| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹4.4 CrAccepted-AOC | ₹4.4 Cr | 1st | Accepted-AOC Due to L-1 |
| 2 | 2nd₹4.7 Cr+₹32.9 L (7.46%)Accepted-AOC VPO BARI TEHSIL GANAUR SONEPAT 131101 | SONEPAT | SONIPAT | HARYANA | 131101 | ₹4.7 Cr+₹32.9 L (7.46%) | 2nd | Accepted-AOC Due to L-2 |
Tender Value
Refer Docs
EMD Value
₹7.9 L
Closing Date
1 Mar 2021, 5:00 pmClosed
Executive Engineer
EE-PD2-PWD B and R Railway Road Sonepat
Improvement by Pdg. Wdg. and Stg. of road from Purkhas to Agwanpur road RD 0.00 to 4.20 (Road ID 6089) and Moi to Rehmana road RD 0.00 to 3.26 km (Road ID 9314) in Ganaur constituency in Sonipat Distt. under NABARD XXVI scheme. (Re-invite)
2021_HRY_159766_1
pwd-eepd2-sonepat
Open Tender
Civil Works
Works
270 days
Sonepat
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
Yes
₹7.9 L
Yes
11 Jun 2021
12 Feb 2021
2 Mar 2021
12 Feb 2021
1 Mar 2021
12 Feb 2021
Amount
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item.
Earth work excavation in ordinary soil exclusive of compensation of earth, Kassi work undressed involving an average horizontal throw upto 2 metres, and an average vertical lift upto 0.5 metre including breaking of clods (HSR 6.2 (b) and recompact the same including laying dressing, watering & rolling as per HSR 6.2 g-I, g-II and g-v.
Dismantling Brick work, tile masonry or tile lining and tile terracing, dry brick work {(HSR 8.5 (i)}.
Preparation of sub grade including trenching, rough dressing of spoil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1) Note: - In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work.
Providing and laying 150 mm thick granular sub base consisting of filter layer confirming to Table 400.1 Grading - III of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer in writing.
Providing & laying 150 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - No local earth /natural occurring sand shall be allowed to be used as binding/ screening 2. Materials to be used and operations of manufacturing shall be approved by engineer in writing..
Providing and applying primer coat with bitumen emulsion (S.S grade-I) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.502. (N.S.)
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing and Laying 50 mm thick Compacted bituminous macadam in (BM) in one layer by drum type hot mix plant and paver finisher with sensor control to the required grade as per clause No. 504 table No. 500-4 of MoRT&H specification for road and bridge works (5th Revision) of 2013 using minimum 3.4 % bitumen grade VG-30 as binder content by weight of total mix, complete in all respects i/c cost of bitumen, instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required on this account is more than 3.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Pdg & laying 50mm BM using the reclaimed material to the extent of 30% of the required quantity, hauling and stockpiling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in drum type hot mix plant, with appropriate arrangement for use of R.A.P., transporting and laying at site with hydraulic paver finisher with sensor control to the required grade and compacting to the required grade level and thickness with appropriate rollers all as specified in clause 519 (5th Revision) of 2013 using bitumen VG-30. (minimum Bitumen's 3.40% i/c bitumen of retrieved material as per job mix formula). Note: - 1. The milled material to be used in BM shall be minimum 80% of the theoretical quantity. 2. If bitumen required more than 3.40% as per job mix formula no extra payment will be paid extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and laying 20mm thick premix carpet (PC) excluding cost of tack coat, 1.46 kg. per sqm with mixed material brought from drum type Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified value of compaction and direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect. i/c cost of Bitumen VG-10 grade as per clause 510 MoRT&H specification (5th edition) 2013 (NS). Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and laying ‘B’ type seal coat with VG-10 grade bitumen excluding cost of tack coat, with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified/desirable value of compaction as per direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect as per clause 511 and 510.1.3 of MoRT&H specification (5th edition) 2013 (NS).
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M ) M-30 grade using minimum cement concrete 320 Kg/ per cum with digital batching plant duly compacted with table vibration including setting in position over bed prepared with 25mm thick fine sand and filling up the joints with fine sand (NS)
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked , antitermite as required at site , into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches , if required , Jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and with end dowels filled with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No 29.38,29.44,29.45 & 29.46) including cartage , loading and unloading complete in all respects. Note: - Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
Reinforced cement concrete 1:2:4 Kilometer stone of standard design, fixed in position, including finishing and including painting; (HSR 10.129 + 16.75 b )(ii) Kilometer stone on village roads
Reinforced cement concrete 1:2:4 village board of standard design, fixed in position, including finishing and including painting. (HSR 10.130+16.74 b)
Reinforced cement concrete 1:2:4 boundary pillars of standard design, fixed in position, including finishing and including painting. (HSR 10.131 + 16.74 b )
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M)
Sholder mounted sign boards:- (Providing and fixing of shoulder mounted sign boards of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC: 67 -2012 type lV HIP specification fixed on 3mm thick Aluminium Composite Panel, having 0.5 mm thick Aluminium on both sides supported on Mild Steel Pipe leg post 80mm NB, 1.6mm thick duly painted in alternative color of black and white embeded M-20 Grade concrete foundation of size 450mmx450mmx600mm, complete as per drawings, Technical Specifications and as directed by Engineer-in-Charge. MANDATORY/REGULATORY SIGNS:- 600mm Circularsign, "No Parking" and "No Stopping" sign,"Speed Limit" "Prohibitory" 'Vehicle Control" sign, "Restriction" sign, and "Compulsory DirectionControl" and other sign etc. as per item No. 6.1 of the list of road furniture uploaded on the website of Haryana PWD B&R branch
Cautionery/warnng signs 600mm equilateral Tringle (Left Right curve,Right left Hairpin Bend, Side Road Left Right 'Y- lntersection, Cross Road, Narrow Road Ahead,Road Widens, Nanow Bridge Ahead,Reduced Carriageway, Start of Dual Caniageway,End of Dual Carriageway,Gap in Median, Pedestrian Crossing,School Ahead,Men at Work, Speed Breaker,Rumble Strip, Guarded Railway Crossing and other signs etc.) as per item No. 6.4 of the list of road furniture uploaded on the website of Haryana PWD B&R branch
MANDATORY/REGULATORY SIGN:-600 mm High Octagon Usage:- STOP SIGN as per item No. 6.6 of the list of road furniture uploaded on the website of Haryana PWD B&R branch
Providing & erecting OVERHEAD SIGNS gantry supported by M. S. Pipe Structure complete as per drawings, Technical Specifications and as directed by Engineer-In-Charge including construction of R. C. C. foundation for providing of M. S Tubular structure for Cantilever signage at given site as per drawing enclosed. The C. C. mix to be in ratio of 1:1½:3 (RCC 1:1½:3) and that of lean to be ratio of 1:3:6 the work will be carried out as per the instructions of Engineer-In-Charge. Note: Foundation including reinforcement etc. as per Drawing. Cantilever Over head Sign gantry. (r-Type) frame/truss Size- 3.05m x 1.525m
Providing and fixing sign boards on the gantry as provided in item No. 23 above, of Size- Size- 3.05 m x 1.525 m made out of retro-reflective sheeting of high intensity micro prismatic grade conforming to IRC: 67 - 2012 Type IV standards fixed on 4mm thick Aluminum Composite Panels (ACP sheet ) as base board with pressure-sensitive adhesive having 0.5 mm thick Aluminum on both sides. The messages (legends, letters, numerals etc.) and borders of Retro Reflective Boards shall be of cut letters made in transparent overlay film pasted over the base sheeting with pressure sensitive adhesive or as instructed by the manufacturers or as directed by the Engineer-In-Charge. Note:- 1.) Work will be carried out as per MoRTH specification for road and bridges works (5th Revision). 2.) Retro-reflective sheeting of high intensity mirco-prismatic grade confirming to IRC 67-2017 Type-IV Standards shall be of Avery Dennision/3M make only. 3.) Warranty and Durability as per clause 801.3.11 of MoRTH Specification 5th Revision will be applicable which is reproduced as under :- The Contractor shall obtain from the manufacturer a ten year warranty for satisfactory field performance including stipulated retro-reflectance of the retro-reflective sheeting of micro-prismatic sheeting and a seven-year warranty for high intensity grade and submit the same to the Engineer. The warranty shall be inclusive of the screen printed or cut out letters/legends and their bonding to the retro-reflective sheeting. The Contractor /supplier shall also furnish the LOT numbers and certification that the signs and materials supplied against the assigned work meets all the stipulated requirements and carry the stipulated warranty and that the contractor /supplier is the authorized convertor of the particular sheeting. All signs shall be dated during fabrication with indelible markings to indicate the start of warranty. The warranty shall also cover the replacement obligation by the sheeting manufacturer as well as contractor for replacement/repair/restoration of the retro-reflective efficiency. A certificate in original shall be given by the sheeting manufacturer that its offered retro-reflective sheeting has been tested for various parameters such as co-efficient of retro-reflection, day/night time colour and luminance, shrinkage, flexibility, linear removal, adhesion, impact resistance , specular gloss and fungus resistance; the tests shall be carried out by a Government Laboratory in accordance with various ASTM procedures and the results must show that the sheeting has passed the requirements for all the above mentioned parameters. A copy of the test reports shall be attached with the certificate.
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres..(HSR 6.6)
Cement concrete 1 : 4 : 8 with brick ballast 40 mm Nominal size in foundation and plinth.( HSR 10.36 )
Cement concrete 1; 2 ; 4 with stone aggregate 20 mm nominal size in foundation and plinth. (HSR 10.41)
Cement concrete 1:1 ½:3 with stone aggregate 20 mm nominal size in first storey upto 4 Mtr.s above plinth level.(HSR 10.60)
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cemetn concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in charge in first storey upto 4 meters above plinth level (hsr 10.73) Note: Cement content considered in this items is @ 330 kg/cum.
First class brick work laid in cement sand mortar 1:5 in foundation and plinth.(HSR 11.3)
First class brick work laid in cement sand mortar 1:3 in first storey upto 4 metres above plinth level. (hsr 11.10)
Extra for making tapered surface of brick Masonry (HSR 11.99)
Cement pointing 1:2 deep variety on brick and Tile work(HSR 15.60)
Striking joints in lime or cement on brick and tile walls. (hsr 15.69)
Steel reinforcement TMT bars FE-500 EQR/FE-500 D grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights/ depths/ storeys/ basements etc. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameter as actually used in work, excluding overlaps, wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement (HSR 18.22).
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflector zing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use.
Preparation and formation of berms and slopes as per X-sections including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. This item also includes E/W if required in sub grade for Widening and Shoulder. Earth used for sub grade, shoulder and berms should have minimum CBR of 8%. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :-- i) Bricks Bats @400/- Per cum
ii) Good Bricks @ 4.50 /- Each Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Routine maintenance 1st year Maintenance as per general condition of contract data Rs. 24069.00
2nd year Maintenance as per general condition of contract data Rs. 72207.00
3rd year Maintenance as per general condition of contract data Rs. 96272.00
4th year Maintenance as per general condition of contract data Rs. 120345.00
5th year Maintenance as per general condition of contract data Rs. 168483.00 Note- The bidder is required to quote his rate for routine maintenance as defined in DNIT. The rates of routine maintenance as indicated in DNIT will be considered for financial evaluation and determining L-1 contractor irrespective of rates quoted by the contractor. if the rates quoted by the contractor differ from fixed rates, then it will not be considered and base rates as fixed in the DNIT will be considered. However, the total amount of L-1 will not be increased from the total amount quoted by the contractor and rebate to that extent shall have to be given by the contractor. Note:- If any discrepancy found in the unit/ Nomenclature in the items of BOQ. The Nomenculature of HSR/ MoRT&H shall be applicable
Deepak Kumar Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .