Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.6 Cr+₹1.3 Cr (40.1%)Admitted-Finance | ₹4.6 Cr+₹1.3 Cr (40.1%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Theme Engineering Services Pvt. Ltd. L2 | JC Technocrats Private Limited L1 |
|---|---|---|---|---|---|
| 1.00APPENDIX C-2 : SUMMARY OF COSTS | |||||
| 2.00 | Remuneration for Local Professional Staff | 10 | Nos | - | - |
| 3.00 | Supporting Staff | 10 | Nos | - | - |
| 4.00 | Transportation | 1,500 | Nos | - | - |
| 5.00 | Duty Travel to Site | 12 | Nos | - | - |
| 6.00 | Office Rent | 1 | Nos | - | - |
| 7.00 | Office Supplies, Utilities and Communication | 1 | Nos | - | - |
| 8.00 | Reports and Document Printing | 1 | Nos | - | - |
| 9.00 | Consultancy Services Tax (GST)Payable in India | 1 | Nos | 69,83,586 ₹69,83,586 | 49,83,408 ₹49,83,408 Lowest |
| 10.00Note: Payments will be made as per stipulations of the Conditions of Contract. | |||||
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
5 Oct 2023, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Consultancy Services for Authority Engineer for Supervision of High Level Bridge Across River Chambal Near Jharel Ke Balaji on Khatoli Khaithuda Sawaimadhopur Road MDR 51 Across River Kali Sindh at Dheepari Barod in Km. 58/0 on SH-70 in District Kota
2023_CEPWD_372075_1
ACE PWD ZONE KOTA NITNO-18-2023-24
Open Tender
Civil Works
Item Rate
730 days
KOTA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
5000 EE PWD DIV. ITAWA
₹9.2 L
ACE PWD ZONE KOTA
13 Dec 2023
28 Sept 2023
9 Oct 2023
28 Sept 2023
5 Oct 2023
28 Sept 2023
4 Oct 2023
Amount
APPENDIX C-2 : SUMMARY OF COSTS
Remuneration for Local Professional Staff
Supporting Staff
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Reports and Document Printing
Consultancy Services Tax (GST)Payable in India
Note: Payments will be made as per stipulations of the Conditions of Contract.
Description of Work / Item(s)
Amount
A: Key Personnel
Team Leader cum Senior Bridge Engineer (1 No. for both the projects) Man-month in Construction period of 24 months and 18 months respectively = 24 (1 Man X 24 Months) Man-month in Maintenance/Defect Liability period of 120 months (cumulative for both projects) = 10 (1 Man X Net 10 Months during the DLP period)
Bridge Construction Control and Design Specialist (Predominantly based in Home Office with intermittent site visits) (1 Nos.) Man-month in Construction period of 24 months and 18 months respectively = 3.5 (1 Man X Net 3.5Months during the construction period)
Bridge Construction Expert –PSC Girder Bridge (HLB) (2Nos) Man-month in Construction period of 24 months and 18 months respectively = 24 (1 Man X 24 Months) + 18 (1 Man X 18 Months) Man-month in Maintenance/Defect Liability period of 120 months (cumulative for both projects) = 20 Months during the DLP period)
Quantity cum Material Expert) ( 2 Nos; 1 for each project) Man-month in Construction period of 24 months and 18 months respectively = 24 (1 Man X 24 Months) + 18 (1 Man X 18 Months)
B: Sub Professional Staff
Assistant Bridge Engineer ( 2 Nos; 1 for each project) Man-month in Construction period of 24 months and 18 months respectively = 24 (1 Man X 24 Months) + 18 (1 Man X 18 Months)
Surveyor
Lab Technician (2 Nos; 1 for each project) Man-month in Construction period of 24 months and 18 months respectively = 24 (1 Man X 24 Months) + 18 (1 Man X 18 Months)
CADD Experts (2 Nos; 1 for each project) Man-month in Construction period of 24 months and 18 months respectively = 24 (1 Man X 24 Months) + 18 (1 Man X 18 Months)
NOTE - TBN = To Be Named
Description of Work / Item(s)
Amount
I. Support staff:
Computer Operator cum steno (1 No. for each)Cum Photocopy Machine Operator Staff Months (Construction period 24 months and 18 months respectively) = 24 (1 Man X 24 Months) + 18 (1 Man X 18 Months)
Office Boy (1 No. for each) Staff Months (Construction period 24 months and 18 months respectively) = 24 (1 Man X 24 Months) + 18 (1 Man X 18 Months)
Watchman (1 No. for each) Staff Months (Construction period 24 months and 18 months respectively) = 24 (1 Man X 24 Months) + 18 (1 Man X 18 Months)
NOTE - TBN = To Be Named
Description of Work / Item(s)
Amount
I. Transportation (Fixed rate on rental basis) The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx.3000km/month run
Swift Dzire or equivalent (not more than 3 years old) (i) For Authority Engineer (1 vehicle for both projects) 1x24 months
Description of Work / Item(s)
Amount
I. Duty Travel to Site (Fixed Costs): Both Project
Professional and Sub-Professional Staff The employer may require the Key Personnel to visit the Employer’s Site/CEoffice. The quoted amount should include travel fare for all trips to Employer’s Head Office and as and when required to Employer’s regional office (including Hotel charges, travel costs etc. Complete)
Description of Work / Item(s)
Amount
I. Office Rent (Fixed Costs)– Minimum 150 sqm area of office shall be rented by the consultant/Authority’s engineer (for employer).
The rent cost includes electricity and water charges, office furniture, maintenance, cleaning, repairs, etc. complete. 24 + 9 = 33months(common for both projects )
Description of Work / Item(s)
Amount
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies(common office) Months (construction period 24 months and 18 months) = 24+ 9months
Drafting Supplies(common office) Months (construction period 24 months and 18 months) = 24+ 9months
Computer Running Cost(common office) Months (construction period 24 months and 18 months) = 24+ 9months
Description of Work / Item(s)
Amount
I. Reports and Document Printing
Monthly reports (for each project) No. of Reports 24 x No. of Copies per Report 6 Total = 144 Nos.
Quarterly Reports(for each project) No. of Reports 16 x No. of Copies per Report 6 Total = 96 Nos.
Various others reports as Provided in the EPC Agreement such as Completion Report(for each project) No. of Reports 6 x No. of Copies per Report 6 Total = 36 Nos.
Theme Engineering Services Pvt. Ltd.
Theme Engineering Services Pvt. Ltd.
Theme Engineering Services Pvt. Ltd.
Theme Engineering Services Pvt. Ltd.
Theme Engineering Services Pvt. Ltd.
Theme Engineering Services Pvt. Ltd.
Theme Engineering Services Pvt. Ltd.
JC Technocrats Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
RFP-AUTHORITY-27-09-2023.pdf
Tender Documents • 5.09 MB
FINANCIAL-DOCUMENT.pdf
Tender Documents • 0.04 MB
BOQ_663243.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .