Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
30 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Ahmedabad Urban Development Authority, Ahmedabad
ARC Tender for Desilting by CCTV Camera System Work of Different Dia Sewerage Line in AUDA area(Job No.19/2026-27)
362686
Job No.19/2026-27
Open
Miscellaneous Works
Works
Ahmedabad
1 document required · 1 mandatory
₹3,600
Ahmedabad Urban Development Authority Ahmedabad
₹1.9 L
4 Nov 2026
4 Nov 2026
4 Nov 2026
30 Nov 2026
4 Nov 2026
Bill of Quantities
Name of Work:- ARC Tender for Desilting by CCTV Camera System Work of Different Dia Sewerage Line
in AUDA area (Job No……./ 2026-27)
Item Item / Description Qty Rate Unit Total
1 Temporary / Permanent Plugging for blocking of sewer line, branch connections
and diversion of flows and removal of all plugs by any means etc. comp. as
directed by Engineer In Charge of the work.
(J) 1800 mm dia to 2200mm Dia 10.00 7500.00 No.
(K) RCC Duct of any size 10.00 8000.00 No.
2 Provide everything else required for diversion of flow by pumping and / or
bypassing and to maintain the sewerage system functioning normal and
managing the flow without any sur-charging, overflows etc during the De-silting/
rehabilitation works of the sewer line to
the satisfaction of the Engineer in charge of the work.
(J) 1800 mm dia to 2200mm Dia 2000.00 1100.00 RMT
(K) RCC Duct of any size 40.00 1200.00 RMT
3 Loosen, de-silt and thoroughly clean and remove debris and objects such as
boulders, bricks etc, bacteriological slimes, roots, encrustations, grease,
carbonated deposits, etc from the sewer line including disposal of silt / debris /
malba / objects etc, including solidification of silt/malba/debris for disposal to
the dumping sites as per the direction of the Engineer - in -
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 50.00 984.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 50.00 615.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 50.00 1452.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 50.00 907.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 50.00 1968.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 50.00 1230.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 20.00 2624.00 RMT
Item Item / Description Qty Rate Unit Total
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 20.00 1640.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 20.00 2960.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 20.00 1850.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 10.00 3560.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 10.00 2225.00 RMT
(G) 1200 mm dia
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 20.00 4032.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 20.00 2520.00 RMT
(H) 1400 mm dia
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 20.00 4704.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 20.00 2940.00 RMT
(I) 1600 mm dia
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 500.00 5376.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % AS/ 100.00 3360.00 RMT
(J) 1800 mm dia to 2200mm Dia
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 1200.00 6048.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 1000.00 3780.00 RMT
(K) RCC Duct of any size
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS / 10.00 6400.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 % 10.00 4000.00 RMT
4 Post-desilting colour CCTV/ Photographic survey including pan and Zoom
inspection of laterals and defects and submission of video tapes or CD inclusive
of colour photographs to the Engineer in total 2 Sets.
(B) 450mm dia 10.00 250.00 RMT
(C) 600mm dia 10.00 250.00 RMT
(D) 800mm dia 10.00 250.00 RMT
(J) 1800 mm dia to 2200mm Dia 2000.00 250.00 RMT
(K) RCC Duct of any size 20.00 250.00 RMT
5 Cutting of bituminous road of DBM and Asphalt 40.00 75.00 SMT
concrete of any thickness.
6 Brickwork using common burnt clay builing bricks having 10.00 4051.78 CMT
crushing strength not less than 35 kg/ sq.cm in foundation and plinth in cement
mortar 1:5 (1 cement :5 fine sand ) ( B)
7 Finding & Raising buried manhole underneath road using Brick massonery with 9.00 2500.00 No.
Brick Strenghth 35kg / quare cm and cement morter 1:4 and CC work up to
new road level as per instruction of engineer in charge
Item Item / Description Qty Rate Unit Total
8 Providing and fixing F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & 10.00 2294.00 No.
Frames Cover : 728mm ø & 100 mm thick circular cover,35.00 MT load design,
100x2mm MS flat allround, 16mm ø plain round bar for lifting the cover & should
be fitted with plastic cups.
Frame : 560 mm ø clear opening, outer size-888x888x175 mm. On the upper
periphery of frame 25 x 3 mm wide MS flat should be well embed in concrete to
protect the edges of frame. FRC E.H.D.-35 manhole cover & frame incl. carting
to the work site
9 Providing TMT Bar Fe-500/500D reinforcement bars for R. C. C. work including 200.00 76.22 Kg.
bending, binding and placing in position complete upto floor two level.
10 Survey to determine sewer alignment, levels, M/H positions, proximity of 5000.00 7.50 Rmt
structures, measurement of exact length between manholes and providing two
sets of autocad drawing as per instruction of Engg.
incharge.(App.C.C.T.V. Disilting Tender Rate)
11 Providing & Supplying JCB Machine on rental basis in case of emergency 10.00 600.00 Hour
situation and break down type work & also during unavoidable condition as per .
instruction of engg.incharge , rate includes all nece. shifting, fuel and operating
charges and stacking of useful & non-useful materials separately up to store.
(No payment should be allowed for non working condition of machinery and for
pipe line excavation and laying work) Work as per instruction of engineer in
I/We am/are willing to carry out the work at ________% above/below percent (should be written in figures and words) of the
estimated rate mentioned above. Amount of my / our tender works out as under .
Estimated amount put to tender Estimated amount put to tender
Deduct____% below Add____% Above
In words In words
1 Rates quoted include clearance of site (prior commencement of work and completion of work ) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
2 The Labour Cess will be deducted as per prevailing rules i.e.1% of the work done.
3 For abnormal high or law rates payment of such items shall be regulated as per Govt. Circular letter No. Parach-
4 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
5 GST and Income tax TDS will be deducted at a source while making payments of bills.
6 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in SOR used for preparation of Estimate.
Signature of Contractor Executive Engineer
Ahmedabad Urban Development Authority
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Read Notice.pdf
Schedule B.pdf
Tender Notice.pdf
Vol - 4 Drawing.pdf
Vol- 2 Specification.pdf
Vol- 3 Price Bid.pdf
Vol-1 Technical Bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .