Executive Engineer, Rajkot Irrigation Division, Rajkot.
SANKROLI IRRIGATION SCHEME. Various Repairing and Renovation Work at Sankroli Canal of Sankroli Irrigation Scheme
327653
S.B.D./14 of 2026-27
Open
Civil - All
Works
Rajkot
4 documents required · 4 mandatory
₹900
Executive Engineer, Rajkot Irrigation Division Rajkot
₹23,000
10 Aug 2026
25 Jul 2026
11 Aug 2026
25 Jul 2026
10 Aug 2026
25 Jul 2026
NAME OF WORK :-
Various Repairing and Renovation Work at Sankroli Canal of Sankroli Irrigation Scheme
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Dismantling stone/brick masonry & stacking of useful and unuseful 33.00 Cum. 616.00 Rupees: Six Hundred
material from the dismantled materials as directed etc complete. Sixteen Only.
(a) In cement mortar
2 Dismantling of RCC work viz. slab, beam, lintel, barrel, staircase, etc. 47.00 Cum. 1362.00 Rupees: One Thousand
including removing the steel from the dismantled portion without damage to Three Hundred Sixty
reinforcement sorting and stacking of useful and unuseful material from the Two Only.
dismantled material as directed etc comp.
3 Dismantling the existing RCC pipes including sorting out and stacking of 10.00 Rmt. 214.00 Rupees: Two Hundred
the useful material (Pipe) measurable conditions upto lead 200 mt. as Fourteen Only.
directed under the specification
iii) 650mm to 950mm dia meter
4 Removing the damaged precast CC block lining breaking the joints, 175.00 Sqm. 74.00 Rupees: Seventy Four
removing the same sorting and stacking of useful and unuseful material in Only.
measureable conditions from the dismantled material up to lead of 200mt
as directed up to 7.50 cm thick incl all
5 Dismantling C.C. foundation or flooring sorting & stacking useful and 3.00 Cum. 828.00 Rupees: Eight Hundred
unuseful material in lead upto 200mt as directed etc. Complete. Twenty Eight Only.
6 Excavation in all sort of strata and formations incl. depositing the unuseful 219.00 Cum 83.00 Rupees: Eighty Three
excavated stuff as and where directed incl sorting and stacking useful Only.
materials as directed upto 30 mt lead etc. complete incl. dewatering.
(Depth 0 TO 3.0 mt)
(For all type canal & foundation trenches of C.D. works)
(A) IN OVERBURDEN INCL. HARD MURRUM.
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
7 Providing and laying in position Controlled cement cocrete using cement 44.00 Cum 4303.00 Rupees: Four
sand and crushed aggragates by mass and machine mix for R.C.C./C.C. Thousand Three
work including necessary formwork, centering, scaffolding, compaction by Hundred Three Only.
vibrators using as directed with all lead and lift etc completed Excluding the
cost of reinforcement.
FOR PLINTH COURSE AND COPPING
(A) Concrete grade M-15 and MSA-20 mm
8 Providing,cutting,bending,binding and fixing in position as per drawing 4.13 M.T. 76574.00 Rupees: Seventy Six
.TMT BAR , reinforcement for R.C.C. works and anchor bars incl cost of Thousand Five Hundred
black annealed 16 to 18 BWG M.S.. Wire etc.complete with all lead and lift. Seveny Four Only.
9 Prov. and Laying in position Controlled cement concrete using cement, 84.00 Cum. 5230.00 Rupees: Five Thousand
sand and crushed aggregate by mass and machine mix for R.C.C/CC work Two Hundred Thirty
including necessary formworks centering scaffolding compaction by Only.
mechanical vibrator,curing as directed with all lead & lift etc complete
Excluding the cost of reinforcement
FOR SLABS AND LOFTS
c) Concrete grade M-20 and MSA-20mm
10 Providing, supplying, Lowering & laying ISI Standard R.C.C. NP-3 Class 10.00 Rmt. 3969.00 Rupees: Three
pipes in standard lengths of following Diameter suitable for either collar Thousand Nine
joints or rubber ring joints including all taxes, insurance, transportation, Hundred Sixty Nine
freight charges, octroi, inspection charges, loading, unloading, conveyance Only.
to site, and jointing in proper position, grade and alignment at all level as
directed by Engineer-in-charge including all labour, giving hydraulic testing
as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended
RCC pipe, cost included in rates below. One rubber ring should be supplied
with each full length socketed pipe, cost included in rates below.
(G) 900 mm dia.
(H) 1100 mm dia. 15.00 Rmt. 5472.00 Rupees: Five Thousand
Four Hundred Seventy
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
(i) 1200 mm dia. 20.00 Rmt. 6359.00 Rupees: Six Thousand
Three Hundred Fifty
11 White Stone Bela masonry block in course in superstructure with stone of 65.00 Cum. 5109.37 Rupees: Five Thousand
approved quality in Cement mortar 1:5 (1-cement : 5-course sand) One Hundred Nine &
including packing the joints etc. complete. (More than 10 ton) Ps. Thirty Seven Only.
12 Cement plaster 15mm thick in single coat to brick masonry in C.M. 1:3 incl 305.00 Sqm. 216.00 Rupees: Two Hundred
finishing, curing, scaffolding etc complete. Sixteen Only.
a) UPTO 6.0 Mt HEIGHT
13 Providing and laying in position Controlled cement concrete using cement 20.00 Cum 4540.00 Rupees: Four
sand and crushed aggregates by mass and machine mix for R.C.C./C.C. Thousand Five Hundred
work including necessary formwork, centring, scaffolding, compaction by Forty Only.
vibrators using as directed with all lead and lift etc completed Excluding the
cost of reinforcement.
FOR WEARING COATS
a. Concrete grade M-20 and MSA-20 mm
14 Rehandling the excavated stuff incl stacking as and where directed for all 31.00 Cum. 57.00 Rupees: Fifty Seven
sort of soil, soft murrum, hard murrum, soft rock, hard rock etc. for Only.
specified lead as under and all lift incl loading unloading transportation etc
complete without rolling and watering.
(a) Lead upto 200mt.
15 Providing & Fixing G.I. Pipe railing (B-class medium duty) as per design of 160.00 Rmt. 1942.00 Rupees: One Thousand
1.0 mt. height, using 75x75x10 mm size M.S Angle at 2.0 mt. c/c for Nine Hundred Forty
vertical posts and 38mm dia G.I pipe for 4 horizontal rows incl. one coat of Two Only.
red oxide primer & two coats of oil paint etc. complete
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
16 Prov. & Laying in position Controlled cement concrete using cement, sand 175.00 Sqm. 340.00 Rupees: Three Hundred
and crushed aggregate by mass and machine mix for C.C work in canal Forty Only.
lining incl. necessary formworks centering scaffolding compaction by plate
vibrator, curing as directed with all lead & lift etc complete incl dressing the
bed and trimming the canal section if required and minor filling with murrum
/ earth as per site condition to the correct profile, Incl providing bitumen
joints as per drawing and specified interval.(Without using paver
(d) For 7.50cms thick cast-in-citu canal lining in M-15 grade of conc.
with MSA-20mm without sleepers
17 Earth work in embankment from borrow pits in all sort of soil and soft 459.00 Cum 165.20 Rupees: One Hundred
murrum or other suitable strata as directed incl breaking clods and Sixty Five & Ps. Twenty
dressing to the design section with lead as under and all lift incl.site Only.
clearance etc comp. For all canal capacity & Without rolling and watering.
(200 to 1000 mt lead to 5.0 Km. lead)
Rupees: Twenty Two Lac Fifty Thousand Seven Hundred One & Ps. Sixty Two Only
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the estimated
rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of contractor. Rajkot Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Sankroli Rep Reno SBD.pdf
2 Sch-B Sankroli Rep Reno.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .