| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC KERALA KL | KANNUR | KERALA | 670511 | L1 | Accepted-AOC Accept | |
| 2 | Rejected-Technical SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | - | Rejected-Technical L4 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹14.5 L
EMD Value
₹36,333
Closing Date
1 Nov 2019, 4:00 pmClosed
Executive Engineer
Executive Engineer PWD NH Division Kozhikode
Construction of Coastal highway Investigation of Road from Kadalundi to Karuvanthuruthi and Vengalam Poyilkkavu Koyilandi Fishing Harbour
2019_PWD_312880_1
NHDNKKD/NH/2019/811
Open Tender
Civil Works - Highways
Item Rate
90 days
Kadalundi Vengalam
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
online
₹36,333
Yes
15 May 2020
25 Oct 2019
4 Nov 2019
25 Oct 2019
1 Nov 2019
25 Oct 2019
Amount
Investigation
2.2 : Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the areaClearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
2.3.2.B : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of thorny jungle - By Mechanical Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle - By Mechanical Means
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.c.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In land.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.6 : Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7 : Conducting standard penetration test in bore hole at any depth.Conducting standard penetration test in bore hole at any depth.
od2220/2019_2020 : Collecting water from bore hole and conducting water testing at approved laboratory including collection, packing transportation to laboratory etc as directed by the departmental officers at site
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
56.11.c : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)<br>Additional set for machine boring(extra for bore holes exceeding 5 nos)Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)Additional set for machine boring(extra for bore holes exceeding 5 nos)
56.12.a : Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
od2221/2019_2020 : Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian road congress (IRC). Also satisfying the engineering aesthetic and economic requirement designing of horizontal curves (where ever feasible ) including spiral transitions and vertical curves after finalizing the alignments and also preparing the LS and CS at an interval of 30 m C/C and quantity calculations, preparing investigation report incorporating soft copy of old field details suppilied by the Engineer in charge with all details annexures and designs
RTF INFRA PRIVATE LIMITED
AA AND S CONSTRUCTIONS
C Two Infrastructure Private Limited
Bidder Name
RTF INFRA PRIVATE LIMITED
AA AND S CONSTRUCTIONS
MUHAMMED NOUFAL
C Two Infrastructure Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_430753.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .