| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.5 LAccepted-AOC | ₹54.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹58.3 L+₹3.8 L (6.94%)Rejected-Finance | ₹58.3 L+₹3.8 L (6.94%) | L2 | Rejected-Finance Due to higher rates |
| 3 | L3₹61.1 L+₹6.6 L (12.1%)Rejected-Finance | ₹61.1 L+₹6.6 L (12.1%) | L3 | Rejected-Finance Due to higher rates |
| 4 | L4₹63.4 L+₹8.9 L (16.3%)Rejected-Finance | ₹63.4 L+₹8.9 L (16.3%) | L4 | Rejected-Finance Due to higher rates |
Tender Value
₹72.7 L
EMD Value
₹1.5 L
Closing Date
12 Aug 2026, 6:00 pmClosed
Executive Engineer
HPPWD Division Jaisinghpur
C/O main building portion alongwith WS and SI, Rain water harvesting tank and septic tank etc
2026_PWD_140596_1
Jaisinghpur 5250-59 dated 27.07.26
Open Tender
Civil Works - Buildings
Percentage
270 days
Jaisinghpur
Please refer Tender documents.
14 documents required · 14 mandatory
₹2,000
₹1.5 L
9 Sept 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
12 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains etc. in all kind of soil (not exceeding 1.5 m (one point five Metre) in width or 10 Per Square Metre (ten square Metre) on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil asdirected, within a lead from the edge of excavation . All kind of soil complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | 291.35 | - |
| 2 | Supplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | - | Per cubic metre | 1,357.2 | - |
| 3 | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Foundation, footings basis of columns etcetera and mass concrete including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | - | Per Square Metre | 262.5 | - |
| 4 | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Flat surfaces such as soffits of suspended floors, roofs, landings and the like floor etcetera upto any thickness including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | - | Per Square Metre | 597.3 | - |
| 5 | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Beams, cantilever, girders and lintels. Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto all depth and in all heights including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | 1 | Per Square Metre | 481.9 | ₹481.42 |
| 6 | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Columns, Pillars, Piers, Abutments, Posts and Struts up to all width and heights including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | 1 | Per Square Metre | 621.6 | ₹620.98 |
| 7 | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Stairs, (excluding landings) except spiral-staircasesup to all width and heights including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | - | Per Square Metre | 523 | - |
| 8 | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Edges of slabs and breaks in floors and walls up to all width and heights including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | - | Per Running Metre | 143.6 | - |
| 9 | Providing form work with steel plates of 3.15mm thick, welded with angle iron in frames of 30mmx30mmx5mm, so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in Vertical surfaces including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | 1 | Per Square Metre | 243.1 | ₹242.86 |
| 10 | Providing form work with steel plates of 3.15mm thick, welded with angle iron in frames of 30mmx30mmx5mm, so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in Vertical surfaces including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, and all type of other taxes imposed by the Government but excluding GST. | - | Per Square Metre | 515.4 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
SBD.pdf
Tender Documents • 4.52 MB
BOQ_208552.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .