Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹68.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹70.3 L+₹1.5 L (2.11%)Admitted-Fee/PreQual/Technical/Finance | ₹70.3 L+₹1.5 L (2.11%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹71.5 L+₹2.7 L (3.97%)Admitted-Fee/PreQual/Technical/Finance LID AND EW SECTION PALLIKKATHODU GRAMA PANCHAYATH | KOTTAYAM | KERALA | 686102 | ₹71.5 L+₹2.7 L (3.97%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹72.2 L+₹3.4 L (4.99%)Admitted-Fee/PreQual/Technical/Finance | ₹72.2 L+₹3.4 L (4.99%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹73.6 L+₹4.7 L (6.90%)Admitted-Fee/PreQual/Technical/Finance | ₹73.6 L+₹4.7 L (6.90%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Shajimon Joseph L3 | SHAJI PAILYE L6 | COCHIN SURAKSHA INFRASTRUCTURE PRIVATE LIMITED L2 | JOSE K V L4 | May Flower Constructions L5 | Joy Kalappurayil L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Structural and Finishing works | |||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 173.45 | cum | 321.95 ₹55,843.52 | 367.74 ₹63,785.97 | 314.17 ₹54,494.04 | 323.03 ₹56,030.85 | 330 ₹57,239.82 | 308 ₹53,423.83 Lowest |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 172.16 | cum | 285.03 ₹49,071.05 | 325.57 ₹56,050.46 | 278.15 ₹47,886.58 | 285.99 ₹49,236.32 | 295 ₹50,787.5 | 273 ₹46,999.95 Lowest |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 8.96 | cum | 652.8 ₹5,850.39 | 745.65 ₹6,682.52 | 637.04 ₹5,709.15 | 654.99 ₹5,870.02 | 670 ₹6,004.54 | 626 ₹5,610.21 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.32 | cum | 7,467.42 ₹9,842.06 | 8,529.54 ₹11,241.93 | 7,287.2 ₹9,604.53 | 7,492.45 ₹9,875.05 | 7,650 ₹10,082.7 | 7,174 ₹9,455.33 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 35.82 | cum | 7,099.94 ₹2,54,291.45 | 8,109.79 ₹2,90,460.24 | 6,928.58 ₹2,48,154.02 | 7,123.74 ₹2,55,143.87 | 7,270 ₹2,60,382.32 | 6,821 ₹2,44,300.94 Lowest |
| 1.01 | OD256251/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess cement used as per design mix will not be payable .All work upto plinth level | 80.73 | cum | 9,746.17 ₹7,86,847.29 | 11,132.4 ₹8,98,763.18 | 9,510.95 ₹7,67,857.04 | 9,778.83 ₹7,89,484.06 | 9,995 ₹8,06,936.33 | 9,364 ₹7,55,993.18 Lowest |
| 1.01 | OD256250/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix will not be payable .All work above plinth level up to floor V level | 66.56 | cum | 11,567.03 ₹7,69,959.35 | 13,212.26 ₹8,79,474.09 | 11,287.87 ₹7,51,377.07 | 11,605.81 ₹7,72,540.74 | 11,850 ₹7,88,795.25 | 11,114 ₹7,39,803.41 Lowest |
| 1.01 | 4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.46 | cum | 10,522.16 ₹25,884.51 | 12,018.77 ₹29,566.17 | 10,268.21 ₹25,259.8 | 10,557.43 ₹25,971.28 | 10,775 ₹26,506.5 | 10,110 ₹24,870.6 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 9,680.28 | kilogram | 97 ₹9,38,987.16 | 114.93 ₹11,12,554.58 | 98.19 ₹9,50,506.69 | 100.96 ₹9,77,321.07 | 101 ₹9,77,708.28 | 95 ₹9,19,626.6 Lowest |
Tender Value
₹80.4 L
EMD Value
₹50,000
Closing Date
13 Aug 2026, 11:00 amClosed
executive engineer
PWD BUILDING DIVISION KOTTAYAM
GENERAL Construction of new School building for Government L P school Velloo rConstruction of new School building for Government L P school Velloor General Civil Work
2026_PWD_864409_1
PWD/BLDG/TR/23520/2025
Open Tender
Civil Works - Buildings
Item Rate
365 days
KOTTAYAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
17 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Structural and Finishing works | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.6 | cum | - | - |
| 1.002 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 0.4 | cum | - | - |
| 1.003 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1 | cum | - | - |
| 1.004 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | OD256251/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess cement used as per design mix will not be payable .All work upto plinth level | 0.6 | cum | - | - |
| 1.007 | OD256250/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix will not be payable .All work above plinth level up to floor V level | 1 | cum | - | - |
| 1.008 | 4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.03 MB
finance_1462543.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_1462543.xls
BOQ • 0.37 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .