Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.1 L+₹13,735.73 (7.03%)Rejected-AOC TC 25664 RAJI OPP HOTEL AMRITHA THYCAUD THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | L2 | Rejected-AOC L2 |
Tender Value
₹2.0 L
EMD Value
₹4,977
Closing Date
28 May 2026, 6:00 pmClosed
AEE
PWD Electrical Sub Division Tvpm
GENERAL-Govt Secretariat, Tvm- Finance dept- CMC for ductable split AC unit (excluding compressor) installed in FD hall, Main hall at Main block, FI wing at South block and SFC at sixth floor of Annex-1 for the period from 01/03/26 to 31/03/27- AC
2026_PWD_852023_1
ESDT/ET-16/2026-27
Open Tender
Electrical Works
Percentage
365 days
PWD Electrical Sub Division Tvpm
please refer tender documents
5 documents required · 5 mandatory
₹555
₹4,977
3 Aug 2026
20 May 2026
30 May 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1AC AMC | |||||
| 1.001 | OD293240/2025-2026:All inclusive Comprehensive maintenance contract for the following air conditioner unit (excluding the replacement of defective compressor, electrical Main switches and Civil works) having all routine and preventive maintenance, attending to all breakdowns and petty repairs and rectifying the defects if any, including replacement of defective accessories, refrigerant controls, pressure testing of the system, vacummizing, compressor oil charging, gas charging etc. as required. The cleaning and servicing of IDU and ODU includes 1no. water servicing using chemicals, water pump etc. and 3 nos. Air servicing using cleaning materials and pressure air pump etc. The Air filter of the indoor unit shall be cleaned by using cleaning material, check the indoor and outdoor units, refrigerant status, cooling temperature and check all electrical components for every month of the year. The operating status of the units should be regularly monitored and intimated to the department staff in charge and the Air conditioner Units should be maintained in proper working condition through out the period of contract. - 5.5 TR, 415V Air cooled Ductable split Air Conditioner Units (1 nox 12 services) | - | each | 1,081.36 | - |
| 1.002 | OD293233/2025-2026:All inclusive Comprehensive maintenance contract for the following air conditioner unit (excluding the replacement of defective compressor, electrical Main switches and Civil works) having all routine and preventive maintenance, attending to all breakdowns and petty repairs and rectifying the defects if any, including replacement of defective accessories, refrigerant controls, pressure testing of the system, vacummizing, compressor oil charging, gas charging etc. as required. The cleaning and servicing of IDU and ODU includes 1no. water servicing using chemicals, water pump etc. and 3 nos. Air servicing using cleaning materials and pressure air pump etc. The Air filter of the indoor unit shall be cleaned by using cleaning material, check the indoor and outdoor units, refrigerant status, cooling temperature and check all electrical components for every month of the year. The operating status of the units should be regularly monitored and intimated to the department staff in charge and the Air conditioner Units should be maintained in proper working condition through out the period of contract. - 7.5/8.5 TR, 415V Air cooled Ductable split Air Conditioner Units (1 no x 12 services) | - | each | 1,677.21 | - |
| 1.003 | OD293239/2025-2026:All inclusive Comprehensive maintenance contract for the following air conditioner unit (excluding the replacement of defective compressor, electrical Main switches and Civil works) having all routine and preventive maintenance, attending to all breakdowns and petty repairs and rectifying the defects if any, including replacement of defective accessories, refrigerant controls, pressure testing of the system, vacummizing, compressor oil charging, gas charging etc. as required. The cleaning and servicing of IDU and ODU includes 1no. water servicing using chemicals, water pump etc. and 3 nos. Air servicing using cleaning materials and pressure air pump etc. The Air filter of the indoor unit shall be cleaned by using cleaning material, check the indoor and outdoor units, refrigerant status, cooling temperature and check all electrical components for every month of the year. The operating status of the units should be regularly monitored and intimated to the department staff in charge and the Air conditioner Units should be maintained in proper working condition through out the period of contract. - 11 TR, 415V Air cooled Ductable split Air Conditioner Units (1 no x 12 services) | - | each | 2,173.17 | - |
| 1.004 | OD293236/2025-2026:All inclusive Comprehensive maintenance contract for the following air conditioner unit (excluding the replacement of defective compressor, electrical Main switches and Civil works) having all routine and preventive maintenance, attending to all breakdowns and petty repairs and rectifying the defects if any, including replacement of defective accessories, refrigerant controls, pressure testing of the system, vacummizing, compressor oil charging, gas charging etc. as required. The cleaning and servicing of IDU and ODU includes 1no. water servicing using chemicals, water pump etc. and 3 nos. Air servicing using cleaning materials and pressure air pump etc. The Air filter of the indoor unit shall be cleaned by using cleaning material, check the indoor and outdoor units, refrigerant status, cooling temperature and check all electrical components for every month of the year. The operating status of the units should be regularly monitored and intimated to the department staff in charge and the Air conditioner Units should be maintained in proper working condition through out the period of contract. - 17 TR, 415V Air cooled Ductable split Air Conditioner Units (3 nosx 12 services) | - | each | 3,363.7 | - |
| 1.005 | OD293241/2025-2026:Annual Maintenance and servicing of 1TR/1.5 TR/ 2TR/3 TR, 240/415V Vertical and Wall/ Floor Mounting type Split /Cassette/Ductable split Air Conditioner Units covering all routine and preventive maintenance, attending to all breakdowns and rectifying the defects if any (excluding the cost of spare). The cleaning and servicing of IDU and ODU includes 1no. water servicing using chemicals, water pump etc. and 3 nos. Air servicing using cleaning materials and pressure air pump etc. The operating status of the units should be regularly monitored and intimated to the department staff in charge and the Air conditioner Units should be maintained in proper working condition through out the period of contract | - | each | 2,402.29 | - |
| 1.006 | OD293235/2025-2026:Supply for filling sufficient quantity of freon 22/32/410 A gas for existing air conditioner unit including leak testing rectifying the defects leak arresting including brazing and make the compressor in good working condition for the following. - 1TR/1.5TR/2TR/3TR | - | kilogram | 1,292.03 | - |
| 1.007 | OD293237/2025-2026:Supply and renewing 36/40/50 mfd capacitor suitable for compressor motor of 1TR/1.5TR/2TR in the place defective one. | - | each | 504.03 | - |
| 1.008 | OD293238/2025-2026:Supply and renewing 2.5/4 mfd capacitor suitable for out door fan motor of 1TR/1.5TR/2TR in the place defective one. | - | each | 94.93 | - |
| 1.009 | OD293234/2025-2026:Supply and providing the following rubberized foam sleeve 10mm thick, brazing, leak testing in the existing copper pipe between indoor and out door 1/4 and 1/2, 3/8 and 5/8 etc.:- rubberized foam sleeve | - | metre | 254.06 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1439656.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
viewsbd.pdf
Additional Documents • 1.63 MB
BOQ_1439656.xls
BOQ • 0.32 MB
Specificondtionsac-1.pdf
Additional Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .