Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1Admitted-Fee/PreQual/Technical/Finance | -21.21% | - | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1Admitted-Fee/PreQual/Technical/Finance | -25.10% | - | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1Admitted-Fee/PreQual/Technical/Finance | -21.00% | - | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1Admitted-Fee/PreQual/Technical/Finance | -7.00% | - | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹3.9 LAdmitted-Fee/PreQual/Technical/Finance | -21.66% | ₹3.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
5 Aug 2026, 3:00 pmClosed
Xen IFC Sopore
Xen IFC Sopore
Construction of Foot Bridge on zaingeer main canal near H/O Abdul Salam Reshi at watlab
2026_IFC_316281_2
enit06.IFCD.SPR.2026.27
Open Tender
Civil Works
Percentage
20 days
Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹400
as specified in NIT
₹10,000
17 Aug 2026
16 Jul 2026
6 Aug 2026
16 Jul 2026
5 Aug 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 32.2 | Cum | 187.3 | ₹6,031.06 |
| 2 | Providing & Laying Dry Stone Soling Including Cost of Stones | 2.2 | Cum | 937.9 | ₹2,063.38 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.29 | cum | 5,202.9 | ₹6,711.74 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 12.08 | cum | 9,395.7 | ₹1,13,500.06 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.18 | Cum | 7,104.35 | ₹36,800.53 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 1,755.9 | kg | 138.2 | ₹2,42,665.38 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. | 483 | kg | 123.2 | ₹59,505.6 |
| 8Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 8.1 | Foundations, footings, bases of columns etc. for mass concrete. | 3.45 | SQM | 286.35 | ₹987.91 |
| 8.2 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 27.6 | SQM | 628.95 | ₹17,359.02 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_1030495.xls
BOQ • 0.25 MB
Corrigendum06.pdf
PDF • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .