| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 L+₹6,296.60 (2.26%)Admitted-Finance | ₹2.8 L+₹6,296.60 (2.26%) | L2 | Admitted-Finance |
| 3 | L3₹2.9 L+₹6,852 (2.46%)Admitted-Finance | ₹2.9 L+₹6,852 (2.46%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SETHI KUMAR L2 | Sudarshan L1 | Mukhtyar Mohammad L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in earth work in all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-Charge. | 13.26 | Cum | 560 ₹7,425.6 | 350 ₹4,641 Lowest | 550 ₹7,293 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand :8 graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth. | 1.8 | Cum | 10,600 ₹19,080 | 9,700 ₹17,460 Lowest | 9,850 ₹17,730 |
| 3.00Providing & laying cement concrete 1:1.5:3 (1 cement 1.5 sand 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in: | ||||||
| 3.01 | Foundation,footing basis of columns & the likeand mass concrete complete in all respect and as per the direction of Engineer-in-Charge | 7.5 | Cum | 12,550 ₹94,125 | 12,100 ₹90,750 Lowest | 12,250 ₹91,875 |
| 4.00 | Providing tor steel reinforcement for RCC work including bending, binding and placing in position i /c binding wire complete up to floor two level complete in all respectas per direction & to the entire satisfaction of Engineer-in- Charge upto all lead & lifts. | 562.5 | Kg | 107 ₹60,187.5 | 105 ₹59,062.5 Lowest | 107 ₹60,187.5 |
| 5.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work in:- | ||||||
| 5.01 | Vertical Walls ( any thickness ), partitions and the like including attached pilasters, buttresses, plinth and string courses etc. and the like. | 30.4 | Sqm | 540 ₹16,416 | 535 ₹16,264 Lowest | 560 ₹17,024 |
| 6.00 | Providing and laying cement concrete 1:5:10(1cement:5sand:10 graded stone aggregate of 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually be 150mm to 300mm as per H.P.P.W.D specification including all leads and lifts | 9.2 | Sqm | 9,500 ₹87,400 Lowest | 9,800 ₹90,160 | 9,900 ₹91,080 |
Tender Value
₹2.8 L
EMD Value
₹5,664
Closing Date
12 Mar 2026, 5:00 pmClosed
EE CHAUNTRA
EE JSD CTR
Improvement and Re-modeling of LIS Bhararoo, Banaroo, Banog FIS Chhatar Tanu Kuhl Godhan Kuhlunder in Tehsil Joginder Nagar Distt Mandi HP HP SH C O foundation plateform for pumping machinery and CO Rwall to protect the water storage tank at Petu
2026_HPIPH_130341_1
EE-CTR-13101-149 dated 02.03.2026-3
Open Tender
Civil Works - Others
Item Rate
90 days
Joginder Nagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
EE CHAUNTRA
₹5,664
25 Mar 2026
3 Mar 2026
13 Mar 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
Excavation in foundation, trenches etc. in earth work in all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-Charge.
Providing and laying cement concrete 1:4:8 (1cement: 4 sand :8 graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth.
Providing & laying cement concrete 1:1.5:3 (1 cement 1.5 sand 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in:
Foundation,footing basis of columns & the likeand mass concrete complete in all respect and as per the direction of Engineer-in-Charge
Providing tor steel reinforcement for RCC work including bending, binding and placing in position i /c binding wire complete up to floor two level complete in all respectas per direction & to the entire satisfaction of Engineer-in- Charge upto all lead & lifts.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work in:-
Vertical Walls ( any thickness ), partitions and the like including attached pilasters, buttresses, plinth and string courses etc. and the like.
Providing and laying cement concrete 1:5:10(1cement:5sand:10 graded stone aggregate of 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually be 150mm to 300mm as per H.P.P.W.D specification including all leads and lifts
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
02Form6.pdf
Tender Documents • 0.21 MB
03Form8.pdf
Tender Documents • 1.39 MB
term.pdf
Tender Documents • 0.29 MB
BOQ_192708.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .