Loading…
Loading…
Tender Value
₹18.6 L
EMD Value
₹19,000
Closing Date
9 Sept 2026, 6:00 pm
Executive Engineer, Botad Irrigation Division, Botad
Goma Irrigation Scheme Restoration works of existing VRB to BOX culvert and canal syphon cum fall with RCC construction
338817
Tender Notice No. 11 of 2026-27
Open
Civil Works
Works
Botad
6 documents required · 6 mandatory
₹900
Executive Engineer Botad Irrigation Division Botad
₹19,000
26 Aug 2026
26 Aug 2026
26 Aug 2026
9 Sept 2026
26 Aug 2026
Bill of Quantities
A) Percentage Rate Tender (Upto INR 50.0 CR)
Name of Work: Goma Irrigation Scheme
Restoration works of existing VRB to Box Culvert and Canal Syphon cum fall with RCC
Item Description Of Item (With brief specification & Rate in
Quantity Unit Amount
No. reference to book of specification) Figure
Excavation in all sort of strata and formations
including depositing the unusefull excavated stuff as
and where rected incl. sorting and stacking usefull
1 materials as irected up to 30 mt lead 179.94 Cum 83.00
etc.complete.incl.dewatering (Depth 0 to 3.00 mt.)
(A) In overburedn incl. hard murrum
Providing and Laying in position nominal mix cement
cocrete using cement cement,sand and gravel by mass
and mahine mix for C.C. work including necessary
form work centering,scaffolding,compaction
2 compaction by mechanical vibrator, curing as directed 112.49 Cum 3816.00
with all lead and lift etc complete
For general purpose
Conceret Grade(1:2:4) and MSA 40 mm
Prov. and Laying in position "Controlled cement
Concrete"using cement, sand and crushed aggregate
by mass and machine mix for RCC/C.C. work including
necessary formworks centering scaffolding
3 compaction by mechanical vibrator,curing as directed 121.44 Cum 5766.00
with all lead & lift etc complete.Excluding the cost of
For CSY/DSY Barrel.
A) Concrete Grade M20 and MSA-20 mm
Providing,cutting,bending,binding and fixing in posion
as per drawing TMT bar renforcement for RCC works
4 and anchor bar incl.cost of black anneaded 16 to 18 8.034 MT 76574.00
BWG MS wire etc.complete with all lead and lift
Dismentling stone /brick masonary & sorting, and
stacking of useful and unuseful material from the
5 dismentled materials as directed etc complete. 35.44 Cum 616.00
A) in cement mortar
Dismentlling the existing RCC pipes including sorting
out and stacking out of useful material
6 (pipe)measurable condition upto lead 200 mtr as 7.32 Rmt 214.00
directed under the specification
(iii) 650 mm to 900 mm diameter
Providing,Supplying lowering and laying ISI Standard
RCC NP3 Class pipes in standard lentgh of Following
diameter suitable for either collar joint or per rubber
ring joint including all taxes, insurance, transportation,
freigth charges octroi, inspection charges, loading,
unloading , conveyence to site and joiniting in proper
position grade and alignement as directed by engineer
7 in charge including all labour giving hydraulic tetsting 15.00 Rmt 2235.00
as per IS code.
Note:One collar should be supplied with each full
length plain ended RCC pipe cost included in rates
below one rubber ring should be supplied with each
full length socketed pipe cost included in rates below
(F) 600 mm dia.
White washing with lime on wall surface (one coats) to
give an even shade including thoroughly booming the
8 surface to remove all dirt, dust; mortar drops and 193.680 Sq.mt 5.99
loose scales of lime wash and other foreign matter.
Type - A, "W" : Metal Beam Crash Barrier (Providing
and erecting a "W" metal beam crash barrier
comprising of 3 mm thick corrugated sheet metal
beam rail, 70 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm
9 spaced 2 m centre to centre, 1.8 m high, 1.1 m below 12.00 Rmt 3468.34
ground/road level, all steel parts and fitments to be
galvanised by hot dip process, all fittings to conform to
IS:1367 and IS:1364, metal beam rail to be fixed on the
vertical post with a spacer of channel section 150 x
x 5 mm, 330 mm long complete as per clause 811)
10 Videography and photography related work. 1.00 Per Job 1000.00
I/We am/are willing to carry out the work at……...….%. below /Above percentage (Should be
written in figures and words) of the estimated rate mentioned above. Amount of my /our tender
works out as under.
Estimated amount put to tender Rs. 18,60,318.16 Estimated amount put to tenderRs.
Deduct Rs………………… Add Rs…………………
Net Rs. ……………………… Net Rs………………………
In words In words
2) The labour cess will be deducted as per prevailing rules i.e. 1 % of work done.
3) GST and Income tax TDS will be deducted at a source while making payment of bill.
4) In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.NO.:MIS102010/17/K1Dated:30/07/2018as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption has been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
5) All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
6) Rates quoted include clearance of site (prior commencement of work and at its close) in all
respects and hold good for work under all conditions, site, moisture, weather etc.To be
continued on additional sheets, if found necessary.
Signature of Contractor
Deputy Executive Engineer
Irrigation Sub Division Executive Engineer
Paliyad Botad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD-Goma RBMC canal.pdf
Itemwise Specification RBMC Canal.pdf
Goma RBMC Testing Schedule.pdf
BOQ Goma RBMC Canal.pdf
NIT Goma RBMC Canal.pdf
Nivida No. 11 of 2026-27.pdf
Specification and Condition-RBMC Canal.pdf
Work and Site Condition RBMC Canal.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].