OFFICE OF EE KADAPA DIVISION
SSA, KADAPA
Construction of Additional Class Room at MPPS to Rajaka Street of Badvel in YSR Kadapa District
992981
NIT No. 06/EE/SS/2026-27, DATED: 10.09.2026.
OPEN - NCB
Civil Works
YSR
9 documents required · 9 mandatory
₹424
₹12,000
24 Sept 2026
24 Sept 2026
24 Sept 2026
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work for Foundation of Building.(APSS No. 308)
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) HBG machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for (APSS No. 402 & 403) For FOOTINGS
Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) HBG machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for (APSS No. 402 & 403) For PEDESTALS
Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) HBG machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work For Coloumns
R.R. Masonry in C.M (1:8) including cost and conveyance of all materials and labour charges etc., complete.
Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) HBG machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work For Plinth Beam
Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 225 x 100 x 60 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compressive strength not less than 50 kg/sqm for walls for Superstructure walls.
Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) HBG machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work V Beam
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, . For Lintels
Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) HBG machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for 60cm wide sun-shades (APSS No.403) at avg thickness of 62.50 mm
Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) HBG machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work For Roof Beams
Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) HBG machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work For Roof Slab 125mm thick with slab projection of 300 mm alround.
Providing Impervious coat plastering 20 mm thick in single coat in CM (1:3) along with 2 % accoproof powder mixed with cement with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) with slab projection of 300 mm alround
Plastering 12 mm thick in single coat in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904).
Plastering 20 mm thick in single coat in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904)
Ornamental Plastering to ceiling 12mm thick in C.M.(1:3) with dibara sponge finish including cost and conveyance of all materials like cement sand water etc., to site of all materials under all operational incidental charges and including cost of labour charges for mixing motor finishing scaffolding lift charges curing including cutting grooves wherever necessary as directed by the Engineer-in-charge etc., including for finished item of work(apss no 903&904)
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Filling with sand in basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Flooring with Galaxy Granite 18-20 mm thick upto 2.43M (Premium Quality) set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of work.
Providing skirting to internal walls to 15 cm height/ risers of steps with Galaxy Granite 18-20 mm thick upto 2.43M (Premium Quality), length equal to flooring stones set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like granite slabs, cement, sand and water etc., complete for finished item of work.
White washing Two coats with Whiting of approved quality to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges such as scaffolding, lift charges etc., complete for finished item of work.
Colour washing Two coats with Janatha cem with Colour Stainer of approved quality to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges such as scaffolding, lift charges etc., complete for finished item of work. External
Painting to walls with two coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer of exterior grade-2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls.G.F
Two coats New iron work with Synthetic Enamel Paint including cost and conveyance of all materials and labour charges etc., complete G.F
Supply and fixing of M.S.Door of size 1.22x2.06Mts made by 50x50x3mm "L"angular frame and 25x25x2mm "L" angular for shutters frame with 18 gauge flat sheet including cost and conveyance of all materials and labour charges etc., complete. G.F
Supply and fixing of M.S.Windows of size 1.53x1.32Mts made by 32x32x6mm "L"angular frame and 25x25x5mm "L" angular for shutters frame with 18 gauge flat sheet including 10 mm Square Rods at 10 cms centre to centre including cost and conveyance of all materials and labour charges etc., complete. G.F
Supply and fixing of Varandah ventilator Grills including cost and conveyance of all materials and labour charges etc., complete.
Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 36mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. G.F
Supply and fixing of 25mm dia 2.2mm thick P.V.C. pipe (ISI Mark) concealed in Roof Slabs with all required accessories including masonary work and labour charges including over heads and contractors profit but excluding seigniorage charges for finished item of work.
Supply and fixing of 25mm dia 1.8mm thick P.V.C. pipe (ISI Mark) concealed in wall with all required accessories including masonary work and labour charges including over heads and contractors profit but excluding seigniorage charges for finished item of work.
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm tick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential buildings including over heads and contractors profit but excluding seigniorage charges for finished item of work.
Supply and fixing of 6A 3 pin wall plug socket with a 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges including over heads and contractors profit but excluding seigniorage charges for finished item of work.
Supply and Transportation of 1x40W patty type tube light luminaire with copper choke, starter etc., including 1 No. 40W tube including over heads and contractors profit but excluding seigniorage charges and VAT for finished item of work.
Supply of 1200mm (48") Sweep 230V, A.C 50 Hz Ceiling Fan with 3 blades and double ball bearings with all standard accseeories including over heads and contractors profit but excluding seigniorage charges and VAT for finished item of work.
Supply of stepped type electronic Regulator including over heads and contractors profit but excluding seigniorage charges and VAT for finished item of work.
Labour charges for fixing of ceiling fan and regulator including transportation and giving connections with twin core wire including over heads and contractors profit but excluding seigniorage charges and VAT for finished item of work.
Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation) including over heads and contractors profit but excluding seigniorage charges and VAT for finished item of work.
Supply and Run of 2 of 2.5 sq. mm WPSC (Weather Proof Single Core) Aluminium cable along with No.10 SWG G.I. bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains including over heads and contractors profit but excluding seigniorage charges and VAT for finished item of work.
Supply and run of 2 of 56/0.3mm (4 Sq.mm) F.R. P.V.C. insulated flexible copper cable in existing pipe for mains including all labour charges etc., complete.
Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB / DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface/ flush mounting etc., complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
ACR MPS Tender Document for Rajaka Street.doc
TENDER_DOCUMENT • 0.23 MB
MPPS Rajaka Street GF - Schadule.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .