Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance THORANATHINGAL HOUSE ELOOR MLA ROAD MANJUMMEL P O ERNAKULAM KERALA 683501 UDYAM KL 02 0028061 | ERNAKULAM | KERALA | 683501 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
23 Aug 2024, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM(Projects And Planning) FACT-UC
AGM(Projects And Planning) FACT-UC, Udyogamandal, Cochin, Kerala
Floor repair works at lactam godown and Casting of pedestals for proposed high mast light poles in FACT Petro-UC
2024_FACT_820578_1
5066/2024-2025/E29913
Limited
Civil Works
Item Rate
180 days
Udyogamandal
5 documents required · 5 mandatory
₹0
₹12,000
Yes
24 Aug 2024
8 Aug 2024
24 Aug 2024
8 Aug 2024
23 Aug 2024
8 Aug 2024
Floor repair works at lactam godown & Casting of pedestals for proposed high mast light poles in FACT Petro-UC
Earthwork excavation in all classes of soil except hard rock requiring blasting for foundation trenches, drains, column footings, equipment foundations etc. not exceeding 1.5m in width or 10 sq.m on plan including filling in basement and sides of foundation with the spoil earth in layers, breaking clods, watering, ramming and consolidating and conveying and depositing the excess spoil or filling in low lying area and levelling within an initial lead of 50m and lift upto 1.5m etc. complete.
Cement concrete work in 1:4:8 mix using first class 40mm nominal size hard granite broken stones including all charges for mixing concrete, laying, consolidating, curing etc. complete foundation/levelling course, flooring etc. complete but excluding cost of formwork.
Providing and laying Reinforced cement concrete of M30 grade concrete with minimum cement content of 420kg /cum of concrete using Portland Pozzolana cement conforming to IS 1489, river sand/manufactured sand conforming to IS 383 and using 20 mm and down hard granite broken stones including all charges for machine mixing concrete, transporting, laying, mechanically vibrating, consolidating, curing, etc. complete and finished to a fair face to slopes/lines as specified including cost of cement and materials but excluding cost of form work and reinforcement (Quoted rate shall include bailing out water from all sources and causes )
Providing form work to RCC / CC works with necessary wooden planks, joists, runners, struts, posts etc. including removal after completion/ curing for foundation footings, machine equipment foundations and pedastals over foundation footings, sides of trench walls, plinth beams and rafts, pile caps and mass concrete works etc.at all levels inside factory area.
Supplying, fabricating, and fixing reinforcement to RCC works at all levels with High strength deformed bars Fe 500 grade conforming to IS 1786 including all charges for uncoiling and straightening rods, cutting rods, bending cold, placing in position and tying with tying wire etc. complete.
Providing reinforcement to RCC works at all levels with MS or deformed bars including all charges for uncoiling and straightening rods, cutting rods, bending cold, placing in position and tying with tying wire of suitable gauge etc.complete.( Only Reinforcement Rods will be issued free of cost by the company)
Dismantling and removing the existing CC/RCC works and conveying and depositing the debris at places pointed out within a distance of 150m as directed by Engineer-in charge.
RCC work 1:1 1/2:3 nominal mix using first class 20mm and down grade hard granite broken stones including all charges for mixing , laying, consolidating, curing, handling and fixing in position, etc. complete but excluding cost of form work and reinforcement for foundation footing, bottom and sides of trench , raft, plinth beams and pedestals over foundation footings of all shapes pile caps and mass concrete.
SANUSH TH
T K SALIM
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .