| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.2 CrAccepted-AOC | ₹51.2 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹52.4 Cr+₹1.2 Cr (2.42%)Rejected-AOC NO 91 GROUND FLOOR 3RD CROSS ROAD OPPOSITE VASAVI KANNIKA PARAMESHWARI TEMPLE BENGALURU BENGALURU 560021 KARNATAKA INDIA | BENGALURU | BENGALURU | KARNATAKA | 560021 | ₹52.4 Cr+₹1.2 Cr (2.42%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹62.0 Cr+₹10.9 Cr (21.2%)Rejected-AOC KANNUR | KERALA | 670001 | ₹62.0 Cr+₹10.9 Cr (21.2%) | L3 | Rejected-AOC Third Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Experience certificate submitted for similar work is less than 40 percentage of EPAC. Hence rejected. |
| Sl No | Description | Qty | Unit | irikkur construction company L1 | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L3 | KVR Construction Heights Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00Road Work | ||||||
| 1.00 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | 79 | each | 1,056.31 ₹83,448.49 Lowest | 3,480 ₹2,74,920 | 1,450 ₹1,14,550 |
| 1.00 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | 68 | each | 654.92 ₹44,534.56 Lowest | 1,740 ₹1,18,320 | 950 ₹64,600 |
| 1.00 | 2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm | 35 | each | 2,225.63 ₹77,897.05 Lowest | 11,600 ₹4,06,000 | 2,800 ₹98,000 |
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 5.28 | Hectare | 47,681.22 ₹2,51,756.84 | 47,567 ₹2,51,153.76 Lowest | 72,500 ₹3,82,800 |
| 1.00 | 2.3.2.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle - By Mechanical Means | 0.8 | Hectare | 58,578.06 ₹46,862.45 | 58,438 ₹46,750.4 Lowest | 72,500 ₹58,000 |
| 1.01 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 384.52 | cum | 700.96 ₹2,69,536.64 Lowest | 730 ₹2,80,703.25 | 1,220 ₹4,69,120.5 |
| 1.01 | 2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry | 3,127.47 | cum | 461.12 ₹14,42,138.97 Lowest | 466 ₹14,57,401.02 | 860 ₹26,89,624.2 |
| 1.01 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 369.63 | cum | 473.81 ₹1,75,134.86 | 441 ₹1,63,007.27 Lowest | 820 ₹3,03,097.42 |
| 1.01 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 8,734.77 | cum | 46.85 ₹4,09,223.97 Lowest | 160 ₹13,97,563.2 | 215 ₹18,77,975.55 |
Tender Value
₹52.6 Cr
EMD Value
₹5 L
Closing Date
10 Feb 2026, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2026_KRFB_831241_1
PWD/KR/TR/13627/2022_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
545 days
Kozhikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
Office of the Project Director, PMU-KRFB, TVM
15 Sept 2026
28 Jan 2026
12 Feb 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Work | |||||
| 1.001 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | - | each | - | - |
| 1.002 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | - | each | - | - |
| 1.003 | 2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm | - | each | - | - |
| 1.004 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | - | Hectare | - | - |
| 1.005 | 2.3.2.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle - By Mechanical Means | - | Hectare | - | - |
| 1.006 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 1 | cum | - | - |
| 1.007 | 2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry | 1 | cum | - | - |
| 1.008 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 0.4 | cum | - | - |
| 1.009 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | - | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Requisitionfore-payment.pdf
Additional Documents • 0.10 MB
SBD.pdf
Tender Documents • 4.45 MB
BOQ_1396645.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .