Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC 22045 R 100 M S PANJIPILLAI GINDADA P O KERALA | IDUKKI | KERALA | 685501 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹12.4 L+₹55,110.50 (4.65%)Rejected-AOC MADATHIN PADICAL HOUSE K S MANGALAM VAIKAM 686608 | KOTTAYAM | KERALA | 686608 | L2 | Rejected-AOC Second Lowest | |
| 3 | L3₹13.0 L+₹1.1 L (9.46%)Rejected-AOC | L3 | Rejected-AOC Third Lowest | |
| 4 | L4₹13.2 L+₹1.4 L (11.6%)Rejected-AOC SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | L4 | Rejected-AOC Fourth Lowest | |
| 5 | L5₹13.6 L+₹1.7 L (14.6%)Rejected-AOC | L5 | Rejected-AOC Fifth Lowest |
Tender Value
₹16 L
EMD Value
₹40,000
Closing Date
6 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer KIP RB Division No II PulamonKottarakkara PIN 691531
SDRF Urgent leak rectification works Between ch 13990M and 14550M inOyoor branch canal
2020_Irrig_388079_1
3/ET/KIP/RB/DnII/2020-21
Open Tender
Civil Works - Canal
Item Rate
60 days
Paruthiyara
Please refer Tender documents.
7 documents required · 7 mandatory
₹4,180
Yes
SBI Kottarakkara
₹40,000
Yes
10 Nov 2020
28 Sept 2020
12 Oct 2020
28 Sept 2020
6 Oct 2020
28 Sept 2020
45 days
Amount
Scheme 1 Relining of canal in between 13990m and 14017
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 2 Relining of canal in between 14017and 14043
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 3. Relining of canal in between Ch 14043 and 14070
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 4.Relining of canal in between Ch 14175 and 14202
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 5.Relining of canal in between Ch 14202 and 14229
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 6.Relining of canal in between Ch 14229 and 14256
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 7.Relining of canal in between Ch 14256 and 14283
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 8.Relining of canal in between Ch 14283 and 14310
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 8.Relining of canal in between Ch 14310 and 14337
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
Scheme 8.Relining of canal in between Ch 14337 and 14550
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc.complete as specification and as per the direction of the Engineer-in-charge.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) etc.complete as specification and as per the direction of the Engineer-in-charge.
od17629/2020_2021/P2 : C C 1:4:7 using 20 mm broken stone over existing damaged portion of open canal to lines and lining of open canal includingcost of materials curing materials labour and hire charges etc.complete as specification and as per the direction of the Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as specification and as per the direction of the Engineer-in-charge.
SAJI P.C. CONTRCATOR
SUNIL KUMAR A CONTRACTOR
R.Rajendran Pillai
SIRAJ .M ,Hairtha Constructions
Bidder Name
baiju
R.Rajendran Pillai
SAJI P.C. CONTRCATOR
SUNIL KUMAR A CONTRACTOR
SIRAJ .M ,Hairtha Constructions
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_551617.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .