| 1 | L1₹62.6 LAccepted-AOC | ₹62.6 L Quoted ₹82.8 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹82.8 LRejected-Finance GOSAIPUR MOHAV CHOLAPUR VARANASI | CHANDAULI | UTTAR PRADESH | 221009 | ₹82.8 L | L2 | Rejected-Finance IInd Lowest |
| 3 | Not Admitted-Fee/PreQual/Technical DUKANGANJ VARANASI | VARANASI | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Updated dates
Tender Value
₹84 L
EMD Value
₹6.2 L
Closing Date
20 Dec 2025, 12:00 pmClosed
Shri Praveen Kumar
Office of the SE, Varanasi Circle, PWD, Varanasi
Parasiya se Gayghat marg ke Nav Nirman ka karya
2025_CEUVZ_1097991_1
SE Ref. No 6049/183com-va-vritt/25-26 Dt. 03.12.25
Open Tender
Civil Works - Roads
180 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹6.2 L
Yes
Varanasi
17 Feb 2026
10 Dec 2025
20 Dec 2025
10 Dec 2025
20 Dec 2025
10 Dec 2025
10 Dec 2025
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of granular Sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Specification clause 401/4.1 As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing, laying, spreading and compacting stone aggregates of 45-63mm Sukrut stone ballast to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, Type-B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing, laying, spreading and compacting stone aggregates of 22.4-53mm Sukrut Stone ballast size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, Type-B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and appying prime coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate 0.7 kg/Sqm using mechanical means as per Technical specification claue 502 . As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying tack coat with bitumen VG-10 pressure distributor at the rate of 0.30 kg. per sqm on the prepared bituminous / granular surface cleaned with hydrulic broom as per Techinical Specification No. 503 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm and 11.2mm dalla aggregate either using 80/100 penetration grade bitumen VG-10 @1.46kg per sqm. To required line,grade and level to serve as wearing course on a previously prepared base,including mixing by mixol,laying and rolling with a three wheel 80-100 KN static roller capacity.as per technical specification clause 508.(Including cost of bitumen) As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510.As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Brick edging on both side of road with first class brick 8 cm. (3”) wide 12 cm. (4.50”) deep laid with mud mortar including all materials, labour, T & P etc. complete.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of patari and shoulder with approved material obtained from borrow pits with a lift upto 1.50 m and 30 meter lead, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 as per techanical specification clause 301.5 As direction by the E/I As Per SI No-253 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1st year - maintainance cost 0% For road work (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
2nd year - maintainance cost 0.75% For road work (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
3rd year - maintainance cost 1.50% For road work (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
4th year - maintainance cost 2.25% For road work (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
5th year - maintainance cost 3.00% For road work (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
Construction of granular Sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Specification clause 401/4.1 As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing, laying, spreading and compacting stone aggregates of 22.4-53mm Sukrut Stone ballast size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, Type-B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of un reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M30(Grade) coarse and fine aggregates confoming to IS:383 maximum size of coarse aggreagate not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) spreading the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints and near aapproaches and construction joints admixtures as approved curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. & also including all taxes. Labour cess but excluding GST)Clause 1501. As direction by the E/I
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers,trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
M150 brick work in 1:4 cement and coarse sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour,and tools and plants etc required for proper complition of work Complete as per Direction of E/I 7 Also including all taxes .labour cess but excluding GST
12mm thick plaster with cement mortar consisting of 1 part cement and 3 part of approved coarse sand. Minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper completion of the work. SOR 583 Complete as per Direction of E/I 7 Also including all taxes .labour cess but excluding GST
R.C.C. work with cement approved coarse sand and 2cm Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows, excluding its fixing and binding the same with 24B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including S/o all materials required for proper completion of the work. Binding wire to be supplied by the contractor free of cost. SOR 283 Complete as per Direction of E/I 7 Also including all taxes .labour cess but excluding GST
Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and As per SOR SI No-504(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying 600 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. but excluding cost of collor (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Stone masonry in 1:4 cement mortar,Stone masonery work in cement mortar in foundation/sub-structure complete excepting pointing and plastering, as per drawing and technical specification Clause 702, 704, 1201 & 1203 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 FM including Supply of all material , labour T&P etc required for proper completion of work.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1st year - maintainance cost 0% For CC,Drain (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
2nd year - maintainance cost 0.25% For CC,Drain (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
3rd year - maintainance cost 0.50% For CC,Drain (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
4th year - maintainance cost 0.75% For CC,Drain (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
5th year - maintainance cost 1.00% For CC,Drain (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 0.69 MB
BOQ_2022015.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid