Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.8 LAccepted-AOC KERALA KL | MALAPPURAM | KERALA | 670612 | L1 | Accepted-AOC Agreement Executed | |
| 2 | L2₹49.8 L+₹96,735.12 (1.98%)Rejected-AOC 301 C KUZHIPPILLIL COMPLEX PAMPAKUDA MUVATTUPUZHA ERNAKULAM DISTRICT | ERNAKULAM | KERALA | 680667 | L2 | Rejected-AOC L1 Agreement Executed |
Tender Value
₹44.5 L
EMD Value
₹50,000
Closing Date
4 Jan 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
PWD ROADS DIVISION IDUKKI
GENERAL-RM/ RC II Phase -I/ 2023- 24/CLUSTER II/ One Year RC-Zone IX -For various PWD Roads under Roads SectionNedumkandam in Idukki District - 4 Road stretches for a length of 16.20 Km
2023_PWD_635503_1
26/EE/2023-24
Open Tender
Civil Works - Roads
Item Rate
365 days
IDUKKI
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
8 Feb 2024
23 Dec 2023
6 Jan 2024
23 Dec 2023
4 Jan 2024
23 Dec 2023
Amount
Initial rectification appendix A
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
OD72266/2023-2024:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with dozerin sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD61944/2023-2024:Mix seal surfacing providing & rolling of close graded premix surfacing material 20mm thickness composed of 11.2mm to 0.9mm Type A aggregate using penetration grade bitumen to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying & rolling with a three wheel 8 to 10KN static roller & finishing to required level & grade as per technical specification clause 509 of MORD (usage of bitumen is 55kg/10m2) by manual means.
OD61945/2023-2024:Providing and fixing of DLP board for Running contract work with N 011-ret:ro-reflectorised Vinyl sign with 1 years warranty manufactured Vinyl Printed sheeting fixed over aluminum sheeting 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqrn, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
OD61946/2023-2024:Vinyl sticker including lettering & printing for RC DLP board
Pre-monsoon work Appendix B
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD61947/2023-2024:Engaging man Mazdoor For Removing / Cleaning the rubbish and other aligned activities etc.
Proactive/ Preventive Maintenance Appendix C
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
OD72797/2023-2024:Filling up potholes with bituminous ready mix compound (25kg bag ) and compacting by ramming to get a compact surface including of cost materials, laying charges, transportation to site etc. complete. Rate is arrived for a bag of 25kg
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD61953/2023-2024:Mix seal Surfacing Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm Type-A aggregate using penetration grade bitumen to required line, grade and level to serve as wearing course on previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification clause 509 of MORD (Usage of bitumen is 22.00 kg /(10 m2) By Manual Means
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
OD191994/2023-2024:Dry rubble masonry for retaining walls using blasted rubble size below 40 dm3 including wedging them tightly with chips including all cost and conveyance of materials, labour charges etc. complete
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
OD61957/2023-2024:Conducting and Reporting Routine Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period of the Running Contract as directed by the departmental officers at site Additional RI may be required in response to reports of complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc and are not measurable/ payable. A proportion of the RI should be carried out either during or immediately following a period of we weather.
8.15:Supplying and installation of delineator (Roadway indicators) posts 80- 100cm high above ground level, pained black, and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorized panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification)
Emergency works Appendix D
OD61948/2023-2024:Engaging Hydraulic Excavator for removing slipped earth and other unserviceable materials.
OD61949/2023-2024:Engaging Man Mazdoor for clearing existing choked culverts, drain and for placing cover slabs
OD61950/2023-2024:Engaging small Tipper for Various works in roads as per the directions of Engineer in charge
B2 Builders and Developers
Bidder Name
Ginish John
B2 Builders and Developers
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_964997.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .