Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance MIR AND SONS 45 LALPORA LALPORA KUPWARA JAMMU KASHMIR 193223 | KUPWARA | JAMMU AND KASHMIR | 193223 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.1 L
EMD Value
₹10,200
Closing Date
13 Mar 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer ED Baramulla
Executive Engineer ED Baramulla
Replacement of 100kVA by 200kVA at war Mohalla Vohlutra under PRI Grants 2022-23
2023_PDD_206618_1
EDB/228
Open Tender
Electrical Works
Turn-key
10 days
Replacement of 100kVA by 200kVA at war Mohalla
Please refer Tender documents.
3 documents required · 3 mandatory
₹551
Yes
Executive Engineer ED Baramulla
₹10,200
Yes
13 Mar 2023
1 Mar 2023
13 Mar 2023
1 Mar 2023
13 Mar 2023
2 Mar 2023
1 Mar 2023 - 2 Mar 2023
Amount
Supply,Carraige upto site, Installation, testing and Commissioning of 11/0.433KV,200KVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2(Pre-amended L2)
Supply, Carriage up to site, laying ,stringing, tensioning , binding of ACSR Conductor, (50mm2 ACSR Conductor)
Supply,Carraige upto site, and fixing of GI Channel Iron x-arm 9' long 100x50x6mm including suitable clamps/collars (32 kg/No)
Supply, Carriage up to site, Installation, testing and Commissioning of 11KV G.O, AB switch 3-phase, 3pole,200Amp, vertical type
Supply, Carriage up to site, Installation, testing and Commissioning of 11kV Horn Gap Fuse Set 3 Phase 200A
Supply, Carriage up to site, Installation, testing and Commissioning of LT Fuse Sets (Pre-fabricated)
Supply, Carriage up to site, Installation, testing and Commissioning of 11kV Gapless surge arrestor, 9 kV, 10kA, LA with polymer housing station type
Supply, Carriage up to site, Installation, testing and Commissioning of 240sqmm Single core cable 1.1kV Grade XLPE insulated Stranded conductor FRLS type
Supply, Carriage up to site, Installation, testing and Commissioning of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc.
Supply, Carriage up to site, Installation, testing and Commissioning of Galvanised Nuts & Bolts
Earthing of Sub Station --Excavation of earth pit dia 650mm & depth 3000mm, installation of earthing pipe pf 40mm nominal bore & 4mm wall thickness & length 2.5mtr long as per IS 1239. GI strip for neutral earthing of size 25mmX3mm for connection of transformer body, GO set & lightening arrestors as per IS 2629/85, GI nut & bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover.
Supply, Carriage up to site, Installation, testing and Commissioning of Sign Board
Mir and Sons
M/S T N S ASSOCIATES
M/S POWER PACK ELECTRICAL n MECH ENGG WORKS
KHAN ELECTRICAL WORKS AND SUPPLIERS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .