Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42,352.89Accepted-AOC | ₹42,352.89 | L1 | Accepted-AOC ACCEPT |
| Sl No | Description | Qty | Unit | sajiththaniyullatIL L1 |
|---|---|---|---|---|
| 1.00Handrail | ||||
| 1.00 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 183.19 | kg | 210.94 ₹38,642.10 |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 0.12 | cum | 8,458.49 ₹1,031.94 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1.84 | sqm | 360.41 ₹663.15 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 13.1 | sqm | 153.87 ₹2,015.70 |
Tender Value
₹42,353
EMD Value
₹1,059
Closing Date
21 Jan 2026, 6:00 pmClosed
Assistantengineer
KAVILUMPARA GP
RETENDER KAVILUMPARA GP PROJECT NO. 315/26 CONSTRUCTION OF HAND RAIL AT STREAM NEAR ANAKKULAM ANGANAWADI IN WARD 8
2025_LSGD_824466_18
04/2025/AE/LIDEW/KVRA/PHASE
Open Tender
Civil Works - Others
THOTTILPALAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹335
Yes
₹1,059
Yes
19 May 2026
14 Jan 2026
23 Jan 2026
14 Jan 2026
21 Jan 2026
14 Jan 2026
Handrail
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1388991.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
AFF.pdf
Tender Documents • 0.24 MB
FOT.pdf
Tender Documents • 0.25 MB
PREL.pdf
Tender Documents • 0.25 MB
SBD.pdf
Tender Documents • 0.96 MB
BOQ_1388991.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid