194.00 126.48 1011.86
11 STAY SET WITHOUT STAY WIRE16mm Paint11KV 1 NO 585.42 585.42 496.12 496.12
13 Stay clamp LT/Pair 1 NO 334.5 334.50 283.47 283.47
14 LT 3PH 5 WIRE AERIAL BUNCHED CABLE OF SI 0.38 KM 148,104.56 56,279.73 125512.34 47694.69
INCIDENTIAL CHARGES 0.075 10160.94
TOTAL 145640.13
S.NO SERVICES UNIT QTY GST+RATE TOTAL Ex.RATE TOTAL
2 Tree cutting Km.
3 Approach Clearance Km.
5 Shifting of materials to pole pits No. 8 70.01 560.11 59.33 474.67
6 Stay pit digging No. 1 334.05 334.05 283.10 283.10
7 Transportation of pole from road side to pole pit for a lead of 1 Km. No. 8 345.57 2,764.57 292.86 2342.86
8 Fixing of LT 5 Pin cross arm with insulator No. 0 83.90 0.00 71.11 0.00
9 Pole erection complete with earthing No. 8 894.18 7,153.40 757.78 6062.20
10 Concreting of supports Cft. 0 25.36 0.00 21.49 0.00
11 Stay erection complete No. 1 230.38 230.38 195.24 195.24
12 Painting of cross arm, pole and numbering of poles No. 8 460.76 3,686.10 390.48 3123.81
13 Diamond guarding Pair 8 70.01 560.11 59.33 474.67
15 transportation charges LS 1 3100.00 3,100.00 2,627.12 2627.12
TENDER AMOUNT 171172.00
Executive Engineer (O)
O/o Superintending Engineer
City Circle CSPDCL, Bilaspur
MATERIAL Estimate for Shifting of LT pole at bangali hotel to pandav Bhawan at sirgitti ward no 11 (As per single line diagram of under scheme of mukhyamantri shahari vidhyutikaran yojana under Sirgitti zone bilaspur.under Ctiy Dn-1 (East) CSPDCL bilaspur
MATERIAL RETURN TO BOARD
S.NO B43020251320 QTY UNIT GST+RATE TOTAL
1 MS SCRAP POLE -800 KG 39.11 -31288
2 INSULATED WIRE/CABLE ALUMINIUM SCRAP -38 KG 103.13 -3918.94
Executive Engineer (O)
O/o Superintending Engineer
City Circle CSPDCL, Bilaspur
Materials for LT LINE Estimate for extension of 03 no PCC Pole for bannak chouk to sahu dukan on pcc pole through AB Cable under scheme of Mukhyamantri Shahari Vidhyutikaran Yojana under Basant Vihar Zone Bilaspur under City Dn-1 (East) CSPDCL Bilaspur.
5320/30.03.2026 73,900.54 WITH GST WITHOUT GST
S.NO B43020251316 QTY UNIT GST+RATE TOTAL Ex.RATE TOTAL
2 SUSPENSION CLAMP 2 NO 569.12 1,138.24 482.31 964.61
3 INSULATING PIERCING CONNECTOR AB CABLE(S 1 NO 97.13 97.13 82.31 82.31
4 INSULATING PIERCING CONNECTOR FOR AB CAB 2 NO 126.53 253.06 107.23 214.46
5 INSULATING PIERCING CONNECTOR FOR ABC TO 2 NO 176.36 352.72 149.46 298.92
6 UDC- UNIVERSAL DISTRIBUTION CONNECTOR 2 NO 158.95 317.90 134.70 269.41
7 ANCHOR CLAMP/ DEAD END CLAMP 2 NO 784.09 1,568.18 664.48 1328.97
8 LT 3PH 5 WIRE AERIAL BUNCHED CABLE OF SI 0.16 KM 148,104.56 23,696.73 125512.34 20081.97
9 STAY SET WITHOUT STAY WIRE16mm Paint11KV 1 NO 585.42 585.42 496.12 496.12
11 Stay clamp LT/Pair 1 NO 334.5 334.50 283.47 283.47
13 M S NUTS AND BOLTS: - 16x40mm 2 KG 87.55 175.10 74.19 148.39
14 M S NUTS AND BOLTS: - 16x65mm 2 KG 86.09 172.18 72.96 145.92
15 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M 3 NO 149.25 447.75 126.48 379.45
16 DISTRIBUTION BOX 3 PH 4 CONNECTOR 2 EA 1,583.04 3,166.08 1341.56 2683.12
17 Service ring made of 16 mm 2 NO 457.5 915.00 387.71 775.42
18 ALUMINIUM 1C 16 SQ MM UNARMOURED LT PVC 12 M 28.37 340.44 24.04 288.51
19 END CLAMP CAP FOR 50/70 SQMM 2 NO 38.39 76.78 32.53 65.07
20 CABLE TIE FOR AB CABLE (UV PROTECTED BLA 80 NO 7.14 571.20 6.05 484.07
21 G.I. WIRES: - Barbed wire. 2 KG 86.44 172.88 73.25 146.51
INCIDENTIAL CHARGES 0.075 3102.67
S.NO SERVICES UNIT QTY GST+RATE TOTAL Ex.RATE TOTAL
2 Tree cutting Km.
3 Approach Clearance Km.
5 Shifting of materials to pole pits No. 3 70.01 210.04 59.33 178.00
6 Stay pit digging No. 1 334.05 334.05 283.10 283.10
7 Transportation of pole from road side to pole pit for a lead of 1 Km. No. 3 345.57 1,036.71 292.86 878.57
8 Fixing of LT 5 Pin cross arm with insulator No. 0 83.90 0.00 71.11 0.00
9 Pole erection complete with earthing No. 3 894.18 2,682.53 757.78 2273.33
10 Concreting of supports Cft. 0 25.36 0.00 21.49 0.00
11 Stay erection complete No. 1 230.38 230.38 195.24 195.24
12 Painting of cross arm, pole and numbering of poles No. 3 460.76 1,382.29 390.48 1171.43
13 Diamond guarding Pair 0 70.01 0.00 59.33 0.00
15 transportation charges LS 1 970.00 970.00 822.03 822.03
TENDER AMOUNT 54065.37
Executive Engineer (O)
O/o Superintending Engineer
City Circle CSPDCL, Bilaspur
TOTAL BILL OF QUANTITY FOR MATERIAL TO BE PROVIDED BY THE CONTRACTOR
S.No Name of Work Estimate No. Work Order & Date Estimate Amount Tender Amount
Material Services Total (F+G)
A B C D E F G H
1 Estimate for Extenstion of 07 no LT PCC pole through AB Cable at various location of ward no 46 Under Sirgitti Zone City Dn 1(East) Bilaspur in Mukhyamantri Shahri Vidyutikaran Yojana for the the year 2025-26 B43020251309 5315/30.03.2026 154,833.00 95124 20801.76 115925.86
2 Estimate for Extenstion of 09 no LT PCC pole through AB Cable at Various Location of Ward no 10 under sirgitti zone city dn-1 East Bilaspur in Mukhyamantri shahri vidyutikaran yojana for the year 2025-26 B43020251295 5317/30.03.2026 214,499.00 134303 28602.74 162906.01
3 Estimate for Shifting of LT pole at bangali hotel to pandav Bhawan at sirgitti ward no 11 (As per single line diagram of under scheme of mukhyamantri shahari vidhyutikaran yojana under Sirgitti zone bilaspur.under Ctiy Dn-1 (East) CSPDCL bilaspur B43020251312 5316/30.03.2026 242,529.58 145640 25531.87 171172.00
4 Estimate for extension of 03 no PCC Pole for bannak chouk to sahu dukan on pcc pole through AB Cable under scheme of Mukhyamantri Shahari Vidhyutikaran Yojana under Basant Vihar Zone Bilaspur under City Dn-1 (East) CSPDCL Bilaspur. B43020251316 5320/30.03.2026 73,900.54 44472 9593.79 54065.37
Executive Engineer (O)
O/o Superintending Engineer
City Circle CSPDCL, Bilaspur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
source.json
RAW_JSON • 0.01 MB
253647-NIT_TENDER_TD105644.pdf
pdf • 0.64 MB
253659-NIT-03-03.PDF
pdf • 8.58 MB
253660-NIT-03-04.PDF
pdf • 5.54 MB
253661-NIT-31-01.PDF
pdf • 7.71 MB
253662-NIT-31-02.PDF
pdf • 9.30 MB
253658-BOQ_TD105644.xlsx
xlsx • 0.04 MB
257054-DATE_EXT_TD105644.pdf
pdf • 0.63 MB
257054-DATE_EXT_TD105644.pdf
pdf • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .