Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹10.4 Cr+₹54,380.30 (0.05%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD and Tender processing fees not submitted and representative of this firm found to be absent | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD and Tender processing fees not submitted and representative of this firm found to be absent |
| Sl No | Description | Qty | Unit | M/S N B ENTERPRISES L1 | M/S HACHANG TACHANG L2 |
|---|---|---|---|---|---|
| 1.00SH:- FORMATION CUTTING | |||||
| 1.01 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 69,467.46 | Cum | 210 ₹1,45,88,166.6 | 209 ₹1,45,18,699.14 Lowest |
| 1.02 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 46,311.64 | Cum | 90 ₹41,68,047.6 Lowest | 90 ₹41,68,047.6 Lowest |
| 1.03 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 29,771.77 | Cum | 304 ₹90,50,618.08 Lowest | 304 ₹90,50,618.08 Lowest |
| 1.04 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock) | 19,847.85 | Cum | 145 ₹28,77,938.25 Lowest | 147 ₹29,17,633.95 |
| 2.00SH:- GSB LAYING | |||||
| 2.01 | Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | 12,631.5 | Sqm | 96 ₹12,12,624 Lowest | 97 ₹12,25,255.5 |
| 2.02 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. | 12,631.5 | Sqm | 5 ₹63,157.5 Lowest | 5 ₹63,157.5 Lowest |
| 2.03 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by Plant Mix Method providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 c) Material For Grading-I Material | 947.37 | Cum | 1,800 ₹17,05,266 Lowest | 1,802 ₹17,07,160.74 |
| 2.04 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by Plant Mix Method providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 c) Material For Grading-II Material | 947.37 | Cum | 1,630 ₹15,44,213.1 | 1,628 ₹15,42,318.36 Lowest |
Tender Value
₹10.4 Cr
EMD Value
₹10.4 L
Closing Date
26 Jul 2024, 4:00 pmClosed
Executive Engineer, PWD, Palin Division
Office of the EE, Palin Division, PWD, AP.
C/o road from District Hospital, Palin to Tubing village i/c Bridge/culvert in Kra Daadi district
2024_PWDAP_1893_1
PLND/CRIF/2023-24/001
Open Tender
Civil Works – Roads
Item Rate
548 days
Palin
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE PWD Palin Division
₹10.4 L
29 Jul 2024
19 Jul 2024
29 Jul 2024
19 Jul 2024
26 Jul 2024
19 Jul 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH:- FORMATION CUTTING | |||||
| 1.01 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | - | Cum | 100 | - |
| 1.02 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 1 | Cum | 100 | ₹99.9 |
| 1.03 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | - | Cum | 10 | - |
| 1.04 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock) | 1 | Cum | 10 | ₹9.99 |
| 2SH:- GSB LAYING | |||||
| 2.01 | Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | - | Sqm | 10 | - |
| 2.02 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. | - | Sqm | 10 | - |
| 2.03 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by Plant Mix Method providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 c) Material For Grading-I Material | - | Cum | 10 | - |
| 2.04 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by Plant Mix Method providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 c) Material For Grading-II Material | - | Cum | 10 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_2031.xls
BOQ Document • 0.29 MB
148585467.pdf
Tender Document • 0.27 MB
SBDFinal.pdf
Tender Document • 8.69 MB
148585469.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .