Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.2 L+₹47,986.89 (6.19%)Rejected-Finance 8113 9 C CHANDERPURI COLONY AMBALA CANTT 2025R22607 | AMBALA | AMBALA | HARYANA | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.7 L+₹98,086.74 (12.6%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹9.2 L+₹1.4 L (18.3%)Rejected-Finance VILLAGE PAPLOTHA P O SAHA AMABAL CANTT 133203 | AMABAL CANTT | AMBALA | HARYANA | 133203 | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | THE PAPLOTHA LABOUR AND CONSTRUCTION CO. OP. SOCIETY L4 | THE SACHDEVA COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED CHANDERPURI L2 | THE UPASANA CO-OP L&C SOCIETY LTD. L1 | the asha cooperative labour & construction society L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Recovery of old Bricks | 32,152.5 | each | 2 ₹-64,305 Lowest | 3 ₹-96,457.5 | 3 ₹-96,457.5 | 3 ₹-96,457.5 |
| 2.00 | Analysis for House Water Connection damaged
during construction of street nalla and drain complete including pipe clamp etc | 10 | nos | 1,150 ₹11,500 | 800 ₹8,000 | 500 ₹5,000 Lowest | 1,150 ₹11,500 |
| 3.00 | Rates Analysis of Earth Filling with a lead of 10 K.M. including loading unloading and shifting complete | 157.5 | per cum | 155 ₹24,412.5 | 160 ₹25,200 | 130 ₹20,475 Lowest | 170 ₹26,775 |
| 4.00 | 45 wattage LED lights with 5 years warranty | 5 | per month | 30 ₹150 Lowest | 2,000 ₹10,000 | 500 ₹2,500 | 220 ₹1,100 |
Tender Value
₹9.3 L
EMD Value
₹18,600
Closing Date
15 Apr 2026, 11:00 amClosed
SURENDER SINGH
Municipal Council Ambala Sadar
Construction of CC street from sardarji Dipo wala chowk to jain mandir park mod in ward 26 MC Ambala Sadar
2026_HRY_513376_1
2026F06A986A D684 4A81 97FA 0A7AF53C08021594ULB
Open Tender
Civil Works
Works
150 days
Ambala Sadar
2 documents required · 2 mandatory
₹1,000
Yes
₹18,600
Yes
14 May 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
7 Apr 2026 - 9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Recovery of old Bricks | - | each | - | - |
| 2 | Analysis for House Water Connection damaged
during construction of street nalla and drain complete including pipe clamp etc | - | nos | - | - |
| 3 | Rates Analysis of Earth Filling with a lead of 10 K.M. including loading unloading and shifting complete | - | per cum | - | - |
| 4 | 45 wattage LED lights with 5 years warranty | - | per month | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_592196.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .