| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L1 | Accepted-AOC awarded | |
| 2 | l2₹4.9 L+₹49,525.68 (11.2%)Rejected-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | l2 | Rejected-AOC rejected | |
| 3 | L3₹5.0 L+₹58,721.45 (13.2%)Rejected-AOC CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L3 | Rejected-AOC rejected | |
| 4 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | Rejected-Technical TECHNICALLY NOT OK |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L2 | coalfields engineering works L3 | CENTRAL ENGINEERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cost of copper wire/strip size 13SWG dual coated wire for primary and secondary windings. | 390 | Kg | 1,342.63 ₹5,23,625.7 Lowest | 1,367 ₹5,33,130 | 1,400 ₹5,46,000 |
| 2.00 | Cost of insulation charges @ 15% of sl. No. 1 | 1 | job | 78,543.86 ₹78,543.86 Lowest | 79,969.5 ₹79,969.5 | 81,900 ₹81,900 |
| 3.00 | Cost of labour charges @ 15% of sl.no. 1 | 1 | job | 78,543.86 ₹78,543.86 Lowest | 79,969.5 ₹79,969.5 | 81,900 ₹81,900 |
| 4.00 | Cost of replacement of complete gasket of conservator, radiator, top lever, inspection chamber | 1 | job | 16,050 ₹16,050 | 16,350 ₹16,350 | 3,000 ₹3,000 Lowest |
| 5.00 | Cost of filtration of transformer oil | 680 | Ltr | 17.1 ₹11,628 Lowest | 17.5 ₹11,900 | 20 ₹13,600 |
| 6.00 | Cost of replacement of breather with silica gel blue, 2 kg capacity | 1 | Nos. | 14,820 ₹14,820 | 15,200 ₹15,200 | 3,000 ₹3,000 Lowest |
| 7.00 | Cost of bushing with stud and oil seal for secondary side suitable for 630 KVA | 3 | Nos. | 10,165 ₹30,495 | 10,355 ₹31,065 | 3,200 ₹9,600 Lowest |
| 8.00 | Complete dismantling and reassembling after repair with painting of transformer | 1 | job | 16,050 ₹16,050 | 16,350 ₹16,350 | 10,000 ₹10,000 Lowest |
| 9.00 | Complete testing of tramsformer as per IS specification from NABL accrediated lab with test report | 1 | job | 19,260 ₹19,260 | 19,620 ₹19,620 | 12,000 ₹12,000 Lowest |
| 10.00 | Contractor's profit on sl.no. 3-9 | 1 | nos. | 18,684.69 ₹18,684.69 | 19,045.45 ₹19,045.45 | 10,600 ₹10,600 Lowest |
Tender Value
₹5.4 L
EMD Value
₹6,900
Closing Date
28 Jul 2025, 6:00 pmClosed
SO ENM
SO ENM OFFICE RAJRAPPA
Complete repairing rewinding of 01 no 630KVA 6.6 3.3KV/ 415V Transformer Make NA Sl No NA of Rajrappa Project
2025_CCL_339382_1
GM(R)/ SO(ENM)/Rjp/25-26/Et/43 dt 17.07.25
Open Tender
Electrical and Maintenance Works
Item Wise
15 days
RAJRAPPA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,900
4 Nov 2025
17 Jul 2025
29 Jul 2025
18 Jul 2025
28 Jul 2025
18 Jul 2025
18 Jul 2025 - 21 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .