| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC 61 DANDA KHUDANEWALA NEAR GAS GODAM SAHASTRADHARA ROAD DEHRADUN 248001 | DEHRADUN | UTTARAKHAND | 248001 | ₹3.9 L | L1 | Accepted-AOC Rate quoted by bidder is found lowest and reasonable |
| 2 | L2₹4.4 L+₹44,083 (11.3%)Rejected-Finance | ₹4.4 L+₹44,083 (11.3%) | L2 | Rejected-Finance Rate quoted by bidder is found higher than L1 bidder |
| 3 | L3₹4.8 L+₹85,124 (21.7%)Rejected-Finance | ₹4.8 L+₹85,124 (21.7%) | L3 | Rejected-Finance Rate quoted by bidder is found higher than L1 bidder |
Tender Value
Refer Docs
EMD Value
₹7,900
Closing Date
28 Sept 2020, 4:00 pmClosed
Estate Manager
Estate Manager, EMU RnD Estate, Sanchar Vihar, Dehradun
MAINTENANCE n REPAIR OF TRANSFORMERS AND ALLIED WORK AT ITM MUSSOORIE
2020_DRDO_579688_1
EMU/DDN/25/TRANS/01/MUSS/20-21
Limited
Miscellaneous Works
Works
180 days
Mussoorie
As per NIT
6 documents required · 6 mandatory
₹500
Yes
Estate Manager, EMU RnD Estate, Sanchar Vihar
₹7,900
Yes
26 Oct 2020
26 Aug 2020
29 Sept 2020
26 Aug 2020
28 Sept 2020
27 Aug 2020
Amount
Dehydration/centrifuging of transformer oil by means centrifuging machine electrically operated at site of installation of transformer after isolating the transformer from HT & LT side including testing of transformer oil before and after centrifuging from top and bottom of transformer at 4mm gap the BDV should be 40KV complete all as specified and directed by Engineer in charge.
Material and labour for replacement of worn out bushing rod made out of copper with heavy duty double nuts and one washer at both ends suitable for HT side all as exiting size, shape and length suitable for following capacity transformers ;-
250 KVA Transformers.
315 KVA to 500 KVA Transformers.
Material and labour for replacement of worn out bushing rod made out of copper with heavy duty double nuts and one washer at both ends suitable for LT side all as exiting size, shape and length suitable for following capacity transformers :-
250 KVA Transformers.
315 KVA to 500 KVA Transformers.
Dismantling of old unserviceable breather assembly of any description/capacity and supply & fixing new breather assembly transparent body suitable for 11/0.433 KV transformers of capacity upto 250 KVA complete all as specified and directed by Engineer-in-charge.
All as per item No 4 above but transformer of capacity 315 KVA to 500 KVA
Material and labour for replacement of worn out porcelain bushing for 11KV HT side indoor /outdoor transformers with rubberised cork sheet washers all as required at site and as directed by Engineer in charge suitable for following capacity transformers:-
250 KVA Transformers.
315 - 500 KVA Transformers.
Material and labour for replacement of worn out porcelain bushing for .433 KV LT side indoor /outdoor transformers with rubberised cork sheet washers all as required at site and as directed by Engineer in charge suitable for following capacity transformers:-
250 KVA Transformers.
315 - 500 KVA Transformers.
Supply and fixing with replacement of LT side copper set stem with nut bolts and washers complete for 250 KVA capacity transformer complete all as specified and directed by Engineer-in-Charge.
Supply and fixing with replacement of LT side copper set stem with nut bolts and washers complete for 315 KVA to 500 KVA capacity transformer complete all as specified and directed by Engineer-in-Charge.
Supply and fixing with replacement of HT side brass set stem with nut bolts and washers complete for 250 KVA to 500 KVA capacity transformer complete all as specified and directed by Engineer-in-Charge.
Material and labour for replacement of worn out rubberised cork sheet 4mm thick for transformer top cover all as required at site and as directed by Engineer in charge suitable for following capacity transformers:-
250 KVA Transformers.
315 KVA to 500 KVA Transformers.
Material and labour for replacement of worn out rubberised cork sheet 4mm thick suitable for HT/ LT side bushing of off sizes all as required at site and as directed by Engineer in charge.
Supply and topping up of transformer oil of di-electric strength of 60 BDV at various locations of transformers at ITM area complete all as specified and as directed by Engineer in charge.
Material and labour for replacement of worn out silica gel breather all as per existing sample suitable for following capacity of transformers of any make:-
250 KVA Transformers.
315 KVA to 500 KVA Transformers.
Material and labour for oil temperature gauge / thermometer suitable for transformers all as per existing shape and size for any make and model transformers all as specified and as directed by Engineer in charge.
S& F in replacement of UNSV lugs after cutting the worn out /faulty cable end from HT/ LT side of Transformer/ LT pillar/ panel box including necessary earth work for taking out the cable from loop returning, filling & making cable lead by providing aluminium lugs lead including crimping with crimping tools in the existing LT cable including necessary connection complete etc, all as specified and as directed by Engineer-in-Charge.
From 70 Sq mm to 120 Sq mm
Painting of metallic street light / OH line swaged type steel poles of 9 mtr length with one coat of aluminium paint including cross arms and MS channels, nut bolts etc including numder/strip marking with black colour synthetic enamelled paint all as directed by Engr-in-charge.
CLYMATE CONTROL
Metro Electric Services
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .