| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC HEREIKKANATHU VEEDU PANACODE P O | ₹5.7 L Quoted ₹6.7 L | L1 | Accepted-AOC Lowest rate quoted.Below 6.1 percentage |
| 2 | L2₹7.0 LRejected-AOC | ₹7.0 L | L2 | Rejected-AOC Second Lowest rate quoted.Below 2.0 percentage |
Tender Value
₹6.0 L
EMD Value
₹15,100
Closing Date
9 Mar 2026, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Electrical Sub Division, Nedumangad
Erumala Reconducting LT 3ph OH line with ABC under Electrical Section, Chullimanoor (work code CW-4653-202526-28)
2026_KSEB_831525_1
09/AEE/ESD NDD/2025-26/22.01.2026
Open Tender
Electrical Works
CHULLIMANOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,534
₹15,100
16 May 2026
29 Jan 2026
13 Mar 2026
29 Jan 2026
9 Mar 2026
29 Jan 2026
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit
Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line
Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling
IInstallation of Pre-insulated lugs for 16sqmm
Providing End Caps
Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections
Installation of Pre-insulated lugs for 50sqmm
Installation of Pre-insulated lugs for 70sqmm
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle)
Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle)
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil.
Providing Stay for LT poles including digging & back filling pit in ordinary soil.
Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil.
Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.
Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly.
Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles
Erection of Anchor clamp / dead end clamp for LT ABC of any size
Erection of suspension clamp for LT ABC of any size
Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm
Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm
Insertion of one HT PSC pole in existing HT/LT line including digging & back filling of pit in ordinary soil, fitting cross arm, insulator, binding etc. , drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing)
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires.
Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
Renewal of existing damaged/old LT PSC/RCC (three phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.
Straightening one slanted 11kV pole after unbinding the line and binding the line after work
Straightening one Slanted LT pole after unbinding the line and rebinding the line after work
Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.
Renewal of existing damaged/broken old 11kV Stay to the existing stay rod.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
Renewal of existing damaged/old 11kV PSC/RCC Pole with new A type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.
Renewal of existing damaged/broken old LT stay in existing stay rod
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same
Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.
Fitting one Additional V cross arm in existing single pole including conveyance of materials
Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole
Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_1397160.xls
BOQ • 0.30 MB
BID.pdf
Tender Documents • 1.08 MB
TE1.pdf
PDF • 0.18 MB