Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance T10 3RD FLOOR RAYHILSORT RESIDENCY DR PICKLE ROAD UTTARA KANNADA KARNATAKA 581301 UDYAM GA 02 0002041 27AAJCM4307Q1ZY B 29AAJCM4307Q1ZU R | UTTARA KANNADA | KARNATAKA | 581301 | Admitted-Finance |
| 2 | Admitted-Finance 11 2 1 149 FLAT NO 204 SEA SHELLS ENCLAVE MERIDIAN TOWERS BEHIND NAVY HOUSE BEHIND NAVY HOUSE VISAKHAPATNAM ANDHRA PRADESH 530003 | VISAKHAPATANAM | ANDHRA PRADESH | 530003 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technically Disqualified |
| 4 | Rejected-Technical 701 7TH FLOOR LE MERIDIEN COMMERCIAL TOWER RAISINA ROAD NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Rejected-Technical Technically Disqualified |
| 5 | Rejected-Technical C 111 STATION PLAZA STATION ROAD STATION ROAD BHANDUP W MUMBAI 400078 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | Rejected-Technical Technically Disqualified |
Tender Value
Refer Docs
Closing Date
13 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Admiral Superintendent
Naval Ship Repair Yard ,Naval Base,Karwar
NORMAL REFIT (NR) OF TUG KUSHAL
2022_NAVY_526036_1
YCM/NR22/25T TUG KUSHAL
Open Tender
Marine Services
Item Rate
150 days
Naval Ship Repair Yard, Naval Base, Karwar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
Manager(CoY) office
15 Sept 2022
24 May 2022
14 Jun 2022
24 May 2022
13 Jun 2022
25 May 2022
31 May 2022
Amount
Erection of fixed staging/scaffolding in way of steel renewal work(Based on Volume Basis, LXBXH). Staging material to be provided by Contractor. Quote for Service and Material.
Fire sentry for minimum 10 hot work locations /day Note:- Fire sentries with adequate knowledge of fire and safety procedures for all hot work locations will need to be provided i.a.w NO 09/12. Sentries are to be in possession of required type of fire extinguishers in appropriate quantity. All sorts of fire safety to be ensured by sentries upon completion of job / shift in surrounding areas as well. Asbestos sheet / fire proofing blankets to be provided during hot work in vicinity of sensitive equipment / electrical systems or cabling, with vendor holding responsibility for damage and repairs in case of fire/ incident. Quote for Service and Material.
Tanks - Cleaning and Gas free certification of following tanks to be carried out ( Total area- 923 SqM)- :- (a) Fuel Tank - 04 nos. (b) Fresh Water Tank - 02 nos. (c) Foam Tank - 01 no. (d) Ballast Tank - 02 nos. (e) Lub Oil Tank- 01 no. (f) Sludge Tank - 01 no. Material and Service to be provided by contractor.
Underwater Tanks- Pressure testing of underwater tanks subjected to structural repairs/ renewals as per hull survey report and cutting of technical window for blasting work. Job involves repairs/ blanking of manhole covers with new rubber gaskets/studs/bolts as required and defect rectification of all structural leaks. Ballast Tank- 02 nos, Fuel Tank -04 nos, FW Tank-02 nos, Misc Tank - 03 nos. Material and service to be provided by contractor. Payment on actuals.
Bollards and Fairleads - Carry out surface preparation to achieve WJ 2 standard byhydro jet blasting. Repairs/ renewal of bollards and fairleads and mooring pipes to be undertaken as per Hull survey report by NSRY Survey team. Bollards - 07 nos, Fairleads/ mooring pipe - 07 nos and 01 A-Frame. Material and service to be provided by contractor. Payment on actuals for repairs/ renewal.
Sea Chest/ tubes - (a) Remove all gratings and carry out surface preparation to achieve SA 2.5 standard by abrasive blasting. Repairs / renewal of sea chest/ tubes to be carried out as per hull survey report by NSRY survey team. Air pressure testing of repaired/ renewed sea chest/ tubes to be carried out post completion of work. (b) Paint renewal of sea chests/ tubes to be undertaken with Navy approved paint scheme of M/s Jotun for underwater hull . (Qty - 03) Material and Service to be provided by contractor.
Underwater Painting - (a) Remove marine fouling and loose paint by using hydro jet cleaning and prepare areas for underwater inspection. Carry out hydrojet blasting to WJ 2 standard and prepare the areas for hull survey. Repairs/ renewal of structures (covered under separate serial in SoW) to be undertaken as per Hull survey report of NSRY Survey Team (b) Carry out abrasive blasting to achieve SA 2.5 standard on entire underwater hull and boot top including wind and water areas i.e. Area up to 500mm above boot top area. (c). Following paint scheme to be restored:- (i) One coat primer (Dft 50 microns) (ii) Two coats of Anticorrosive paint (Dft 150 microns each) (iii) One Tie coat (Dft 125 microns) (iv) Two coats of Antifouling paint (150 microns) (d) Draught marks to be painted with underwater paint scheme and the top coat to be painted with white paint. (i) Forward (ii) Midship, (iii) Aft. Renew defective draught marks, if required. Note:- Painting to be undertaken with Navy approved paint scheme of M/s Jotun for underwater hull areas. All rules and regulatinos iaw MARPOL compliance are to be followed. Material and Service to be provided by contractor. Firm to mention breakdown of Ser (a) and ser (b). Payment on actuals.
Above Water Area, Weather Deck Area and Masts - Carry out surface preparation of entire area by hydro jet blasting up to bare metal to WJ 2 standard of weather deck, above water area, ship side, inner side of buwark and 300 mm above from deck on super structure area and prepare for hull survey. Defects to be rectified as per hull survey report. Carry out painting of above water area with high performance advanced hybrid coating system as per navy approved paint scheme Jotun mentioned below post sweep by grit blasting to SA 2.5 standard except super structure and weather deck area to be painted with high performance non- skid coating system as per navy approved paint scheme Jotun mentioned below. (a) Paint scheme for above water area (ship side, Mast, bridge, deck & super structure)(Area - 730 Sqm):- (i) 02 coats of primer to achieve 80 microns dft, (ii) 02 coats of Ral 7040 colour specification to achieve 80 microns thickness, (iii) Total dft 320 microns. (b) Paint scheme of weather deck area (Upper Deck, Boat Deck, and Bridge Top Deck) (Area - 400 Sqm) :- (i) 01 coat primer coat - dft 50 microns, (ii) 02 coat anti corrosive intermediate coat - dft 300 microns, (iii) 02 coat non skid top coat (NMRL approved) - dft 500 microns, (iv)Total dft - 850 microns. Note:- Painting to be carried out as per no 53/16. Mast to be rigged up and proved post painting. Material and service to be provided by contractor
Funnel - Carry out surface preparation of internal areas of funnel to ST 3 standard. Application of Heat resistant paint on internal areas to be undertaken as per navy approved paint scheme of M/s Jotun. Material to be provided by contractor
Machinery Spaces - (a) Clean all bilges, machinery foundations, limber holes and drain holes. Carry out surface preparation as per ST 3 standard and painting of the entire area to be undertaken as per Navy approved paint scheme of M/s Jotun. (i) One coat of primer (Dft 50 microns). (ii) Two intermediate coats (each 150 microns Dft) . (iii) One top coat (Dft 50 microns) . (b) Machinery pipelines painting to be undertaken as per colour coding post surface preparation to ST 3 standard. (c) All equipment/ machinery to be painted as per existing paint scheme. (d) Painting of bulkheads, deck head of Engine room and Voith compartment to be undertaken as per existing paint scheme post surface preparation to ST 3 standard. (e) Examine structures not covered by lagging, paying particular attention to position where water is likely to accumulate, longitudinal junctions with side plating and machinery bearers with bottom plating, horizontal surfaces such as tank tops, horizontal stiffeners and structure obscured by cable plating. (f) Portable fittings that obscure structure are to be removed for examination of structure behind. Paint to be restored as per existing paint scheme. Paints to be provided by Firm. Material and Service to be provided by contractor.
Cathodic Protection Sacrificial Anodes - Replacement of all existing sacrificial anodes with indum free aluminium alloy sacrificial anodes fitted to underwater hull, inlets and outlets, sea chest. Quality certificate of to be provided for new anodes and NSRY QC inspection to be cleared prior fitment . (MK III - 22, MK IV - 21, Anodes for OBD - 13).and . Material and Service to be provided by contractor To be paid on actual. Material and Service to be provided by contractor
Steel Renewal- (a) Renew steel plates along with stiffeners at following locations: - (i) Underwater Hull (ii) Underwater compartments (iii) Fuel, Fresh Water, Ballast and Misc tanks (iv) Shipside and Superstructure (v) Masts and Funnel (vi) Weather deck, bridge deck, funnel deck and deck fittings (vii) internal compartments. (b) Job also involves degutting and re-gutting works like lagging, deck covering, machinery equipment , paneling, system pipelines/ valves, electrical cables/ conduits/ junction boxes, foundations/ Brackets, wooden fittings etc in way of steel renewal to be undertaken. (c) Surface preparation of renewed plates and stiffeners to be undertaken prior paint scheme restoration. Apply one coat of primer immediately after completion of hot work (d) Record section wise report of steel renewal and forward final report in 03 sets of hard copy and 01 set of soft copy to ship staff. Steel plates and stiffeners will be supplied by Yard. All consumables material supplied by contractor. Payment on actuals. Quote for Service and consumables.
Repair & refitment of paneling including regutting of lagging, clamps and fasteners. Mat-CRCA , thickness - 50 mm, B15 Type. Payment on actuals. Material and Service to be provided by contractor
Fabrication & fitment of new paneling including regutting of lagging, clamps and fasteners. Mat- CRCA, thickness - 50 mm, B15 Type. Payment on actuals. Material and Service to be provided by contractor
Anchor, Chain Cable and Cable Locker - (a) Remove and lay out Anchor, chain cables and accessories. Dismantle anchor, chain cables and accessories. Carry out surface preparation up to bare metal to WJ 2 standard for survey of anchor, chain cable along with accessories , naval pipe for survey . (Qty:- Anchor - 02 nos, chain cable length- 275 mtr, Swivel piece - 04 nos, Lug less Joining shackles - 10 nos, D Shackles - 04 nos). (b) Carry out surface preparation of cable locker to ST 3 standard and restore paint scheme of M/s Jotun. (i) One coat of primer (Dft 50 microns) (ii) Two intermediate coat (Dft 150 microns each) (iii) One Top coat (Dft 50 microns) (c) Anchor cleaning sea water line to be repaired/ renewed and make functional. Repairs to be under taken as per Survey report of NSRY survey team. (d) Clean and grease all joining shackles. Strip and grease slip in cable locker. Re-arrange cable length to ensure equality of wear. Re-mark cable length. Overhauling hull associated fittings including deck rollers and renew as required. (e) Clean and grease trunion pin and housing. Grease to be used:- LG-280 .The machined surface of the joints of lugless joining shackles are to be examined for corrosion. All Anchor, chain cables and accessories are to be stripped, greased and re-assembled. (f) Painting of anchor, chain cables and accessories to be painted with two coats of Bituminous paint (Black) and restore onboard. Paint to be provided by firm. Material and service to be provided by contractor.
Overhauling- Capstan (Mfg- Geeta Engg Works) - Following work to be carried out:- (a) Overhauling of capstan along with motor assembly. Job includes replacement of gear box oil and all spares required for operationalisation of davit. Undertake weather proofing of motor terminal box (IP67). (b) Replacement of all glands and packing of cable glands to be undertaken Veriseal compound/ equivalent material. (c) Dismantle gear box components and replace defective viz. bearings, oil seals, circlips, level indicator etc. (d) Replace all high speed bearings with new bearings. (e) Blow out all motor windings thoroughly with clean dry air using hot blowers. Clean and thereafter varnish dirty and oily windings. Winding to be replaced if defective. (f) Motor to be overhauled, with both bearings replaced with new bearing & tested onboard on load (subject to QC checks). (g) Replace all grease nipples. (h) Overhauling of brake mechanism to be carried out. Replacement of defective components if required to make the equipment operational (j) Inspect and overhaul the control panel and replacement of defective components and cabling. (k) Carry out surface preparation of foundation and structure by hydrojet blasting to WJ 2 standards for undertaking survey. Structural repairs / renewal to be undertaken as per survey report of NSRY survey team. (l) System to be proved for designed operation and load trials to be offered. Clean and restore paint scheme post surface preparation and offered to NSRY QC department for final inspection. Note:- Vendor to cater for all consumables including POLs top up required for energising the equipment post repairs. Material and Service to be provided by Contractor
Overhauling- Anchor Windlass (Mfg- Geeta Engg Works) - Following work to be carried out:- (a) Overhauling of anchor windlass along with motor assembly, rollers associated with windlass and other accessories. Replacement of gear box oil to be carried out. Insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box (IP67). (b) Replace all high speed bearings with new bearings (specification as per existing bearings) (c) Blow out all motor windings thoroughly with clean dry air. (d) Clean and varnish dirty and oily windings and replacement with new copper winding if defective. (e) Motor to be overhauled, both bearing to be replaced with new bearing post QC checks by NSRY QC team. (f) Overhaul brake mechanism. Replacement of defective components if required. Greasing of lubrication points to be undertaken (g) Overhaul the control panel, and replacement of defective components and cabling. (h) Replace all safety pins along with SS chain used for locking arrangement. (j) Carry out surface preparation of foundation and structure by hydrojet blasting to achieve WJ 2 standard for undertaking survey. Structural repairs/ renewal to be undertaken as per survey report of NSRY survey team. (k) Replacement of all fasteners on foundation to be undertaken. Replacement of all grease nipples to be undertaken and grease to be charged. (l) System to be proved for designed operation and load trials to be offered. Clean and restore paint scheme post surface preparation to WJ 2 standard and offered to NSRY QC prior painting. Note:- Vendor to cater for all consumables, including POLs topup required for energising the equipment post repairs. Material and Service to be provided by Contractor.
Overhauling- Single Arm Boat Davit (Mfg - Bhawani Engineering Pvt Ltd): - (a) Overhauling of boat davit, manual release hook, gear box along with motor assembly to be carried out. Insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box(IP67). During trials motor parameters are to recorded and same to be cleared by NSRY QC. (b) Renewal of boat fall and release mechanism wire rope along with end fittings , securing arrangement, hooking arrangement and other associated lifting gears to be undertaken. (c) Operation of manual hand release mechanism to be proved. (d) Replacement of gear box oil to be carried out. (e) Replacement of all limit switches to be carried out with specifications as existing and proving of limit switch operation to be undertaken. (f) Replacement of all grease nipples and grease to be charged. (g) Carry out surface preparation of foundation and structure by hydrojet blasting to achieve WJ2 standards for undertaking survey. Structural repairs/ renewal to be undertaken as per survey report of NSRY QC team. Clean and restore paint post surface preparation and inspection to be offered to NSRY QC. (h) Load test to be carried out post completion of repairs and equipment should withstand load trials. Defects observed during load testing to be liquidated. (j) System to be proved for designed operation and load trials to be cleared. Load test certificate to be provided post successfull completion of load testing.Note:- Vendor to cater for all consumables, including POLs topup required for energising the equipment post repairs. Material and Service to be provided by contractor.
Overhauling 4.7 Mtr Rescue Boat (Mfg - M/s Poly Glass Fibre Industries) - Carry out following: - (a) Repair of GRP hull structure to be carried out. Check and inspect the double securing arrangement of foam filled boat collar. Repair/ renew to be undertaken on boat collar. (b) Overhauling of boat lifting/ release mechanism. replacement of defective parts to make it operational. Trials to be carried out along with weighing of boat with accessories post repairs. Test certificate to be provided. (c) Replacement of roving paddles and boat hook view existing are broken. Qty - 02 nos (d) Overhauling of motor boat engine including calibration of injectors to be carried out. Replace defective components if required. (e) Lub oil and lub oil filter to be renewed. (f) Air filter, fuel filter and fuel hand pump to be renewed. (g) Anodes to be renewed. (h) Fitment of reflective tapes on boat collar and repalcement of hand hold lines to be undertaken. (j) Boat chocks and cushion of sitting arrangement of rescue boat, to be repaired. (k) Boat securing rachet strap (gripes) to be replaced with new along with end fittings. Mat - Polyester. Qty - 02 (5mtrs each) (l) Boat trials to be conducted and proved for satisfactory performance. Material and Service to be provided by contractor.
Towing Hook with quick release mechanism (Mfg- M/s Nautilus Eng & Construction Company) - Carry out overhauling and repairs of towing hook assembly (Qty - 02). Job involves renewal of release line and other associated accessories. Load testing of towing hook to be proved post completion of work and certificate to be provided. Additionally, pneumatic cylinder and air line, solenoid, push buttons mechanism to be checked and proved for satisfactory operation. Replace all defective components, if required. Material and service to be provided by contractor
Doors-water tight and Non WT doors - (a) WT Doors (06 nos) - Following work to be undertaken:- (i) Carry out surface preparation of door structure to ST 3 standard by manual chipping/ buffing up . (ii) Overhauling of clips and hinges to be caried out. Replacement of defective clips, hinges and associated fittings . Examine washers, toridal sealing rings and rubber sealing. Replace all worn out parts of doors .Replace rubber beading with high performance silicone rubber beading. (iii) Carry out chalk test of all W/T doors post completion of work and to be proved in presence of NSRY QC team. (iv) Paint to be restored as per existing navy approved paint scheme of M/s Jotun. (Qty - 06, Size - 1750X700). (b) NWT Doors (14 nos) - Following work to be undertaken:- (i) Repair/ replacement of defective door hinges, deformed structure (including replacement of door locking mechanism with spares, hinges, handles, stoppers, latches, locking arrangement hydraulic door closing mechanism and beading. (ii) Replacement of sunmica/ CRCA (white colour) to be undertaken on all NWT doors. (iii) Renew hydraulic doors closer for NWT doors. Curtain to be provided made of fire retardant cloth. Qty - 14 (Size 7X3 feet each) . Material and Service to be provided by contractor.
Scuttles and Windows - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear / damage. Renew worn out or damaged parts and rubber beadings. Curtain to be provided made by fire retardant cloth. Scuttles- 14 nos (Glass Thickness- 8-15 mm, Size - 250-300 mm) , Windows- 20 nos. Chalk testing to be carried out post repairs. Material to be provided by contractor. Payment on actuals.
WT Hatch (Qty-07 nos) -(a) Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). (b) Repairs and overhauling of hatch clips, hinges assembly and locking mechanism. Rectify structural defects if required. Replace defective parts/ components, if required. (c) Carry out replacement of existing rubber beading with High performance silicone rubber beading. Chalk test to be undertaken post repairs and proved in presence of NSRY/ QC team. (Qty - 07). Material and Service to be provided by contractor.
Manholes - (a) Renewal of damaged/ deteriorated manhole covers to be undertaken of various tanks (Qty- 05 nos). (b) Replacement of rubber gasket and fastners of manhole to be undertaken. (Qty - 15 nos). Material and Service to be provided by contractor. Payment on actuals.
Overhauling- Sewage Treatment Plant (Mfg - Hamworthy, England, Model-ST1A-C) - Undertake following routines: (a) Carry out de-sludging of sewage tanks. Undertake surface preparation of tanks to ST-3 stanadard by mechanical cleaning. Paint scheme to be restored with- (i) One coat of primer (Dft 50 microns). (ii) Two coats of Intermediate anticorrosive paint (Dft 150 microns each) (iiii) One top coat (Dft 50 microns) (b) Carry out functional checks of tank level switches. Replace defective component if required. (c) Dismantle and clean all system pipelines. Surface preparation and painting to be carried out as per existing paint scheme. Renew defective pipelines if required. Pressure testing of renewed lines to be carried out. (d) Dismantle all system valves and undertake overhauling of valves. Replace defective valves and valve components if required.(e) Carry out following on Macerator pump:- (i) Carry out overhauling of pump. Replace defective components. Replace drive end bearing and seals if required. (ii) Ensure impeller is free for rotation with no vibration. (iii) Ensure overload units are operating correctly. (f) Carry out overhauling of blower. Replace all defective components/ parts if required. (g) Carry out overhauling of dosing pumps (02 nos). Replace alll defective components if required. (h) Replace all chemical solutions with requisite quantity, used for operation of STP. (h) Post repairs/ overhauling work, STP is to be proved for operation as per designed parameters. (j) Undertake Effluent test from NABL accredited lab and check compliance to MARPOL norms. (k) Sewage pollution prevention certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) and 227(64) as per annex iv of marpol 73/78. (l) Carry out calibration of fixed H2S sensor. Certificate of calibration to be obtained from the OEM. Date of calibration and next due date should be clearly indicated on the certificate. Material and Service to be provided by contractor
Life raft - (a) Renew Hydrostatic Release Gears by NABL accredited agency. (Qty 02) Quote for material. (b) Life raft stowing brackets (Qty 02) along with life raft securing straps, slips, hooks, rubber padding of brackets and shackles to be renewed. Quote for services and material.
Fender - Key hole fixed rubber fenders on fwd and aft of tug found damaged and perished. Fenders to be replaced as per existing fender along with securing arrangement. Job involves renewal of securing fasteners and fitment of fenders. Material to be provided by refitting firm. Payment on actuals. Quote for service and material.
Fenders -Tyre fenders of barge found damaged. Replacement of tyre fenders with new (Qty- 40, Aircraft tyres with outer dia 90 cm) to be carried out. Job involves fabrication of three hook brackets along with securing plate for securing tyre with chain in three diamensions, renewal of eye pads associated with rubber fenders, 20 mm galvanised chain and D shackle 20 mm. Note:- (i) Job involves cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders. (ii) Job involves degutting / regutting works like lagging, underlay, panelling, electrical wires minor eqpts. Brackets if required for welding of eye pads. (Note : Vendor to clear QC checks from user manager prior fitment). Payment on actuals. Material and Service to be provided by contractor
Fender - D type rubber fender port and stbd side (underwater) damaged and perished. to be renewed in situ. Job involves welding and cutting assistance for removal of old securing brackets and renew new securing brackets. (length - 600 mm, width - 305 mm). Note: Job involves degutting / regutting works like lagging, underlay, panelling, electrical wires minor eqpts. Brackets if required for welding of eye pads. Payment on actuals. Quote for service and material.
Pneumatic side fenders (size- L- 1160 MM, Dia - 660 MM) to be renewed. (Qty - 06, Mat-Neoprene Blended Rubber having 65 % min Neoprene Content , , Colour-White/ Black, Tensile strength- 180 Kgf/CM2, Elongation at break- 400 % min, Hardness- 700 max, Tear Strength- Min 40 Kgf/CM2, Compression set- 30 % Max, Abrasion resistance- 0.5 CC Max). Material and Service to be provided by contractor
Life saving appliances - Following life saving appliances to be supplied:- (a) Stretcher, size - standard, as per IMO standards (Qty - 01) (b) First Aid box, standard metallic frame (2.5 ft x 1.5 ft box, two racks) with front glass/ perspex sheet, hanging and locking arrangent to be provided and fitted as indicated (Qty - 03) (c) Life Jackets, SOLAS approved, proof load 120 Kg, test certificate to be supplied alongwith material - (Qty - 20) Quote for service and material.
Renewal (a) Lifebuoy with self-igniting light and smoke signal (mob marker) quick release type to be renewed on bridge deck (Qty 02) (b) Lifebuoy with life line (30m long) to be renewed on main deck (Qty 02) (c) Ordinary lifebuoy damaged. To be renewed on main deck (Qty 04) (d) lifebuoy with self-igniting light and 30m buoyant life line to be renewed on funnel deck (Qty 04). Material and service to be provided by contractor
Renewal of Name Board Ships illumination name box on mast damaged/ defective. To be renewed. Job involves renewal/ replacement of securing arrangement and electrical fittings. Mat - MS (Qty 01) Box dimensions - 770 mm X 470 mm, Font Size - 150 mm. Material and Service to be provided by Contractor
Ships name board on Port and Stbd side to be renewed. Mat - Wood (Qty 02) with name engraved by steel electroplating. Size - 1090 mm X 780 mm, Font Size - 230 mm (Hindi and English Fonts). Material and Service to be provided by Contractor
Renewal and fitment of punkah louvers at various trunkings. size – 6”. Payment on actuals. Material and Service to be provided by contractor
Life saving applicences - pilot cum embarkation rope ladder broken. to be renewed. (Dia - 20 mm, Length - 03 mtr). Quote for service and material.
Mushroom Heads- Overhauling of entire mushroom head assembly. Job involves opening of mushroom heads, replacement of wire mesh, rubber beading, fasteners, flaps etc. Replace spindle assembly with wheel, if defective. Chalk test to be carried out post repairs and proved in the presence of NSRY/ QC team. Quote for service and material.
Airvent pipe and valve - Overhauling of 15 in nos (10 ball type check valve and 05 goose neck) of Airvent pipe to be undertaken. Structural repairs to be carried out. Replace wire mesh along with aluminium/GI cover , fasteners, rubber gasket/ beading of all air vent pipes. Overhaul check valves and replace defective valves, if required. Payment on actuals. Material and Service to be provided by contractor
Accommodation and Offices - Renewal of sunmica, wooden furniture , wooden fittings, locking arrangement, hinges of table, wooden cupboards and drawers in compartments and accommodation spaces. Dining table with SS top (size: 1200x 700x 750 mm), locker - 20, bunk drawer - 14, Cloth Hangers - 15. Payment on actuals. Material and Service to be provided by contractor
Replacement of single mattress (6 inch), mattress covers and their securing arrangements. Rectified and renewal as necessary. bunk cover - 14, mattress - 14 (single type mattress), Bunk curtains - 14. Curtain to be provided made of fire retardant cloth. Material to be provided by refitting firm. (Note : Vendor to clear QC checks from user manager prior fitment). Quote for service and material.
Dining chairs of Dining hall damaged/ broken. To be renewed Qty - 08 nos. Quote for service and material.
Executive Chairs (Revolving) of master, chief engg and wheel house broken/damaged (Qty 04) nos. To be replaced. Quote for service and material.
Deck Covering Scheme. Removal of old deck covering to be undertaken. Surface preparation to ST- 3 standard to be carried out for hull survey. All structural defects to be rectified as per survey report of NSRY survey team. Deck covering scheme to be renewed post application of primer on deck. Payment on actuals. Material and Service to be provided by contractor
Ventilation System - Carry out mechanical/ cleaning of all ventilation trunkings. Replacement of perished / damaged trunkings including wire meshes, diffusers/ punka louvers to be carried out. Paint scheme to be restored post repairs as per existing paint scheme. Blow through/ leak checks and air flow to be offered post completion of work. Payment on actuals. Quote for services and material.
Grease filters inside exhaust trunking in galleys to be chemically cleaned and preserved. Renew if defective. Quote for services and material.
Bulwark area damaged / deformed at various locations. To be repaired / renewed as per survey report of NSRY survey team. Mat - MS. Material will be provided. Payment on actuals. Quote for services.
Dadoe area in wet compartment corroded / damaged. To be repaired / renewed as per survey report of NSRY Survey team. Job also involves degutting and regutting requirement of CRCA panels/ lagging and other fittings. Payment on actuals. Quote for services.
Securing bracket of fire hose box corroded at multiple locations. To be renewed. Payment on actuals, Quote for service and material.
Bulwark door damaged/ corroded. To be renewed (Qty-02 nos). Quote for service and material.
Canvas covers of following deck equipment torn/ perished. To be renewed. Windlass (Qty-02), and control stand (Qty-02), rescue boat (Qty-02), search light (Qty-02), magnetic compass (Qty-02), capstan (Qty-02), and illumination boards(Qty - 02). Quote for service and material.
Deck locker in the forecastle deck corroded and thinned, to be renewed with its securing brackets. Mat - MS. Securing bracket Mat - MS. Size - 2 mtr X 1mtr X 700mm. Quote for service and material.
Jack staff and ensign staff support pipe with socket and shoe corroded in forecastle and qarter deck to be renewed as per sample. Material - GI pipe 50 NB. Quote for service and material.
Hand pump fitted on forecastle and quarter deck jammed and handle broken, to be overhauled and handle to be renewed. Qty 03 nos. size 40 NB. Quote for service and material.
Removal, chemical cleaning and repair of pipelines in bathroom, toilet and galley to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Mat - Cu/Ni and 50NB). Payment on actuals. Quote for service and material.
Tiles in various toilets and bathroom damaged. All defective and damaged tiles to be replaced with new. Job involes degutting of broken/ damaged tiles and replacement of new tiles. Grout work to be undertaken post completion of work on tiles. Payment on actuals. Quote for service and material.
Following defective WC and bathroom accessories to be replaced. (a) Shower - 04, (b) Water tap - 04, (c) SS urinal with full fittings and accessories - 02, (d) Commode with full fittings and accessories - 02, (e) Two way basin / sink - 02 (f) Basin drain pipe - 06 (g) Shower curtains- 03 nos. Note. Defective valves and reducers, to be replaced at no additiaonal cost. Quote for services and material.
Drain pipe lines chocked at various locations on upper deck. To be repaired/ renewed. Job involves renewal of strainer, flanges, SS nut bolts including degutting and regutting requirement. Mat – MS, Length – 10 mtr. Payment on actuals. Quote for services and material.
Strip and clean sanitary system drain pipes. Re-galvanize/ renewal to be undertaken if required. Payment on actuals. Material and service to be provided by contractor
Main deck port side and stbd side footsteps corroded and thinned. Material -MS Chequred plate. To be renewed. Quote for service and material.
Sunmica paneling damaged and peeled off at various locations. To be replaced with matching colour. Payment on actuals. Quote for service and material.
IMO stickers to be restored after painting. Quote for service and material.
08 nos cleat fitted in upper deck on bull work deteriorated and damaged. To be renewed as per sample. Material - MS. Quote for service and material.
Ladders - Carry out surface preparation to ST 3 standard of all ladders up to bare metal. Repairs to be under taken as per hull survey report of ladders with associated footsteps and handrails. Paint to be restored as per existing paint scheme. Quote for service and material.
All electrical equipments securing brackets, fireman line securing clamps corroded/ thinned/ broken at various locations on upper deck. To be renewed with paint scheme. Quote for service and material.
Wooden paneling in master cabin, ED cabin, crew cabin, WC'S and bathrooms damaged/ broken. To be renewed. Quote for service and material.
9 Mtr aluminum gangway damaged / broken. To be replaced as per existing gangways. Mat - Al, length - 09 mtr. Material and Service to be provided by contractor
Paint Scheme Renewal Water Ballast Tank (02 nos)and Fresh Water Tank (02 nos)- Carry out complete surface preparation to SA 2.5 standard by using abrasive blasting. All Structural defects to be rectified as per hull survey report of NSRY survey team.Thereafter, complete Paint Scheme to be restored as per Navy approved paint scheme of M/s Jotun for the following tanks:- (a) Water ballast tanks - 553 SqM (b) Fresh Water Tanks - 70 sqm. Material and Service to be provided by contractor
Internal Super Structure and Compartments - Carry out surface preparation to bare metal (ST 3) standard of all internal super structure and compartments for hull survey. Repair/ renewal work to be under taken on internal hull structure including bulkhead and fittings as per survey report of NSRY survey team. Painting to be under taken post repairs as per existing paint scheme. Payment on actuals. Quote for services and material.
Geared Rope Reel - Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repairs/ renewal to be undertaken as per hull survey report. Painting work to be undertaken post repairs. Material and service to be provided by contractor
Cleaning/ Electroplating and buffing works to be undertaken on galley fittings and ships bell respectively. Material and service to be provided by contractor.
Metallic canopy on Main deck to be renewed as per sample. Job involves complete renewal of stanchions (Mat - GI), stanchion shoes, securing strips and installation with new canopy (45 sqm). Job involves provisioning of lighting arrangement including fittings. Material and service to be provided by Contractor
Vent Flaps (Qty-06 nos) - Following to be undertaken:- (a) Carry out surface preparation to ST 3 by mechanical cleaning. Repairs/ renewal of deteriorated flaps covers to be carried out. (b) Rubber beading of all flaps to be replaced with new. (Mat- EPDM/ Neoprene rubber) (c) Overhaul all tumbler bolts and butterfly nuts of all flaps. Replace defective bolts and butterfly nuts (Mat- Brass), if required. (d) Degutting of baffle plates from flaps and carry out surface preparation to ST 3. Repair/ renewal of deteriorated plates to be carried out. (e) Chalk test to be proved post completion of work. (f) Painting of flaps and baffle plates to be undertaken with existing paint scheme of M/s Jotun. Payment on actuals. Quote for services and material.
Port and Stbd Main engine, Make- Caterpillar, Model- 3512C (Port- 9542 hrs, Stbd- 9612 hrs):- Carry out Following Top Overhaul/ 12K routines on both Main engines. (a) Remove and inspect components of the air shut off damper. (b) Replace the coolant temperature regulator. (c) Remove and clean engine speed/ timing sensor. (d) Overhaul Air Starting motors. (e) Overhaul water pump. (f) Overhaul the auxiliary water pump. (g) Adjust engine valve lash. (h) Inspect the condition of metallic compensators and change all flexible hoses. (j) Clean the lubricating bowl of the air starting motor. (k) Inspect the crankshaft vibration damper for evidence of dents, cracks and leaks of the fluid. Identify causes and rectify at source. Replace in case defect on damper beyond permissible limits. (l) Change engine oil and oil filter. (m) Replace the primary and secondary filter in the fuel system. (n) Remove and clean crankcase breather elements, inspect condition of hoses and replace defective seals. (p) Change water separator of the fuel system. (q) replace Alternator and accessories belts. (r) Flush engine cooling system and replace Main engine coolant. (s) Check engine mounts. (t) Inspect the Cylinder head assembly.(u) Replace Electronic Unit Injectors. (v) Clean the Oil suction screen after oil has been drained. (w) Inspect the following components, replace if required: (i) Camshaft followers (ii) Cylinder head assembly (iii) Scavenge oil pump (iv) Engine wiring harness (v) Exhaust manifold seals (vi) Exhaust manifold bellows (vii) Fuel pressure regulating valve (viii) Fuel priming pump (ix) Fuel transfer pump (x) Inlet manifold gaskets (xi) Inlet manifold seals (xii) Oil pump (xiii) Prelub oil pump (xiv) Push rods (xv) Rocker arms (xvi) Spacer plates (xvii) Software update (xviii) Turbocharger (x) Inspect the following components:- (i) After cooler core (ii) Camshaft (iii) Alignment of driven equipments (iv) Engine control module (v) Exhaust bellow shields (vi) oil suction screen. Note:- Post completion of routines, Check for any oil/ water leakage, exhaust leakage, stop the engine and re-check engine oil level, top up if require. Trials to be undertaken and system performance to be proved for satisfactory. Services to be provided by OEM/OEM approved vendor. Relevant coolant and lub oil to be provided by contractor, separate cost breakdown for the same to be given. Quote for services. Payment on actuals
Kit for Top Overhaul/ 12K routines of both Main engines. Quote for Material, Payment on actuals.
Both Main Engines Sea water pump to be renewed , associated discharge pipe to be renewed. Quote for Service and Material, Payment on actuals.
Overhaul Air starting motor of both Main engines. Quote for Service and Material, Payment on actuals
Lub oil cooler of both Main engines to be dismantled, chemically cleaned and boxed back with new gaskets. Defective tubes/ cooler to be replaced.System to be pressure tested(1.5 times working pressure) and proved for operation post fitment of coolers. Quote for Service and Material, Payment on actuals
Carry out SDC checks of both Main engines both hot and cold, and prove for satisfactory performance, rectify all defects. Defective sensors to be renewed. Quote for Service and Material, Payment on actuals
Carry out SDC of both main engine LCP. Rectify defects of both Main engine local control panel and wheel house control panel.Prove for satisfactory operation Quote for Service and Material, Payment on actuals
Port and Stbd Diesel Alternator (M/s Cummins India Ltd) (Present Running Hours - Port: 7863 hrs; Stbd: 7415 hrs) Carry out following Major overhaul/ 12K routines on both DA:- (a) Remove intake and exhaust manifold. Clean & pressure test, (b) Remove turbocharger. Clean, inspect & repair with new spares. (c) Remove fuel injection pump. Clean, inspect, calibrate & repair with new spares, (d) Remove rocker levers & shaft. Clean, inspect & repair with new spares. (e) Remove injectors, clean, inspect, repair & calibrate with new spares, (f) Remove fuel connections (high pressure pipe lines). Clean, inspect & repair with new spares, (g) Remove push rods. Clean, inspect. Replace if required, (h) Dismantle cylinder head. Clean, inspect & repair with new spare parts, (j) Dismantle one piston & one con rod assembly. Replace if required. Based on inspection, undertake inspection of balance piston / connecting rods accordingly, (k) Remove and Replace fresh water Pump, (l) Replace vibration damper. (m) Remove belt tensioner. Clean, inspect & repair with new spare parts, (n) Remove & replace fuel feed Pump, (p) Replace sea water pump, (q) Remove starter motor. Clean, inspect, & repair with new spare parts , (r) Replace all hoses of cooling system, air system, lub oil and fuel systems, (s) Replace all zinc plugs, (t) Tighten all foundation bolts, (u) Clean all dismantled parts and cylinder block top position. Assemble engine with all new gaskets / 'o' rings, seals and above dismantle sub-assemblies, (v) Carry out tappet setting. (w) Undertake inspection and cleaning of charge air cooler followed by pressure testing. (x) Remove Heat exchanger, clean & pressure test. (y) Reflush cooling system with fresh coolant. (z) Check all cut-out & safety controls., rectify all defects. (aa) Dismantle all liner & replace with new O-rings & liners. (ab) Remove flywheel and flywheel housing. Clean, inspect and repair with new spare parts. (ac) Remove Gear case cover. Clean, inspect & repair with new spare parts. (ad) Remove and replace tappets. (ae) Remove Cam Shaft. Clean, inspect & remove with new spare parts. (af) Remove Lubricating oil pump. Clean & inspect. (ag) Remove Crankshaft. Clean, inspect & measure the crankpins and main journals. Regrind/Replace if require. (ah) Remove and replace Main Bearing. (aj) Clean & inspect cylinder block. Check inline boring of main cap. (ak) Post completion of routines, Start the engine, check for any oil/ water leakage, exhaust leakage, stop the engine and re-check engine oil level, top up if require. (al) Carry out load trials and observe parameters.Note:- Post completion of routines, Carry out load trials and observe parameters. prove both DA for satisfactory performance. Cost breakdown for carrying out load trials (serial(al) refers) should be higlighted separately. Services to be provided by OEM/ OEM approved vendor. Relevant coolant and lub oil to be provided by contractor, separate cost breakdown for the same to be given. Quote for Service. Payment on actuals
Kit for Major Overhaul/ 12K routines of both Diesel Alternators. Quote for Material, Payment on actuals
Pick up magnetic. (2885708). Quote for Material, Payment on actuals
Voltage Monitoring relay VCTD2 (SPE0101172135). Quote for Material, Payment on actuals
Under voltage relay 220/240 V AC (LV429407). Quote for Material, Payment on actuals
Inhibitor Corrosion DCA14L. (3167217). Quote for Material, Payment on actuals
Carry out following works on both DA:- (a) Clean all contact studs and bolts from rust cleaner and to be tightened, (b) Check AVR for serviceability and rectify. Carry out calibration, after calibration of AVR undertake the voltage control test and paralleling trials (c) All loose screws to be tightened, (d) Carry out calibration of over voltage protection unit (OVPU) and reverse power relay and replace, if required (e) Undertake trials on completion of overhauling viz. Full load trials, voltage control test, speed control test and paralleling trials. Rectify all defects. (f) Both DA winding heaters and control panel door to be replaced. (g) Following instrumentation gauges and PCBs of DA control panel to be renewed:- (i) Ammeter (ii) Voltmeter (iii) Lub oil pressure (iv) Lub oil Temp (v) Fresh water temp (vi) Exhaust gas temp (vii) Tachometer (viii) Hour counter. (h) All cable conduits of DA to be replaced. (j) Alternators/ Dynamo to be replaced and proved for operation. Note:- Services to be provided by OEM/ OEM approved vendor. Quote for Service and Material, Payment on actuals.
Both DA expansion tank gauge glass to be replaced as per existing fitted onboard and drain line to be provisioned. Quote for Service and Material, Payment on actuals.
Following works to be undertaken on both DA:- (a) Carry out SDC checks of local control panel, rectify all defects. (b) LCP panel display (Make- Inteli drive DCU marine) to be replaced. (c) DA control battery charger to be replaced. (d) Electronic Governor to be replaced. Quote for Service and Material, Payment on actuals.
DA Expansion tank. Quote for Material, Payment on actuals
Reciprocating Air compressor :- Carry out following routines:- (a) Replace all pressure gauges (Qty 04), (b) Carry out complete major overhauling of compressor including motor. (c) All cut-outs and rlief valves to be replaced . (d) change lub oil (e) SDC and Performance trials to be conducted and system to be proved for satisfactory performance.Note :- Relevant lub oil to be provided by contractor (5 ltr). Quote for Service and material, Payment on actuals.
Air Comp Ingersoll-Rand 7T2 - Kit Complete overhaul 7T2 (37123742AS01). Quote for Material, Payment on actuals
Element filter T-line (32012957). Quote for Material, Payment on actuals
Both MD Air compressor outlet filter element to be replaced. Moisture trap to be opened, cleaned and boxed back. Quote for Service and Material, Payment on actuals.
Pressure guage (0- 32 bar) to be provided at discharge pipe in both Air Compressors. Quote for Service and Material, Payment on actuals
Carry out overhauling of Air compressor starter panel. Calibrate all safety relays and replace all defective sensors, gauges relay/components (if required). Quote for Service and Material, Payment on actuals
Fuel/Lub oil Centrifuge (Make –Alfa Laval, Model- MAB 103B-24):- Carry out complete overhauling (Major overhauling) of both centrifuge and replace all worn out parts including instrumentation guages. Post completion of routines, trials to be undertaken and system performance to be proved for Satisfactory operation. Note:- Services to be provided by OEM/ OEM approved vendor, Quote for Service, Payment on actuals.
Alfa laval fuel/ oil centrifuge:- Major Service kit for MAB 103 (549286-02). Quote for Material, Payment on actuals
Intermediate Service kit for pump(547965-05). Quote for Material, Payment on actuals
Carry out overhauling of Starting Control panels. All MCBs, relays and cut-outs to be proved for satisfactory operation, replace defective components. Quote for Service and Material, Payment on actuals
Port and Stbd Voith Turbo Schneider, Model - 21 R 5/150-2 (Running Hour: Port- 9542 hrs, Stbd- 9612 hrs):- Carry out following 10K/ Dry docking routines on both Voith: - (a) Check the screw joints. (b) Check for the leakage from blade shaft sealing. (c) Check condition of blades. (d) Check axial clearence of the blades. (e) Check coating, replace anodes and rectify leakages from Rotor casing (f) Check for the leakage from main seal. (g) Check Main gear toothing for any damage. (h) Check the input gear. (j) Check for the leakage from mounting cover. (k) Check for leakage from the propeller well (l) Check Permanent magnet filter rods. (m) Check for correct functioning of Rotor space ventillation. (n) Check Oil temperature. (p) replace Lub Oil in system and elevated tanks. (q) replace Oil filters. (r) Check Lub oil pressure in P1,P2 & P3 indicators, rectify defects. (s) Check Main pump for correct functioning. (t) Check sight feed oilers. (u) replace corrosion protection. Trials to be undertaken and system performance to be proved for satisfactory. Note:- Rectify all defects and leakages and replace defective components.Services to be provided by OEM/ OEM approved vendor. Relevant lub oil to be provided by contractor, separate cost breakdown for the same to be given. Quote for Service, Payment on actuals.
Kit for 10K/ Dry docking routines of both Voith. Quote for Material, Payment on actuals
Following oil pressure sensors and transmitters on local display panel on both Voith not working, to be replaced and proved:- (i) Lub oil pressure (ii) Control oil pressure (iii) Rotor oil pressure. (iv) Bearing oil temperature. (v) Limit Switces. Replace defective component, system to be proved for satisfactory operation. Quote for Service and Material, Payment on actuals
SDC checks to be undertaken on both Voith system. Replace all defective safety devices. Both Voith system performance checks to be proved for both local and remote operation. Both Voith system to be calibrated for "zero" position. Quote for Service and Material, Payment on actuals.
Both Voith Lub oil coolers to be chemically cleaned and pressure tested. Zinc anodes to be replaced. Quote for Service and Material, Payment on actuals.
Both Voith limit switches not working. Limit switches to be replaced. Qty- 04. Quote for Service and Material, Payment on actuals
Voith Indication panel/ display in engine room to be calibrated. Quote for Service and Material, Payment on actuals
Voith Lub oil pressure pump (Gear type, Model- 21R5/ 150-2). Quote for Material, Payment on actuals
Oily Water Separator, Make- Blohm & Voss Industries GMBH, Model- Turbu 20NPB-0.5 :- Carry out complete overhauling (Major overhauling) of the separator and replace all worn out parts including instrumentation guages. Post completion of routines, OWS trials to be undertaken and system performance to be proved for Satisfactory operation. Note:- Services to be provided by OEM/ OEM approved vendor. Quote for Service, Payment on actuals
Kit for Major overhauling of OWS, Make- Blohm & Voss Industries GMBH, Model- Turbu 20NPB-0.5 Quote for Material, Payment on actuals
OWS ppm meter to be calibrated for designed performance. replace if required. Quote for Service and Material, Payment on actuals.
Carry out overhauling of Starting control panel of OWS and defective components to be replaced. Quote for Service and Material, Payment on actuals.
CO2 Fire Fighting System (Make - M/s New Fire) - Carry out following routine/works :- (a) replace all flexible hoses. (b) Overhaul non-return valves and safety stop valves. (c) Remove and inspect cylinder operating heads, test for correct functioning. Rectify all defects. (d) Carry out weight test of all CO2 cylinders, refill gas if required. Qty-10 (e) CO2 control panels malfunctioning, to be repaired. (g) CO2 fire fighting system bottles to be pressure tested at 1.5 times of working pressure (10 Main cylinders and 03 pilot cylinders). (h) Blow out all distributing piping with LP air to make sure that it is not blocked. (j) Calibrate pressure gauges fitted in the system. (K) Check Audio Visual Alarm Function of CO2 system, Limit Switches In Control Panel for Operation, replace if defective . (l) CO2 fire fighting system to be proved for satisfactory performance. Quote for Service and Material, Payment on actuals.
Serviceability checks of CO2 fire fighting control system to be undertaken and all defects to be rectified. Control panels to be proved for designed performance and limit switches to be replaced. Quote for Service and Material, Payment on actuals.
External Firefighting system, Make-Jason Engg, Model-SRU-C255 VK1.8 CCW-02:- Following works to be undertaken on both FIFI system (a) Both FIFI clutch lub oil cooler to be cleaned and pressure test to be carried out. (b) Serviceability checks of both FIFI system to be undertaken, all defects to be rectified. Trials to be undertaken and system performance to be proved for satisfactory. (c) Actuator nozzles of FIFI system on top of bridge not operating. Same to be replaced. Qty- 02 (d) Operating wheels of FIFI system valves damaged. Same to be replaced, Qty- 08. (e) Fire monitor panel and pendant switch with cable and Control panel at bridge operating erratically, control panel checks to be undertaken and defective components to be replaced. (f) Both FIFI lub oil and lub oil filter to be replaced. (g) Both FIFI clutch not engaging/ disengaging from remote, defect to be rectified. (h) Both FIFI pump casing corroded, defect to be rectified. (j) Lub oil leakage from both FIFI lub oil level indicator, defect to be rectified. Note:- Relevant lub oil to be provided by contractor, seaprate cost breakdown for the same to be given (Qty- 50 ltrs). (k) Complete overhaulling of pump and gear box of STBD side. (l) Overhauling of Port FiFi pump with replacement of LIP seal. Quote for Service and Material, Payment on actuals.
Voith cooling Pump (Make:- B.E. PUMP, 18 TPH Centrifugal) - Following works to be carried out:- (a) Dismantle pump and motor from foundation, de-couple motor. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out. (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventor, timers and any control components defective to be replaced. (h) Remove impeller lock nut and take out the impeller. (j) Remove mechanical seal. (k) Remove bearing cover from other side and take out shaft. (l) replace mechanical seal and bearings. (m) Clean all parts post inspection and assemble. (n) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (p) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance. Quote for Service and Material, Payment on actuals
Domestic F/W and S/W Pump (Make:- B.E. PUMP, Capacity- 2 TPH, Centrifugal) - Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out (OLR-WTR). (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventor, timers and any control components defective to be replaced. (h) Remove impeller lock nut and take out the impeller. (j) Replace mechanical seal. (k) Remove bearing cover from other side and take out shaft. (l) replace mechanical seal and bearings. (m) Clean all parts post inspection and assemble. (n) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (p) Re-fitment of pump and motor on foundation and alignment to be carried out using dial gauge/ appropriate method. System to be proved for satisfactory performance. Quote for Service and Material, Payment on actuals
Bilge Pump (Make:- B.E. Pumps, Model:- CV-40-250,CV-80-400, 30 TPH, Centrifugal) - Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out (OLR-WTR). (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventor, timers and any control components defective to be replaced. (h) Remove impeller lock nut and take out the impeller. (j) Remove mechanical seal. (k) Remove bearing cover from other side and take out shaft. (l) replace mechanical seal and bearings. (m) Clean all parts post inspection and assemble. (n) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (p) Re-fitment of pump and motor on foundation and alignment to be carried out and alignment to be carried out using dial gauge/ appropriate method. System to be proved for satisfactory performance. Quote for Service and Material, Payment on actuals
Fire/ GS Pump (Make:- B.E. Pumps, Model:- CV-40-250,CV-80-400, 30 TPH, Centrifugal) - Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out (OLR-WTR) (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out.Relays, MCBs, single phase preventor, timers and any control components defective to be replaced. (h) Remove impeller lock nut and take out the impeller. (j) Remove mechanical seal. (k) Remove bearing cover from other side and take out shaft. (l) Replace mechanical seal and bearings. (m) Clean all parts post inspection and assemble. (n) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (p) Re-fitment of pump and motor on foundation and alignment to be carried out and alignment to be carried out using dial gauge/ appropriate method. System to be proved for satisfactory performance. Quote for Service and Material, Payment on actuals
Fuel Oil transfer Pump (Make:- Tushaco Pumps, Cap- 5 TPH) - Following works to be carried out:- (a) Pump to be overhauled (b) Overhauling of motor to be undertaken. (c) Bearing & seal to be replaced. (d) Impeller balancing to be undertaken. (e) Shaft to be replaced if worn out. (f) Starter panel to be overhauled. System to be proved for satisfactory designed performance. Note:- Pump inner casing machining not to be done, suitable bush to be used. Quote for Service and Material, Payment on actuals
Lub Oil Pump (Make:- Tushaco Pumps, Cap- 1 TPH) - Following works to be carried out:- (a) Pump to be overhauled (b) Overhauling of motor to be undertaken. (c) Bearing & seal to be replaced. (d) Impeller balancing to be undertaken. (e) Shaft to be replaced if worn out. (f) Starter panel to be overhauled. System to be proved for satisfactory designed performance. Note:- Pump inner casing machining not to be done, suitable bush to be used. Quote for Service and Material, Payment on actuals
Dirty Oil Pump (Make:- Tushaco Pumps, Cap- 1 TPH) - Following works to be carried out:- (a) Pump to be overhauled (b) Overhauling of motor to be undertaken. (c) Bearing & seal to be replaced. (d) Impeller balancing to be undertaken. (e) Shaft to be replaced if worn out. (f) Starter panel to be overhauled. System to be proved for satisfactory designed performance. Note:- Pump inner casing machining not to be done, suitable bush to be used. Quote for Service and Material, Payment on actuals
Heat Exchangers:- Following works to be carried out:- (a) Both Alfa coolers to be dismantled in-situ, mechanically and chemically cleaned and boxed back with new gaskets. System to be pressure tested and proved for operation post fitment of coolers. Test pr- 3.5 kg/cm2. (b) Existing inlet and outlet pipes with flanges of both Alfa coolers to be replaced with Cu-Ni (90:10) pipe. Length- 1.5 mtr each, Mat- Cu-Ni, Dia- 100 mm, Zinc anode fitment plugs to be provisioned on each pipe (c) Sea water and Fresh water pressure and temperature guages line adaptors to be fabricated/ replaced in both Alfa coolers, respective pressure and temperature guages to be replaced. Qty- 08. Quote for Service and Material, Payment on actuals.
Suction and discharge pressure gauges of various system lines to be replaced as per sample as given bellow :- (a) Range -1 to 2 bar. Qty-05 (Back mounted) (b) Range- 0 to 10 bar. Qty-08 (Back mounted) (c) Range-0 to 40 bar. Qty-03 (Back mounted) (d) Range-0 to 6 bar. Qty-06 (Vertical mounted) (e) Range-0 to 25 bar. Qty-02 (Vertical mounted) Quote for Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 65mm globe valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 300mm Gate valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 80mm globe valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 80mm NR valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 80mm Butterfly with pinion drive valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 125mm globe valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 50mm Quick close valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 125mm Butterfly valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 50mm butterfly valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 50mm SD valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 100mm globe valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 40mm SDNR valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 40mm globe valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 25mm SD valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 32mm Ball valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 25mm Ball valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 32mm Ball valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 25mm Ball valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 65mm SDNR valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 300mm Butterfly valves post painting. Quote for Service and Material, Payment on actuals.
Valves:- Removal, overhauling, pressure testing and fitment of 200mm Butterfly valves post painting. Quote for Service and Material, Payment on actuals.
Following Valves to be replaced:- (a) Size- 80 mm, Type- Butter fly, Mat- Brass/ GM, Qty- 02 (b) Size- 15 mm, Type- Ball, Mat- SS, Qty- 10 (c ) Size- 20 mm, Type- Ball, Mat- SS, Qty- 12 (d) Size- 150 mm, Type- Gate, Mat- NAB, Qty- 01 Quote for Service and Material, Payment on actuals.
System Pipelines: -Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (Cu- Ni– 65 mm). Quote for Service and Material, Payment on actuals
System Pipelines: -Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (Cu- Ni– 100 mm). Quote for Service and Material, Payment on actuals.
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (Cu- Ni– 125 mm). Quote for Service and Material, Payment on actuals.
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (MS– 125 mm). Quote for Service and Material, Payment on actuals.
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (MS– 100 mm). Quote for Service and Material, Payment on actuals.
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu- Ni– 40 mm). Quote for Service and Material, Payment on actuals.
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (MS– 125 mm). Quote for Service and Material, Payment on actuals.
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (Stainless Steel– 250 mm). Quote for Service and Material, Payment on actuals.
Sea Water Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (Stainless Steel– 150 mm). Quote for Service and Material, Payment on actuals.
Sea Water Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Gun metal– 100 mm). Quote for Service and Material, Payment on actuals.
Sea Water Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard post painting and prove for designed performance (Gun Metal– 125 mm). Quote for Service and Material, Payment on actuals.
Pneumatic pipeline to be replaced. Dia- 15 mm, Mat- SS, Length- 5 mtrs. Quote for Service and Material, Payment on actuals.
Both Main engine FIFI pump drain line damaged. To be replaced. Quote for Service and Material, Payment on actuals
02 Nos push cock of Voith rotor header tank found leaking, to be replaced. Quote for Service and Material, Payment on actuals
Voith turbo coupling side cover of both Port and Stbd Voith found damaged. To be replaced. Material-GI. Quote for Service and Material, Payment on actuals
Sea water suction Strainers: - replace following suction strainers as per sample: Main sea chest, Bilge suction, DA suction and fuel system. Mat - SS. Quote for Service and Material, Payment on actuals.
Replace hot lagging with metallic clading for DA and Main Engine exhaust system pipeline. Material- MWMB. Quote for Service and Material, Payment on actuals.
Overhauling of fire hydrants to be carried out, brass coupling to be replaced. Respective 'O' ring and plastic cap to be replaced. Quote for Service and Material, Payment on actuals.
Hinges to be provided/ fabricated on chequred plates of engine room for operating system valves. Quote for Service and Material, Payment on actuals.
Both Main engines turbo coupling safety guards damaged. Guards to be manufactured as per sample. Quote for Service and Material, Payment on actuals
Repair of hand pump at Main deck and Engine room to be undertaken. Quote for Service and Material, Payment on actuals.
Temperature thermometers of various system lines to be replaced as per sample. Quote for Service and Material, Payment on actuals.
Air bottles (Capacity- 500 ltrs) to be pressure tested and proved up to 45 bar, Qty-02. Assiciated safety valves to be overhauled. Quote for Service and Material, Payment on actuals.
Both bilge pump foundation corroded. Foundation to be replaced as per sample. Quote for Service and Material, Payment on actuals.
Fuel and Lub oil RU tank Guage glass coloumn to be replaced. Quote for Service and Material, Payment on actuals.
System pressure guage line including end fittings of various sytem perished, to be replaced/ positioned. Mat- Copper, Dia- 5mm. Quote for Service and Material, Payment on actuals.
Fuel shutt off valves along with associated fittings to be overhauled. System to be proved for satisfactory operation. Quote for Service and Material, Payment on actuals
Valve wheels of various system valves to be replaced as per sample. Quote for Service and Material, Payment on actuals
Portable Submersible Pump(Make-Mody Pumps, 20TPH) - (a) Overhauling of portable submersible pump to carried out alongwith startor and motor part. (b) Male-female brass coupling of pump and starter to be replaced. Quote for Service and Material, Payment on actuals
Portable Submersible Pump(Make-Mody Pumps, 40TPH) - (a) Overhauling of portable submersible pump to carried out alongwith startor and motor part. (b) Male-female brass coupling of pump and starter to be replaced. Quote for Service and Material, Payment on actuals
DD Non submersible pump (Make- Mody, 37 TPH):- Overhaul pump including engine part and calibration of instrumentation gauges. Rubberised suction and discharge hoses damaged, to be replaced. Proved for satisfactory operation. Brass coupling of pump also to be replaced. Quote for Service and Material, Payment on actuals
FIFI discharge hoses along with adaptors at Main deck to be replaced as per sample. Qty- 08. Quote for Material, Payment on actuals
Firemain hoses to be replaced as per sample. Qty- 10. Quote for Material, Payment on actuals
Both Fuel filling point to be modified as per sample. Quote for Service and Material, Payment on actuals.
Both Fresh water filling point to be modified as per sample. Quote for Service and Material, Payment on actuals.
Portable Manual Starter of Diesel Alternator to be overhauled. Quote for Service and Material, Payment on actuals.
Following Workshop Machineries to be overhauled:- (a) Drill machine (b) Grinding machine. Quote for Service and Material, Payment on actuals.
Main Switch board: Following works to be carried out:- (a) Undertake calibration of instrument panel/ meters fitted on MSB (Qty- 10), Defective meters to be replaced. (b) Replace bus bar insulators (Qty 06). (c) 01 no. breaker handle damaged, handle to be replaced. (d) Carryout calibration of all breakers, RPR/ UVR relay, CT, PT and other protection circuit, replace defective relays/ components. (e) Replace defective lugs, connector and wiring. (f) Earth fault parameter with hooter to be checked and proved. (g) Synchronising panel to be overhauled and proved. (h) Transformer changing breaker to be proved. All defects to be rectified subject to QC checks. Quote for Service and Material, Payment on actuals.
Navigational lights (230V 65W, 24V 40W) fitted at various locations defective, to be replaced. Job also involves replaceal of securing brackets. Quote for Service and Material, Payment on actuals
Navigation light cable damaged/perished at various location. Cable to be replaced. (2.5sqmm, 100 mtrs). Quote for Service and Material, Payment on actuals
Navigation control panel-Carry out repair of the panel and prove system for both (230V AC & 24V DC) operation. PCBs, toggle switches and indicator lamps to be proved. All defects to be rectified subject to QC checks. Quote for Service and Material, Payment on actuals.
Signaling lantern not working. To be repaired/ replaced. prove system as per designed performance. All defects to be rectified subject to QC checks Quote for Service and Material, Payment on actuals
Cable tray- Cable tray damaged/perished at various location. Cable tray to be replaced, job involves removal of damaged cable tray and securing of cables with matelic strips after replacement of cable tray. Quote for Service and Material, Payment on actuals
Air Whistle and Electric Horn not working. To be replaced to latest version along with panel and prove system for both electrical and pneumatic mode. Quote for Service and Material, Payment on actuals
Tank content gauges control panel (Nivo system) (Qty 06 Panels) observed to be defective. Functional checks of all gauges to be carried out. Defective components and sensors to be replaced. Tank level calibration to be undertaken. Serviceability checks and calibration of display module to be undertaken. All defects to be rectified subject to QC checks.Quote for Service and Material, Payment on actuals
Indication panel in wheel house for Anemometer not showing reading. Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material, Payment on actuals
Overhauling of domestic transformers (15KVA, Qty-02) and lighting transformer (10KVA, Qty-02) to be carried out. To be proved for satisfactory operation. Quote for Service and Material, Payment on actuals
Sound power telephone in various locations is not working. To be replaced and proved for satisfactory operation. (Qty- 08 nos, Make - M/s Elcome). Quote for Service and Material, Payment on actuals
Wall mounted fans defective in accommodation area and wheel house. To be replaced as per sample. Make -Orient. Quote for Service and Material, Payment on actuals
02 no. search light (1000W) not working. To be replaced and rotaing mechanism of both search light defective, to be repaired. Job involves replaceal of securing bracket and fitment. Prove for satisfactory opertaion. Quote for Service and Material, Payment on actuals
Lighting DB to be repaired for satisfactory operation. 08 MCBs (32 A) to be replaced. Quote for Service and Material, Payment on actuals
Echo sounder(Furuno)- (a)Undertake calibration of main recorder, repeater, transducer and prove system as per designed performance. Replace defective components. (b) Examine the transducer and casings. Preserve the transducer surface during dry-docking. Carry out visual examination of the transducer cables, check continuity and insulation. Replace defective components. All defects to be rectified subject to QC checks. Quote for Service and Material, Payment on actuals
Emergency light fittings (24V DC, 40W) at various locations not working, to be replaced. Job also involves replacement of fitting at 40 locations. Additionally, change over contactor, control wiring and cables to be checked and proved for satisfactory operation. Quote for Service and Material, Payment on actuals
Tube light (25W) fitted in engine room defective. All lights to be replaced with LED (18W) tube light. Job also involves replacement of securing brackets at 15 locations. Quote for Services and Material
Deck lights (60W) and Deck lights guard/ fitting are broken. To be replaced with fittings as per sample. Job involves replacement of securing arrangement and fitment. Quote for Service and Material, Payment on actuals
Flood light- Flood lights (200W Bulb, 230V) fitted on upper deck and Engine Room not working, to be replaced as per sample. Quote for Service and Material, Payment on actuals
Tube light (40W) fitted onboard at various locations to be replaced with LED (15W) tube lights. Job also involves replacement of securing brackets at 30 locations. Quote for Services and Material
Switches faulty / defective in various location. To be replaced:- (a) 32 A Switch (Qty - 15), (b) 16 A switch (Qty 32), (c)10 A switch, Qty-28. Quote for Service and Material
Sockets faulty / defective in various location. To be replaced:- (a) 32 A Sockets (Qty 15), (b) 16 A Sockets (Qty 32), (c)10 A Sockets, Qty-28. Quote for Service and Material
Fire detection alarm system - Undertake calibration of the system and prove as per designed performance. Any discrepancies to be resolved including material replacement. Certificate to be forwarded for safe operation. Quote for Service and Material, Payment on actuals
Magnetic compass(Reflector type)-Magnetic compas to be calibrated and proved for satisfactory performance. All defects to be rectified subject to QC checks. Quote for Service and Material, Payment on actuals
Both Main engine SMPS voltage fluctuating. SMPS to be replaced. Input Rating - 15 A/ 230V, Output - 0 to 30V/ 25A to 50 A. Existing model fitted - M/s Powertron. Quote for Service & Material
Following domestic equipment to be supplied:- (a) Microwave oven (23 liters), Make - LG or equivalent (b) RO purifier (20 liters), Make - Kent (c) Refrigerator(210 liters), Make - LG or equivalent. Quote for Service and Material, Payment on actuals
SART to be replaced. Quote for Material, Payment on actuals
EPRIB to be replaced. Quote for Material, Payment on actuals
Following batteries to be replaced :- ( a) 12V, 7.2 AH, Qty- 12 (b) 12V, 180 AH, Qty-09 (c) 12V, 120 AH, Qty- 20. Quote for Material, Payment on actuals
Both DA breaker tripping, breaker to be replaced with new one (Existing - M/s L&T). Quote for Service and Material, Payment on actuals
Shore supply breakers tripping, breaker to be replaced with new one along with male female socket. Quote for Service and Material, Payment on actuals
Following work on Window wiper to be carried out: - (a) 05 nos Motor not getting start, to be repaired/ replaced. (c) 03 nos rotary switch defective, to be replaced. (d) Rubber beading of 10 nos Wiper damaged. Window wiper to be replaced. (e) Wiper control panel to be overhauled. repace all defective lamps and switches. Complete system to be proved for satisfactory operation. Quote for Service and Material, Payment on actuals
Clear view screen in wheel house not working, to be replaced. Quote for Service and Material, Payment on actuals
Calibration of AFDS sensors (08 nos) to be undertaken and defective sensors to be replaced. Serviceability checks of AFDS system to be undertaken. System to be proved for satisfactory performance. All defects to be rectified subject to QC checks. Quote for Service and Material, Payment on actuals
Split AC- (Voltas- 2 TR) fitted onboard to be replaced. Quote for Service and Material, Payment on actuals
Trans rectifier unit to be upgraded to latest version. Existing System - M/s L&T, 3 KW. System to be proved thereafter for satisfactory operation. Quote for Service and Material, Payment on actuals
Shore supply flexible cable 35 sqmm 3 core as per sample. Quote for Material, Payment on actuals
VHF-DSC, Sailor 6222 (Thrane & Thrane), Denmark - Undertake calibration of the system and prove system as per designed performance. All defects in components to be rectified subject to QC checks. Quote for Service and Material, Payment on actuals
PA system - Following work on PA system to be carried out:- (a) Amplifier unit to be replaced. (b) 04 nos. microphone and 08 nos speakers to be replaced. © remote panel of PA system to be overhauled, all defective components to be replaced and system to be proved for satisfactory performance. Quote for Service and Material, Payment on actuals
Ammeter- 0-150A, 96x96mm- To be replaced as per sample. Quote for Material, Payment on actuals
Volt meter- 0-550V, 96x96mm -To be replaced as per sample. Quote for Material, Payment on actuals
Frequency meter- 45-50-55 Hz -To be replaced as per sample. Quote for Material, Payment on actuals
KW-meter-0.75KW-96x96mm -To be replaced as per sample. Quote for Material, Payment on actuals
Carry out overhauling of following Ventillation motors along with starters:- (a) E/R supply blower, 10 HP (b) E/R exhaust blower, 10 HP (c) Galley ventillation blower, 0.5 HP, Qty- 02 (d) Accomodation ventillation blower, 1 HP (e ) Bathroom ventillation blower, 0.5 HP (f) CO2 room exhaust blower, 0.5 HP (g) Wheel house supply blower, 1 HP. Additionally, associated trunking/ cages/ wire meshes to be replaced with fittings. Quote for Service and Material, Payment on actuals
Shore supply connection box -(a)Shore supply box damaged. To be replaced. Job involves replacement of securing brackets and fitment. (b) 05 no. meters of shore supply box to be calibrated, defective meters to be replaced. (c) Male female connectors to be replaced, qty- 04. (d) Control MCBs, Glass, indicator switches and control wiring to be replaced. All defects to be rectified subject to QC checks. Note- Box to be of weather resistant(IP66). Quote for Service and Material, Payment on actuals
Cable gland- 32 nos cable gland of various sizes damaged, gland packing to be carried out. Quote for Service and Material, Payment on actuals
Engineering and Electrical log books with covers as per sample to be printed. Quote for Material, Payment on actuals
Portable Shore Supply Connection Box with Industrial sockets and plug (125 Amps) alongwith following fitted instrumentation (i) Ammeter (0- 100 Amps), (ii) Voltmeter (0- 600 Volts), (iii) Phase sequence meter (iv) Current Transformer and other miscellaneous fittings. Note: - Shore Supply Connection box to be of IP 67 rating. Quote for Material, Payment on actuals.
Portable PA system as per sample to be supplied. Quote for Material, Payment on actuals.
Portable GPS to be provisioned. Quote for Material, Payment on actuals
Main engine Rotary Switch (360 degree rotation) fitted in ME control panel ( Caterpillar -35121C, Part no.-1272331) Quote for Material, Payment on actuals
Main Engine Starter Solenoid (Make- M/s ASCO). Quote for Material, Payment on actuals
Magnetic Pickup (MPU) of Cummins DA (80Kw). Quote for Material, Payment on actuals
Replacement of ME RPM indicator at bridge as per sample. System to be proved for satisfactory operation. Quote for Material, Payment on actuals
Portable Battery charger, Input Rating - 415V/16A/50Hz AC Output Rating - 24V DV/50A (SMPS). Quote for Material, Payment on actuals
ME spares(3512C) :- (a) Electronic controler Unit, Qty-02 nos (b) Thermostat, Qty -12 © ECS Switch, qty - 04, (d) Secondary Speed sensor, Qty - 04 (e Primary Throttle & Secondary throttle, Qty - 04. Quote for Material, Payment on actuals
Following Miscellaneous items:- (a) Tool Box with open and ring spanner (6-32 mm) (Taparia) (b) Allen Key set (c ) Screw driver set (d) Box spanner (Taparia S14HXL,1/2 Square driveSocket Set). Quote for Material, Payment on actuals.
Pesto flash(Insect killer) in dining area to be replaced. Quote for Material, Payment on actuals.
Nicole lacquer. Quote for Material, Payment on actuals
Personnel protection gear kit- Helmet. Quote for Material, Payment on actuals
Personnel protection gear kit- Gloves and Electric Hand Gloves( insulated). Quote for Material, Payment on actuals
Personnel protection gear kit- Goggles. Quote for Material, Payment on actuals
Personnel protection gear kit- Ear defender. Quote for Material, Payment on actuals
Personnel protection gear kit- Mask. Quote for Material, Payment on actuals
Zinc plugs of system lines, coolers and auxiliary equipment to be replaced as per the sample. Quote for Service and Material, Payment on actuals
Shore supply connector (125A, 415 V, male and female) as per sample. Quote for Material, Payment on actuals
Cotton rags (for cleanship). Quote for Material, Payment on actuals
Fuel booster pump as per sample. Quote for Material, Payment on actuals
DA breaker with EOM (400A/ 3 pole), Make- L& T Quote for Material, Payment on actuals
Shore supply breaker (125A/ 3 pole), Make- L&T Quote for Material, Payment on actuals
Pump Panel supply breaker- (a) 125A, 415V, Qty-02 (b) 160A,415V, Qty-02 Quote for Material, Payment on actuals
Antiflash lamps(60W 230V) with fittings to be provisioned in pump room. Quote for Service and Material, Payment on actuals
Rubber mat for electrical equipments to be replaced. Thickness- 10mm. Quote for Service and Material, Payment on actuals
Starter for 40TPH and 20TPH Submersible pump. Qty- 03 each Quote for Material, Payment on actuals
Forward pump room portable battery charger(1 KW) to be overahuled. Quote for Service and Material, Payment on actuals
Submersible pump socket to be replaced. (415V, 32A). Quote for Service and Material, Payment on actuals
Following tools to be provided for onboard maintenance:- (a) Self-centring mechanical easy puller (2/3 arm)- 01, Cap- 5T, Make- Powerjac(PM105) (b) Hydraulic puller (2/3 arm)- 01, Cap-6T, Make- Powerjac(PM600) (c ) Power & hand tool kit(92 tools)- 01, Make- Bosch(GSB500RE) (d) Hydraulic wedge spreader(HWS series)- 01, Cap- 8T, Make- Powerjac(HWS8) (e) Bench Vice 300mm (Heavy duty)- 02 (f) Surface plate (630X400mm)- 01, Mat- Cast iron, Garde 1 (g) Anvil 100Kg- 01 (h) Universal V block(100x63x100mm)- 02 (j) Cordless Impact wrench- 01, Make- Bosch(GDS250LI). (k) Bearing puller. (l) Electrical tool kit (Taparia) Qty -05 nos (m) Rachet box (Taparia SA46 steel socket set, 1/4 Dr 46 pcs Socket set) (n) Pointed Soldering iron (p) Multimeter(Fluke 179). (q) SPM meter-qty 01 no. Quote for Material, Payment on actuals
Vetillation blower with 10 mtr exhaust trunking. Rating- 80W/220V, 2800 RPM. Quote for Material, Payment on actuals
Fasteners (Nut & Bolt) of various System pipelines and Valves to be replaced with Stainless Steel (SS). Size- M8 to M32, Qty- 600. Quote for Service and Material, Payment on actuals
Locktite/ Sealants for Maintenance of Main engine/ DAs:- (a) Loctite 243 thread locker 50 ml, Qty- 10 (b) Loctite 542 thread sealant 50 ml, Qty- 10 (c) Loctite 577 thread Sealant 50 ml, Qty- 10 (d) Loctite 574 flange Sealant 50 ml, Qty-10 (e) Loctite 638 New retainer 50 ml, Qty- 10. (f) Loctite 406 Instant adhesive 20 gm, Qty- 15. (g) Loctite SF7840 natural blue 5 ltr, Qty- 02. (h) Loctite freeze and release LB 8040 310 gm, Qty- 10. (j) Loctite 8008 C5-A-LB, Qty- 10. Quote for Material, Payment on actuals
WINTECH ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .