Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.9 LAccepted-Finance | ₹67.9 L | L1 | Accepted-Finance Lowest quoted and declared as L1 |
| 2 | L2₹92.1 LAccepted-Finance | ₹92.1 L | L2 | Accepted-Finance 2nd lowest quoted and declared as L2 |
| 3 | L3₹1.2 CrAccepted-Finance H NO 1 6 5 5 PLOT NO 5 3RD FLOOR GANAPATHI ARCADE SRIRAM NAGAR COLONY KAPRA ECIL POST SECUNDERABAD MEDCHAL MALKAJGIRI TELANGANA 500062 KAPRA HYDERABAD TELANGANA 500062 UDYAM TS 09 0007678 | MEDCHAL MALKAJGIRI | TELANGANA | 500062 | ₹1.2 Cr | L3 | Accepted-Finance 3rd lowest quoted and declared as L3 |
| 4 | L4₹1.3 CrAccepted-Finance | ₹1.3 Cr | L4 | Accepted-Finance 4th lowest quoted and declared as L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
Tender Value
₹2.1 Cr
EMD Value
₹5.2 L
Closing Date
27 Nov 2020, 3:00 pmClosed
Divisional Engineer (Engg)
O/o Principal General Manager Maintenance, Southern Telecom Region, Room No. 103, 1st Floor, Telephone Bhavan, Saifabad, Hyderabad-500 004
Outsourcing of SLA based Optical Fibre Cable Route Repair and Maintenance with connected OFC patch works in Various Transmission Maintenance Divisions in Telangana State under the Jurisdiction of General Manager Maintenance, STSR BSNL Hyderabad
2020_BSNL_61620_1
STR/HD/Tender/OFC R and M and Patch Work/Telangana
Open Tender
Repair and Maintenance Services
365 days
As per tender document
As per tender document
2 documents required · 2 mandatory
₹2,360
Yes
AO (CC) O/o PGMM STR Hyderabad
₹5.2 L
Yes
18 Dec 2020
6 Nov 2020
28 Nov 2020
6 Nov 2020
27 Nov 2020
7 Nov 2020
7 Nov 2020 - 20 Nov 2020
Amount
Part-A R&M: Combined rate per Kilometer per Month for Preventive Maintenance (including the cost of Patrolling service @ 50 Kms- to and 50 kms fro per patroller etc.) and Corrective maintenance for all types of soil and strata as per Scope of Work (excluding GST)
Part-B OF Cable Patch Works: Combined rates per running Meter for patch works (Excavation OFC trench to the depth of 165 cms, PLB laying, cable blowing, Splicing including transportation and reinstatement for overhead normalization/OF cable patch works for all types of soil and strata (for variation in depth from 165 Cms rate shall proportionately vary)) as per Scope of Work (excluding GST).
BONDADA ENGINEERING PVT LTD
Sri Progressive projects
ITR INFRATECH PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid