Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
31 Jan 2022, 6:00 pmClosed
GE I RNDDEHRADUN
GE I RND DEHRADUN DEAL RESIDENTIAL COMPLEX RAIPUR ROAD DEHRADUN 248008
COMPREHENSIVE MAINTENANCE AND REPAIR WORK OF CENTRAL AC PLANTS AND EQUIPMENTS INCLUDING CONNECTED MISC ITEMS AT IRDE AREA UNDER GE (I) R N D DEHRADUN
2022_MES_500477_1
GE(I)RND/9104/E8/21-22
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
DEHRADUN
Class E Category c (i) FOR UNENLISTED CONTRACTOR (i) Enlistment criteria may be seen in Para 1.4 of section of Part I of MES Manual on contracts-2007 (Reprint 2020) as available in all MES formations (ii) Copy of police verification /passport.
6 documents required · 6 mandatory
₹500
Yes
GE I R N D DEHRADUN
₹16,000
Yes
21 Feb 2022
10 Jan 2022
2 Feb 2022
10 Jan 2022
31 Jan 2022
17 Jan 2022
10 Jan 2022 - 17 Jan 2022
Amount
Material and labour for Descaling of condenser unit by rubbing with nylon brush/ cleaning rod using hydrochloric acid pumped through electric driver descaling pump including dismantling and connecting all dismantled components in proper position after servicing/ overhauling/ greasing etc replacement of packing gasket 3mm thick, nuts, bolts with washer, testing of water line for leakage & repairing of pipe line to make it leak proof complete, all as specified and directedEngr-in-Chagre for the following AC plants :- Notes : (i) The de-scaling & cleaning of condenser (Heat Exchanger) of cooling tower shall be done by circulating concentrated de-scaling solution mixed with water of make as approved to the entire satisfaction of GE/Engineer-in-Charge complete all as specified in Sch ‘A’. (ii)The hydrochloric acid shall be used as a de-scaling solution mixed with water in a suitable proportion as approved by the GE/Engineer-in-Charge so as avoid damage to existing pipe lines.
2X11TR capacity AC Plant Package Type(installed at P-7 Room No 116 Technical Area. IRDE)
2x27.5/2X27 TR capacity AC Plant (installed at Micro /C V RAMAN BuildingIRDE)
2x 30 TR capacity AC plant (installed at Cketak Buildling ).
4x80 TR capacity AC Plant (installed at EOL/ TIS Building IRDE)
Openning and cheacking of 1070 ac plant at chiller Unit of chiller cutting welding with insulation and presure testing of copper tube fixing of new copper tube size 5/8" x3 meter long with expending and pressure testing 350 PSI stand 24 hours complete testing,all as specified and directed.
Dismantling the head from compressor fitted in system, and strip opening of compressor head of twin cylinder for Model AC 1070 : of Kirloskar make SMC 8-65 model of ACCEL compressor completely for servicing /overhauling mechanically and electrically, and checking of various components with precision instruments to assess the requirements of repair/replacement, and making inventories for repairs required and re-fixing the serviceable parts in position after proper cleaning, oiling/greasing,etc ,and removing & replacement of defective / unserviceable parts with new parts, as required at site, and reassembling the compressors head ensuring perfectly leak proof after cleaning the oil sump, oil pump connecting rod, piston, liner etc and filling of compressor oil, before charging of refrigerant gas to required pressure and testing at site on full load to the entire satisfaction complete all as specified and directed for following :- ( included notes mentioned in here in after) Notes: - (i) The replacement of defective / nonfunctional parts, and Refrigerant gas and compressor oil for top up shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing/filling rate for new items are deemed to include under these items. (ii) The refregrent gas to be pumped down before dismantlling the compressure head for avoid the wastage of gas. (iii) The quoted rate shall be deemed to include replacement of small/ minor parts for prroper functioning of compressure .
M&L for cutting and grinding the crank-shaft (for 1070 : of Kirloskar make/SMC 8-65 model of ACCEL compressor) of 0.50/0.75 mm around as required to make it equivalent to manufacturer’s standard size and smoothening/ fine finishing,polishing of shaft to match with half section big end bearings, cleaning oil ports for proper lubrication complete all as specified and directed by Engr-in-Charge. Note : (i) The cost of taking out and re-fixing of the shaft / rod in position after necessary repairs is deemed to be included under the rates quoted by the contractor for respective Schedule `A' item. (ii) The rates for above items are deemed to include transportation to & fro of crank-shaft to workshop for necessary repairs.
Supply only following items / spare parts suitable for Kirloskar make compressors of Model AC-1070, dismantled / fixed under Sch ‘A’ item No.4 here in above complete all as specified and directed
Cylinder liner
Piston Bare
Compression ring set
Piston pin/ gudgen pin
Circlip internal
Connecting rod -05mm
Suction valve 'o' ring
Suction & Discharge valve spring
Discharge valve assembly (R-22)
Crank shaft AC COMPRESSOR MODEL AC-1070 KIRLOSKER
Safety plate
Shaft seal assembly
Paper filter
Filter wire gauge
Suction filter with nut
Oil pump with ring set for AC-1070
Set of gasket for AC-1070
Main bearing .05 mm.
Oil filter
loading coil
pressure gauge - 30 to 300 PSI
Supply only following items / spare parts suitable for ACCEL make compressors of Model SMC 8-65, dismantled / fixed under Sch ‘A’ item 3 here in above complete all as specified and directed .
MainBushing with detachable coller for repair .50/.75mm u.s.
Connecting rod
Bolt for Connecting rod
Castle nut
Split pin
Guide pin
Big end bearing (half section bearing) 0.050/.0.75 MM U.S.
Crank shaft SMC 8-65
Oil pump assembly.
Shaft seal assembly.
Piston with pin and rings
Cylinder liner for R-22. with suction valve
Single frame unloader- 65 (bracket).
Busing for piston pin.
Discharge valve assembly (R-22)
Gasket set complete for SMC 8-65.
Set of neoperne ''O" ring set for SMC 8-65.
Oil pressure regulator valve.
Suction stop valve 'O' RING SET" with nylon washer
Discharge stop valve 'O' RIG SET" with nylon washer
Safety valve assembly
V BELT B-68
V BELT B-105
Carrying out leak detection in the system of AC plants including nitrogen pressure testing for 24 hours and repairing the leakage by gas welding / electric welding of refrigerant pipes, replacement of valve gland, gaskets etc. and then creating vacuum for 4 hours before charging refrigerant gas R-22 in the system and testing the complete plant for working pressure for 24 hours complete, all as specified and directed. Note : R-22 gas shall be measured and paid separately under Schedule ‘A’ Item.
2X11TR capacity AC Plant Package Type(installed at P-7 Room No 116 Technical Area. IRDE)
2x27.5/2X27 TR capacity AC Plant (installed at Micro /C V RAMAN Building IRDE)
2x 30 TR capacity AC plant (installed at Cketak Buildling ).
4x80 TR capacity AC Plant (installed at EOL/ TIS Building IRDE)
Supply and fixing/testing in replacement of UNSV compressore 5.5 tr make denfoss/copland scroll compressore R-407 with pressure testing complete, all as specified and directed.
Supply and fixing/testing in replacement of UNSV V belt 'A' type as per existing for blower fan of packege type unit complete, all as specified and directed.
Supply of refrigerant gas monochloro difluoro methane (CHCLF2) R- 22 conforming to IS-5160 of 1983 , duly filled in factory sealed cylinder standard capacity for filling under Sch ‘A’ item No 3. and here in above complete, all as specified and directed.
Supply of lubricating oil anti freezing for refrigeration in factory sealed container of standard capacity for filling under Sch ‘A’ items No 3 complete,all as specified and directed. Make: Servo froze -68-10c of IOC.
Supply only R-407 refrigrant gas with testingn under Sch ‘A’ item 3 here in above complete, all as specified and directed.
Supply fixing and testing in replacement of UNSV pre filter with GI sheet frame of size 610mm x 610mm x 50mm deep suitable for Air handling units of air conditioning plants including efficiency 90% , down to 10-20microns, Initial Pressure drop- 2.5 mm WG, filter media shall be Synthetic Non Woven with Both Side HDPE Mesh, and testing complete complete, all as specified and directed.
Supply fixing and testing in replacement of UNSV Pre filter with GI sheet frame of size 1000mm x 1000mm x 10mm deep suitable for Pakage type units of air conditioning plants including efficiency 90% , down to 10-20microns, Initial Pressure drop- 2.5 mm WG, filter media shall be Synthetic Non Woven with Both Side HDPE Mesh, and t testing complete complete, all as specified and directed.
Supply fixing and testing in replacement of UNSV condencer safety valve of size ½”, for pressure 300 PSI with and Including ½”, mild steel socket duly welded on condenser ensuring perfectly leak proof joint with pressure testing complete all as specified and directed.
Supply fixing and testing in replacement of UNSV thermostatic expansion valve (R-22) suitable for 80 TR capacity of central AC plant complete, all as specified and directed.
Supply fixing and testing in replacement of UNSV water pressure gauge 100 mm dia of range 0 to 100 PSI for central AC plant complete all as specified & directed.
Supply fixing and testing in replacement of UNSV Gas pressure gauge 100 mm dia of range 0 to 300 PSI for central AC plant complete all as specified & directed.
Supply fixing and testing in replacement of UNSV liqude line filtter driers of suitable size for Package type AC plant 11TR complete all as specified & directed.
Supply fixing and testing in replacement of UNSVlow pressure control switch type MP-1 with required cutting, flaring/chipping and gas welding ensuring perfectly leak proof joint with pressure testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV low pressure control switch type MP-5 with required cutting, flaring/chipping and gas welding ensuring perfectly leak proof joint with pressure testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV low pressure control switch type MP-15 with required cutting, flaring/chipping and gas welding ensuring perfectly leak proof joint with pressure testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV oil pressure control switch type MP-55 with required cutting, flaring/chipping and gas welding ensuring perfectly leak proof joint with pressure testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV PVC Fills of FPR cooling tower size 600mmx300mmx 150 mm complete, all as specified and directed
Supply, fixing and testing in replacement of UNSV pully 2 step 'V' groov B type of size 10" dia suitable of 2x27 TR at MICRO AHU, and EOL AHU No-2 Bldg of any description complete,all as specified and directed.
Disconnecting and removing old existing non functional electric motor, of any description and in any position from existing platform for compressor/blowers/pumps/ cooling towers and dismantling and strip opening of the motor, for cleaning oiling/greasing and fixing of serviceable parts in position and removing the old existing burnt windings, cleaning the slots & rewinding of the electric motor with existing gauge super enameled copper wire, including insulating material such as illuminous paper, Letherized paper, cotton tape, glass sleeves insulating varnish etc for powering compressor /blowers /pumps / cooling towers and transportation to site & refixing on existing platform ,connecting with exising connections & testing on full load complete all as specified and directed for following capacity :- .
5.0 HP capacity, Three phase 50 Hz AC supply
7.5 HP capacity, Three phase 50 Hz AC supply
10 HP capacity, Three phase 50 Hz AC supply
Disconnecting and removing old existing non functional electric motor, of any description and in any position from existing platform for pumps and dismantling and strip opening of the motor, for cleaning oiling/greasing and fixing of bearing, imppler serviceable parts in position pumps and transportation to site & refixing on existing platform ,connecting with exising connections & testing on full load complete all as specified and directed for following capacity :- .
7.5 HP capacity, Three phase 50 Hz AC supply
10 HP capacity, Three phase 50 Hz AC supply
AHU Room/duct cleaning with the help the of veccum cleaner by opening gill/defuser etc. and refixing testing complete all as specified and directed.
Supply fixing,connecting and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 16 Amps. Complete all as specified and directed .Make L&T or equievelent model of specified and directed.
Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 25 Amps. Complete all as specified and directed .Make L&T or equievelent model of specified and directed.
Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 32 Amps. Complete all as specified and directed . Cat part No SS90935- Type ML-10 of make L&T or equievelent model of specified and directed. ,
Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 50 Amps. Complete all as specified and directed .Make L&T or equievelent model of specified and directed. .
Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 70 Amps. Complete all as specified and directed .Make L&T or equievelent model of specified & directed
Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 06 to 18 Amps complete all as specified and directed. make L&T or equievelent model of specified and directed. .
Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 18 to 30 Amps complete all as specified and directed. make L&T or equievelent model of specified and directed.
Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 32 to 45 Amps complete all as specified and directed. make L&T or equievelent model of specified and directed.
38. Supply fixing and testing in replacement of UNSV digital type of size 96mm x 96mm, AC Volt meter 0- 500 Volts including wiring with 1.5 Sqmm PVC insulated stranded copper conductor cable complete all as specified and directed.
39. Supply fixing and testing in replacement of UNSV digital type of size 96mm x 96mm, AC Amp meter 0- 200 Amps with including 3 Nos C.T of Ratio 200/5 of class-1.0 including wiring with 1.5 Sqmm PVC insulated stranded copper conductor cable complete all as specified and directed.
Supply fixing and testing in replacement of UNSV insulated connectors 4 pole 100 amps rating including testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV insulated connectors 4 pole 63 amps rating including testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV Electronic timers 415 Volts, 50 Hz, AC supply, with delay period of 9-30-Seconds complete all as specified and directed f make L&T or equievelent model of specified make as approved by the GE
Supply fixing and testing in replacement of UNSV FN type switch 63 Amps capacity complete in the existing panel Complete connecting electrically all as specified and directed. Model : FN 63 TPN / FP of L&T or equivalent make in INDO ASIAN as specified
Supply fixing and testing in replacement of UNSV Connector push button ON/OFF complete in the existing panel Complete connecting electrically all as specified and directed
Supply fixing and testing in replacement of UNSV indicator light red/yellow /green complete in the existing panel Complete connecting electrically all as specified and directed
Supply, fixing, connecting and testing in replacement of UNSV thermostate heating/cooling of any description complete,all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV strip heater fins type, 3.0 KW, 230 volts, single phase, AC supply in any position complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV MCCB Triple pole, 250 Amps 415 volts, 50 Hz having breaking capacity 35/36 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete all as specified and directed. Make : L&T /INDO ASIAN/Havells
Supply, fixing, connecting and testing in replacement of UNSV MCCB Triple pole, 200 Amps 415 volts, 50 Hz having breaking capacity 36 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete, all as specified and directed. Make : L&T /INDO ASIAN/Havells
Supply, fixing, connecting and testing in replacement of UNSV MCCB Triple pole, 100 Amps 415 volts, 50 Hz having breaking capacity 25 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete, all as specified and directed. Make : L&T /INDO ASIAN/Havells
MAHADEV ELECTRICALS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .