| 1.00Appendix A - Construction of Motorshed | ||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 2.6 | cum | 1,015.5 ₹2,640.3 Lowest |
| 1.00 | 15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge. | 116.26 | kg | 5.35 ₹621.99 Lowest |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 20 | sqm | 228.6 ₹4,572 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 5.07 | sqm | 517.65 ₹2,624.49 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.01 | cum | 10,634.15 ₹10,783.03 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.6 | cum | 12,381 ₹19,834.36 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.07 | sqm | 517.65 ₹2,624.49 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 10.08 | sqm | 1,352 ₹13,628.16 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 20.51 | sqm | 1,022.65 ₹20,974.55 Lowest |
Tender Value
₹50.8 L
EMD Value
₹50,000
Closing Date
11 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
Office of Executive Engineer KD Division Mancombu
GENERAL-Arthissery Perillamaram Padasekharam-KP - FMP - Construction of Motorthara and Motorshed in Arthissery Perillamaram Padasekharam in Thalavady and Muttar Panchayath in Kuttanad LAC - Phase II -General Civil Work
2026_Irrig_860270_5
IRR/KP/TR/7034/2025_5_1_1/1 Dated 13-07-2026
Open Tender
Civil Works - Others
Item Rate
540 days
Muttar
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
15 Sept 2026
3 Sept 2026
15 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
3 Sept 2026 - 11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A - Construction of Motorshed | |||||
| 1.001 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 2.6 | cum | - | - |
| 1.002 | 15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge. | 116.26 | kg | - | - |
| 1.003 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 20 | sqm | - | - |
| 1.004 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 5.07 | sqm | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.01 | cum | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.6 | cum | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.07 | sqm | - | - |
| 1.008 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 10.08 | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 20.51 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1469254.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 4.05 MB
NIT.pdf
Tender Documents • 0.04 MB
SBDmerged.pdf
Tender Documents • 4.03 MB
BOQ_1469254.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .