| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAccepted-AOC | ₹6.7 Cr | L1 | Accepted-AOC AGT DRAWN |
| 2 | L2₹7.7 Cr+₹97.4 L (14.5%)Rejected-Finance | ₹7.7 Cr+₹97.4 L (14.5%) | L2 | Rejected-Finance UNSUCCESSFUL BIDDER |
| 3 | L3₹8.4 Cr+₹1.7 Cr (24.7%)Rejected-Finance AT BAGHAMARI MAIN ROAD PO PS BIRMAHARAJPUR DIST SUBARNAPUR 767018 | SONEPUR | ODISHA | 767018 | ₹8.4 Cr+₹1.7 Cr (24.7%) | L3 | Rejected-Finance UNSUCCESSFUL BIDDER |
| 4 | Rejected-Technical 3RD FLOOR LAXMIPRIYA TWIN CITY TOWERS PO PAHAL NH 16 BHUBANESWAR DIST KHORDHA ODISHA 751032 | BHUBANESWAR | KHORDHA | ODISHA | 751032 | - | - | Rejected-Technical As per the decision of Tender Evaluation Committee |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per the decision of Tender Evaluation Committee |
Tender Value
₹7.9 Cr
EMD Value
₹7.9 L
Closing Date
10 May 2025, 5:00 pmClosed
C.C.E, Northern R AND B Circle, SAMBALPUR
O/O THE C.C.E, Northern R AND B Circle, SAMBALPUR
BRIDGE WORK
2025_EICCL_112036_1
CCENC (R AND B) /19/ 2024-25
National Competitive Bid
Civil Works - Bridges
Percentage
450 days
BARGARH
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹7.9 L
Yes
18 Dec 2025
23 Apr 2025
12 May 2025
23 Apr 2025
10 May 2025
23 Apr 2025
23 Apr 2025 - 29 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 9,010.4 | Sqm | 8.27 | ₹74,516.01 |
| 2 | Excavation for road way in ordinary rock with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment locations with all lifts & leads up to 1000m.as per approved Drawing & Technical Specifications and as per Clause - 301 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). | 381.92 | Cum | 90.28 | ₹34,479.74 |
| 3 | Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (latest Revision) & Direction of Engineer in charge. | 3,427.24 | Cum | 74.72 | ₹2,56,083.37 |
| 4 | Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (latest Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 2,666.41 | Cum | 35.8 | ₹95,457.48 |
| 5 | Loosening to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (latest Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1,351.6 | Cum | 36.01 | ₹48,671.12 |
| 6 | Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 18,434.7 | Cum | 203.67 | ₹37,54,595.35 |
| 7 | Providing and laying Granular Sub-base with Grading-VI stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1,515.2 | cum | 1,992.8 | ₹30,19,490.56 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works.(Latest Revision) | 1,684.3 | cum | 2,293.35 | ₹38,62,689.41 |
| 9 | Providing and applying primer coat with slow setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 6,282.6 | Sqm | 38.4 | ₹2,41,251.84 |
| 10 | Providing and applying tack coat with rapid setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 6,941.28 | Sqm | 13.41 | ₹93,082.56 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.34 MB
Tenderdocument.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .