| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.5 LAccepted-AOC | L-1 | Accepted-AOC Accepted as L-1 bidder | |
| 2 | Rejected-Technical PO SITARAMPUR BARDHAMAN BARDHAMAN 713359 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713359 | - | Rejected-Technical As per TC recommendation. | |
| 3 | Rejected-Technical | - | Rejected-Technical As per TC recommendation. |
Tender Value
₹3.5 L
EMD Value
₹4,400
Closing Date
31 Aug 2024, 5:00 pmClosed
AE (E and M), Mugma Area
Office of The General Manager, Mugma Area, P.O-Mugma, Dist.- Dhanbad, 828204
Lifting of Endless Haulage from Kumardhubi (BL Incline) Colliery and Installation at 31 No. Incline of Badjna Colliery.
2024_ECL_315137_1
ECL/GM/MA/E and M/24-25/eTender/87 Dt. 13.08.2024
Open Tender
Miscellaneous Works
Item Rate
30 days
Kumardhubi Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,400
19 Nov 2024
16 Aug 2024
2 Sept 2024
16 Aug 2024
31 Aug 2024
17 Aug 2024
17 Aug 2024 - 24 Aug 2024
Amount
Item Description/ Heading
Engagement of manpower for following works:- A ) Endless Haulage Dismantling, lifting U/G to S/F at B.L Incline Kumardhubi Colliery., Semi-skilled-5 Heads x7 shift=35 heads Skilled-2 heads x7 shifts= 14 heads High skilled-1 Head x 7 shifts= 7 heads
Engagement of manpower for following works:-B)Complete endless haulage loading on T/Truch from Kumardhubi Colliery & Unloading at 31 No incline Badjna Colliery Semi-skilled-5 Heads Skilled-2 heads x 1 shifts = 2 heads High skilled-1 Head
Engagement of manpower for following works:-C) Endless Haulage Pully dismantling and Lifting U/G to S/F at BL Inlince Kumardhubi Colliery & Loading on T/Truch & Unloading at 31 no Incline Badjna Colliery Semi-skilled- 01 Heads Crane Charge - 06 hrs.
Engagement of manpower for following works:-D) Complete endless haulage with pulley 2 nos loading on trolley and unloading at U/G workplace 31 no incline Badjna Colliery Semi-skilled-8 Heads x 2 shifts = 16 heads Skilled-2 heads x 2 shifts = 4 heads High skilled-1 Head x 2 shift = 2 heads
Engagement of manpower for following works:-E) Endless Haulage shifting, installation & Fitting at 31 no incline Badjna Colliery Semi-skilled-7 Heads x 7 days = 49 heads Skilled-2 heads x7 days = 14 heads High skilled-1 Head x 7 days = 07 heads
Endless pully frame making with girder & Gas & Electrodes - 2 nos
Fully fitting for U/G 2 nos.
Complete Haulage rope 19 M.D. Loading on Trolley & Unloading & Laying Pulley to Pulley Semi-skilled-8 Heads x 3 shifts = 24 heads Skilled-1 heads x 3 shifts = 3 heads High skilled-1 Head x3 shift = 3 heads
Tentioning Rod & Grinder Fitting Semi-skilled-5 Heads x 3 shift = 15 heads Skilled-1 heads x 3 shift = 3 heads High skilled-1 Head x 3 shifts = 3 heads
Total impact of GST for the purpose of CTC
SATYAM ENGINEERING WORKSHOP
BHARAT MINING STORES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .