Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 2 | Not Admitted-Fee/PreQual/Technical PLOT NO 7 PIONEER SOCIETY SWAVALAMBI NAGAR NAGPUR 440022 | NAGPUR | MAHARASHTRA | 440022 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.0 L
EMD Value
₹22,090
Closing Date
9 May 2026, 6:00 pmClosed
Executive Engineer (Civil)
3rd Floor BSNL TE Building Vasna Ahmedabad
Construction of hall with GI roofing for alternate arrangement for shifting of T.E. building equipments including toilet facilities at Vadnagar campus under Mehsana BA
2026_BSNL_276047_1
NIT No. 11/BSNL/CD/AHD/2026-27 dtd 29.04.2026
Open Tender
Civil Works - Others
Item Rate
90 days
Vadnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Accounts Officer (Cash) O/o PGMTD, BSNL, Ahmedabad
₹22,090
11 May 2026
29 Apr 2026
11 May 2026
29 Apr 2026
9 May 2026
29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil. | 33 | One Cubic Metre | 260.3 | ₹8,589.9 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 21 | One Cubic Metre | 196 | ₹4,116 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 4.5 | One Cubic Metre | 2,123.75 | ₹9,556.88 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 4.01 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 7.5 | One Cubic Metre | 6,812 | ₹51,090 |
| 5Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : | |||||
| 5.01 | 1:1½:3 (1 cement : 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.5 | One Cubic Metre | 10,357.55 | ₹5,178.78 |
| 6 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources). | 7 | One Square Metre | 495.75 | ₹3,470.25 |
| 7 | Providing and applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 7 | One Square Metre | 146.15 | ₹1,023.05 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_322402.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .