Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC VILL ADISAPTAGRAM PO MOGRA | ₹2.9 Cr Quoted ₹3.1 Cr | L1 | Accepted-AOC As L1 Bidder |
| 2 | L2₹3.4 Cr+₹28.0 L (8.89%)Rejected-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹3.4 Cr+₹28.0 L (8.89%) | L2 | Rejected-AOC As L2 Bidder |
| 3 | L3₹3.6 Cr+₹45.3 L (14.4%)Rejected-AOC PUNJAB NATIONAL BANK BUILDING P O MECHEDA MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | ₹3.6 Cr+₹45.3 L (14.4%) | L3 | Rejected-AOC As L3 Bidder |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
14 Jul 2020, 12:00 pmClosed
GM(BTPS)
Administrative Building, Bandel Thermal Power Station, Tribeni, Dist Hooghly Pin712503
Annual Maintenance Contract of Boiler and Auxiliaries including optional jobs of Unit#5, BTPS, WBPDCL
2020_WBPDC_285331_1
WBPDCL/BTPS/NIT/E1689/20-21
Open Tender
Support/Maintenance Service
Item Rate
730 days
Bandel Thermal Power Station
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5.6 L
Administrative Building, Bandel Thermal Power Stn.
9 Oct 2020
16 Jun 2020
16 Jul 2020
16 Jun 2020
14 Jul 2020
25 Jun 2020
23 Jun 2020
Amount
AMC Boiler Non-pressure parts of Unit#5
Mandatory jobs under AMC
Optional job: Ball filling for 8.5E9 Coal Mill
Ball filling for 8.5E9 Coal Mill
Optional job: Insulation Job
Removal of insulation and re-insulation with necessary Sheet Cladding work
TECHNO ENGINEERING
INDIAN CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .