Tender Value
₹20.9 L
EMD Value
₹21,000
Closing Date
10 Jul 2026, 5:00 pmDue tomorrow
The Chief Officer, Umargam Nagarpalika, Umargam
BID DOCUMENTS FOR ASPHALT ROADROAD AT WARD NO. 3 AT KAKARIYA MORA MAIN ROAD TO ESR AND WARD NO. 3 AT KAKARIYA MORA INTERNAL ROAD UMARGAM NAGARPALIKA, UMARGAM
317113
2026-27 02
Open
Civil Works - Roads
Valsad
11 documents required · 11 mandatory
₹2,400
Chief officer Umargam Nagarpalika, Umargam.
₹21,000
24 Jun 2026
24 Jun 2026
24 Jun 2026
10 Jul 2026
24 Jun 2026
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT RS.
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -ROAD AT WARD NO. 3 At Kakariya Mora Main road to ESR, Umargam Nagarpalika, umargam
Sr. Qauntity Item S.O.R. 1% Labour Total Unit Amount
No. Rate Cess Rate
315.00 Box cutting the road surface to proper slope
& camber for making a base of road work
incl. a removing the excavated stuff &
depositing on the road side slope as
directed up to 50 m lead.(c) Above
1 Meters upto 500 Meters
180.00 Providing & laying of specified compacted
thickness Granular sub base (GSB) in
specified grading in table 400-1 of the
specification MORT&H and compactor to
the required density with 8 - 10 tonne
vibratory roller with plain drum or heavy
pneumatic tyred roller of minimum 200 to
300 KN weight in all seasons as per 942 9.42 951.42 Cum
MORT&H, maintaining the required slope
& grade during the operation as approved
by the engineer in charge & watering to the
proper moisture content and sprinkled with
the help of truck mounted water tank fitted
with suitable arrangement. (fully saturated
having CBR value greater or equal to 30)
As per Rate Anaylysis
180.00 Providing and laying Wet Mix Macadam
Base Course as per MORTH Specification
using machine crushed B.T chips as per
required gradation,mixing with required
optimum quantity of water converying the
mix to site of work,spreading in to grade and 1029.65 10.29 1039.94 Cum
camber with paver / Mechanical means and
consoilation each layer with vibratory roller
to achieve the desired density including cost
of material labour plant and equipment etc.
As per Rate Anaylysis
5 74.25 Providing and Laying 37.50 mm thick
M.T. Bituminous Macadam with B.T. aggregate
as Per MORT & H. specification & asphalt
for tack coat @ 2.50 Kg./10 Smt. with
Mechanical Sprayer & Bitumen Grade 60/70
for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of
total weight of mix including heating the
aggregate & asphalt in continous batching
drum mix plant and spreading the same by
paver finisher & consolidation with vibratory
roller including providing all materials
equipments, tools & plants, fire wood, oil,
kerosene, labour charges etc. complete
using contractor's own machinery drum mix 2967.01 29.67 2996.68 M.T.
plant & paver finisher etc. complete.
Sr. Qauntity Item S.O.R. 1% Labour Total Unit Amount
No. Rate Cess Rate
6 51.75 Providing and laying 25 mm thick Semi
M.T. Dense Bituminous Concrete with B.T.
aggregate as per M.O.R.T. & H. gradation,
asphalt Grade: VG-30 (60/70) for mixing @
50.00 KG. / M.T. i.e. 5.0% by weight of total
mix including heating and mixing the
aggregate and asphalt by continuous
batching of drum mix plant and spreading
the same by paver finisher and
consolidation with vibratory roller, including
providing all materials equipments, tools and
plants, oil, kerosene, firewood, labour
charges etc. complete using contractor's 3961.23 39.61 4000.84 M.T.
own machineries drum mix plant and paver
finisher etc. complete.
ADD 2% CONTIGENCY
ADD 1% Quality Control
UMARGAM MUNICIPALITY, UMARGAM
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -ROAD AT WARD NO. 3 At Kakariya Mora Internal road, Umargam Nagarpalika, umargam
( Rate As Per R&B SOR Year : 2024-25)
Sr. Qauntity Item S.O.R. 1% Labour Total Unit Amount
No. Rate Cess Rate
315.00 Box cutting the road surface to proper slope
& camber for making a base of road work
incl. a removing the excavated stuff &
depositing on the road side slope as
directed up to 50 m lead.(c) Above
1 Meters upto 500 Meters
180.00 Providing & laying of specified compacted
thickness Granular sub base (GSB) in
specified grading in table 400-1 of the
specification MORT&H and compactor to
the required density with 8 - 10 tonne
vibratory roller with plain drum or heavy
pneumatic tyred roller of minimum 200 to
300 KN weight in all seasons as per 942 9.42 951.42 Cum
MORT&H, maintaining the required slope
& grade during the operation as approved
by the engineer in charge & watering to the
proper moisture content and sprinkled with
the help of truck mounted water tank fitted
with suitable arrangement. (fully saturated
having CBR value greater or equal to 30)
180.00 Providing and laying Wet Mix Macadam
Base Course as per MORTH Specification
using machine crushed B.T chips as per
required gradation,mixing with required
optimum quantity of water converying the
mix to site of work,spreading in to grade and 1029.65 10.29 1039.94 Cum
camber with paver / Mechanical means and
consoilation each layer with vibratory roller
to achieve the desired density including cost
of material labour plant and equipment etc.
As per Rate Anaylysis
5 74.25 Providing and Laying 37.50 mm thick
M.T. Bituminous Macadam with B.T. aggregate
as Per MORT & H. specification & asphalt
for tack coat @ 2.50 Kg./10 Smt. with
Mechanical Sprayer & Bitumen Grade 60/70
for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of
total weight of mix including heating the
aggregate & asphalt in continous batching
drum mix plant and spreading the same by
paver finisher & consolidation with vibratory
roller including providing all materials
equipments, tools & plants, fire wood, oil,
kerosene, labour charges etc. complete
using contractor's own machinery drum mix 2967.01 29.67 2996.68 M.T.
plant & paver finisher etc. complete.
As per Rate Anaylysis
Sr. Qauntity Item S.O.R. 1% Labour Total Unit Amount
No. Rate Cess Rate
6 51.75 Providing and laying 25 mm thick Semi
M.T. Dense Bituminous Concrete with B.T.
aggregate as per M.O.R.T. & H. gradation,
asphalt Grade: VG-30 (60/70) for mixing @
50.00 KG. / M.T. i.e. 5.0% by weight of total
mix including heating and mixing the
aggregate and asphalt by continuous
batching of drum mix plant and spreading
the same by paver finisher and
consolidation with vibratory roller, including
providing all materials equipments, tools and
plants, oil, kerosene, firewood, labour
charges etc. complete using contractor's 3961.23 39.61 4000.84 M.T.
own machineries drum mix plant and paver
finisher etc. complete.
ADD 2% CONTIGENCY
ADD 1% Quality Control
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
SBD.pdf
Download all tender documents and submit your bid