Loading…
Loading…
Tender Value
₹20.7 L
EMD Value
₹41,400
Closing Date
27 Jul 2026, 3:00 pmClosed
Executive Engineer PWD RNB DH PORA
Executive Engineer PWD RNB DH PORA
Construction of ACR at MS Samnoo (Gutted)
2026_PWDJK_315822_1
27 Of RnB/D.H. Pora/2026-27/1997-2005 Dtd. 13/07/2026
Open Tender
Civil Works
Percentage
270 days
Executive Engineer PWD RNB DH PORA
Please refer Tender documents.
5 documents required · 5 mandatory
₹800
Acc no 0470010200000099
₹41,400
13 Jul 2026
13 Jul 2026
28 Jul 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation All kinds of soil by mechanical means in trenches for foundations (not exceeding 1.5 m in width) not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms, all lift , including getting out excavated earth and disposal of surplus excavated earth as directed: | - | Cum | 0.2 | - |
| 2 | Providing and laying stone soling duly hand packed in maintaning level and section including ramming and carriage of the same up to site of work complete. | 7.18 | Cum | 0.8 | ₹5.74 |
| 3 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 grade stone aggregate 40 mm
nominal size including curing but excluding the
cost of centring and shuttering. All work upto plinth level | 6.4 | Cum | 0.4 | ₹2.55 |
| 4 | Providing and laying in position cement concrete 1:3:6 (1
Cement:3 Corase sand: 6 grade stone aggregate 20 mm
nominal size including curing but excluding the cost of centring and shuttering. All work upto plinth level | 19.16 | Cum | 1 | ₹19.14 |
| 5 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1 Cement:1.5 Corase sand: 3 grade stone aggregate 20 mm nominal size including curing but excluding the
cost of centring, shuttering, finishing and reinforcement. All work upto plinth level | - | Cum | 0.4 | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 15.19 | Cum | 0.2 | ₹3.04 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 27.2 | Cum | 0.4 | ₹10.85 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 27.2 | Cum | 0.6 | ₹16.29 |
| 9 | Filling available excavated earth in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 9.74 | Cum | 0.4 | ₹3.9 |
| 10 | Supplying and filling of RBM ( river bed material )/boulders under floors including spreading,watering,ramming with all carriages complete | 35.4 | Cum | 0.8 | ₹28.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
ACRMSSAMNOO.xls
Other Document • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .