Tender Value
₹1.9 L
EMD Value
₹1,928
Closing Date
16 Jul 2026, 6:00 pm
Executive Engineer, Public Health Works Division, Palanpur.
Construction Pump Room of size (3.00 Mtr x 3.00 Mtr x 3.0 mt.) at . Motabamodara HW Due To Flood Damage 2025 For Danta-Vadgam-Palanpur RWSS, Tal:-Danta, Dist : Banaskantha.
319928
09 of 2026-2027
Open
Civil Works - Water Works
Banaskantha
6 documents required · 6 mandatory
₹600
Executive Engineer, P. H. Works Division, Palanpur
₹1,928
2 Jul 2026
2 Jul 2026
2 Jul 2026
16 Jul 2026
2 Jul 2026
Name of Work : Construction Pump Room of size (3.00 Mtr x 3.00 Mtr x 3.0 mt.) at . Motabamodara HW Due To
Flood Damage 2025 For Danta-Vadgam-Palanpur RWSS, Tal:-Danta, Dist : Banaskantha.
Sr. No. Description of Materials Qty. to be Rate Unit Place of Delivery
1 The Contractor submitting the tender should see that the rate in Schedule - A (of tender documents) are filled by the
Engineer in charge prior of the time of issue of tender.
2 Any additional materials to be supplied free of cost as per Schedule-A if found necessary at the time of execution will be
supplied to the contractor free of cost.
3 Any materials other than that provided in Schedule-A if required for the labour items of Schedule-B issued on request to the
contractor provided the same are available with department at prevailing market rate or department issue rate whichever is
4 The contractor shall provide his own arrangement at his own cost for loading, unloading and transport to the site of work for
the material stipulated in Schedule-A.
5 Those works will be executed which are found necessary at the time of execution, contractor will not be entitle for any claim
for saving in any items as per site condition.
6 The rate of recovery for short fall or damage of material issued free of cost will be present S.O.R. plus 3% storage charge or
rates of Board R/C Plus 3 % storage whichever is higher.
7 No negotiation at present in from and hence contractor should quote their rates accordingly.
8 The sub contract, if any given by the contractor would not create any right against the Board.
9 The Amount Recoverable from the contractor by the Gujarat water supply and sewerage board on any account shall be
liable to be recovered from the amount payable to the contractor / suppliers.
10 After passing the bill fund shall be demanded to higher authority payment shall be made after getting fund from higher
11 Labour Cess under the prevailing rules of the Government Resolution shall be borne by the bidder. (Present rate is 1%).
12 Royalty on Minerals Consumed in works from End User under the prevailing rules of the Government Resolution Dt.
18/06/2016 shall be borne by the bidder.
13 The contractor has to supply all the equipment / accessories / materials & components as per GWSSB’ approved vendor list
only. Prevailing approved vendor list is uploaded on www.gwssb.org website. However any addition (approved by the
competent authority of Board) in makes / brands of equipment etc. during bidding process, shall automatically apply. In case
of items not explicitly mentioned in vendor list the same shall be supplied as per relevant national / international standard of
reputed makes with prior approval from the Chief Engineer.
Signature of Contractor. Executive Engineer
P.H.Works Division
Name of Work : Construction Pump Room of size (3.00 Mtr x 3.00 Mtr x 3.0 mt.) at.Motabamodara HW Due To Flood Damage
2025 For Danta-Vadgam-Palanpur RWSS, Tal:-Danta, Dist : Banaskantha.
Items Qty Unit Rate Per Amount
Description of item
Constructing B.B. Masanory pump House as per data given and specification at
various site.incl. doors, windows & required electrical wiring, light points & all
associated civil works ,Jungle cutting ,site clearance and debris removal
9.00 Smt Size- 3.00 Mtr x 3.00 Mtr x 3.00 Mtr @ Mota bamodara HW 21421.72 Smt
Rupees One Lac Ninety Two Thousand Seven Hundred Ninety Five & Paise Forty Eight only
I / We am / are willing to carry out work at _______________ % (Should be written in figures and words) Below/ Above the
estimated rate mentioned above amount of my/our tender work out as under;
Estimated cost put to Estimated cost put to
Tender Rs.______________ Tender Rs.______________
Signature of Contractor. Executive Engineer
P.H.Works Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00_Title_ P_0.pdf
01B_NIT_.pdf
01C_P.pdf
02_VOL 1 A Technical Bid_.pdf
03A_VOL 1 B GCC_.pdf
04A_Memorandum_.pdf
04B_ Volume-III Price bid_.pdf
05_SCH-A and B_.pdf
05A_Schedule of Payment_.pdf
06_Itemwise Spe. Civil_.pdf
07_General Specifications_.pdf
08_Special Note_.pdf
09_INTEGRITY PACT_.pdf
10_Vendor list_.pdf
11_1.2_Royelty_18.06.19_New rate.pdf
12_05_Ann 5 Purchase Policy.pdf
13_06_Any-6A_Labour Circular.pdf
14_6_Mecilianius-min.pdf
15_07_Ann 6B shramyogi GR.pdf
16_7_GR LD Deduction 10-1-2018.pdf
17_08_GST GR.pdf
18_8_Circular_26_SIGN BOARD.pdf
19_13_GR- PART - 1_01 to 11.pdf
20_Min wages Circular.pdf
21_DMO_2941_01-Apr-2026_744.pdf
Download all tender documents and submit your bid