Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹297.8 CrAccepted-AOC 1C 1D VINDHYA TELELINKS LIMITED UDYOG VIHAR REWA MADHYA PRADESH 486006 | REWA | MADHYA PRADESH | 486006 | ₹297.8 Cr Quoted ₹309.1 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹311.6 CrRejected-AOC 1ST FLOOR POLYCAB HOUSE 771 PANDIT SATWALEKAR MARG MAHIM WEST MUMBAI MAHARASHTRA 400016 | MUMBAI | MAHARASHTRA | 400016 | ₹311.6 Cr | L2 | Rejected-AOC second lowest |
| 3 | L3₹336.2 CrRejected-Finance | ₹336.2 Cr | L3 | Rejected-Finance highest |
Tender Value
₹271.2 Cr
EMD Value
₹5 Cr
Closing Date
23 Sept 2024, 5:00 pmClosed
Chief Engineer(Dist. North Malabar)
Office of Chief Engineer(Dist. North Malabar), Vydyuthi Bhavanam, Kannur-670002
Development of Distribution infrastructure at Kannur , Kasargod and Wayanad districts of Kerala under the Revamped Reforms-Based and Results Linked, Distribution Sector Scheme
2024_KSEB_680680_1
KSEB/CE(DNM)/RDSS-LR Ph 2/03/24-25
Open Tender
Electrical Works
250 days
Kasargod and Wayanad
As per tender document
7 documents required · 7 mandatory
₹17,700
₹5 Cr
Yes
Office of Chief Engineer(Dist. North Malabar)
21 Apr 2025
17 Jul 2024
27 Sept 2024
18 Jul 2024
23 Sept 2024
27 Jul 2024
18 Jul 2024 - 20 Jul 2024
25 Jul 2024
Replacement of old/frayed conductor
Reconductoring of 11KV OH Line
Reconductoring of 11KV OH Linewith ACSR Raccoon
Conductor ACSR Racoon
Pole PSC 9 M
A pole 11 m
11 kV Composite Polymeric Disc Insulator with Hardware Fittings and GI Cleat etc.
11 kV COMPOSITE POLYMERIC PIN INSULATOR
11 kV V cross arm with GI Clamps, Bolt & Nuts with washers
Pole Top Bracket -F Type GI -11 kV
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
Channel cross arm GI 75 x 40 x 6mm 2.4 m with GI- Clamp Bolt & Nut with washers
LT 2 pin channel cross arm with GI- Clamp Bolt & Nut with washers
LT 4 pin channel cross arm with GI- Clamp Bolt & Nut with washers
Composite type polymeric PIN INSULATOR 415V
SHACKLE INSULATOR 415V (WITH STRAP BOLT&NUT)
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI WIRE (4 mm DIA 8 SWG)
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia - 2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) with RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc. as required as per technical specification, approved drawings and scope of work.
Bolt & Nut (GI ) with washers of various sizes as per requirement
RDSS sign Board as per approved spec
Reconductoring of 11KV OH Line using AAAC 99 sqmm Covered conductor
Covered conductor HT AAAC 99 sqmm conforming to EN 50397 - 1 2020
PSC Pole 9m
A pole 11 m
A pole 12 m
11 kV COMPOSITE POLYMERIC PIN INSULATOR
11 kV V cross arm with GI clamps Bolt & Nut with washers
Pole Top Bracket -F Type GI -11 kV
Disc insulator 11 kV composite polymeric
Hardware fittings ( Tension clamp assembly) for HT covered conductor suitable for 99 Sqmm
Mid span joint set for HT covered conductor suitable for 99 Sqmm - 1 set = 3 nos
Single core outdoor termination kit for HT covered conductor suitable for 99 Sqmm 1 set = 3 nos
Insulated piercing connector set for covered conductor HTsuitable for 99 Sqmm ( Bare to Covered conductor & Covered conductor to Covered conductor)
Helical UV plastic tie
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
Channel cross arm GI 75 x 40 x 6 mm 2.4 mt- with GI Clamp Bolt & Nut with washers
CROSS ARM GI CHANNEL 2 LINE (2 Line Channel Cross Arm) with Clamp, Bolt & Nut and washers
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp Bolt & Nut and washers
Composite type polymeric PIN INSULATOR 415V
SHACKLE INSULATOR 415V (WITH STRAP BOLT&NUT)
G.I.WIRE. 4MM (8 SWG)
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia - 2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 Sq.mm - GI etc as required as per technical specification, approved drawings and scope of work.
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
Bolt & Nut (GI ) with washers of various sizes as per requirement
RDSS sign Board as per approved spec
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymeric Housing
Reconductoring of 11KV OH Line using ABC 3x120+1x95 sqmm cable
Aerial Bunched Cable HT 3x120 + 1x95 sq.mm (Insulated Messenger)
Pole PSC 9 M
A pole 11 m
A pole 12 m
A pole 13 m
Anchoring /Dead end Clamp Assembly for HT AB Cables up to 120 sq.mm
Suspension Clamp Assembly for HT AB Cables up to 120 sq.mm
Stainless Steel Strap 20mmX0.7mm along with Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm] as per requirement
MVT Kit For HT ABC- 1 set = 3 Nos
Heat Shrinkable Termination Kit (3 Nos) for 120 Sq.mm Three phase Aerial Bunched Cable
Channel cross arm GI 75 x 40 x 6mm 2.4 m with GI- Clamp Bolt & Nut with washers
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM
CROSS ARM GI CHANNEL 2 LINE (2 Line Channel Cross Arm) with Clamp, Bolt & Nut and washers
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp Bolt & Nut and washers
Composite type polymeric PIN INSULATOR 415V
SHACKLE INSULATOR 415V (WITH STRAP BOLT&NUT)
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
G.I.WIRE. 4MM (8 SWG)
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia - 2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) with RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
Bolt & Nut (GI ) with washers of various sizes as per requirement
RDSS Sign Board as per approved spec
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
Reconductoring of 11KV OH Line using ABC 3x150+1x120 Sqmm cable
Aerial Bunched Cable HT 3x150 + 1x120 sq.mm (Insulated Messenger)
Pole PSC 9 M
A pole 11 m
A pole 12 m
Anchoring /Dead end Clamp Assembly for HT AB Cables up to 150 sq.mm
Suspension Clamp Assembly for HT AB Cables up to 150 sq.mm
Stainless Steel Strap 20mmX0.7mm along with Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm] as per requirement
MVT Kit For HT ABC- 1 set = 3 Nos
Heat Shrinkable Termination Kit (3 Nos) for 150 Sq.mm Three phase Aerial Bunched Cable
Channel cross arm GI 75 x 40 x 6mm 2.4 m with GI- Clamp Bolt & Nut with washers
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM
CROSS ARM GI CHANNEL 2 LINE (2 Line Channel Cross Arm) with Clamp, Bolt & Nut and washers
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp Bolt & Nut and washers
Composite type polymeric PIN INSULATOR 415V
SHACKLE INSULATOR 415V (WITH STRAP BOLT& NUT)
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
G.I.WIRE. 4MM (8 SWG)
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia - 2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab as per approved drawing. 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
Bolt & Nut (GI ) with washers of various sizes as per requirement
RDSS sign Board as per approved spec
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
Reconductoring of LT Line
Reconductoring of LT Line with Bare ACSR conductor OH ( Rabbit )
Pole PSC 8 M
Pole PSC 9 M
Conductor ACSR Rabbit
SHACKLE INSULATOR 415V SET(WITH STRAP BOLT&NUT)
COMPOSITE POLYMERIC PIN INSULATOR 415V
LT CROSS ARM GI CHANNEL 4 LINE with Clamp, Bolt & Nut .
LT CROSS ARM 2 LINE SET WITH CLAMP BOLT & NUT.
11 kV Composite Polymeric Disc Insulator with Hardware Fittings and GI Cleat etc.
11 kV COMPOSITE POLYMERIC PIN INSULATOR
11 kV V cross arm with GI Clamps, Bolt & Nuts with washers
Pole Top Bracket -F Type GI -11 kV
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
GI wire 4mm ( 8 SWG)
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI 4. Earth Knob etc as required as per technical specification, approved drawings and scope of work.
GI Stay Set includes (LT) 1. Stay Insulator Porcelain 11 k V - 1 No 2. Anchor Plate 200 x 200 x 6 mm GI (LT Stay Plate GI) 3. STAY TIGHTNER LT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 16 mm dia (LT Stay Rod) 6. Helically formed Guy-Grip LT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11 k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (LT Stay Plate GI) 3. STAY TIGHTNER LT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (LT Stay Rod) 6. Helically formed Guy-Grip LT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
Cable 1.1kV XLPE AL 1C X 95 sq mm (Un Armoured)
FUSE UNIT 415 V 100 A PORCELAIN
Base Frame SMC with clamps nuts & bolts for LT Section Fuse neutral Link.
LT LINE SPACERS 4 Line 300 mm
LT LINE SPACERS 2 Line 450 mm
Bolt& Nut GI of various sizes
RDSS sign Board as per approved spec
Crimping Socket
Reconductoring of LT Line with ABC 3X95+1X70+1X16 sqmm, 3X70+1X50+1X16 sqmm, 3X50+1X35+1X16 sqmm & 2x50 sqmm
Aerial Bunched Cable LT 3x95 + 1x70 + 1x16 sq.mm (Insulated Messenger)
Aerial Bunched Cable LT 3x70 + 1x50 + 1x16 sq.mm (Insulated Messenger)
Pole PSC 8 M
Pole PSC 9 M
A Pole 11 M
Suspension Clamp Assembly suitable for insulated messenger of sizes 70 sq.mm, 50 sqmm & 35 Sqmm.
Anchoring /Dead end Clamp Assembly suitable for insulated messenger of sizes 70 sq.mm, 50 sqmm & 35 Sqmm.
Stainless Steel Strap 20mmX0.7mm along with Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm] shall also be supplied as per requirement
Pre-insulated Bi metallic lug for 95 sqmm with brass nut and bolt
Pre-insulated Bi metallic lug for 70 Sqmm with brass nut and bolt
Pre-insulated Bi metallic lug for 50 Sqmm with brass nut and bolt
Pre-insulated Bi metallic lug for 16 Sqmm with brass nut and bolt
1.1 kV 1C X 25 sqmm unarmoured PVC Al Cable
Distribution Box for service connection
Satellite connector for service connection Main:16sqmm to 95sqmm,Tap:2.5 sqmm to 35sqmm(4 way)
Insulation Piercing Connector ( IPC Connector): For ABC to Distribution box & other service connection Main 16 sq mm to 95 sq mm; Tap 4 sq.mm to 35 sq.mm
Insulation Piercing Connector (IPC Connector): For ABC to ABC/Bare Main 16 sq mm to 95 sq mm; Tap 16 sq.mm to 95 sq.mm
Insulation Piercing Connector ( IPC Connector): For ABC to service connection/street light/Earthing Main 16 sq mm to 95 sq mm; Tap 1.5 sq.mm to 10 sq.mm
11 kV Composite Polymeric Disc Insulator with Hardware Fittings and GI Cleat etc.
11 kV COMPOSITE POLYMERIC PIN INSULATOR
11 kV V cross arm with GI Clamps, Bolt & Nuts with washers
Pole Top Bracket -F Type GI -11 kV
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
GI Stay Set includes (LT) 1. Stay Insulator Porcelain 11 k V - 1 No 2. Anchor Plate 200 x 200 x 6 mm GI (LT Stay Plate GI) 3. STAY TIGHTNER LT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 16 mm dia (LT Stay Rod) 6. Helically formed Guy-Grip LT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11 k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip LT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
G.I.WIRE. 4MM (8 SWG)
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
RDSS Sign Board as per approved spec
FUSE UNIT 415 V 100 A PORCELAIN
Base Frame SMC with clamps nuts & bolts for LT Section Fuse neutral Link.
Conversion of LT Sph line to 3 Ph lines with ABC using 3X95+1x70+1x16sqmm , 3X70+1X50+1X16 sqmm & 3X50+1x35+1x16sq.mm
Aerial Bunched Cable LT 3x95 + 1x70 + 1x16 sq.mm (Insulated Messenger)
Pole PSC 8 M
Pole PSC 9 M
A Pole 11 M
Suspension Clamp Assembly suitable for insulated messenger of sizes 70 sq.mm, 50 sqmm & 35 Sqmm.
Anchoring /Dead end Clamp Assembly suitable for insulated messenger of sizes 70 sq.mm, 50 sqmm & 35 Sqmm.
Stainless Steel Strap 20mmX0.7mm along with Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm] shall also be supplied as per requirement
Pre-insulated Bi metallic lug for 95 sqmm with brass bolt & nut
Pre-insulated Bi metallic lug for 70 Sqmm with brass bolt & nut
Pre-insulated Bi metallic lug for 16 Sqmm with brass bolt & nut
1.1 kV 1C X 25 sqmm unarmoured PVC Al Cable
Distribution Box for service connection
Satellite connector for service connection Main:16sqmm to 95sqmm,Tap:2.5 sqmm to 35sqmm(4 way)
Insulation Piercing Connector ( IPC Connector): For ABC to Distributio box & other service connection Main 16 sq mm to 95 sq mm; Tap 4 sq.mm to 35 sq.mm
Insulation Piercing Connector (IPC Connector): For ABC to ABC/Bare Main 16 sq mm to 95 sq mm; Tap 16 sq.mm to 95 sq.mm
Insulation Piercing Connector ( IPC Connector): For ABC to service connection/street light/Earthing Main 16 sq mm to 95 sq mm; Tap 1.5 sq.mm to 10 sq.mm
11 kV Composite Polymeric Disc Insulator with Hardware Fittings and GI Cleat etc.
11 kV COMPOSITE POLYMERIC PIN INSULATOR
11 kV V cross arm with GI Clamps, Bolt & Nuts with washers
Pole Top Bracket -F Type GI -11 kV
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
GI Stay Set includes ( LT) 1. Stay Insulator Porcelain 11 k V - 1 No 2. Anchor Plate 200 x 200 x 6 mm GI (LT Stay Plate GI) 3. STAY TIGHTNER LT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 16 mm dia (LT Stay Rod) 6. Helically formed Guy-Grip LT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11 k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (LT Stay Plate GI) 3. STAY TIGHTNER LT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (LT Stay Rod) 6. Helically formed Guy-Grip LT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
G.I.WIRE. 4MM (8 SWG)
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
RDSS Sign Board as per approved spec
Provision for New ABC:
New 11 kV line
New 11 kV line using ABC 3x120+1x95 sqmm cable
Aerial Bunched Cable HT 3x120 + 1x95 sq.mm (Insulated Messenger)
Pole PSC 9 M
A pole 11 m
A pole 12 m
A pole 13 m
Anchoring /Dead end Clamp Assembly for HT AB Cables up to 120 sq.mm
Suspension Clamp Assembly for HT AB Cables up to 120 sq.mm
Stainless Steel Strap [20 mm x 0.7 mm] with adeqaute no. of Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm]
MVT Kit For HT ABC- 1 set = 3 Nos
Heat Shrinkable Termination Kit (3 Nos) for 120 Sq.mm Three phase Aerial Bunched Cable
Channel cross arm GI 75 x 40 x 6mm 2.4 m with GI- Clamp Bolt & Nut with washers
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
GI WIRE 6MM DIA 4 SWG
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
G.I.WIRE. 4MM (8 SWG)
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
Bolt & Nut (GI ) with washers of various sizes as per requirement
RDSS Sign Board as per approved spec
LT CROSS ARM 2 LINE SET WITH CLAMP BOLT & NUT.
LT CROSS ARM GI CHANNEL 4 LINE with Clamp, Bolt & Nut .
SHACKLE INSULATOR 415V SET(WITH STRAP BOLT&NUT)
COMPOSITE POLYMERIC PIN INSULATOR 415V
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
New 11 kV line using ABC 3x150 + 1x120 sqmm cable
Aerial Bunched Cable HT 3x150 + 1x120 sq.mm (Insulated Messenger)
Pole PSC 9 M
A pole 11 m
Anchoring /Dead end Clamp Assembly for HT AB Cables up to 150 sq.mm
Suspension Clamp Assembly for HT AB Cables up to 150 sq.mm
Stainless Steel Strap [20 mm x 0.7 mm] with adeqaute no. of Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm]
MVT Kit For HT ABC- 1 set = 3 Nos
Heat Shrinkable Termination Kit (3 Nos) for 150 Sq.mm Three phase Aerial Bunched Cable
Channel cross arm GI 75 x 40 x 6mm 2.4 m with GI- Clamp Bolt & Nut with washers
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
GI WIRE 6MM DIA 4 SWG
GI Stay Set includes 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
G.I.WIRE. 4MM (8 SWG)
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia - 2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel starp and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
Bolt & Nut (GI ) with washers of various sizes as per requirement
RDSS Sign Board as per standard
LT CROSS ARM 2 LINE SET WITH CLAMP BOLT & NUT.
LT CROSS ARM GI CHANNEL 4 LINE with Clamp, Bolt & Nut .
SHACKLE INSULATOR 415V SET(WITH STRAP BOLT&NUT)
COMPOSITE POLYMERIC PIN INSULATOR 415V
Channel cross arm GI 75x40x6mm 1.8M- with GI- Clamp Bolt & Nut with washers
New LT line
New LT line using ABC - 3 x 95 + 1 x 70 + 1 x 16 sqmm
Aerial Bunched Cable LT 3x95 + 1x70 + 1x16 sq.mm (Insulated Messenger)
Pole PSC 8 M
Pole PSC 9 M
Anchoring /Dead end Clamp Assembly for LT AB Cables up to 95 sq.mm
Suspension Clamp Assembly for LT AB Cables up to 95 sq.mm
Stainless Steel Strap 20mmX0.7mm along with Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm] shall also be supplied as per requirement
Pre insulated Bi metallic lug for 95 sqmm with brass nut and bolt
Pre insulated Bi metallic lug for 70 sqmm with brass nut and bolt
Pre insulated Bi metallic lug for 16 sqmm with brass nut and bolt
Distribution Box for Service Connection
Satellite connector for service connection Main:16sqmm to 95sqmm,Tap:2.5 sqmm to 35sqmm(4 way)
Insulation Piercing Connector ( IPC Connector): For ABC to Distributio box & other service connection Main 16 sq mm to 95 sq mm; Tap 4 sq.mm to 35 sq.mm
Insulation Piercing Connector (IPC Connector): For ABC to ABC/Bare Main 16 sq mm to 95 sq mm; Tap 16 sq.mm to 95 sq.mm
Insulation Piercing Connector ( IPC Connector): For ABC to service connection/street light/Earthing Main 16 sq mm to 95 sq mm; Tap 1.5 sq.mm to 10 sq.mm
1.1 kV 1 C x 25 sqmm unarmoured PVC Al cable
G.I.WIRE. 4MM (8 SWG)
GI Stay Set includes (LT) 1. Stay Insulator Porcelain 11 k V - 1 No 2. Anchor Plate 200 x 200 x 6 mm GI (LT Stay Plate GI) 3. STAY TIGHTNER LT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 16 mm dia (LT Stay Rod) 6. Helically formed Guy-Grip LT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia - 2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
RDSS Sign Board as per approved spec
11 kV COMPOSITE POLYMERIC PIN INSULATOR
11 kV V cross arm with GI Clamps, Bolt & Nuts with washers
Pole Top Bracket -F Type GI -11 kV
Channel cross arm GI (75x40x6mm) 1.8m with GI clamp bolt and nut with washers
Provision for Disaster Resilient Infrastructure works
Construction of new 11 kV line using XLPE 3 C x 300 sqmm UG cable
Cable 11kV XLPE AL UG 3 C X300 sq mm (Armoured)
Pole PSC 9 M
Pipe HDPE 110 mm PN 6 configuration and PE grade 80
GI Pipe 150mm Class B 4.8 mm thick GI pipe
Cable End Termination Kit 11 kV XLPE 3 C x 300 Sq.mm -Heat Shrinkable (Outdoor)
Cable Straight Joint Kit for 11 kV XLPE 3 C x 300 Sq.mm -Heat Shrinkable straight joints using Shear Bolt Type as per IS 13573 Part II 2011 with dual wall and single triple extruded hybrid tubing with shear bolt connector as per IEC 61238 of rating 300/400 A
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
Channel cross arm GI 75 x 40 x 6 mm 2.4 mt with GI- Clamp Bolt & Nut with washers
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM
GI WIRE ( 6mm DIA 4 SWG & 4 mm DIA 8 SWG)
Bolt & Nut (GI ) with washers of various sizes as per requirement
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia - 2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) etc as required as per technical specification, approved drawings and scope of work.
RDSS Sign Board as per approved spec
INSTALATION OF NEW DTRs
Installation of 100kVA Transformer
Distribution Transformer 3 Phase 100 kVA 11kV/433 V ONAN - Level 1
Pole PSC 9 M
Pole PSC 8 M
A Pole - 11 M
Distribution Box LT Outdoor 2 Way 200 A as per technical specification
Distribution Box LT Outdoor 3 Way 200 A as per technical specification
Conductor ACSR Rabbit
Conductor ACSR Racoon
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
11 kV Composite Polymeric Disc Insulator with Hardware Fittings and GI Cleat etc.
COMPOSITE PIN INSULATOR 11 kV with Pin
Composite type polymeric PIN INSULATOR 415V
SHACKLE INSULATOR 415V (WITH STRAP BOLT&NUT)
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM, insulating brackets etc
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Stay Set includes (LT) 1. Stay Insulator Porcelain 11 k V - 1 No 2. Anchor Plate 200 x 200 x 6 mm GI (LT Stay Plate GI) 3. STAY TIGHTNER LT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 16 mm dia (LT Stay Rod) 6. Helically formed Guy-Grip LT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 4. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 5. Earth wire of suitable sizes 6. SS strap for earthing etc as required as per technical specification, approved drawings and scope of work.
Pole Top Bracket -F Type GI -11 kV with Clamp, Bolt & Nut and washers
V cross arm GI 11 kV with Clamp, Bolt & Nut
Composite polymeric type Drop out fuse 11 kV
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp, Bolt & Nut
Channel Cross arm for LT 2 Pin -GI 75 x 40 x 6 mm-0.510 mt (2 line Cross arm)- with Clamp , Bolt & Nut
Channel cross arm GI 75x40x6mm 1.8M with Clamp , Bolt & Nut
CROSS ARM GI CHANNEL 100X50 mm 3 M with Clamp , Bolt & Nut
Cable 1.1 kV XLPE AL 1c X 120 sq mm (Un Armoured) cable with palm type crimping socket of suitable sizes
Bolt & Nut GI of various sizes with washers
Danger Board 250 x 200 mm (11000 V) with all mounting accessories
RDSS Sign Board as per specification
Enhancement of DTR
ENHANCEMENT OF 25kVA to 100kVA TRANSFORMER
Distribution Transformer 3Ph 100kVA, 11kV/433V ONAN- Level 1
PSC Pole 9 m
Distribution Box 415V 200A 2 way Outdoor
Conductor ACSR Rabbit
Conductor ACSR Racoon
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
11 kV Composite Polymeric Disc Insulator with Hardware Fittings and GI Cleat etc.
COMPOSITE PIN INSULATOR 11 kV with Pin
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM/ insulating brackets etc
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 4. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 5. Earth wire of suitable sizes 6. SS strap for earthing etc as required as per technical specification, approved drawings and scope of work.
V cross arm GI 11 kV with Clamp, Bolt & Nut
Pole Top Bracket -F Type GI -11 kV with Clamp, Bolt & Nut and washers
Composite polymeric type Drop out fuse 11 kV
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp, Bolt & Nut
Channel Cross arm for LT 2 Pin -GI 75 x 40 x 6 mm-0.510 mt (2 line Cross arm)- with Clamp , Bolt & Nut
Channel cross arm GI 75x40x6mm 1.8M with Clamp , Bolt & Nut
CROSS ARM GI CHANNEL 100X50 mm 3 M with Clamp , Bolt & Nut
Cable 1.1 kV XLPE AL 1c X 120 sq mm (Un Armoured) cable with palm type crimping socket of suitable sizes
Bolt & Nut GI of various sizes with washers
Danger Board 250 x 200 mm (11000 V) with all mounting accessories
RDSS Sign Board as per specification
ENHANCEMENT OF 63kVA to 100kVA TRANSFORMER
Distribution Transformer 3Ph 100kVA, 11kV/433V ONAN - Level 1
Danger Board 250 x 200 mm (11000 V) with all mounting accessories
RDSS Sign Board as per specification
ENHANCEMENT OF 100kVA to 160kVA TRANSFORMER
Distribution Transformer 3Ph 160kVA, 11kV/433V ONAN- Level 1
PSC Pole 9 m
A Pole - 11 M
Distribution Box 415V 200A 3 way Outdoor
Conductor ACSR Rabbit
Conductor ACSR Racoon
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
11 kV Composite Polymeric Disc Insulator with Hardware Fittings and GI Cleat etc.
COMPOSITE PIN INSULATOR 11 kV with Pin
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM, insulating brackets etc
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 4. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 5. Earth wire of suitable sizes 6. SS strap for earthing etc as required as per technical specification, approved drawings and scope of work.
V cross arm GI 11 kV with Clamp, Bolt & Nut
Pole Top Bracket -F Type GI -11 kV with Clamp, Bolt & Nut and washers
Composite polymeric type Drop out fuse 11 kV
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp, Bolt & Nut
Channel Cross arm for LT 2 Pin -GI 75 x 40 x 6 mm-0.510 mt (2 line Cross arm)- with Clamp , Bolt & Nut
Channel cross arm GI 75x40x6mm 1.8M with Clamp , Bolt & Nut
CROSS ARM GI CHANNEL 100X50 mm 3 M with Clamp , Bolt & Nut
Cable 1.1 kV XLPE AL 1c X 120 sq mm (Un Armoured) cable with palm type crimping socket of suitable sizes
Cable 1.1 kV XLPE AL 1c X 185 sq mm (Un Armoured) cable with palm type crimping socket of suitable sizes
Bolt & Nut GI of various sizes with washers
Danger Board 250 x 200 mm (11000 V) with all mounting accessories
RDSS Sign Board as per specification
ENHANCEMENT OF 160kVA to 250kVA TRANSFORMER
Distribution Transformer 3Ph 250 kVA, 11kV/433V ONAN- Level 1
A Pole - 11 M
Conductor ACSR Racoon
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
COMPOSITE PIN INSULATOR 11 kV with Pin
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM, insulating brackets etc
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 4. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 5. Earth wire of suitable sizes 6. SS strap for earthing etc as required as per technical specification, approved drawings and scope of work.
V cross arm GI 11 kV with Clamp, Bolt & Nut
Composite polymeric type Drop out fuse 11 kV
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp, Bolt & Nut
Channel Cross arm for LT 2 Pin -GI 75 x 40 x 6 mm-0.510 mt (2 line Cross arm)- with Clamp , Bolt & Nut
CROSS ARM GI CHANNEL 100X50 mm 3 M with Clamp , Bolt & Nut
Cable 1.1 kV XLPE AL 1c X 185 sq mm (Un Armoured) cable with palm type crimping socket of suitable sizes
Bolt & Nut GI of various sizes with washers
Danger Board 250 x 200 mm (11000 V) with all mounting accessories
RDSS Sign Board as per specification
Uplifting of Transformer
A Pole 12 m
Distribution Box 415V 200A 3 way Outdoor
Conductor ACSR Rabbit
Conductor ACSR Racoon
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
11 kV Composite Polymeric Disc Insulator with Hardware Fittings and GI Cleat etc.
COMPOSITE PIN INSULATOR 11 kV with Pin
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM/ insulating brackets etc
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) With RCC Covering Slab 3. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 4. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 5. Earth wire of suitable sizes 6. SS strap for earthing etc as required as per technical specification, approved drawings and scope of work.
V cross arm GI 11 kV with Clamp, Bolt & Nut
Composite polymeric type Drop out fuse 11 kV
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp, Bolt & Nut
Channel Cross arm for LT 2 Pin -GI 75 x 40 x 6 mm-0.510 mt (2 line Cross arm)- with Clamp , Bolt & Nut
Channel cross arm GI 75x40x6mm 1.8M with Clamp , Bolt & Nut
CROSS ARM GI CHANNEL 100X50 mm 3 M with Clamp , Bolt & Nut
Cable 1.1 kV XLPE AL 1c X 120 sq mm (Un Armoured) cable with palm type crimping socket of suitable sizes
Bolt & Nut GI of various sizes with washers
Danger Board 250 x 200 mm (11000 V) with all mounting accessories
RDSS Sign Board as per specification
Providing new 11kV feeder from various substations under Transmission circle Kannur for SCADA DMS application of Kannur Town
11kV 3 X 300 mm² XLPE Cable
11kV 3 X 300 mm² XLPE cable indoor end termination kit
11kV 3 X 300 mm² XLPE cable outdoor end termination kit
11 kV station class LA
11 kV indoor VCB panel
11 kV 630A Station class AB switch
3Mtr Channel Cross arm with CB&N
A type Pole, 11 m
50x6 GI strip
GI Pipe, 2.5m
Bolt & Nut
11kV Lightning Arrester structure
Description of Work / Item(s)
Replacement of old/frayed conductor
Reconductoring of 11KV OH Line
Reconductoring of 11KV OH Linewith ACSR Raccoon
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in all classes of soil, fitting cross arm, insulators, binding etc, drawing sufficient length of GI earth leads to the ground for earthing.
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in all classes of soil , fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Providing concrete muffing for A pole of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting channel cross arms, digging and back filling pit in all classes of soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
Renewal of existing damaged/old 11kV PSC/RCC/Teak wood Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of existing damaged/old 11kV Stay with complete stay set along with excavation of stay pit in classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Fitting and providing one Strut using HT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Dismantling (without damage) 11 kV line (Three conductors) /LT line including dismantling cross arm, insulators, disc, spacers, disconnecting jumper connection etc & disconnection of service connection where ever necessary & rolling the conductor and stacking the materials and then transporting safely to the KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Stringing of 11kV line with ACSR Raccoon (Three conductors) after fitting insulators (Hellically formed distribution top tie shall be used for binding conductor with pin insulators) , providing disc sets at cut points and giving jumper connections including touching clearance wherever necessary including cut point works. The work also included re erection of dismantled LT lines and all associated materials ( including street light fittings) / re connection of dismantled service connections where ever necessary. Straightening of poles wherever necessary shall also form part of the work.
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Providing one Earth using GI earth pipe of size 40mm dia, 2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
Fitting one addl channel cross arm 2.4/3m (75x40x6mm) in existing 11kV DP including conveyance of materials
Reconductoring of 11KV OH Line using AAAC 99 sqmm Covered conductor
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in all classes of soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in all classes of soil , fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Providing concrete muffing for A pole of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides
Renewal of existing damaged/old 11kV PSC/RCC/ Teak wood Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items , drawing sufficient length of GI earth leads to the ground for earthing. etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of existing damaged/old 11kV Stay with complete stay set along with excavation of stay pit in classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one Strut using HT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Dismantling (without damage) 11 kV line (Three conductors) /LT line including dismantling cross arm, insulators, disc, spacers, disconnecting jumper connection etc & disconnection of service connection where ever necessary & rolling the conductor and stacking the materials and then transporting safely to the KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Stringing of 11 kV line with Covered conductor HT 99 sqmm conforming to EN 50397 - 1 2020 (3 conductors) after fitting insulators, binding conductors to pin insulators using helical UV plastic tie suitable for any neck dia, fixing disc insulators and anchoring with anchoring clamps including cut point works.The works also includes 1. Touching clearance where ever necessary 2. Doing straight joint on HT covered conductor 99 Sqmm using the mid span jointing kit as per specification. 3. Doing one cable end termination on HT covered conductor 99 Sqmm using the cable jointing kit as per specification. 4. Re erection of dismantled LT lines and all associated materials ( including street light fittings) / re connection of dismantled service connections whereever necessary. 5. Straightening of poles wherever necessary. 6. Installation of Insulation piercing connector ( Bare to Covered conductor & Covered conductor to Covered conductor) for branching suitable for HT Covered conductor 99 Sqmm etc
Erection of 11kV LA set ( 3 Nos) with supporting plates and giving all connections etc including cost of earth strip - GI ( 25 x 3mm) and its drawal.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure all classes of soil& backfilling.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting channel cross arms, digging and back filling pit in all classes of soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for
Fitting one additional 75x40 mm, 1.8m channel cross arm in existing single pole including conveyance of materials
Fitting one addl channel cross arm 2.4/3m (75x40x6mm) in existing 11kV DP including conveyance of materials
Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays strutetc and stacking the same
Renewal of existing damaged/old 11kV PSC/RCC/Teak wood Pole/ A pole with new A type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc, drawing sufficent length of GI earth leads to the ground for earthing etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with propoer documentation as direcyed by KSEBL
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Reconductoring of 11KV OH Line using ABC 3x120+1x95 sqmm cable
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in all classes of soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items, drawing sufficient length of GI earth leads to the ground for earthing etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in all classes of soil , fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Providing concrete muffing for A pole of size 0.45x0.45x1.5m (0.5 m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5 sides
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of existing damaged/old 11kV Stay with complete stay set along with excavation of stay pit in classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one Strut using HT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Dismantling (without damage) 11 kV line (Three conductors) /LT line including dismantling cross arm, insulators, disc, spacers, disconnecting jumper connection etc & disconnection of service connection where ever necessary & rolling the conductor and stacking the materials and then transporting safely to the KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with insulated Messenger through existing poles/ newly inserted pole providing loop where ever necessay and tieing the cables using UV plastic tie -Heavy Duty of Length as per standard( including cost of plastic tie).The work also includes 1. Touching clearance where ever necessary. 2. Erection of Anchoring clamp / suspension clamp 3. Installation of MVT and its terminal connections where ever necessary 4.Straightening of poles wherever necessary 5. Re erection of dismantled LT lines and all associated materials ( including street light fittings) / re connection of dismantled service connections whereever necessary etc
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm
Erection of 11kV LA set ( 3 Nos) with supporting plates and giving all connections etc including cost of earth strip- GI ( 25 x 3mm) and its drawal.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in all classes of soil & backfilling.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting channel cross arms, digging and back filling pit in all classes of soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision for earthing)
Fitting one addl channel cross arm 2.4/3m (75x40x6mm) in existing 11kV DP including conveyance of materials
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Renewal of existing damaged/old 11kV A pole with new A type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc, drawing sufficent length of GI earth leads to the ground for earthing etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with propoer documentation as direcyed by KSEBL
Reconductoring of 11KV OH Line using ABC 3x150+1x120 Sqmm cable
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in all classes of soil, fitting cross arm , insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Renewal of existing damaged/old 11kV PSC/RCC/ Teak wood Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items , drawing sufficient length of GI earth leads to the ground for earthing. etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in all classes of soil , fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Providing concrete muffing for A pole of size 0.45x0.45x1.5m (0.5 m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5 sides
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of existing damaged/old 11kV Stay with complete stay set along with excavation of stay pit in classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one Strut using HT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc.
Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Dismantling (without damage) 11 kV line (Three conductors) /LT line including dismantling cross arm, insulators, disc, spacers, disconnecting jumper connection etc & disconnection of service connection where ever necessary and rolling the conductor and stacking the materials and then transporting safely to the KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with insulated Messenger through existing poles/ newly inserted pole providing loop where ever necessay and tieing the cables using UV plastic tie -Heavy Duty of Length as per standard( including cost of plastic tie).The work also includes 1.Touching clearance where ever necessary 2. Erection of Anchoring clamp / suspension clamp 3. Installation of MVT and its terminal connections where ever necessary 4.Straightening of poles wherever necessary 5. Re erection of dismantled LT lines and all associated materials ( including street light fittings) / re connection of dismantled service connections whereever necessary etc
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm
Erection of 11kV LA set ( 3 Nos) with supporting plates and giving all connections etc including cost of earth strip- GI ( 25 x 3mm) and its drawal.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in all classes of soil & backfilling.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.
Fitting one additional 75x40 mm, 1.8m channel cross arm in existing single pole including conveyance of materials
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting channel cross arms, digging and back filling pit in all classes of soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision for earthing)
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Reconductoring of LT Line with Bare ACSR conductor OH ( Rabbit )
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Dismantling (without damage) LT Single /three phase OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.The work also includes dismantling of service connections, branch circuits, street lights etc
Single phase Two wire
Single phase Three wire
Three phase Four wire
Three phase Five wire
Insertion of one LT PSC pole in existing Single /three phase OH line including digging & back filling pit in all classes of soil, fitting cross arm, insulator, binding etc. drawing sufficient length of GI earth leads to the ground for earthing.
Renewal of existing damaged/old LT PSC/RCC/Teak wood (Single phase/ three phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items, including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in all classes of soil, fitting cross arm , insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Renewal of existing damaged/old 11kV PSC/RCC/ Teak wood Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items , drawing sufficient length of GI earth leads to the ground for earthing. etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Erection of LT complete stay set along with excavation of stay pit in all classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 1 No) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings and backfilling etc.
Renewal of existing damaged/old LT stay with complete stay set along with excavation of stay pit in all classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 1 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, conveyance the dismantlled items to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of existing damaged/old 11kV Stay with complete stay set along with excavation of stay pit in classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one Strut using LT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Providing Fly stay for LT pole using LT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 1 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc.
Stringing ACSR conductor, shackling, fitting cross arms, insulators and binding helically formed ties suitable for ACSR Rabbit, giving jumper connections, providing LT line spacers etc. The work also includes 1. Touching clearance where ever necessary 2. Reconnection of service connections branch circuits , street lights and re erection of 11 kV line where ever necessary 3. Staightening of poles etc.
Single phase Two wire
Single phase Three wire
Three phase Four wire
Three phase Five wire
Fitting one Section fuse with base frame on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in classes of soil & backfilling.
Reconductoring of LT Line with ABC 3X95+1X70+1X16 sqmm, 3X70+1X50+1X16 sqmm, 3X50+1X35+1X16 sqmm & 2x50 sqmm
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Dismantling (without damage) 11 kV/LT - Single /three phase OH line conductor by dismantling cross arms, insulators, spacers , jumper connections etc and stacking the conductors in rolls properly including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.The work also includes dismantling of branch circuit, service connection, street light etc
Single phase Two wire
Single phase Three wire
Three phase Four wire
Three phase Five wire
Insertion of one LT PSC pole in existing Single/three phase OH line including digging & back filling pit in all classes of soil, binding etc. drawing sufficient length of GI earth leads to the ground for earthing.
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in all classes of soil, fitting cross arm , insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in all classes of soil , fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Providing concrete muffing for A pole of size 0.45x0.45x1.5m (0.5 m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5 sides
Renewal of existing damaged/old LT PSC/RCC/teak wood Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc . Conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL is also form part of the work.
Renewal of existing damaged/old 11kV PSC/RCC/ Teak wood Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items , drawing sufficient length of GI earth leads to the ground for earthing. etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Erection of complete LT stay set along with excavation of stay pit in all classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 1 No) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings and backfilling etc.
Renewal of existing damaged/old LT stay with complete stay set along with excavation of stay pit in all classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 1 No) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of existing damaged/old 11kV Stay with complete stay set along with excavation of stay pit in classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Providing Fly stay for LT pole using LT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 1 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc.
Providing Strut using LT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Drawing, Testing and commissioning of LT AB cable. Stringing of 1.1 kV Aerial bunched cable with insulated Messenger through existing/renewed poles including erection of tension clamp for dead ends, suspension clamps , installation of IPCs of various types and satellite connectors where ever necessary. The work also includes the following 1. Touching clearance where ever necessary . 2. UV plastic tie for binding the conductors ( Including cost of plastic tie) 3. Providing end caps ( Including cost of end caps) 4. Installation of pre insulated mid span joints of sizes 16 sqmm, 35Sq.mm, 50 Sqmm,70 sqmm & 95 sqmm as per field requirement( Including cost of pre insulated mid span joints). 5. Reconnection of service connection, branch circuit lines, street light & re erection of dismantled 11kV lines where ever necessary 6. Straightening of poles where ever necessary. 7. Installation of pre insulated bi metallic lugs at transformer points & other fuse points etc.
3 x 95 + 1 x 70+1x 16 sqmm with insulated Messenger
3 x 70 + 1 x 50+1x 16 sqmm with insulated Messenger
Fitting of one No. pole top service connection box of standard size - up to 4 way (3 phase connection -4 Nos or 1 Ph connection - 12 Nos ) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height including giving connections
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in all classes soil & backfilling.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Fitting one additional 75x40 mm, 1.8m channel cross arm in existing single pole including conveyance of materials
Fitting one no. section fuse on LT line with dropping cables, crimping sockets, connecting with bolt and nuts etc
Conversion of LT Sph line to 3 Ph lines with ABC using 3X95+1x70+1x16sqmm , 3X70+1X50+1X16 sqmm & 3X50+1x35+1x16sq.mm
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Dismantling (without damage) 11 kV/LT Single /three phase OH line conductor by dismantling cross arms, insulators, spacers, jumper connections etc and stacking the conductors in rolls properly including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.The work also includes dismantling of branch circuit, service connection, street light etc
Single phase Two wire
Single phase Three wire
Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in all classes of soil, binding etc. drawing sufficient length of GI earth leads to the ground for earthing.
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in all classes of soil, fitting cross arm , insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in all classes of soil , fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Providing concrete muffing for A pole of size 0.45x0.45x1.5m (0.5 m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5 sides
Rnewal of existing damaged/old LT PSC/RCC/teak wood Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc . Conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL is also form part of the work.
Renewal of existing damaged/old 11kV PSC/RCC/ Teak wood Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items , drawing sufficient length of GI earth leads to the ground for earthing. etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Renewal of existing damaged/old LT stay with complete stay set along with excavation of stay pit in all classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 1 No) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Erection of complete LT stay set along with excavation of stay pit in all classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 1 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings and backfilling etc.
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of existing damaged/old 11kV Stay with complete stay set along with excavation of stay pit in classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Providing Fly stay for LT pole using LT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 1 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc.
Providing Strut using LT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Drawing, Testing and commissioning of LT AB cable. Stringing of 1.1 kV Aerial bunched cable with insulated Messenger through existing/renewed poles, erection of tension clamp for dead ends, suspension clamps , installation of IPCs of various types and satellite connectors where ever necessary. The work also includes the following 1. Touching clearance where ever necessary . 2. UV plastic tie for binding the conductors ( Including cost of plastic tie) 3. Providing end caps ( Including cost of end caps) 4. Installation of pre insulated mid span joints of sizes 16 sqmm, 35Sq.mm, 50 Sqmm,70 sqmm & 95 sqmm as per field requirement( Including cost of pre insulated mid span joints). 5. Reconnection of service connection, branch circuit lines, street light & re erection of dismantled 11kV lines where ever necessary 6. Straightening of poles where ever necessary 7. Installation of pre insulated bi metallic lugs at transformer points & other fuse points etc.
3 x 95 + 1 x 70+1x 16 sqmm with insulated Messenger
Fitting of one No. pole top service connection box of standard size - up to 4 way (3 phase connection -4 Nos or 1 Ph connection - 12 Nos ) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height including giving connections
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in all classes soil & backfilling.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Provision for New ABC:
New 11 kV line
New 11 kV line using ABC 3x120+1x95 sqmm cable
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Fitting and erecting one HT PSC Single Pole in position, fitting cross arm if needed, digging and back filling pit in all classes of soil (as per standards), drawing sufficient length of GI earthing leads to the ground for earthing etc.(excluding provision of earthing)
Fitting and erecting one HT 'A' type Single Pole in position, fitting cross arm if needed, digging and back filling pit inall classes ofsoil (as per standards), drawing sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing)
Providing concrete muffing of size 0.45x0.45x1.5m (0.5 m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5 sides
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting channel cross arms, digging and back filling pit in all classes of soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc.
Fitting and providing one Strut using HT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with insulated Messenger through existing poles/ newly inserted pole providing loop where ever necessay and tieing the cables using UV plastic tie -Heavy Duty of Length as per standard ( including cost of plastic tie)). The work also includes 1. Touching clearance where ever necessary 2. Erection of Anchoring clamp / suspension clamp 3. Installation of MVT and its terminal connections where ever necessary etc 4. Pole numbering as per standards etc
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Erection of 11kV LA set ( 3 Nos) with supporting plates and giving all connections etc including cost of earth strip - GI ( 25 x 3mm) and its drawal.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in classes of soil & backfilling.
Providing one Earth using GI earth pipe of size 40mm dia, 2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Transferring (without damage ) LT single/three phase OH line conductor by dismantling cross arms, insulators, spacers, jumper connections, LT stays, LT struts, LT Fly stays etc and refitting properly on to the newly erected 11kV poles as directed by KSEBL. The work also included dismantling and refitting of branch circuit, service connection, street light and dismantling of all LT poles erected for the line
1ph 2/3wire
3ph 4/5 wire
New 11 kV line using ABC 3x150 + 1x120 sqmm cable
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Fitting and erecting one HT PSC Single Pole in position, fitting cross arm if needed, digging and back filling pit in all classes of soil (as per standards), drawing sufficient length of GI earthing leads to the ground for earthing etc.(excluding provision of earthing)
Fitting and erecting one HT 'A' type Single Pole in position, fitting cross arm if needed, digging and back filling pit inall classes ofsoil (as per standards), drawing sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing)
Providing concrete muffing of size 0.45x0.45x1.5m (0.5 m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5 sides
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting channel cross arms, digging and back filling pit in all classes of soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole, drawing sufficient length of GI earth leads to the ground for earthing including excavation of stay pit in all classes of soil and back filling, erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Fitting and providing one Strut using HT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with insulated Messenger through existing poles/ newly inserted pole providing loop where ever necessay and tieing the cables using UV plastic tie -Heavy Duty of Length as per standard ( including cost of plastic tie)). The work also includes 1. Touching clearance where ever necessary 2. Erection of Anchoring clamp / suspension clamp 3. Installation of MVT and its terminal connections where ever necessary 4. Pole numbering as per standards etc
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Erection of 11kV LA set ( 3 Nos) with supporting plates and giving all connections etc including cost of earth strip- GI ( 25 x 3mm) and its drawal.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in classes of soil & backfilling.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Transferring (without damage ) LT single/three phase OH line conductor by dismantling cross arms, insulators, spacers, jumper connections, LT stays, LT struts, LT Fly stays etc and refitting properly on to the newly erected 11kV poles as directed by KSEBL. The work also included dismantling and refitting of branch circuit, service connection, street light and dismantling of all LT poles erected for the line
1ph 2/3wire
3ph 4/5 wire
Fitting one addl channel cross arm 2.4/3m (75x40x6mm) in existing 11kV DP including conveyance of materials
New LT line
New LT line using ABC - 3 x 95 + 1 x 70 + 1 x 16 sqmm
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Erecting one LT PSC Pole in position including digging & back filling pit in all classes of soil.
Fitting and erecting one HT PSC Single Pole in position, fitting cross arm if needed, digging and back filling pit in all classes of soil (as per standards), drawing sufficient length of GI earthing leads to the ground for earthing etc.(excluding provision of earthing)
Erection of complete stay set LT along with excavation of stay pit in all classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 1 No) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings and backfilling etc.
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Fitting and providing one Strut using LT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil , including the cost of Strut clamp.
Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in all classes of soil including Erection of complete stay set ,with GI stay wire ( 7/3.15 mm dia), binding of stay wire,providing guy stay insulator ( 1 No) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings
Drawing, Testing and commissioning of LT AB cable. Stringing of 1.1 kV Aerial bunched cable 3 x 95 + 1 x 70 + 1 x 16 Sqmm with insulated Messenger through existing/renewed poles, erection of tension clamp for dead ends, suspension clamps , installation of IPCs of various types and satellite connectors where ever necessary. The work also includes the following 1. Touching clearance where ever necessary. 2.UV plastic tie for binding conductors ( Including cost of plastic tie) 3. Providing end caps ( Including cost of end caps) 4. Installation of pre insulated mid span joints of sizes 16 sqmm, 70 Sqmm, 95 sqmm as per field requirement( Including cost of pre insulated mid span joints). 5. Pole numbering as per standards . 6. Installation of pre insulated bi metallic lugs at transformer points & other fuse points.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in all classes of soil & backfilling.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Fitting of one No. pole top service connection box of standard size - up to 4 way (3 phase connection -4 Nos or 1 Ph connection - 12 Nos ) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height including giving connections
Fitting one additional 75x40 mm, 1.8m channel cross arm in existing single pole including conveyance of materials
Provision for Disaster Resilient Infrastructure works
Construction of new 11 kV line using XLPE 3 C x 300 sqmm UG cable
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Excavation of cable trench of appropriate size ( normally 1.2 m deep and 0.35m/0.5m wide for single /double run) in all classes of soil including breaking clods, watering,rammimg and sectioning of soil bank etc and back filling the soil after cable laying and consolidating the soil in layer of 75 cm( excluding laying of cable). The cost includes temporary restoration charges along NH with 1:3:6 CC
Additional rate for excavation of cable trench in exceptionally hard conditions ( like in *ordinary rock).
Charges for HDD including survey of site information collection regarding underground Utilities, survey of utilities, pit marking,pilot drilling Pre-reaming pulling 110 mm dia HDPE pipe ( includes cost of HDPE pipe, temporary restoration charges for HDD pit with 1:3:6 CC etc.)
11 kV line for underground rail way crossing- Laying of 11 kV UG cable through railway crossing as per the approved specification of rail way authority. Two no of separate cable of size 3 x 300 Sqmm shall be laid in separarte HDPE pipe of size 160 mm per crossing. One cable to be kept as a spare. HDD method shall be used for installation of cable below the rail way track. The HDPE pipe shall be PE 80 grade with pressure rating PN 6 conforming to IS 4984/1995 and shall have wall thickness of 6.2 to 7.10 mm
Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc.and through already laid HDPE pipe of size 110 mm &160 mm (for Railway crossing) whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with concrete slabs providing cable route markers at 100 m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling.
Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site.
Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections.
Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit after baricading, caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers.
Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in all classes of soil (as per standards), drawing sufficient length of GI earthing leads to the ground for earthing etc (excluding provision of earthing).
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in all classes of soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.
Erection of 11kV LA set ( 3 Nos) with supporting plates and giving all connections etc including cost of earth strip- GI ( 25 x 3mm) and its drawal.
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, by providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Plain cement concrete 1:3:6 using 20mm broken stone at the HDPE and GI pipe ends for holding the pipe in position and for reconstruction cement concrete demolished as per the directions of departmental officers at site
INSTALATION OF NEW DTRs
Installation of 100 kVA Transformer
Erection of one 100 kVA Transformer in DP structure using PSC pole. The work includes the following 1. Fitting and erecting one HT Double Pole Structure using PSC pole in position digging and back filling pit in all classes of soil,muffing as per standard,Fitting channel cross arms ,AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines /Covered conductor/ABC etc., Fixing distribution box with LT fuse units , drawing sufficient length of GI earthing leads to the ground for earthing where ever necessary. Independent neutral earth leads and LA earth leads using GI flat strip of suitable sizes (cost includes) to be used as per tender specification and shall be routed through alkathene tube ( cost includes) . 2. Mounting of transformer on DP structure/plinth/platform using Transformer Side Belting Angle (cost includes), making cut points uing Disc set,pin insulator , PG clamp etc and giving connections etc. 3. Routing of LT cables through cable trays of dimensions as per specification ( Cable Tray GI (Perforated) 300 x 30 x 1.6mm) from LT transformer terminals to both distribution box and to the pole top ( erected for drawig LT lines) including cost of cable trays, spacers etc.
Erection of one 100 kVA Transformer in DP structure using A pole. The work includes the following 1. Fitting and erecting one HT Double Pole Structure using A pole in position digging and back filling pit in all classes of soil,muffing as per standard & Specification ,Fitting channel cross arms ,AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines /Covered conductor/ABC etc., Fixing distribution box with LT fuse units , drawing sufficient length of GI earthing leads to the ground for earthing where ever necessary. Independent neutral earth leads and LA earth leads using GI flat strip of suitable sizes (cost includes) to be used as per tender specification and shall be routed through alkathene tube ( cost includes) . 2. Mounting of transformer on poles/plinth/platform using Transformer Side Belting Angle (cost includes), making cut points uing Disc set,pin insulator , PG clamp etc and giving connections etc. 3. Routing of LT cables through cable trays of dimensions as per specification ( Cable Tray GI (Perforated) 300 x 30 x 1.6mm) from LT transformer terminals to both distribution box and to the pole top ( erected for drawig LT lines) including cost of cable trays, spacers etc.
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Erection of complete stay set LT along with excavation of stay pit in all classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 1 No) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings and backfilling etc.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of materials.
Cleaning and levelling of transformer yard , spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.
Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in all classes of soil, fitting cross arm,insulator, binding etc.
Enhancement of DTR
ENHANCEMENT OF 25VA to 100kVA TRANSFORMER
Dismantling HT Double Pole Structure (PSC pole/A pole) after disconnecting stay wires, channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipment, CTs, Distribution Box, statutory display boards, etc. The work also includes conveyance of the taken back materials to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEBL.
Dismantling existing transformer erected in DP structure ( Apole/PSC pole) and its earthing etc and stacking the taken back transformer and other materials properly . The work also includes the conveyance of the taken back materials including transformer to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEB
Erecting one 100 kVA Transformer to existing DP structure ( PSC/A Pole)/Plinth/Platform. The work includes the following 1. Mounting of transformer DP structure ( PSC/A Pole)/Plinth/Platform using Transformer Side Belting Angle (cost includes), making cut points uing Disc set,pin insulator , PG clamp etc and giving connections etc. 2. Routing of LT cables through cable trays of dimensions as per specification ( Cable Tray GI (Perforated) 300 x 30 x 1.6mm) from LT transformer terminals to both distribution box and to the pole top ( erected for drawig LT lines) including cost of cable trays, spacers etc.
Fitting and erecting one HT Double Pole Structure using PSC poles in position digging and back filling pit in all classes of soil,muffing as per standard & Specification ,Fitting channel cross arms ,AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines /Covered conductor/ABC etc., Fixing distribution box with LT fuse units , drawing sufficient length of GI earthing leads to the ground for earthing where ever necessary. Independent neutral earth leads and LA earth leads using GI flat strip of suitable sizes (cost includes) to be used as per tender specification and shall be routed through alkathene tube ( cost includes) .
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of materials.
Cleaning and levelling of transformer yard , spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.
ENHANCEMENT OF 63kVA to 100kVA TRANSFORMER
Dismantling existing transformer erected in DP structure ( (PSC pole/A pole) and its earthing etc and stacking the taken back transformer and other materials properly . The work also includes the conveyance of the taken back materials including transformer to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEB
Erecting one 100 kVA Transformer to existing DP structure ( PSC/A Pole)/Plinth/Platform . The work includes the following 1. Mounting of transformer on existing DP structure ( PSC/A Pole)/Plinth/Platform using Transformer Side Belting Angle (cost includes), making cut points uing Disc set,pin insulator , PG clamp etc and giving connections etc. 2. Routing of LT cables through cable trays of dimensions as per specification ( Cable Tray GI (Perforated) 300 x 30 x 1.6mm) from LT transformer terminals to both distribution box and to the pole top ( erected for drawig LT lines) including cost of cable trays, spacers etc.
ENHANCEMENT OF 100 kVA to 160kVA TRANSFORMER
Dismantling HT Double Pole Structure (PSC pole/A pole) after disconnecting stay wires, channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipment, CTs, Distribution Box, statutory display boards, etc. The work also includes conveyance of the taken back materials to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEBL.
Dismantling existing transformer erected in DP structure ( (PSC pole/A pole)/Plinth/Platform and its earthing etc and stacking the taken back transformer and other materials properly . The work also includes the conveyance of the taken back materials including transformer to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEB
Erecting one 160 kVA Transformer to existing DP structure ( PSC/A Pole)/Plinth/Platform. The work includes the following 1. Mounting of transformer on existing DP structure ( PSC/A Pole)/Plinth/Platform using Transformer Side Belting Angle (cost includes), making cut points uing Disc set,pin insulator , PG clamp etc and giving connections etc. 2. Routing of LT cables through cable trays of dimensions as per specification ( Cable Tray GI (Perforated) 300 x 30 x 1.6mm) from LT transformer terminals to both distribution box and to the pole top ( erected for drawig LT lines) including cost of cable trays, spacers etc.
Fitting and erecting one HT Double Pole Structure using PSC poles in position digging and back filling pit in all classes of soil,muffing as per standard & Specification ,Fitting channel cross arms ,AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines /Covered conductor/ABC etc., Fixing distribution box with LT fuse units , drawing sufficient length of GI earthing leads to the ground for earthing where ever necessary. Independent neutral earth leads and LA earth leads using GI flat strip of suitable sizes (cost includes) to be used as per tender specification and shall be routed through alkathene tube ( cost includes) .
Fitting and erecting one HT Double Pole Structure using A pole in position digging and back filling pit in all classes of soil,muffing as per standard & Specification ,Fitting channel cross arms ,AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines /Covered conductor/ABC etc., Fixing distribution box with LT fuse units , drawing sufficient length of GI earthing leads to the ground for earthing where ever necessary. Independent neutral earth leads and LA earth leads using GI flat strip of suitable sizes (cost includes) to be used as per tender specification and shall be routed through alkathene tube ( cost includes) .
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of materials.
Cleaning and levelling of transformer yard , spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.
ENHANCEMENT OF 160kVA to 250kVA TRANSFORMER
Dismantling HT Double Pole Structure (PSC pole/A pole) after disconnecting stay wires, channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipment, CTs, Distribution Box, statutory display boards, etc. The work also includes conveyance of the taken back materials to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEBL.
Dismantling existing transformer erected in DP structure (PSC pole/A pole)/Plinth/Platformand its earthing etc and stacking the taken back transformer and other materials properly . The work also includes the conveyance of the taken back materials including transformer to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEB
Erecting one 250 kVA Transformer to existing Plinth/Platform. The work includes the following 1. Mounting of transformer on existing Plinth/Platform using Transformer Side Belting Angle (cost includes), making cut points uing Disc set,pin insulator , PG clamp etc and giving connections etc. 2. Routing of LT cables through cable trays of dimensions as per specification ( Cable Tray GI (Perforated) 300 x 30 x 1.6mm) from LT transformer terminals to both distribution box and to the pole top ( erected for drawig LT lines) including cost of cable trays, spacers etc.
Fitting and erecting one HT Double Pole Structure using A pole in position digging and back filling pit in all classes of soil,muffing as per standard & Specification ,Fitting channel cross arms ,AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines /Covered conductor/ABC etc., Fixing distribution box with LT fuse units , drawing sufficient length of GI earthing leads to the ground for earthing where ever necessary. Independent neutral earth leads and LA earth leads using GI flat strip of suitable sizes (cost includes) to be used as per tender specification and shall be routed through alkathene tube ( cost includes) .
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of materials.
Cleaning and levelling of transformer yard , spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.
Constructing Transformer plinth of size 1.5x1.5x1.5m on 1.8x1.8x0.75m basement inclusive of cost of all materials. [Excavation 1.8x1.8x0.75m, Random Rubble in CM(1:6) 1.8x1.8x0.75m + 1.5x1.5x1.5m, concrete (1:2:4, 20mm) 1.5x1.5x0.10 m, plaster CM (1:3) 12mm, 1.5x1.5m, Pointing CM (1:3) 1.5x1.5mx 4 sides].
Uplifting of Transformer
Dismantling HT Double Pole Structure (PSC pole/A pole) after disconnecting stay wires, channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipment, CTs, Distribution Box, statutory display boards, etc. While dismantling, the reusable materials shall be separately stacked and transported to the new location without any damage. The quality of reusable materials shall be ensured before erecting at new site.The work also includes conveyance of the taken back materials to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEBL.
Dismantling transformer erected in DP structure/Plinth/Platform and its earthing etc and stacking the taken back transformer and other materials properly . While dismantling, the reusable materials including transformer shall be separately stacked and transported to the new location without any damage. The quality of reusable materials shall be ensured before erecting at new site.The work also includes the conveyance of the taken back materials including transformer to KSEBL store safely and stacking the same properly with proper documentation as directed by concerned officials of KSEB
Erecting one Transformer ( 100/160/250 kVA) to existing Plinth/Platform. The work includes the following 1. Mounting of transformer on existing plinth/platform using Transformer Side Belting Angle (cost includes), making cut points uing Disc set,pin insulator , PG clamp etc and giving connections etc. 2. Routing of LT cables through cable trays of dimensions as per specification ( Cable Tray GI (Perforated) 300 x 30 x 1.6mm) from LT transformer terminals to both distribution box and to the pole top ( erected for drawig LT lines) including cost of cable trays, spacers etc.
Fitting and erecting one HT Double Pole Structure using A pole in position digging and back filling pit in all classes of soil,muffing as per standard & Specification ,Fitting channel cross arms ,AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines /Covered conductor/ABC etc., Fixing distribution box with LT fuse units , drawing sufficient length of GI earthing leads to the ground for earthing where ever necessary. Independent neutral earth leads and LA earth leads using GI flat strip of suitable sizes (cost includes) to be used as per tender specification and shall be routed through alkathene tube ( cost includes) .
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and 0.2 cu.m concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of materials.
Cleaning and levelling of transformer yard , spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.
Providing new 11kV feeder outlet from various substations under Transmission circle Kannur for SCADA DMS application of Kannur Town
Laying 3x300sq mm 11k V XLPE cables in trench including drawing through pipes wherever necessary.
Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 11 kV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc. as required.
Doing out door cable termination of 3x300 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket.
Doing indoor cable termination of 3x300 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket.
Mounting one 3x300 sq.mm XLPE out door cable end termination to structure very carefully without causing any damage to the cable and drilling holes wherever necessory as directed by department officers.
Mounting one 3x300 sq.mm XLPE indoor cable end termination to structure very carefully without causing any damage to the cable and drilling holes wherever necessory as directed by department officers.
Erection of 1 No. 11KV LA (station type ) /11KV Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers.
Erection of one set 11KV Isolator / AB switch (station class) on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers.
Laying departmentally supplied GI strip/copper strip of suitable size including cleaning and neatly bending of stiprs, cutting, removing of metal/ earth in the yard and burying earth strip to the required depth redoing the yard metalling as per the direction of dept. officers.
Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip and connecting other end with nuts & bolts if required as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete.
Unpacking at the place of storage and transporting 11KV indoor VCB/SF6 switch gear panel and its accessories to the place of erection and erecting after fixing foundation bolts by chipping concrete wherever necessary, tightening, keeping lines and levels taking all safety precautions including erection of potential transformers as per the direction of departmental officers.
Interconnection of panels and 11kV bus bars after opening covers, earthing, interpanel wiring, etc. And making ready for commissioning of breaker as per the direction of departmental officers.
Fitting and erecting one HT Double Pole Structure using 'A' type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift up to 1.5 m, as directed by Engineer-in-Charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.- All kinds of soil.
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m- Ordinary rock.
Laterite neatly dressed stones of size 35X20X20 cm or nearest size in cement mortar 1:6 for foundation and basement(From Sanctioned Estimate for similler work at various substation
Plastering work -12 mm thick with cement mortar 1:4.
Supplying and stacking hard blue granite broken stone 6 mm at site
Supplying and stacking hard blue granite broken stone 40 mm at site
Spreading of broken stone 6 mm size including transportation by head load.
Spreading of broken stone 40mm size including transportation by head load.
Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
Description of Work / Item(s)
Amount
TOTAL BOQ1 (Materials( Total Ex-work price of Materials + Total Transportation cost ) excluding GST.)
TOTAL BOQ2 (Installation / Erection Charges (Excluding GST)
TOTAL AMOUNT [1+2] (Excluding GST)
Discount offerred by Bidder(If any)
BOQ 3: TOTAL excluding GST [3 - 4]
Grand Total including GST (5+ GST Amount of BOQ1+GST Amount of BOQ2 )
Polycab India Limited
VR PATIL VIVIDH VIDYUTH NIRMAN PVT LTD
VR PATIL VIVIDH VIDYUTH NIRMAN PVT LTD
Vindhya Telelinks Limited
Polycab India Limited
VR PATIL VIVIDH VIDYUTH NIRMAN PVT LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid