| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 CrAdmitted-Finance | ₹34.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹35.5 Cr+₹72.9 L (2.09%)Admitted-Finance SHOP NO FF03 SHRISHTI PLAZZO COMMERCIAL SAINT XAVIER SCHOOL ROAD AVANTI VIHAR RAIPUR CHHATTISGARH 492006 | RAIPUR | CHHATTISGARH | 492006 | ₹35.5 Cr+₹72.9 L (2.09%) | L2 | Admitted-Finance |
| 3 | L3₹35.6 Cr+₹75.9 L (2.18%)Admitted-Finance | ₹35.6 Cr+₹75.9 L (2.18%) | L3 | Admitted-Finance |
| 4 | L4₹35.6 Cr+₹84.5 L (2.43%)Admitted-Finance | ₹35.6 Cr+₹84.5 L (2.43%) | L4 | Admitted-Finance |
| 5 | L5₹35.7 Cr+₹93.9 L (2.70%)Admitted-Finance 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | ₹35.7 Cr+₹93.9 L (2.70%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SIDHVI INFRASTRUCTURE PROJECTS LIMITED L13 | B D Raizada Projects Pvt Ltd L9 | CH.VEERARAGHAVULU CONSTRUCTION PVT LTD L8 | Indus Projects Private Limited L7 | GOPAL TEKNOCON PRIVATE LIMITED L12 | R K BUILDER L2 | jd constructions L3 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L5 | NSC Projects Pvt. Ltd. L11 | B DURGA REDDY INFRASTRUCTURES PRIVATE LIMITED L6 | SVS PROJECTS L10 | CHHABINDRA KUMAR PRADHAN L4 | Mukul Builders Private Limited L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| .10SCHEDULE 'A' PART-I [BUILDING & STRUCTURES] | ||||||||||||||||
| 1.00 | Construction of HANGER BUILDING with permanent specification in RCC framed structure and Partly PEB complete all as shown on drawings, as specified and as directed | 1 | Each Block | 27,03,97,220 ₹27,03,97,220 | 15,28,30,224 ₹15,28,30,224 | 15,57,74,374 ₹15,57,74,374 | 15,99,71,816.69 ₹15,99,71,816.69 | 25,40,00,000 ₹25,40,00,000 | 9,45,00,000 ₹9,45,00,000 Lowest | 15,20,00,000 ₹15,20,00,000 | 14,97,03,148.5 ₹14,97,03,148.5 | 20,34,12,648.59 ₹20,34,12,648.59 | 17,27,00,000 ₹17,27,00,000 | 18,35,78,999 ₹18,35,78,999 | 15,95,00,000 ₹15,95,00,000 | 14,35,50,000 ₹14,35,50,000 |
| 2.00 | Construction of AC PLANT ROOM with permanent specification in RCC framed structure in RCC M-30 grade concrete complete all as Shown on drawings, as specified and as directed | 1 | Each Block | 90,08,366 ₹90,08,366 | 49,90,000 ₹49,90,000 | 53,23,242 ₹53,23,242 | 49,38,304.12 ₹49,38,304.12 | 57,00,000 ₹57,00,000 | 41,50,000 ₹41,50,000 | 30,35,730 ₹30,35,730 | 44,35,450 ₹44,35,450 | 52,20,929.81 ₹52,20,929.81 | 40,40,000 ₹40,40,000 | 50,81,999 ₹50,81,999 | 40,00,000 ₹40,00,000 | 28,50,000 ₹28,50,000 Lowest |
| 3.00 | Construction of PARKING SHED FOR 06 CARS with permanent specification in RCC framed structure in RCC M-30 grade concrete complete all as shown on drawings, as specified and as directed. | 2 | Each Block | 84,36,859 ₹1,68,73,718 | 54,90,000 ₹1,09,80,000 | 57,77,945 ₹1,15,55,890 | 38,28,769.27 ₹76,57,538.55 | 50,70,000 ₹1,01,40,000 | 45,00,000 ₹90,00,000 | 24,41,502 ₹48,83,004 Lowest | 39,80,750 ₹79,61,500 | 60,41,987.62 ₹1,20,83,975.24 | 44,00,000 ₹88,00,000 | 50,36,999 ₹1,00,73,998 | 82,00,000 ₹1,64,00,000 | 25,00,000 ₹50,00,000 |
| 4.00 | Construction of PARKING SHED FOR 50 SCOOTERS with permanent specification in RCC framed structure in RCC M-30 grade concrete complete all as shown on drawings, as specified and as directed. | 1 | Each Block | 94,11,046 ₹94,11,046 | 36,90,000 ₹36,90,000 | 51,77,282 ₹51,77,282 | 26,66,643.77 ₹26,66,643.77 | 60,50,000 ₹60,50,000 | 37,00,000 ₹37,00,000 | 16,48,013.85 ₹16,48,013.85 Lowest | 37,31,215 ₹37,31,215 | 64,66,045.14 ₹64,66,045.14 | 37,70,000 ₹37,70,000 | 56,88,599 ₹56,88,599 | 32,00,000 ₹32,00,000 | 21,00,000 ₹21,00,000 |
| 5.00 | RCC septic tank designed to carry sewage and sullage water, excavation in any type of soil, PCC 1:4:8 below foundation , RCC M-30 design mix in walls, base slab, baffle walls and roof slab including beams etc. with vent shaft, manhole openings with covered connection etc. with effective depth of 1.5m with overall depth of 3.0m for 100 users complete all as specified and as directed. | 1 | Each Job | 7,21,747 ₹7,21,747 | 6,90,000 ₹6,90,000 | 3,39,750 ₹3,39,750 | 6,46,024.06 ₹6,46,024.06 | 15,00,000 ₹15,00,000 | 1,00,000 ₹1,00,000 Lowest | 3,00,000 ₹3,00,000 | 4,30,000 ₹4,30,000 | 5,00,000 ₹5,00,000 | 1,25,000 ₹1,25,000 | 6,89,999 ₹6,89,999 | 7,50,000 ₹7,50,000 | 8,00,000 ₹8,00,000 |
| 6.00 | Soakage wells for 100 users, exacvation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M-25 concrete including intercepting chamber and screen chamber made of Brick masonary in CM 1:4, RCC cover slab in M-25/SFRC cover, interconnecting pipes of RCC/DWC complete filled with brick bats complete all as specified and as directed. | 1 | Each Job | 2,84,500 ₹2,84,500 | 2,49,000 ₹2,49,000 | 1,81,200 ₹1,81,200 | 2,87,121.81 ₹2,87,121.81 | 5,00,000 ₹5,00,000 | 55,000 ₹55,000 Lowest | 1,25,000 ₹1,25,000 | 2,45,000 ₹2,45,000 | 2,00,000 ₹2,00,000 | 90,000 ₹90,000 | 6,89,999 ₹6,89,999 | 2,00,000 ₹2,00,000 | 5,00,000 ₹5,00,000 |
| 7.00SCHEDULE 'A' PART- II to SCHEDULE 'A' PART-XIV: Note: Schedule 'A' Part-II to Part-XIV are prepriced by MES. Bidders shall insert their lump sum amount in green coloured field under Column 6 only. | ||||||||||||||||
| 8.00 | Lump Sum price worked out by the contractor for 'Site Clearance/Area Development/Earth Work/Excavation as listed in Schedule 'A' Part-II. | 1 | Each Job | 7,53,93,322 ₹7,53,93,322 | 3,59,00,000 ₹3,59,00,000 | 3,20,38,760 ₹3,20,38,760 | 2,97,46,217.56 ₹2,97,46,217.56 | 5,00,45,155.46 ₹5,00,45,155.46 | 4,50,00,000 ₹4,50,00,000 | 3,72,43,046.75 ₹3,72,43,046.75 | 2,74,52,750 ₹2,74,52,750 | 2,13,75,157.3 ₹2,13,75,157.3 Lowest | 2,37,66,954.69 ₹2,37,66,954.69 | 3,05,24,999 ₹3,05,24,999 | 3,87,56,230 ₹3,87,56,230 | 2,35,45,155.46 ₹2,35,45,155.46 |
| 9.00 | Lump Sum price worked out by the contractor for 'Pile Foundation' as listed in Schedule 'A' Part-III. | 1 | Each Job | 9,20,90,626 ₹9,20,90,626 | 8,09,00,000 ₹8,09,00,000 | 7,94,16,256 ₹7,94,16,256 | 7,93,84,679.97 ₹7,93,84,679.97 | 7,38,02,339.4 ₹7,38,02,339.4 | 6,30,00,000 ₹6,30,00,000 Lowest | 6,99,69,442 ₹6,99,69,442 | 8,25,27,800 ₹8,25,27,800 | 7,72,73,361.71 ₹7,72,73,361.71 | 7,21,98,896 ₹7,21,98,896 | 7,22,93,999 ₹7,22,93,999 | 6,99,46,058 ₹6,99,46,058 | 7,83,02,339.4 ₹7,83,02,339.4 |
Tender Value
₹24.5 Cr
EMD Value
₹15 L
CHIEF ENGINEER NAVY VISAKHAPATNAM
CHIEF ENGINEER NAVY STATION ROAD VISAKHAPATNAM
PROVISION OF HANGAR AND ANNEXE BUILDING AT VISAKHAPATNAM
2023_MES_580739_2
85414
Open Tender
Civil Works
Lump-sum
750 days
VISAKHAPATNAM
As per NIT
8 documents required · 8 mandatory
₹3,000
Garrison Engineer Project Navy No 2 Visakhapatnam
₹15 L
Yes
8 Dec 2023
27 Jun 2023
13 Oct 2023
27 Jun 2023
11 Oct 2023
18 Sept 2023
27 Jun 2023 - 28 Jul 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | SCHEDULE 'A' PART-I to SCHEDULE 'A' PART-XIII:
Note: Schedule 'A' Part-I to Part-XIII are prepriced by MES. Bidders shall insert their lump sum amount in green coloured field under Column 6 only. | - | - | - | - |
| 1 | Lump Sum price worked out by the contractor for 'Buildings & Structures' as listed in Schedule 'A' Part-I. | 1 | Each Job | 18,71,82,419 | ₹18,71,82,419 |
| 2 | Lump Sum price worked out by the contractor for 'Site Clearance/Area Development/Earth Work/Excavation as listed in Schedule 'A' Part-II. | 1 | Each Job | 4,29,45,306.65 | ₹4,29,45,306.65 |
| 3 | Lump Sum price worked out by the contractor for 'Pile Foundation' as listed in Schedule 'A' Part-III. | 1 | Each Job | 7,38,46,133.24 | ₹7,38,46,133.24 |
| 4 | Lump Sum price worked out by the contractor for 'Internal Water Supply' as listed in Schedule 'A' Part-IV. | 1 | Each Job | 68,184.51 | ₹68,184.51 |
| 5 | Lump Sum price worked out by the contractor for 'Internal Electrification' as listed in Schedule 'A' Part-V. | 1 | Each Job | 3,23,664.66 | ₹3,23,664.66 |
| 6 | Lump Sum price worked out by the contractor for 'External Water Supply' as listed in Schedule 'A' Part-VI. | 1 | Each Job | 2,78,198.06 | ₹2,78,198.06 |
| 7 | Lumpsum price worked out by the contractor for 'External Electrification' as listed in Schedule 'A' Part-VII. | 1 | Each Job | 6,44,903.9 | ₹6,44,903.9 |
| 8 | Lump Sum price worked out by the contractor for 'Area Drainage' as listed in Schedule 'A' Part-VIII. | 1 | Each Job | 54,15,442.2 | ₹54,15,442.2 |
| 9 | Lump Sum price worked out by the contractor for 'Sewage Disposal' as listed in Schedule 'A' Part-IX. | 1 | Each Job | 7,24,975.61 | ₹7,24,975.61 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_678454.xls
BOQ Document • 0.36 MB
123916465.pdf
Tender Document • 0.28 MB
85414TendeR.pdf
Tender Document • 2.25 MB
Drawings.rar
Tender Document • 22.00 MB
123916467.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .