Loading…
Loading…
Tender Value
₹18.3 L
EMD Value
₹36,700
Closing Date
13 Apr 2026, 3:00 pmClosed
MUNICIPAL COMMISSIONER, KATIHAR
MCO
SHAHID CHOWK KATIHAR
MUNICIPAL COMMISSIONER, KATIHAR
MUNICIPAL COMMISSIONER
Construction of Earth filling and brick on edge soling road and drain with cover from the house of Fanishwar Nath Das to the house of Durgesh Kumar 2.Construction of Earth filling and brick on edge soling road and drain with cover from the Bajrangbali Sthan to the house of Brajesh Kumar via Chakardhar Paswan in w.no.-17 Under nagar nigam Katihar.
128690
KTR/NIT-25/2025-26-GR-09
Open Tender
CIVIL
Katihar
• DEPARTMENT REGISTRATION NUMBER
• PAN NUMBER
• GST NUMBER
• CHARACTER CERTIFICATE
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹5,000
Processing Fee: 590
₹36,700
OFFICE OF THE MUNICIPAL CORPORATION KATIHAR
6 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
7 Apr 2026
BILL OF QUANTITY
URBAN DEVELOPMENT AND HOUSING DEPARTMENT KATIHAR MUNICIPAL CORPORATION, KATIHAR
Group- 09 / NIT No.-25 /2025-26.
Bill of quantity for 1.Construction of Earth filling and brick on edge soling road and drain with cover from the house of Fanishwar Nath Das to the house of Durgesh Kumar 2.Construction of Earth filling and brick on edge soling road and drain with cover from the Bajrangbali Sthan to the house of Brajesh Kumar via Chakardhar Paswan in w.no.-17 Under nagar nigam Katihar.
Date of Online Saleing of B.O.Q 06.04.2026 dks 15-00 cts ls
Last Date of Online Submission 13.04.2026 ds 15-00 cts rd
Estimated Cost (as per B.O.Q) 1832800
Earnest Money 36700
Time of Completion (in months) 3 Months
Cost of B.O.Q 5000
SL No SOR NO. ITEM OF WORK UNIT QTY. RATE AMOUNT
1 2.8.1 Earth work in excavation in foundation trenches in ordinary soil with all lifts and leads, transporting to site spreading, grading to required slope and compaction to meet requirement of table Rolling with smooth wheeled roller all complete as per specification and direction of E/I. Cum
2 2.28 Supplying and Filling with local sand in road surface including, watering, ramming consolidating and dressing complete. In road embankment all complete job as per building specification and direction of E/I. Cum
3 Providing 100 A Brick flat soling and Joints filled with local sand………… … as per E/I Sqm
4 4.1.3 Providing and laying in position cement concrete(PCC ,1:2:4) of specified grade excluding the cost of centring and shuttering -all work upto plinth level. Cum
5 6.1.12/1 Providing 100 A brick work in cm(1:4) in foundation -all work upto plinth level. Cum
7 13.17.2 Providing 12 mm thlick cp(1:4) finished with a floating coat of neat cement. Sqm
8 5.1.2 Providing and laying in position cement concrete(RCC)(1:1.5:3) in Drain cover excluding the cost of centring and shuttering -all work upto plinth level. Cum
9 5.22.7 Reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete.
10 mm dia TMTC-500 kg 2381.6
10 5.9.1 Providing Centring and shuttering including strutting,propping etc.and removal or form for foundations, footings, bases of columns etc for mass concrete. Sqm
11 3.16(ii) Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Rolling with smooth wheeled roller all complete as per specification and direction of E/I. Cum
12 Providing designation 100 A one brick edge soling Joints filled with local sand including cost of watering taxes royalty all complete job as per building specification and direction of E/I. Sqm
13 Carriage cost of Materials
(A) Bricks Thousand
(B) Coarse sand Cum
(C) Stone chips Cum
(D) Local sand+ Earth Cum
(E) Cement +Steel Cum
14 Extra Cost of Materials
(A) Bricks Thousand
15 Add difference cost for GST due to inhancement of GST from 12% to 18%(multiplying by 0.0536 of A)
16 Add seigniorage fee 10% on basic rate of materials
Bricks Thousand
Coarse sand Cum
Stone chips Cum
S/F/F informantry signboard 1NOS 1
S/F/F inaugurational silapatt 1NOS 1
Total 1832818.31
Say Total 1832800
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT25.pdf
NIT • 2.30 MB
NIT25.pdf
NIT • 2.30 MB
GR09.xls
NIT • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .