Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC Contract Value |
| 2 | L2₹1.6 Cr+₹1.1 L (0.68%)Rejected-Finance | ₹1.6 Cr+₹1.1 L (0.68%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹1.8 Cr+₹16.5 L (10.2%)Rejected-Finance 59 8E CROSS ROAD ATTIGUPPE WEAVERS COLONY NEAR GOVT PU COLLEGE VIJAY NAGAR BANGALORE 560 040 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560040 | ₹1.8 Cr+₹16.5 L (10.2%) | L3 | Rejected-Finance L3 Bidder |
| Sl No | Description | Qty | Unit | Metro Medi Systems L3 | MEDIGAS SYSTEMS L2 | Hitech Med Gas Solutions L1 |
|---|---|---|---|---|---|---|
| 1.00MANIFOLD AND PLANT ROOM - OXYGEN SYSTEM | ||||||
| 1.00 | OD272759/2025-2026:Fully Automatic Oxygen Control System 2000 L/M : Supply, Installation testing and commissioning of Fully Automatic Oxygen Control System with minimum flow rate of 2000LPM; fully complain with ISO 10524-2, ISO 7396-1:2007/ HTM 02-01 as per technical specification. The cylinders shall not be included in the quoted price | 1 | no | 1,75,000 ₹1,75,000 Lowest | 2,45,000 ₹2,45,000 | 2,50,000 ₹2,50,000 |
| 1.00 | OD272761/2025-2026: Oxygen Manifold (12+12) : Supply, Installation, testing and commissioning of Oxygen Cylinder 2banks x 12 cylinders(12+12) as per technical specification. Cylinder shall not be included in the quoted price. | 1 | no | 1,10,000 ₹1,10,000 | 97,657 ₹97,657 | 89,100 ₹89,100 Lowest |
| 1.00 | OD272760/2025-2026:Emergency Oxygen manifold Supply System : Supply, Installation, testing and commissioning of (4+4) Emergency Oxygen Supply System 2 bank x 4 cylinders with high flow regulator. Cylinder shall not be included in the quoted price. | 1 | no | 45,000 ₹45,000 | 39,063 ₹39,063 Lowest | 40,590 ₹40,590 |
| 1.00 | OD272758/2025-2026:Oxygen Flow meter with Humidifier Bottle: Supply, installation, testing and commissioning of oxygen flow meter with humidifier bottle. As per specification. | 140 | no | 1,200 ₹1,68,000 | 1,464 ₹2,04,960 | 1,000 ₹1,40,000 Lowest |
| 2.00NITROUS OXIDE SYSTEM | ||||||
| 2.00 | OD272771/2025-2026:Fully Automatic Manifold Control Panel for Nitrous Oxide 600 L/M: Supply installation testing and commission of fully automatic control panel for Nitrous Oxide as per HTM 02-01/NFPA 99 C standards. | 1 | no | 1,10,000 ₹1,10,000 Lowest | 1,30,210 ₹1,30,210 | 1,30,000 ₹1,30,000 |
| 2.00 | OD272770/2025-2026:Nitrous Oxide Manifold System, (3+3): Supply installation testing and commissioning of 2 bank x 3 cylinders (3+3) Nitrous Oxide Manifold System. The cylinders shall not be included in the quoted price. | 1 | no | 30,000 ₹30,000 | 24,500 ₹24,500 | 19,800 ₹19,800 Lowest |
| 2.00 | OD272769/2025-2026:1+1 Nitrous Oxide Emergency Manifold: Supply installation testing and commissioning of 1 bank x 1 cylinder (1+1) Nitrous Oxide Manifold System | 1 | no | 18,000 ₹18,000 | 17,090 ₹17,090 | 14,169 ₹14,169 Lowest |
| 3.00CARBON DIOXIDE SYSTEM | ||||||
Tender Value
₹1.8 Cr
EMD Value
₹50,000
Closing Date
5 Jan 2026, 3:00 pmClosed
Managing Director
KITCO Ltd M M Gardems Church Landing Road, Pallimukku Ernakulam
Development of Women and Child Hospital at Thalassery Kannur Medical Gas Pipeline System
2025_KITCO_823776_1
HFWD/KITCO/CL/12/2025-26
Open Tender
Civil Works - Others
Item Rate
150 days
Thalassery Kannur
As per NIT
4 documents required · 4 mandatory
₹5,900
Yes
₹50,000
Yes
4 Mar 2026
24 Dec 2025
7 Jan 2026
24 Dec 2025
5 Jan 2026
27 Dec 2025
24 Dec 2025 - 26 Dec 2025
MANIFOLD AND PLANT ROOM - OXYGEN SYSTEM
OD272759/2025-2026:Fully Automatic Oxygen Control System 2000 L/M : Supply, Installation testing and commissioning of Fully Automatic Oxygen Control System with minimum flow rate of 2000LPM; fully complain with ISO 10524-2, ISO 7396-1:2007/ HTM 02-01 as per technical specification. The cylinders shall not be included in the quoted price
OD272761/2025-2026: Oxygen Manifold (12+12) : Supply, Installation, testing and commissioning of Oxygen Cylinder 2banks x 12 cylinders(12+12) as per technical specification. Cylinder shall not be included in the quoted price.
OD272760/2025-2026:Emergency Oxygen manifold Supply System : Supply, Installation, testing and commissioning of (4+4) Emergency Oxygen Supply System 2 bank x 4 cylinders with high flow regulator. Cylinder shall not be included in the quoted price.
OD272758/2025-2026:Oxygen Flow meter with Humidifier Bottle: Supply, installation, testing and commissioning of oxygen flow meter with humidifier bottle. As per specification.
NITROUS OXIDE SYSTEM
OD272771/2025-2026:Fully Automatic Manifold Control Panel for Nitrous Oxide 600 L/M: Supply installation testing and commission of fully automatic control panel for Nitrous Oxide as per HTM 02-01/NFPA 99 C standards.
OD272770/2025-2026:Nitrous Oxide Manifold System, (3+3): Supply installation testing and commissioning of 2 bank x 3 cylinders (3+3) Nitrous Oxide Manifold System. The cylinders shall not be included in the quoted price.
OD272769/2025-2026:1+1 Nitrous Oxide Emergency Manifold: Supply installation testing and commissioning of 1 bank x 1 cylinder (1+1) Nitrous Oxide Manifold System
CARBON DIOXIDE SYSTEM
OD272789/2025-2026:Semi Automatic Manifold Control Panel for CARBON DIOXIDE 600 L/M: Supply installation testing and commission of Semi automatic control panel for CARBON DIOXIDE as per HTM 02-01/NFPA 99 C standards.
OD272788/2025-2026:Supply ,installation testing and commissioning of cylinder CO2 Manifold 1 bank x 1 cylinder (1+1) with all accessories required in the specification.
OD272790/2025-2026:Supply, Installation, testing and commissioning of Emergency Co2 Outlet with Conversion Kit (Conversion Kit- 2nos)
MEDICAL AIR SYSTEM
OD272777/2025-2026:Medical air system: Supply, installation, testing and commissioning of compressed air plant complete with - 2 compressors, each compressor should have minimum free air delivery of 2000 lpm, 1 air receiver , 2 air purification system to ensure medical air quality as HTM 02-01 guidelines, pressure reducing station, control panel, automatic drain valves, ball valves etc and per technical specifications.
VACUUM PLANT
OD272748/2025-2026:Medical Vacuum Plant Package Duplex 3000 LPM with control panel.: Supply, Installation, testing and commissioning of Rotary Vane type Oil-lubricated Duplex Medical Vacuum Plant (Package Unit) having a capacity of 3000 LPM as per HTM 02-01/NFPA 99C standards and tender technical specification (PUMP,RESERVOIR,BACTERIAL FILTER)
OD272746/2025-2026:Ward Vacuum Unit: Supply, installation, testing and commissioning of Ward Vacuum Unit with 600ml collection jar as per specification.
OD272745/2025-2026:Theater Vacuum Unit for Operation Theaters: Supply, installation, testing and commissioning of Theater Vacuum Unit with trolley and 2000 ml collection jar as technical specification.
OD272747/2025-2026:Duplex AGSS System: Supply installation testing and commissioning of Duplex AGSS system ( Operation Theatre 3nos)
PIPELINE SYSTEM
OD272754/2025-2026:Supply, Installation, testing and commissioning of Copper Pipe : Copper pipe should be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes should be degreased & delivered capped at both ends. -12mm OD x 1 mm thick copper pipe
OD272750/2025-2026:Supply, Installation, testing and commissioning of Copper Pipe : Copper pipe should be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes should be degreased & delivered capped at both ends.-15mm OD X 0.9 mm thick copper pipe
OD272749/2025-2026:Supply, Installation, testing and commissioning of Copper Pipe : Copper pipe should be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes should be degreased & delivered capped at both ends. -22mm OD X 0.9 mm thick Copper pipe
OD272753/2025-2026:Supply, Installation, testing and commissioning of Copper Pipe : Copper pipe should be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes should be degreased & delivered capped at both ends. -28mm OD X 0.9 mm thick Copper pipe
OD272755/2025-2026:Supply, Installation, testing and commissioning of Copper Pipe : Copper pipe should be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes should be degreased & delivered capped at both ends.-35 mm OD x 1.2 mm thick Copper pipe
OD272751/2025-2026:Supply, Installation, testing and commissioning of Copper Pipe : Copper pipe should be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes should be degreased & delivered capped at both ends - 42 mm OD x 1.2 mm thick Copper pipe
OD272752/2025-2026:Supply, Installation, testing and commissioning of Copper Pipe : Copper pipe should be as per standard BS: EN 13348:2016/ ASTM B819 standards, Solid drawn, seamless, deoxidized, non-arsenical, half hard (hard can be accepted only for sizes 54mm or more), tempered and degreased copper pipe conforming to the standard. All copper pipes should be degreased & delivered capped at both ends - 54mm OD X 1.2mm thick.
Gas Outlets
OD272767/2025-2026:Supply, Installation, testing and commissioning of Gas outlet points for Oxygen, Nitrous Oxide, Medical Air 4 Bar , Vacuum, CO2 and AGSS complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard/DIN 13260-2 - O2 Outlets with Probes.
OD272764/2025-2026:Supply, Installation, testing and commissioning of Gas outlet points for Oxygen, Nitrous Oxide, Medical Air 4 Bar , Vacuum, CO2 and AGSS complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard/DIN 13260-2 - N2O Outlets with Probes
OD272763/2025-2026:Supply, Installation, testing and commissioning of Gas outlet points for Oxygen, Nitrous Oxide, Medical Air 4 Bar , Vacuum, CO2 and AGSS complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard/DIN 13260-2 - Air (4 bar) Outlets with Probes
OD272765/2025-2026:Supply, Installation, testing and commissioning of Gas outlet points for Oxygen, Nitrous Oxide, Medical Air 4 Bar , Vacuum, CO2 and AGSS complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard/DIN 13260-2 - Medical Air (7 bar) Outlets with Probes
OD272762/2025-2026:Supply, Installation, testing and commissioning of Gas outlet points for Oxygen, Nitrous Oxide, Medical Air 4 Bar , Vacuum, CO2 and AGSS complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard/DIN 13260-2 -Vacuum Outlets with Probes
OD272766/2025-2026:Supply, Installation, testing and commissioning of Gas outlet points for Oxygen, Nitrous Oxide, Medical Air 4 Bar , Vacuum, CO2 and AGSS complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard/DIN 13260-2 - CO2 Outlets with Probes
OD272768/2025-2026:Supply, Installation, testing and commissioning of Gas outlet points for Oxygen, Nitrous Oxide, Medical Air 4 Bar , Vacuum, CO2 and AGSS complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard/DIN 13260-2 - AGSS outlet with probe
Area Valve Services + Alarm units
OD272782/2025-2026:Supply, Installation, testing and commissioning of Medical Gas Area Valve Box With NIST Connection & Alarm Panel as per specification -MEDICAL GAS AVSU WITH ALARM PANEL for 2 services (Oxygen and MA4 bar ).
OD272787/2025-2026:Supply, Installation, testing and commissioning of Medical Gas Area Valve Box With NIST Connection & Alarm Panel.as per specification - MEDICAL GAS AVSU WITH ALARM PANEL for 3 services (Oxygen, MA4 bar and Vacuum) .
OD272784/2025-2026:Supply, Installation, testing and commissioning of Medical Gas Area Valve Box With NIST Connection & Alarm Panel.as per specification - MEDICAL GAS AVSU WITH ALARM PANEL 4 services (Oxygen, N2O, MA4 bar and Vacuum)
OD272786/2025-2026:Supply, Installation, testing and commissioning of Medical Gas Area Valve Box With NIST Connection & Alarm Panel.as per specification - MEDICAL GAS AVSU WITH ALARM PANEL for 5 services (Oxygen, MA4 bar , Vacuum,N2O & SA7)
OD272783/2025-2026:Supply, Installation, testing and commissioning of Medical Gas Area Valve Box With NIST Connection & Alarm Panel.as per specification -MEDICAL GAS AVSU WITH ALARM PANEL for 5 services (Oxygen-2, MA4 bar-1 , Vacuum-2)
OD272785/2025-2026:Supply, Installation, testing and commissioning of Medical Gas Area Valve Box With NIST Connection & Alarm Panel.as per specification - MEDICAL GAS AVSU WITH ALARM PANEL for 6 services (Oxygen,N2O MA4 bar, Air 7, Co2 & Vacuum)
OD272781/2025-2026:Master Alarm Panel : Supply, installation, testing and commissioning of Master Plant Alarm Panel, Complies with HTM 02-01/ISO 7396-1 Standards. Each Master Alarm should be modular in design and to and be fitted with required number of master alarm modules. The master alarms should be capable to monitor minimum 25 point. Each point represents an alarm condition that the source equipment might have. When an alarm condition exists, a red-light flashes and the audible alarm sounds. If several alarm conditions occur simultaneously, the most recent alarm light should flash, while the other alarm lights should remain lit. When an alarm condition is created, an audible alarm should be actuated. A dry contact module should be available to interface with a building management system. The box material should be of gauge steel of requisite thickness and equipped with mounting brackets. The emissions from alarms should conform with EMC standards. Master alarm management system should be designed to display alarm conditions from the source supply units indicating the broad status of the source equipment and manifolds as well as the master distribution status from the source supplies. Depending on the alarm priority, a visual and audible alarm should be initiated to indicate an alarm condition. Each panel shall display and/or input of multi point alarms, including all necessary cabling between mater alarm and floor panels. The master alarm must be able to monitor the following source alarm conditions. as per technical specifications.
Ball Valves
OD272774/2025-2026:Supply, Installation, testing and commissioning of Line Isolation Valves complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard. - 15 mm
OD272776/2025-2026:Supply, Installation, testing and commissioning of Line Isolation Valves complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard. - 22 mm
OD272772/2025-2026: Supply, Installation, testing and commissioning of Line Isolation Valves complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard - 28 mm
OD272773/2025-2026:Supply, Installation, testing and commissioning of Line Isolation Valves complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard - 35 mm
OD272775/2025-2026:Supply, Installation, testing and commissioning of Line Isolation Valves complies with HTM 02-01/ NFPA 99 C/EN/DIN/ISO 7396-1 standard.- 42 mm
D type Cylinders
OD272778/2025-2026:Supply of D type Oxygen Gas Cylinder as per technical specification.
OD272780/2025-2026:Supply of D type Nitrous Oxide Gas Cylinder as per technical specification.
OD272779/2025-2026:Supply of D type CO2 Gas Cylinder as per technical specification.
Other Items
OD272756/2025-2026: Supply and installation of Bed Head 5ft(Horizontal/Vertical) unit made out of High strength extruded Aluminum Panel of minimum 2.5 mm thickness with powder coated to make it aesthetically appealing and long lasting, the panel should be suitable for accommodating following utilities - Oxygen, Vacuum, Medical Air, Nurse call switch-1, Spare probe, 4 Nos of 5A Socket Outlets( 2 UPS & 2 Raw Power) & 2 Nos of 5/16ASocket Outlet (1 UPS & 1 Raw Power), provision for RJ-45 socket/ Ethernet, shall have monitor holder and equipped with two side rail system to hold different associated accessories like vaccine basket, Holder for vacuum collection jar, examination lamp, IV pole, etc. and all necessary mechanical supports for complete installation as instructed and directed by engineer in- charge.
OD272757/2025-2026:Supply, installation, testing and commissioning of Medical gas hose assemblies as per standard followed as per specification
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
TechbidMGPS.pdf
Tender Documents • 5.04 MB
BOQ_1380875.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .