Construction of Storm Water Drain in Yenadri Canal Chainage from 0.00 mts to 900.00 mts i.e. Yerravaram and kothapeta covered in Ward No.11 and 12 of Yelamanchili Municipality (REACH - I) under VMRDA FUNDS
968436
102/2025-26/MAE/YLM
OPEN - NCB
Civil Works
ANAKAPALLI
17 documents required · 16 mandatory · 1 optional
₹5,464
₹1.5 L
25 Jul 2026
25 Jul 2026
25 Jul 2026
Removal of wet silt and sludge from sullage drains with the aid of baskets and vessels including all labour charges and other incidental charges as per SS and as directed by the departmental engineer incharge of the work(Conveyance of wet silt upto 10.00 km lead including cost of unloading and loading)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH
Earthwork in excavation for drains as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and base filling in trenches with excavated suitable material as per Tech. Specification 305 MORD, 304 MORTH. This rate including cost of all labour charges and other incidental charges etc., complete as per SS and as directed by the departmental officer incharge of work. RBR - EECD - 5 / i (Manual Means) For Drains
Conveyance of surplus material lead up to 3 Km for for transporting materials by tippers including loading, unloading and hire charges of machinary including cost and conveyance of all materials and labour charges and as direct by the dept officer.
Collection, supply,spreading of crusher stone dust with hand roller and watering,etc complete as per SS and as Directed by Dept. officers. RBR - FNDN - 2 Page 449
Bailing out of water from the existing drains with oil engine driven pump sets, including hire charges, fuel charges and wages for driver and helper
Plain cement concrete in (1:4:8) prop using 40 mm nominal size hard broken machine crushed granite metal as per SS including cost and conveyance of all materials, sales tax and labour charges such as mixing concrete, laying, tamping, curing all operational, incidental charges etc., complete as per SS for finished item of work
R.C.C grade M 20 (Design Mix) using 20 mm Graded Metal (MORTH) design mix using concrete mixer, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH RBR-FNDN-4 a) Drain bottom with out form work
R.C.C grade M 20 (Design Mix) using 20 mm Graded Metal (MORTH) design mix using concrete mixer, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH RBR-FNDN-4 b) with form work for VRCC Side Walls
Vibrated reinforced cement concrete (R.C.C. grade M 30 Design Mix) using 20 mm Graded Metal (MORTH 12.8 G)using 20 mm graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR-FNDN-4-C-(i)
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18
Vibrated cement concrete M 30 using graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR - FNDN Vol 3 BLD CSTN -2-11
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of HD-20 with 560mm dia clear end opening and ISI making type manhole covers and frames anywhere in AP F.O.R. destination including, loading, un-loading & stacking at site ,central excise duty but excluding GST and other taxes as applicable as per SS and as directed by Dept. Engineer incharge of the work.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
102 SCHEDULE-A.xlsx
TENDER_DOCUMENT • 0.74 MB
102. Tender _Document.doc
TENDER_DOCUMENT • 1.15 MB
DECLARATION.docx
TENDER_DOCUMENT • 0.02 MB
NIT.docx
TENDER_DOCUMENT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].